HomeMy WebLinkAboutAgenda Report - July 2, 2003 I-02COU -NOL COMMUNICATION
AGE=NDA TiTt.E: Adopt Resolution Awarding Contract for Kettleman Lane Median Improvements,
Hutchins Street to School Street, to Clayborn Contracting Group, Inc., of Auburn;
($120,000) and Appropriate Funds
MEETING DATE: July 2, 2003
PREPARE Y: Public Works Director
RECOMMENDED ACTION: That the City Council adopt a resolution awarding the contract for the above
project to Clayborn Contracting Group, Inc., of Auburn, in the amount of
$129,058.00 (base bid plus optional bid item) and appropriate funds in
accordance with the recommendation shown below.
BACKGROUND INFORMATION: This project consists of installing a raised concrete median (base bid)
and electrical conduit for a future traffic signal interconnect system
(optional bid item) on Kettleman Lane from Hutchins Street to 200 feet
east of School Street, all as shown on the plans and specifications for
"Highway 12/Kettleman Lane Safety Median Improvements".
The City received three bids for this project. The lowest bidder, Clayborn, has a bid that is about $67,000
lower than the engineer's estimate and $77,000 lower than the second lowest bidder. This can be due to
the fact that Clayborn was the contractor that completed the concrete median project on Kettleman Lane
from Hare Lane to Hutchins Street in 2001. Their knowledge of the construction methods and familiarity
with the job site gives them an advantage over the other contractors on cost savings in bidding this project.
City staff has worked with Clayborn on the previous median project and is confident that they are a
competen?contractor.
The owner of the Euclid Shopping Center on Kettleman Lane has expressed concerns that the proposed
median would restrict their westbound customers from entering the shopping center. They hired their own
traffic engineer. Linscott, Law & Greenspan (LLG), to study this issue. LLG felt that a westbound left -turn
could be accornmodated between Hutchins Street and Church Street for the shopping center. However,
some of the design assumptions and criteria they used are not consistent with those Caltrans has required
the City to use on other portions of Kettleman Lane. Staff forwarded LLG's study to Caltrans for review and
approval. After reviewing LLCM's study, Caltrans has again disapproved opening the median for the
proposed westbound left -turn pocket for the shopping center (letter attached). Staff felt that the decision by
Caltrans is consistent with past practice and notes that westbound left -turns to the Euclid Shopping Center
continue tc be available at Church Street.
This project is partially funded by Federal money (Hazard Elimination Safety Program) with a required local
funding match_ An additional appropriation is requested above the bid amount to cover material testing
costs, construction contingencies. and engineering.
"H. Dixon Olynn City
u ,:hr"
OW25la3
Adapt Resolution Awarding Contract far Kettleman Lane Median Improvements, Hutchins Street to
School Street to Clayborn Contracting Group, Inc, of Auburn, ($129,060) and Appropriate Funds
July 2 2003
Page 2
Plans and specifications for this project were approved on April 2, 2003. The City received the following
three bids for this project:
Bidder Location Base Bid Optional Dern
Engineer's Estimate $186,81I.00 $24,200,00
Clayborn Contracting Group, Inc. Auburn $119,177.00 $ 9,881.00
Gold Valley Construction, Inc. Rocklin $196,82425 $17,600.00
J. A. Gonsalves & Son Const., Inc. Napa $202,934.00 $22,000.00
FUNDING: Requested Appropriation: $21,000-00 (Street Fund)
HES Funds $127,000.00
Project Estimate: $148,000-00
Bid Opening Date: May 21, 2003
Funding Available:
inanc (director
Richard C. Prima, J.
Public Works Director
Prppare� by 1_Yrnan hang, Associate CiA Engineer
RC,i'II_f, Ipi- f
A''tachmena
cc: City Attoo-ney
'L1rChF�stf"t�} C3tticer
Fars date U01 Engin-eer Chang
�"a trans
PrimeShino Express
C,Award 06/25/03
- _.. .. �.._ - Ci12A1' I)<4�r.,S`?_t t c •rt�::.E.
DEPARTMENT OF TRANSPORTATION
TIO;
STOCKTON, CA 95201
TOD (209);�4k- 9 f
FAX (209) 948-7884
PHONE 1709) (,148-7VS
Rine 16, >CO3)
1. �a uar- Chang,
C:ity of Lodi
1121 Wos" Pine Street
Lodi, CA 95241-1910
Dear,%Ir Chang,
N 1 8 2003
;C TY OF I.. 0 D
S3 -12, -PM 16.931/172164
SR -12 Kettleman Lane Permit
Fles=orrr priu cr.'
1'raffic Operation has completed reviewing the traffic report prepared by Linscott Law and
Greenspan (1 -.LG) Engineers dated May 16, 2003 for the State Route 12 (Kettle an Lane)
raised med]an pennit project in the City of Lodi,
L`.xhibit C; of the traffic report shows the proposed westbound left -turn pocket to the project
driveway with a length of 24.4 meters. According to 'Table 2 of the traffic report, the 95'h
PerceWileuie;ue for the westbound left- Wrn lane on Kettleinan Lane for Hutchins Street is
235 feet (7 1,0 meters) and for the eastbound left -turn laze for Churcb Street is 122 feet (37.2
meters), According to the Table 405.2B of the Caltrans Highway Resign Manual, the
inim um deceleration Iarie length for a design speed of 56.3 knarh (35 mph) is 84.7 meters
(246 feet). When we add the 95"' Percentile Queue aiid the minimum deceleration lane
length the total distance is 278.2 meters (912 feet). The distance between Hutchins and
Church Stroet is 225 meters (738 feet). Therefore, the proposed left -turn pocket can not be
Wcoz .arccl ted. C.al"fa rs will not approve the proposed left -turn pocket.
