HomeMy WebLinkAboutAgenda Report - July 2, 2003 E-03>OTY OF LODI COUNCIL COMMUNICATION AGENDA TITLE: Adopt a resolution to (1j reject the low bid in Category 1 and all bids in Category 6 of the Electric Utility Overhead and Underground Distribution Hardware Supply Contract for Fiscal Years 2003-2005, (2) award contracts to the fi ,ated low bidders meeting specifications in each of the Categories 't through 5 of the two-year supply agreement, and (3) authorize re -advertisement for bids for certain items in the equipment list for Category6 ($77,125.03) (EUD) MEETING DATES July 2, 2003 PREPARED Y- Electric Utility Director RECOMMENDED ACTION: That the City Council Adopt a resolution to (1) reject the low bid in Category 1(Wood Crossarms)for failure to meet bid requirements (bidder proposed a one-time delivery ratherthen a two-year supply arrangement), and all bids in Category 6 (Underground Rubber Products) because of restrictive specifications in that category, (2) award supply contracts to the low vyakated bidders in each of the Categories 1 through 5 of the two-year supply agreement, for an estimated two-year total amount of $77,125.08, and (3) authorize staff to re -advertise for certain items in the equipment list for Category 6, making specifications less restrictive to allow a more competitive bid environment. BACKGROUNDINFORMATION: The Electric Utility Depart enl and Finance Departments Purchasing Division have identified 37 standard high-volume or long -leadtime items routinely used in overhead and underground construction and upgrade projects. By establishing a suppiy contract with one or more suppliers the City can have a guaranteed source for these 37 components without maintaining a large inventory at the MSC warehouse, This means the City will have less money committed to inventory, yet have the components available to schedule and carry out construction or maintenance projects, On May 21 the City Council authorized advertisement for bids to establish supply contracts for these 37 items. Bids were opened on June 11, and were evaluated on the basis of price (55% of evaluation critrria) and stocking and replenishment lead -tries (45%). Related items were grouped into one of six categories, and lowest evaluated bids weir determined for each category. The low evaluated bidder and the estimated annual contract amount foreach respective category are summarized as follows. Category 1 (Mood Crossarrns) Category 2 (Overhead Hardware) Category 3 (Electrical Tape) Category 4 (Under mund, Hardware) Category 5 (Underground Hardware) Western States Electric, Portland, OR $ 6,533.96 Craybar Electric, Sacramento $15,323.53 Southwest Power, Benicia $ 4,778.50 Southwest Power, Benicia 2,805.81 Southwest Power, Benicia $ . 120.74 Estimated ann al total: $38,562.54 Estimated two-year total. $77,125,08 A detail of the bid evaluation is attached Hereto as Exhibit A. Since one of the seven items in Category 6 has only one approved manufacturer, and it was brought to staffs attention that only one bidder is authorized to represent that manufacturer, it is therefore staffs recommendation to reject all bids for Category 6 and redefine the equipment list to allow competition, APPROVED' �r`i, Dixon Flynh City CITY OF LODI s COUNCIL COMMUNICATION FUNDING: Electric Utility Department's 2003-2005 Fiscal Operating Plan vicky ori hie, Finance Director Alan N. Vallow, Electric