HomeMy WebLinkAboutAgenda Report - February 16, 2005 E-05AGENDA ITEM E05 CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Adopt Resolution Accepting Harney Lane Street Frontage Improvements in Century Meadows Two, Unit 4, Tract No. 3272, and Appropriating Funds ($57,990) for Applicable Reimbursements MEETING DATE: February 16,2005 PREPARED BY: Public Works Director RECOMMENDED ACTION: That the City Council adopt a resolution accepting Harney Lane frontage improvements in Century Meadows Two, Unit 4, Tract No. 3272, and appropriating funds ($57,993)for applicable reimbursements. BACKGROUND INFORMATION: Improvementsat Century Meadows Two, Unit 4, Tract No. 3272, include street frontage improvements along Harney Lane, including curb, gutter and street paving for the adjacent parcels to the east (Farros properties: APN 058-210-03 and 058-210-04), as well as improvements with in the subdivision boundaries on the residential streets. The development improvementswithin the subdivision boundaries, as well as the Harney Lane improvements along the adjacent Farros properties, have been completed in substantial conformance with the requirements of the ImprovementAgreement and Addendum to the Improvement Agreement between the City of Lodi and FCB Building Partners I, L.P., as approved by the City Council on December 18, 2002, and January 7, 2004, respectively. The subdivision improvements are shown on City of Lodi Drawing Nos. 002DO62 through 002D074, 002D113 through 002D118 and 002D142. The interior improvements on the residential streets were accepted by Council on February4, 2004. The block wall, landscaping and street improvements along Harney Lane are now complete, and staff is recommending Council acceptance of the remainder of the development. The streets to be accepted are as follows: Streets Length in Miles Harney Lane 0.00 Total New Miles of City Streets 0.00 The Harney Lane street frontage improvements along the Farros properties were included in the subdivision project at staffs request to providefor orderly development and enhance public safety on Harney Lane. The owner of the adjacent properties, Mr. Farros, agreed to dedicate the necessary right-of-way to allow installation of the improvements in exchange for the frontage improvements plus payment for the cost of installation, removal and/or relocation of private improvements necessitated by APPROVED:3 1-7 Blair King, Manager J IDEV SERMM2 41Caccept_Harney.tloc 2/7/2045 Adopt Resolution Accepting Harney Lane Street Frontage Improvements in Century Meadows Two,, Unit 4, Tract No. 3272, and Appropriating Funds ($57,990)for Applicable Reimbursements February 16, 2005 Page 2 the installation of the street improvements. On January 7, 2004, Council approved the above referenced Addendum to the ImprovementAgreement, covering reimbursement to FCB Building Partners I, L.P., for the cost of the Harney Lane street frontage improvements. Council also agreed to reimburse Mr. Farros for the cost of removal and/or relocation of several existing trees, a wood rail fence and decorative iron gate. Council further approved reimbursement to Mr. Farros for the installation of a chain link fence along the existing orchard covering a portion of the Farros properties. At the time, staff estimated that the cost of all this work would be on the order of $58,400 and appropriated the necessaryfunds. The actual reimbursements were to be based on verifiable claims for the improvements when the projectwas complete and all the costs were known. The actual cost of the improvements as verified by staff was $116,393. The additional costs are attributable to roadway construction staging and poor roadway subgrade conditions ($43,500) and unanticipated costs for restoration of the private improvements ($14,500). Staff requests that $57,993 be appropriated to cover the balance of the reimbursable costs. FUNDING: IMF — Local Streets $57,993 r A -.- -4L� Sa)e�sR_ Krueger, jnance Director �2� Richard C. Prima, Jr. \12 Public Works Director Prepared by Wes Fujitani, Senior Civil Engineer and Sharon Welch, Senior Civil Engineer RCPMF/SAW/pmI cc: City Attorney Senior Civil Engineer- Development Services Senior Traffic Engineer Street Superintendent (w/attachment) Senior EngineeringTechnician —Design Chief Building Inspector J:\DEV—SER\tNCM2-4\Carxept_Harney doc 2171;1o05 When Recorded, Please Return lo: Lodi City Clerk P.0Box 3006 Lodi, CA 95241-1910 RESOLUTION NO. 2005-29 A RESOLUTION OF THE LODI CITY COUNCIL ACCEPTING HARNEY LANE STREET FRONTAGE IMPROVEMENTS IN CENTURY MEADOWSTWO, UNIT4, TRACT NO. 3272, AND INCLUDED IN THE IMPROVEMENT AGREEMENT AND ADDENDUM TO THE IMPROVEMENTAGREEMENT BETWEEN THE CITY OF LODI AND FCB BUILDING PARTNERS I, L.P., AND FURTHER APPROPRIATING FUNDS FOR APPLICABLE REIMBURSEMENTS ----------------========- ..... ___--------- ----------------------------------- The City Council of the City of Lodi finds: 1. That all requirements of the Improvement Agreement and Addendum to Improvement Agreement between the City of Lodi and FCB Building Partners I, L.P., for the Harney Lane street frontage improvements in Century Meadows Two, Unit 4, Tract No. 3272, have been substantially complied with. The improvements are shown on Drawing Nos. 002DO62 through 002D074, 002D113 through 002D118, and 002D142, on file in the Public Works Department and as specifically set forth in the plans and specifications approved by the City Council on December 18, 2002 and January 7,2004; and 2. That improvements at Century Meadows Two, Unit 4, Tract No. 3272, included street frontage improvements along Harney Lane, including curb, gutter, and street paving for the adjacent parcels to the east (Farros properties: APN 058-210-03 and 058-210-04), as well as improvements within the subdivision boundarieson the residential streets; and 3. That the Harney Lane street frontage improvements along the Farros properties were included in the subdivision project to provide for orderly development and enhance public safety on Harney Lane. The owner of the adjacent properties, Mr. Farros, agreed to dedicate the necessary right-of-way to allow installation of the improvements in exchange for the frontage improvements plus payment for the cost cf installation, removal, and/or relocation of private improvements necessitated by the installation of the street improvements; and 4. That on January 7, 2004, Council approved the above referenced Addendum to the Improvement Agreement, covering reimbursement to FCB Building Partners I, L.P., for the cost of the Harney Lane street frontage improvements. Council also agreed to reimburse Mr. Farros for the cost of removal and/or relocation of several existing trees, a wood rail fence and decorative iron gate, and installation of a chain link fence along the existing orchard covering a portion of the Farros properties. Staff estimated that the cost of all this work would be approximately $58,400 and appropriated the necessary funds. The actual reimbursements were to be based on verifiable claims for the improvements when the project was complete and all the costs were known. The actual cost of the improvements as verified by staff was $116,393. The additional costs are attributable to roadway construction staging and poor roadway subgrade conditions ($43,500) and unanticipated costs for restoration of the private improvements ($14,500); and 5. That additional funds in the amount of $57,993 be appropriated from the Impact Mitigation Fee - Local Streets Fund for reimbursement to property owner Farros to cover the balance of the reimbursable costs; and 6. The streets to be accepted are as follows: Streets Length in Miles Harney Lane 0.00 Total New Miles of City Streets 0.00 Dated: February 16, 2005 --------------- hereby certify that Resolution No. 2005-29 was passed and adopted by the City Council of the City of Lodi in a regular meeting held February 16, 2005, by the following vote: AYES: COUNCIL MEMBERS— Hansen, Hitchcock, Johnson, Mounce, and Mayor Beckman NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS— None ABSTAIN: COUNCIL MEMBERS— None SUSAN J. BLACKSTON City Clerk 2005-29