Loading...
HomeMy WebLinkAboutAgenda Report - June 2, 2004 E-05AGENDA ITEM EWr3 CITY OF LODI COUNCIL COMMUNICATION • TM AGENDA TITLE: Adopt Resolution Awarding Contract for the Water and Wastewater Main Replacement Program — Project No. 2 to Crutchfield Construction Company; and Appropriate $2,350,000 for the Project MEETING DATE: June 2, 2004 PREPARED BY: Public Works Director RECOMMENDED ACTION: That the City Council adopt a resolution awarding the contract for the above project to Crutchfield Construction Company, of Lodi, in the amount of $1,994,167.20; and appropriate additional funds in accordance with the recommendation below. BACKGROUND INFORMATION: The Water and Wastewater Main Replacement Program is a multi-year, multi -project program to rehabilitate existing water and wastewater infrastructure in the oldest parts of the City. The limits of this project (Project No. 2) are reflected on the attached Exhibit. Portions of Project No. 2 lie adjacent to the limits of Project No. 1 which was completed in the fall of 2003. Project No. 2 includes trenchless rehabilitation of approximately 12,100 LF of existing 6 -inch diameter wastewater main located in the backyards of homes; the installation of approximately 6,500 LF of new water main in the public right-of-way, along with approximately 325 new water services. The construction work is anticipated to take approximately eight months. Plans and specifications for this project were approved on March 17, 2004. On May 12, 2004, sealed bids were opened with the following results: Bidder Location Bid Engineering Estimate $2,511,583.00 Crutchfield Construction Company Stockton, CA $1,994,167.20 Tidelands Construction Company Brentwood, CA $2,388,805.00 The bid received by Crutchfield Construction Company is technically compliant with the City's plans and specifications, and the bidder possesses the required valid contractor's license. A bid summary is attached. Construction of this project is anticipated to start in June of this year. Inspection and construction management services will be performed by City Engineering staff. The work associated with connecting the new water mains with the existing water mains will be performed by Water/Wastewater Division APPROVED: , City Manager CAWARD.doc — r Of 5121/2004 Adopt Resolution Awarding Contract for the Water and Wastewater Main Replacement Program •- Project No. 2 to Crutchfield Construction Company; and Appropriate $2,350,000 for the Project June 2, 2004 Page 2 crews with City -supplied materials. Public information meetings will be conducted to inform the community about the construction schedule and project scope. An additional component of this project includes pavement restoration. However, due to the timing of this project, it may be necessary to postpone this component until the summer of 2005. At such time, the pavement restoration work will be funded by the Water and Wastewater Utility Capital Outlay Funds. FUNDING: Funding for this project will be from the Water and Wastewater Capital Outlay Funds and distributed as shown below. The difference between the contract and the requested appropriation includes funds for City -supplied water and wastewater materials, materials testing, and anticipated change orders arising from unforeseen changes in the work. Requested Appropriation: $2,350,000.00 Water Utility Capital Outlay Fund (181677) $ 730,000.00 Wastewater Utility Capital Outlay Fund (171022) $ 1,620,000.00 Total Project Estimate: $2,350,000.00 Bid Opening Date: May 12, 2004 J es R. Krueger, Finance Director C4 6 Richard C. Prima, Jr. Public Works Director Prepared by Charlie Swimley, Senior Civil Engineer RCPICESIpmf Attachments cc: Stephen Schwabauer, Interim City Attomey F. Wally Sandelin, City Engineer Wes Fujitani, Senior Civil Engineer Sharon Welch, Senior Civil Engineer Paula Fernandez, Senior Traffic Engineer Joel Harris, Purchasing Officer Frank Beeler, Assistant Water/Wastewater Superintendent George Bradley, Street Superintendent CAWARD.doc 5/21/2004 y OFA /•. 