Utility Director Prepared by Joel Haft, Purchasing Officer cc: Mans Hansen, Manager. Electric Utility Engineering and Operations PROVED: H. Dixon Ftynn -- City Manages Qtye I VV.iafi southwest $30.32 Power Porfland Benicia no Summary of Bids Poleline URD Hardware Supply Contract 03-05 Bids Opened 6111/03 Wesco Graybar Brooks GenerW Intraline Dist. Ele c Mfg Pacific S, F Sacramento Seflingham. leo tend Bu6ngame EXHIBIT A Qv� ad Underground Distribution Karst' re FY 2M3-2005 All -Phase Efectric Stockton Unit Price (each) $30.32 $32,05 $37.90 $0M $29.95 $32.24 $0M $0,00 Extension $6,064.00 $6,410.00 $7,580.00 $5,990.00 $6,448,00 Standard Pack NA 25 25 so 25 Category Subtotal $6,064.00 $6,410.00 $7,580.00 $5,990.00 $6,448,00 7.75% Sales Tax $469M $49636 $587,45 $0.00 $464.23 $499,72 $0.00 $0.00 TOTAL CATEGORY I $6,906,78 $8,167,45 $6,454.23 $6,947-72 Lead Times-, Est Reserve Stock 30 28 days 30 days 35 days NA 30 days Replenish Reserve Stock 30 28 days 30 days 0 days NA 30 days Prod hely ARO 5 28 work days 5 work days X work days 28 work days 5 work days Rankings: Price O.55 2 3 5 1 4 Est Reserve Stock 0.10 1 1 4 5 1 lei Resry Stock 0.15 2 3 1 5 3 Product Dely ARO 0.20 4 1 1 4 1 2.4 15 2.6 2.95 Pries firm; Price firm I delivery only until 613/04 until 6/30104 No inventory S to 6% maintained esc. 7/1104 Desc6ption CATEGORY l Steel Pin, 5/8" x .5" 300 Unft Price (tach) Extension !define URD Hardware Std Pack Guy Grips 3/8", 8 Coat 400 Unit Price (Each) Extension Std Pack Guy Vire, 318" 2000 Unit Price ( ) Extension Manufacturer Western Angle Vee Brace 50 Unit Price (Each) erl Extension 9E P Std Pack Power Tension Sleeve, -180 400 Unit Price (Each) Extension !amend Std Pack S. F Sacramento Jumper Sleeve, #210 m 150 Unit Brice (Each) Stockton Extension $2.69 Std Pack No Bid Pin Insulator,�]�8py12 X00 Unit Price$ $6.60.00 Extension i�A;.e a: io d $795.00 $612.00 Std Pack Summary of Fids !define URD Hardware Supply Contract 03--05 Bids Opened 6/11 /03 Western Southwest sc� r c k erl 4ratrai�r� 9E P States Ems, Power O:t. Mfg PacificElectric !amend Beniai S. F Sacramento Bellingham Portland Budin ame Stockton $2.20 $2.69 $2.65 $2.04 No Bid No Bid No Bid No Bid $6.60.00 W-7.00 $795.00 $612.00 25 25 25 25 $1,155 $2.07 $1.91 $1.75 No Bid No Bid No Bid No Bid $740,00 $82&00 $764.00 $700.00 50 50 25 50 $195.00 $0,21 $024 $0.161 No Bid No Bid No Bid No Do $390.00 $420.00 $460.00 $322.00 Cal Wire Cal Wire Bekaert $12,10 $15.21 $12.90 $11.09 No Bid No Bid No Bid No Bid $605.00 $760,50 $645.00 $554.50 5 5 5 5 $4.95 $4.$4 $5.32 $4.58 No Bid No Bid No Bid No Bid $1,980.00 $1,936.00 $2,128.00 $1,832,00 25 25 25 25 $3,05 $3,03 $3.28 $2.82 No Bid No Bid No Bid No Bid $457.50 $454.50 $492.00 $423.00 20 20 20 20 $5.35 $7.46 $8.86 $8.05 No Bid No Bad No Bid No Bid $1,6055.00 $,238.00 $2,658.00 $2,415.00 12 12 12 Summary of Bids powine URD HardwaTe Supply Contract 03-05 Bids opened 6/11/03 1 V Epox"ii ator SusP 160 S1035 $926 $10-90 $9.45 No Bid No Bid No 5W No B�d uqR price (Each) Extension $1,656.0,0 $1,461.60 $1,744-00 $1,513-60 SW Pack 15 15 15 15 jumper sleeve #3`97 200 $4-20 $408 $4.55 $3,34 No Bid No Bid No Bid No Bid Unit Piice (Each) Extension M , $836.oo $910M $668,00 Std Pack 20 20 20 20 'Tension Sleeve #110 50 $5MNo Bid No Bid No Bid No Bid Unit Price (Each) Extension $250M $244,00 $267,50 $228.00 Std Pack 25 25 25 25 Hot in Clamp, #6 50 $7.10 $6.37 $7.60 $6,50 No Bid