Loading...
HomeMy WebLinkAboutAgenda Report - April 16, 2003 E-04MEETING DATE, PREPARED ; April 1, 2003 Electric Utility Director RECOMMENDED ACTION, That the City Council approve the specifications and authorize advertisement for bids for twenty 3 -prase sectionalizing g modol enclosures. BACKGROUND INFORMATION, The Engineering Division of the Electric Utility. Department is preparing or has prepared work orders for installation of electrical service ire a number of new residential subdivisions during the coming year. Those work orders call for 18 of these module ule enclosures. ectionali ing enclosures provide a safe means for "sectionalizing", or dividing, an underground electrical distribution system within a subdivision into smaller segments which can be isolated for maintenance or repair. Connection prints, or taps, within the enclosure provide the means for distribution of power to the various sections of the neighborhood, so that maintenance on one section of the system does not affect distribution of power to other sections of the neighborhood. Some of the subdivisions. planned for service installation are Century meadows #1 Units 2 and 3, Century Meadows #2 Unit 4, Meadows #3 Unit 4, Almondwood Estates, Legacy Estates, and Woodhaven #3, The balance of the carder will be placed into inventory for system upgrades or replacements. The Department has specified. enclosures produced by Malton Equipment Company of Minnesota for use in the Lodi system. Bids are expected from Graybar Electric of Sacramento, and from Southwest Power, Inc., of Benicia. Prepared by Joel Harris, Purchasing, Officer Electric Utility Department's Fiscal Year Plan, Wage -2 Estimated Cast. $12,000 April 30, 2003 Ala Va owl ctri Uri yirect r c Manager, EUQ Engincering and Operatiums d m Wt{a I ti dMtld4 it gin p. = papyy �p��pcc 5.9 � � 4 � xS ms 4 8G Rid wd q bk u+ u1 � ys � e V g: w w RM :—E a s m Wt{a I ti dMtld4 it gin V`LTS c� g p. = papyy �p��pcc 5.9 � � 4 8G Rid wd bk u+ u1 � ys � e V V`LTS c� g � � 4 I �