Loading...
HomeMy WebLinkAboutAgenda Report - May 21, 2003 E-13aCITY OF LODI COUNCIL COMMUNICATION AGENDA TITLE: Depart on Contract Change Orders for the Police Department Facility, 215 West Elm Street MEETING DATE: May 21, 2003 PREPARED BY: Public Works Director RECOMMENDED ACTION: This item is for information oniy. No action is required. BACKGROUND INFORMATION: In accordance with the Contract Change Order Policy, the City Council is being informed of change orders approved by the City Manager for this project. The original contract for this project was $10,894,400. The total cost of change orders to date is $111,866, which is 1% of the original contract. The project is approximately 55% complete. Retailed below is a description of the work involved in the change orders. More detailed descdptions and backup information for these change orders are avwiable in the Public Works Department. Chi )rdr No. This change order is for changes to the Elm Street storm drain for future work tie�ihs. T his will be charged to the Wastewater (Storm) account for main replacement_ (25,516) ChaRqq Order No. 2 - This change order is for the removal of a tree from the County property between Court 2 and our building. The roots impacted our building footings. ($937) Cly Qrd r� o- 3 - This change order is for the addition of code -required thickened concrete slabs at'the jail area block wails. ($3,678) Cht_ e Order No. 4 - This change order is for additional asphalt thickness an Elm Street. ($13,154) Chapg,t Order leo. 5 - This change order covers the cost of adding the required backflow device and class 200 pipe for the Fire Department connection system to the building. ($2,723) Cha Order No. 66 - This change order covers the cost of adding site electrical conduits for charging the equipment in the SWAT van, electric vehicles and other specialized vehicles. ($4,991) Chane Order No.:7 - This change order covers the cost of changing the electrical floor box finishes to brass for better durability. ($842) Chance Order No. 8 - This change order is a credit to delete concrete floor hardener additives from areas that receive floor covering. ($16,600 CREDIT) Ghan.ge_ r r o. 9 - This change order covers the cost cf plastering the site block wall. ($7,206) Charge Order No, 10 - This change order is for rerouting and additional site sewer lines. 4C--3(19) _ham rd r No. 11 - This change order is to cover the cost of hardware changes for correct operation and entry/exit control. ($19;654) APPROVEM PD Change Order H. Dixon Hynn .__ City Manager nil Report on Contract Change Orders for the Police Department Facility, 215 West Elm Street May 21, 2003 Page 2 Chanqe Order No 12 - This change order is for the briefing room fixed seating and tables ($8,333) Chan o Order No l 3 - This change order is a credit for changes made to the HVAC (heating and air- conditioning). ($7.232 CREDIT) C hart ; ?rder No. --This change order covers the cost of required concrete footings at exterior stair 4. ($5,543) Chan Qrder No. 15 - This change order is a credit for reducing the size of the motorcycle garage to allow buses to pass through the vehicle sally port. ($3,029 CREDIT) Qh n e Ord r No. 16 - This change order is for the widening of Pleasant Avenue from the alley north to ;Locust Street. The work includes new streetlights; and driveways, curb, gutter and sidewalk on the east side, as well as the alley approaches. This work was planned as part of the project but was to be done under a separate contract. However, coordination issues led to simplifying the work by incorporating it in this contract. The portion pertaining to streetlights will be charged In the EUD Streetlight account. ($66,644) Ch� arge Order No. 17- This change order covers the cost of adding required flashing at the roof skytight and t sof traffic pads around all rooftop units l o protect the roofing during maintenance operations. ($6,421) Qh r �€ a._ 18 - This change order covers the cost of tying existing Public Safety Building and Cou nty Cert 2 storm drain lines to the new Elm Street storm drain. ($14,364) t 9 -This change order is to change the hardware keying system to a secure proprietary system and a change in the dispatch area lockers. ($3,310) Cha nc�C3rd 1 p. 20 - This change order covers the cost associated with confirming building dimensions a �d other required structural work throughout the building. ($16,340) Change -Order No. 21 - This change order is a value engineering credit for changing the exterior finish on.the upper building exteriorfrom an aluminum panel system to an Exterior Insulation and Finish System (EIFS ). EIFS has an appearance similar to stucco and is the system used on several areas at Hutchins Street Square. This credit also inciudes the deleted radiant gas heaters from the vehicle sally port. ($68,651 CREDIT) Change Order No. 22 - This change order covers the cost of adding required exterior window flashing at all V" floor windows to prevent water intrusion in to the building. ($6,023) FUNDING: Applicable Utility Funds will be charged as noted above. There are sufficient funds budgeted in the Police Department Facility Project account to cover the remaining items. The total contract to date is $11,006,266. � tpc Richard C Prima, Jr Public Works Director Fir€,parols by Gary Wiman, Construction project Manager RCP/GVV'Ipt cc; Construction Project Manager K) ChOnge Order Cwric€I 1 051_12/03