No Bid No Bid No Bid Unit Price (Each) 355.00 $318.50 $380,00$325M Extension Std Pack 50 50 50 50 Not Line Clamp, #6-110 400 $6.17 $7,10 $6..09 No Bid No Bid No Bid No Bid Unft Price (Each) Extension $665 $2,660,00 $2,468-00 $2,840M $2,436,00 Std Pack 100 100 100 100 Hot Line clamp, #410 50 $13M X16.31 $14.65 $15,43 No Bid No Bid NoB id No Bid Unit Price (Each) Extension $690.00 $815.50 $732.50 Std Pack 20 50 20 50$771.50 Stirrup la , #2 250 Unit Price (Each) 0.005 Extension (3.095 Std Pack 0.15 Stip p, #450 1Op Unit Price (Each) 2 Extension $21.04 Std Pack $20.15 Category ubt tal $2,104.00 7.75% Sales Tax $2,015.00 TOTAL. CA"T"EGORY 11 15 Lead Time& 15 Est Reserve' tk (item 1) 60 Est Reserve atk (2-'1 8) 30 Replenish Reserve Stack 30 Prod l„3ely ARO 5 Price 0.55 Reserve Stock (1) 0.005 }Est Est Reserve Stock (2-18) (3.095 Replenish Reserve Stock 0.15 Product Dely ARO 0.2 vaulated Ranking: 2 fient& 00yq51&3A $21.04 Summwy of Bids raieli e URD Hardware Supply Contract 03-05 Bids Opened 6/11/03 $9.55 $9.16 $10.15 $8.76 $2,387.50 $2,290:00 $2,537.50 $2,190 DO 25 25 25 2 $22,00 $21.04 $22,05 $20.15 $2,200,00 $2,104.00 $2,205.00 $2,015.00 15 15 15 15 $17,476,00 $17,961.60 $19,576.50 $17,005.60 $1,354,39 $1,393.57 $1,517.33 $1,317,93 $18,830,39 $19,375.17 $21,095.83 1 ,. 23 30 days 60 days 56 days 35 days 42 days 30 days 42 days 35 days 42 days 30 days 14 days 35 days 2 work days 5 work days 2 work days 2 work days 2 3 4 1 1 1 1 1 4 1 4 4 4 2 1 3 4 1 1 1 2.385 2.25 2.935 Price firma Price firma until 6130104 until 6130/04 utsl to 4% Subj to 4% esc. 7/1/04 esc. 7/1104 No Bid No Bid No Bid No Bid Description qty CATEGORY111 Elec Tape 2" 240 Unit Price (Rail) Extension Po9eline Std Pack Elec Tape 364", Black 10003 Unit Price (Roll) Extension Supply Contract 03-05 Std Pack Elec Tape 3/4", Red .200 Unit Price (Kull) Extension Manufacturer Elec Tape 314", Blue 200 Unit Price (Roll) Graybar Extension General Std Pack Elec Tape 314", White 200 Unit Price (Roll) Elec Extension Pacific Std Pack Electric Category Subtotal Benicia 7.75% Sales Tax aacrameato TOTAL CATEGORY l!1 Portiano Est Reserve Stock 303 Replenish Reserve Mock ail Prod Dely ARO 5 Summary of Bids Po9eline URD Hardware Supply Contract 03-05 Bids Opened 61116033 Western S66thioest 1 esco Graybar Brooks General lntraHneAll-Phase States Elec Dist. Elec Mfg Pacific Electric Pcsrtia.nd Benicia S, F. aacrameato Beflingham Portiano Burlingame Stockton $2.30 $2.17 $2.35 $2.11 No Bid $2.17 $2.43 $4.56 $552.00 $520.80 $564.0# $5036.40 $520.80 $583.201 $1,094,4€3 12 12 12 12 12 12 40 $2.70 $2.54 $2.58 $2.66 No Bid $2.72 $2,54 $2.29 $2,700.00 $2,5403.001 $2,580.003 $2,660.00 $2,720.030 $2,540.00 $2,290.00 100 1001 100 1003 100 1003 10301 $2.45 $2.29 $2.44 $2,35 No Bid $2.41 $2.30 $2.29 $490.00 $458.00 $488.00 $470.00 $482.0301 $460.00 $458.010 100 100 1130 100 100 1030 100 $2.45 $2-29 $2.44 $2.35 No Bid $2.41 $2.303 $2.29 $490,00 $458.003 $488.00 $4701.00 $482.00 $460.130 $458.130 100 1030 100 100 100 100 100 $2.45 $2.29 $2.44 $2.35 No Bid $2.41 $2.30 $2.29 $4903.(10 $458.00 $488.00 $470.001 $48ZOO $4603.00 $458.00 100 10.0 100 1010 100 100 100 $4,722.00 $4,434,80 $4,6038,00 $4,576.40 $4,686.80 $4,503.203 $4,758.40 $365,96 $343,701 $357.12 $354.67 $363.23 $349.00 $368.78 $5,087.96 <:: ,7;: $4,965.12 $4,931.07 $5,050.03 $4,852.20 $5,127.18 10 days 30 days 14 days 10 days 30 days 30 days 103 days 10 days 30 days 14 days 10 .days 430 days 30 days 7 days 10 work days 5 work days 2 work days 2 work days 5 work days 5 work days 5 work days Summary G Bids PoUMeURO Hardware Supply Contract 5 Bids Opened 61]]33 a ) 4 3 5 2 7 ! J ] l ] ] ! 