HomeMy WebLinkAboutAgenda Report - February 16, 2005 E-03AGENDA ITEM E"03 CITY OF LODI COUNCIL COMMUNICATION AGENDA TITLE: Adopt Resolution Approving Plans and Specifications, Authorizing Advertisement for Bids for Pine Street Overlay Project — Ham Lane to Church Street, Authorizing City Manager to Award or Reject the Contract, and Appropriating Funds ($260,000) MEETING DATE: February 16,2005 PREPARED B Y Public Works Director RECOMMENDEDACTION: That the City Council adopt a resolution approving plans and specifications for the above project, authorizing advertisement for bids, authorizing the City Manager to award or reject the contract up to $260,000 and appropriating funds. BACKGROUND INFORMATION: This project includes installing a 0.15 -foot thick asphalt pavement overlay on Pine Street between Ham Lane and Church Street. The work includes approximately 2,000 tons of asphalt concrete and 15,700 square yards of pavement reinforcement fabric, pavement grinding, pavement striping, and other incidental and related work, all as shown on the plans and specifications for the above project. In anticipation of the paving project, City Street crews performed base failure repairs in 2004 along the alignment to stabilize portions of the existing pavementthat were determined to be in too poor of condition to overlay. Additionally, the department is completing installation of wheelchair ramp modifications and upgrades along the corridor. During paving operations, the plans and specifications allow the contractor to close Pine Street for two days within the project limits — one day to pave between Ham Lane and Hutchins Street and one day to pave between Hutchins Street and Church Street. Closing the work area to traffic will expedite the paving process and provide a better overall paving job Temporary access to homes and businesses along the corridor, as well as to City Hall and the Finance Department, will be from the side streets during the closure period, Notifications to the public will be mailed to property owners adjacent to the project limits and advertised in the Lodi News Sentinel prior to the planned closure date. FUNDING: Measure K Maintenance Project Estimate: Less than $260,000 Budgeted: CIB E-59 , fgWned Bid Opening Datp: September 1,2005 , Finance D Richard C. Prima, Jr. ICN Public Works Director Prepared by Charlie Swimley. Senior Civil Engineer RCP/CS/pmf cc: CityAttomey Purchasing Officer City Engineer SeniorTraffic Engineer Senior Civil Engineer Fujitani Senior Civil EngineerWelch Street Superintendent APPROVED: f J 1PROJECTSISTREETS1PineStreetlPineStreetOverla}ACPs&A_Award doc Blair King, City4gsftger r 41.rP RESOLUTION NO. 2005-27 A RESOLUTION OF THE LODI CITY COUNCIL APPROVING PLANSAND SPECIFICATIONSAND AUTHORIZING ADVERTISEMENT FOR BIDS FOR PINE STREET OVERLAY PROJECT - HAM LANE TO CHURCH STREET, AND FURTHER AUTHORIZING THE CITY MANAGER TO AWARD OR REJECT THE CONTRACT UP TO $260,000, AND APPROPRIATE FUNDS FOR THE PROJECT WHEREAS, this project includes installing a 0.15 -foot thick asphalt pavement overlay on Pine Street between Ham Lane and Church Streets: and WHEREAS, the work includes approximately 2,000 tons of asphalt concrete and 15,700 square yards of pavement reinforcement fabric, pavement grinding, pavement striping, and other incidental and related work; and WHEREAS, staff recommends approval of the plans and specifications and authorization for bids for the Pine Street Overlay Project — Ham Lane to Church Street, and further recommends authorizing the City Manager to award or reject the contract up to $260,000 and appropriating $260,000 from the Measure K Maintenance fund for this project. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby approve the plans and specifications and authorize advertisement for bids for the Pine Street Overlay Project - Ham Lane to Church Street; and BE IT FURTHER RESOLVED that the City Council authorizes the City Manager to award or reject the bid up to $260,000 for the Pine Street Overlay Project - Ham Lane to Church Street; and BE IT FURTHER RESOLVED that funds in the amount of $260,000 be appropriated from the Measure K Maintenance fund for this project. Dated: February 16, 2005 TTTTTr1T���iiTTTrrrrr=ri a ri . . . • . . . • �. . . . . . . . . . . : : : : : . : : -: 7^TS'"SP�TiT--- I hereby certify that Resolution No. 2005-27 was passed and adopted by the City Council of the City of Lodi in a regular meeting held February 16, 2005, by the following vote: AYES: COUNCIL MEMBERS — Hansen, Hitchcock, Johnson, Mounce, and Mayor Beckman NOES: COUNCIL MEMBERS — None ABSENT COUNCIL MEMBERS— None ABSTAIN: COUNCIL MEMBERS— None SUSAN J. BLACKSTON City Clerk 2005-27