0' . LODI CITY <<f� PUBUC WORKS Eastside Project 2 Boundary M:\OPEMEXHIBITS\04X025AW9, 05/20/2004 11:05:19 AM, jpizzo Water Wastewater Main Replacement Program (Project No. 2) Eastside2WaterW W RahabBidTab.xls 5/27/2004 Item Unit Qty. Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price No. Description A Miscellaneous 1 Mobilization LS 1 $ 120,000.00 $ 120,000.00 $ 200,000.00 $ 200,000.00 $ 50,000.00 $ 50,000.00 $ 125,000.00 $ 125,000.00 2 1 Construction Photography LS 1 $ 1,000.00 $ 1,000.00 $ 1,000.00 $ 1,000.00 $ 3,500.00 $ 3,500.00 $ 2,250.00 $ 2,250.00 3 Public Notification LS 1 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 1,000.00 $ 1,000.00 $ 3,000.00 $ 3,000.00 4 Clean and CCN Existing 6" LF 12,066 $ 2.25 $ 27,148.50 $ 1.20 $ 14,479.20 $ 1.00 $ 12,066.00 $ 1.10 $ 13,272.60 Wastewater Pipeline (Post Construction) 5 LS 1 $ 30,000.00 $ 30,000.00 $ 11,000.00 $ 11,000.00 $ 8,500.00 $ 8,500.00 $ 9,750.00 $ 9,750.00 Sheeting, shoring, sloping, and bracing or equivalent method conforming to applicable safety standards. 6 Storm Water Pollution Prevention LS 1 $ 10,000.00 $ 10,000.00 $ 2,000.00 $ 2,000.00 $ 3,000.00 $ 3,000.00 $ 15,001.00 $ 15,001.00 Plan 7 LS 1 $ 30,000.00 $ 30,000.00 $ 2,000.00 $ 2,000.00 $ 1,500.00 $ 1,500.00 $ 15,002.00 $ 15,002.00 Storm Water Pollution Control 8 LS 1 $ 5,000.00 $ 5,000.00 $ 2,000.00 $ 2,000.00 $ 500.00 $ 500.00 $ 15,003.00 $ 15,003.00 As Built Drawings Subtotal Miscellaneous $ 228,148.50 $ 237,479.20 $ 80,066.00 $ 198,278.60 B Wastewater 1 Install new 6" Wastewater Pipeline LF 99 $ 100.00 $ 9,900.00 $ 60.00 $ 5,940.00 $ 150.00 $ 14,850.00 $ 105.00 $ 10,395.00 by open -cut methods 2 Rehabilitate Existing 6" LF 12,066 $ 35.00 $ 422,310.00 $ 35.00 $ 422,310.00 $ 26.50 $ 319,749.00 $ 30.75 $ 371,029.50 Wastewater Pipeline 3 Internal / External Lateral EA 281 $ 325.00 $ 91,325.00 $ 330.00 $ 92,730.00 $ 300.00 $ 84,300.00 $ 315.00 $ 88,515.00 Reinstatement 4 Point Repair- Open Cut Method EA 5 $ 2,500.00 $ 12,500.00 $ 2,000.00 $ 10,000.00 $ 6,000.00 $ 30,000.00 $ 4,000.00 $ 20,000.00 5 Manhole Rehabilitation EA 48 $ 1,325.00 $ 63,600.00 $ 1,800.00 $ 86,400.00 $ 950.00 $ 45,600.00 $ 1,375.00 $ 66,000.00 6 Abandon Existing Wastewater LF 120 $ 20.00 $ 2,400.00 $ 10.00 $ 1,200.00 $ 15.00 $ 1,800.00 $ 12.50 $ 1,500.00 Pipeline 7 WW Service Cleanout EA 5 $ 525.00 $ 2,625.00 $ 500.00 $ 2,500.00 $ 1,000.00 $ 5,000.00 $ 750.00 $ 3,750.00 6 Install WW Manhole EA 5 $ 2,000.00 $ 10,000.00 $ 4,200.00 $ 21,000.00 $ 5,000.00 $ 25,000.00 $ 4,600.00 $ 23,000.00 9 Abandon Exist. WW Manhole EA 2 $ 900.00 $ 1,800.00 $ 750.00 $ 1,500.00 $ 1,000.00 $ 2,000.00 $ 875.00 $ 1,750.00 Subtotal Wastewater $ 616,460.00 $ 643,580.00 $ 528,299.00 $ 585,939.50 C Water Improvements 1 Install new 8" Water Main LF 5,266 $ 50.00 $ 263,300.00 $ 66.00 $ 347,556.00 $ 105.00 $ 552,930.00 $ 85.50 $ 450,243.00 2 Install new 6" Water Main LF 217 $ 49.00 $ 10,633.00 $ 61.00 $ 13,237.00 $ 80.00 $ 17,360.00 $ 70.50 $ 15,298.50 3 Install new 3" Water