2 5 4 2 5 5 ! 7 ! ! ! ! j ] +45 F $55 «e 4.4 315 &5 Category Subtotal Summary of Gds Pole i e URD Hardware Supply Contract 03-05 Bids Opened 6111103 Western SPuthwest : Wesco Gr ybar Brooks Gener,0 intralin Ali -Phase states Elec. DiSC Elec Mfg Pacific Electric P riiano Benicia Is. F, Sacramento Beflingham Portland BLiriingame Stockton $M5 $2.97 $3.39 $3.28 No bid No bid No bid No bid $1,220.60 $1,188.00 $1,356.00 $1.,312_00 25 25 9 9 $3.60 $3.54 $4.23 $4.09 No Bid No Bid No Bid No 81d 1,440,00 $17416,00 $1,692.W $1,536.00 25 25 9 $2,66000 2, 3,048,'00 X2,94$.00 $206.15 $201,81 $236.22 $228,47 $2.866.15 $2,.805.81 $3,284.22 $3,176.47 28 days 60 days 30 days 20 days 28 days 60 days 30 days 20 days 20 work days 5 work days 2 work days 2 work days 2 1 4 3 1 1 1 i 2 4 3 1 4 1 1 1 15 [7777777 7777 345 2.5 S mmw-y of Bids Poledne URD Hardware Supply Contract 03-05 Bids Opened 6111703 Description Western `. t ` sco Gra bar Brooks General infr line AII-Ptivs States Elec. Dist, Elec Mfg Pacific Electric CATEGORY V Portland Benicia S. iw. Sacramento B Hingham Po and Burlingame Mots:, -way #12 200 Unit Price (Each) $12.40 $11,62 No Bid No Bid No Bd No Bid No Bid No Bid Extension $2,480,.00 $2,324,00 Std Pack 25 25 Heat Shr Tap Assy #110400 Unci Price (Each) $2.80 $2.68 No Bid No Bid No E30 No Bid No Bb Extension $1,120.00 $1,072.00 Std Pack 25 25 Comp Lug #110 300 Unit Price (Each) $0:.77 $0.75 No Bid No Bid No DI No Bad No Bid No Bid Extension $231.00 $225.00 Std Pack 100 100 Comp Lug #410 100 €Jn.it Price (Bach) $0.92 $0.85 No Bid No Bid No B d No Bid No Rid No Bid Extension $.9.2.00 $85.00 Std Pack 100 100 Comp Lug #500 150 Unit Price (Each) $4.05 $3.97 No Bid No Bid No Bd No Bad No BID No Extension $607.50 $595.50 Std Pack 100 100 Comp thug #750 150 Unit Price (Each) $4.95 $4,58 No Bid No Bid No SO No Bid No B'Id o Bid Extension $742.50 $687.00 Std Peck 100 100 Comp Lug #350 200 Unit Price (Each) $3.70 $3.46 No Bid No Bad No Eid No Bid No Bj:� No Bid Extension $740.00 $692.00 Std Pack 50 50 Summary of Bias Poleline URD Hardware Supply Contract 3--05 Bids Opened 6/11/03 Category Subtotal $6,013,00 $5,680.50 7.751% Sales Tax $466.01 $440.24 TOTAL CATEGORY ,479.01 Est Reserve Stock (1--) 60 45 days 60 days Est Reserve Stock (4-6) 120 20 days 120 days Est Reserve Stack (7) 30 20 days 30 days Replenish Res . to ) 60 20 .days 60 days Replenish Res Stock(7) 30 20 days 30 stays Pro Dely ARC 5 20 work days 5 work days Rankings: Price 0.55 2 1 Est Reserve Stock 0.10 1 1 Rep: enish Reserve Stock 005 1 2 Product Dely ARO 0.20 2 1 Evaluated Rankings: 1.85 200A Protect Cap 160 Unit Price (Each) Extension Std Pack 200A 15kV Bushing W 160 Unit Prire (Each) Extension Std Pack 200A 3 -way Module 50 Unit Price (Each) Extension Std Pack 200A 4 -way Module 50 Unit Price (Each) Brooks Extension Intrahne All -Phase Std Pack Power $24.87 $22.09 $21.95 $3,979,20 $3,534.40 $3,512-00 $92.00 $95.34 $95.35 $4,600.00 $4,767.00 $4,76T50 $104.00 $110.47 $109-2 $5,200,00 $5,523,50 1 Summary of Bids Poeline URD Hardware Supply Contract 03-05 Bids Opened 6/11103 Western Southwest Wesco Graybar Brooks General Intrahne All -Phase States E4ec, Power Dist, Elec Mfg Pacific Electric Portiand