1f you have any question, please contact Jose Mujica of my staff at (209) 948-7003
'1 Ho NGUYEN, Chief
Traffic Operations Branch
c- Clark. Carr, Chief, Traffic Operations Branch
Alex Mmor, Chief. Transportation Fern -ills
"CcaRrmis trnpmues rnobiltly ¢across: ('&forma"
RESOLUTION NO. 2003-117
A RESOLUTION OF THE LODI CITY COUNCIL
AWARDING THE BID FOR KETTL EMAN LANE
MEDIAN IMPROVEMENTS, HUTCHINS STREET TO
SCHOOL STREET, AND FURTHER APPROPRIATING
FUNDS FOR THIS PROJECT
WHEREAS, in answer to notice duty published in accordance with law and the order of this
City Council, sealed bids were received and publicly opened on May 21, 2003, at 11°00 a -m, for
Kettlernan Lane Median Improvements, Hutchins Street t6 School Street, described in the
specifications therefore approved by the City Council on April 2, 2003; and
WHEREAS, said bids have been compared, checked, and tabulated and a report thereof
filed with the City Manager as follows:
Bidder
it Bid
Optional Item
Engineer's Estimate
$186,811'0
24,200.00
Clayborn Contracting Group, Inc- Auburn
$119,177.00
$ 9,881 ,00
Gold Valley Construction, Inc., Rocklin
$196,824.25
$ 17,600.00
J, A. Gonsalves & Son Construction, Inc., Napa $202,934,00 $ 21,000.00
WHEREAS, the City Manager recommends award of the bid for Kettleman Lane Median
improve ments, Hutchins Street to School Street be made to the low bidder, Clayborn Contracting
Group, Inc., of Auburn, California, in the amount of $129,058.00 (base bid plus optional bid item).
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the
bid for Kettle an Lane Median Improvements, Hutchins Street to School Street, be made to the low
bidder, Clayborn Contracting Group, Inc., of Auburn, California, in the amount of $129,058.00 (base
bid plus optional bid item); and
BE
IT FURTHER RESOLVED that funds be appropriated as follows.
Street Fund $ 21,000.00
HES Funds $127,000.00
Dated, July 2, 2003
I hereby certify that Resolution No. 2003-117 was passed and adopted by the City Council of
the City of Lodiin a regular meeting held July 2, 2003, by the following vote:
AY ES: COUNCIL MEMBERS — Beckman, Hansen, Howard, Land, and Mayor
Hitchcock
NOES: COUNCIL MEMBERS — None
ABSENT. COUNCIL MEMBERS — None
SUSAN LA
J. BIL, CKSTON
City Clerk
2003-117
C lETY C0UN, C!L
SUSAN HITCHCOCK, Mayo,.
EMILY HOWARD
N'aynt Fera Tempore
JOHN BECKMAN
LARRY D. "HAfNSEN
KF_TH LA",ID
Prime Shine Express
301 VV Kettleman Lane
Lodi, CA 95240
CITY HALL. 221 WEST PINE STREET
P.C. BOX 3006
LORI, CALIFORNIA g,5241-1910
(209) 333-6706
FAX (209) 333.6710
EMAIL. pwdept@lodi.gov
hf p:'\,,www.loth.gov
June 26,2003
Euclid Shopping Center, LLC
8294 Mira Mesa Blvd.
San Diego, CA 92126
1
H. DIXON FLYNN
City Manager
SUSAN J. BLACKSTON
City Clerk
RANDALL A. HAYS
City Attorney
RICHARD C. PRIMA, JR.
Public Works Director
Caltrans
PO Box 2048
Stockton, CA 95201
SUBJECT Adopt Resolution Awarding Contractfor Kettleman Lane Median Improvements,
Hutchins Street to School Street, to Ciayborn Contracting Group, inc , of Auburn
($129,060); and Appropriate Funds
Enclosed is a copy of background infon-nabon on an item on the City Council agenda of
`Wednesday, July 2, 2003. The meeting will be held at 7 p,m. in the
City Council Chamber, Carnegie Forum, 305 West Pine Street.
This item is on the regular calendar for Council discussion. You are welcome to attend.
if you wish to write to the City Councii, please address your letter to City Council,
City of Lodi, P. O. Box 3006, Lodi, California, 95241-1910. Be sure to allow time for the
mala Or. you may hand -deliver the letter to City Hall, 221 West Pine Street.
if you wish to address the Council at the Council Meeting. be sure I o fill out a speaker's
cera (available at the Carnegie Forum immediately prior to the start of the meeting) and
chive it to he City Clerk. if you have any questions about communicating with the
Council, please contact Susan Blackston. City Clerk, at (209) 333-6702.
if you have any questions about the item itself, please call Lyman Chang, Associate Civil
Engineer, at (209) 333-6800, extension 2665.