Main LF 152 $ 49.00 $ 7,448.00 $ 30.00 $ 4,560.00 $ 90.00 $ 13,680.00 $ 4 Install new 2" Water Main LF 806 $ 49.00 $ 39,494.00 $ 30.00 $ 24,180.00 $ 70.00 $ 56,420.00 $ - 5 EA 171 $ 2,000.00 $ 342,000.00 $ 925.00 $ 158,175.00 $ 950.00 $ 162,450.00 $ 937.50 $ 160,312.50 Install 1" Water Service w/Valve Box (Tapping New Mains) 6 EA 155 $ 1,800.00 $ 279,000.00 $ 1,000.00 $ 155,000.00 $ 1,000.00 $ 155,000.00 $ 1,000.00 $ 155,000.00 Install 1" Water Service w/Valve Box (Tapping Exist. Mains) 7 Connect New Water Service to EA 326 $ 1,200.00 $ 391,200.00 $ 600.00 $ 195,600.00 $ 1,800.00 $ 586,800.00 $ 1,200.00 $ 391,200.00 Buildings 8 Install 1" Extended Water Service EA 10 $ 2,000.00 $ 20,000.00 $ 1,500.00 $ 15,000.00 $ 3,750.00 $ 37,500.00 $ 2,625.00 $ 26,250.00 to Back Lot 9 Install 8" Gate Valve EA 7 $ 900.00 $ 6,300.00 $ 900.00 $ 6,300.00 $ 1,250.00 $ 8,750.00 $ 1,075.00 $ 7,525.00 10 Install Valve Box on Ex. Water 67 $ 800.00 $ 53,600.00 $ 300.00 $ 20,100.00 $ 250.00 $ 16,750.00 $ Services 11 Install Fire Hydrant Assembly EA 12 $ 3,000.00 $ 36,000.00 $ 3,000.00 $ 36,000.00 $ 3,500.00 $ 42,000.00 $ 3,250.00 $ 39,000.00 12 EA 22 $ 2,500.00 $ 55,000.00 $ 1,800.00 $ 39,600.00 $ 1,500.00 $ 33,000.00 $ 1,650.00 $ 36,300.00 Exist. Main Tie -In Excavations Subtotal Water $ 1,503,975.00 $ 1,015,308.00 $ 1,682,640.00 $ 1,281,129.00 D Street and Landscape Improvements 1 EA 326 $ 500.00 $ 163,000.00 $ 300.00 $ 97,800.00 $ 300.00 $ 97,800.00 $ 300.00 $ 97,800.00 Replace Existing Landscape Improvements per Lot Damaged during W/WW service connection/disconnection, and Point Repairs. Subtotal Street and Landscape $ 163,000.00 $ 97,800.00 $ 97,800.00 $ 97,800.00 Improvements $ 2,511,583.50 $ 1,994,167.20 $ 2,388,805.00 $ 2,163,147.10 Total Bid Price Eastside2WaterW W RahabBidTab.xls 5/27/2004 RESOLUTION NO. 2004-105 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE CONTRACT FOR THE WATER AND WASTEWATER MAIN REPLACEMENT PROGRAM (PROJECT NO. 2) AND FURTHER APPROPRIATE FUNDS FOR THE PROJECT WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on May 12, 2004, at 11:00 a.m. for the Water and Wastewater Main Replacement Program (Project No. 2), described in the specifications therefore approved by the City Council on March 17, 2004; and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as follows: Bidder/Location Bids Engineering Estimate $2,511,583.00 Crutchfield Construction Company, Stockton, CA $1,994,167.20 Tidelands, Construction Company, Brentwood, CA $2,388,805.00 WHEREAS, the City Manager recommends award of the contract for the Water and. Wastewater Main Replacement Program (Project No. 2) to Crutchfield Construction Company, of Lodi, California. NOW, THEREFORE, BE IT RESOLVED by the Lodi City Council that the award of the contract for the Water and Wastewater Main Replacement Program (Project No. 2) be and the same is hereby awarded to Crutchfield Construction Company, of Lodi, California, in the amount of $1,994,167.20; and BE IT FURTHER RESOLVED that funds in the amount of $2,350,000 be appropriated as follows: Water Utility Capital Outlay Fund $ 730,000.00 Wastewater Utility Capital Outlay Fund $1,620,000.00 Dated: June 2, 2004 I hereby certify that Resolution No. 2004-105 was passed and adopted by the City Council of the City of Lodi in a regular meeting held June 2, 2004, by the following vote: AYES: COUNCIL MEMBERS — Beckman, Hitchcock, Howard, Land, and Mayor Hansen NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None SUSAN J. BLACKSTON City Clerk 2004-105