sen6a S F, Sa�rarnento Sel4ngharn Portland &hdingame Stocktor $25,15 $22,42 $22.45 No bid No bid No bid No bid No bid $7,545,00 $6,726.00 $6,735,00 1 15 1 $25.15 $22A2 $22A5 $7,545,00 $6,726,00 $6,735.00 1 15 1 $20.00 $19,77 $19,10 $3,200,00 S3,163-20 $3,056.00 $24.87 $22.09 $21.95 $3,979,20 $3,534.40 $3,512-00 $92.00 $95.34 $95.35 $4,600.00 $4,767.00 $4,76T50 $104.00 $110.47 $109-2 $5,200,00 $5,523,50 1 Price 3 2 Summary of Bids Est Reserve Stock 1 1 Poleline URD Hardware Replenish Reserve Stock 1 3 Supply Contract 03-05 Product Dely ARO 3 1 Bids Opened 6/11/03 15kV Stand Off Insulator IGO 2.7 1,95 I'l Unit Price (Each) $36-70 $31.40 $31,05 Extension $3,670..00 $3,140,00 $3,105,00 Std Pack Subj to 3% Note A Note A Category Subtotal $35,739.20 $33,580,10 $337370.50 7.75% Sales Tax $2,769,79 $2,832,46 $2,586.21 TOTAL CATEGORY V1 $38,508,99 $36,182.56 $35,956,71 Lead Times: by Southwest Est Reserve Stock 50 45 days 60 days 56 days Replenish Reserve Stock 60 45 days 60 days 56 days Prod Rely ARO 5 45 work days 5 woit days 2 work days Price 3 2 1 Est Reserve Stock 1 1 1 Replenish Reserve Stock 1 3 2 Product Dely ARO 3 1 1 Evaluated Rankings. 2.7 1,95 I'l Cornmeats: Price firm Price firm Note A� until 6/30/04 until 6/30104 Approved item is Subj to 3% Subj to 3% available from esc. 7/1/04 esc. 7/1104 only one supplier. Products quoted by Southwest Powerand Wesco are not on EUD approved list. RESOLUTION NO. 2003-109 WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on June 11, 2003, at 11:00 a.m. for various items of overhead and underground distribution hardware under a supply agreement covering Fiscai Years 2003-05, described in the specifications therefore approved by the City Council on May 21,2003; and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as shown as follows: Category I (Wood Crossarms) Western States Electric, Portland, OR $ 6,53196 Category 2 (Overhead Hardware) Graybar Electric, Sacramento $18,323.53 Category 3 (Electrical Tape) Southwest Power, Benicia $ 4,778,50 Category 4 (Underground Hardware) Southwest Power, Benicia $ 2,805,81 Category 5 (Underground H ardwa re) Southwest Power, Benicia $ 6J20.74 Estimated annual total: $38,562,54 Estimated two-year total: $77,125.08 WHEREAS, bids were evaluated on the basis of price (55% of evaluation criteria) and stocking and replenishment lead-times (45%), Related items were grouped into one of six categories, and lowest evaluated bids were determined for each category; and WHEREAS, by establishing a supply contract with one or more suppliers, the City can have a guaranteed source for these components without maintaining a large inventory at the MSC warehouse, This means the City will have less money committed to inventory, yet have the components available to schedule and carry out construction or maintenance projects; and WHEREAS, a detail of the bid evaluation is attached hereto as Exhibit A. Since one of the seven items in Category 6 has only one approved manufacturer and it was brought to staffs attention that only one bidder is authorized to represent that manufacturer, it is therefore staff's recommendation to reject all bids for Category 6 and redefine the equipment list to allow competition; and WHEREAS, the City Manager recommends (1) rejecting the low bid in Category 1 (Wood Crossarms) for failure to meell bid requirements (bidder proposed a one-time delivery rather than a two-year supply arrangement), and all bids in Category 6 (Underground Rubber products) because of restrictive specifications in that category, (2) award supply contracts to the low evaluated bidders in each cf the Categories I through 5 of the two-year supply agreement for an es Irnated two-year total amount of $77,125,08, and (3) authorize staff to re -advertise for certain items in the equipment list for Category 6, making specifications less restrictive la allow a more competitive bid environment. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council hereby (1) rejects the low bid in Category I (Wood Crossarrns) for failure to meet bid requirements (bidder proposed a one-time delivery rather than a two-year supply arrangement), and all bids in Category 6 (Underground Rubber Products) because of restrictive specifications in that category, (2) hereby awards supply contracts to the low evaluated bidders in each of the Categories I through _5 of the two-year supply agreement for an estimated two-year total annount of $77,125.08, and (3) further authorizes staff to re -advertise for certain items in the equipment list for Category 6, making specifications less restrictive to allow a more competitive bid environment, cited; July 2, 2003 I hereby certify that Resolution No, 2003-109 was passed and adopted by the City Council of the City of Lodi in a regular meeting held July 2, 2003, by the following vote: AYE& COUNCIL MEMBERS — Beckman, Hansen, Howard, Land, and Mayor Hitchcock NOES: COUNCIL MEMBERS — None ABSENT. COUNCIL MEMBERS — None ABSTAIN, COUNCIL MEMBERS — None SUSAN J, BLKCKSTON City Clerk 2003-109 200A Protect Cap 160 Unit Price (Each) Extension Std Pack 200A 15kV Bushing W 160 Unit Price (Each) Extension Std Pack 200A 3 -way Module 50 Unit Price (Each) Extension Std Pack 200A 4 -way Module 50 Unit Price (Each) Extension Std Pack Summary of Bds Polefine URD Hardware Supply Contract 03-05 Bids Opened 6/11103 Western Southwest Wesco Graybar Brooks General Intraftne Ail -Phase States Eliec, Power Dist. Else Mfg Pact to tri PorV2nd Benda 3, F. Sacramento Bellingham Portland Buriingame Stockton $2515 $22.42 $22,45 $7,545.00 $6,726.00 $6,735.00 1 15 1 $25,15 $22.42 $22.45 $7,545,00 $6,726.00 $6,735-00 1 15 1 $20,00 $19.77 $19.10 $3,200.00 $3,163.20 $3,056.00 $24.87 $22.09 $21.95 $3,979.20 $3,534A0 $3,512.00 $92.00 $95.34 $95.35 $4,600.00 $4,767.00 $4,767.50 $104.00 $110.47 $109-20 $5,200,00 $5,523.50 $5,460.00 No bid No bid No bid No bid No bid i 101, NOR: Summary of Bids Polefine URD Hardware Supply Contract 03-05 Bids Opened 6111103 15kV Stand Off Insulator 100 Price firm Note K until 6/30/04 Unit Price (Each) $36.70 $3140 $31,05 Extension $3,670.00 $3,140.00 $3,105M Std Pack Note A Note A Cate gM Subtotal $35,739.20 $33,580-10 $33,370,50 7,750% Sales Tax $2,769,79 $2,60.2-46 $2,58621 TOTAL CATEGORY VI $38,508.99 $36,182.56 $35,95 ,71 Lead Times: not on EUD Est Reserve Stock 60 45 days 60 days 56 days Rep#enish Reserve Stock 60 45 days 60 days 56 days Prod Lely ARO 5 45 work days 5 work days 2 work days Rankings: Price 3 2 .1 Est Reserve Stock 1 1 .1 Replenish Reserve Stock 1 3 2 Product Daly ARO 3 1 1 2.7 1,95 1'1 Comments: Price firm Price firm Note K until 6/30/04 until 6f3O/O4 Approved item is Subj to 3% Subj to 3% available from esc, 7/1/04 esc, 7/1/04 only one supplier. Products quoted by Southwest Power and Wesco are not on EUD approved list.