Loading...
HomeMy WebLinkAboutAgenda Report - April 16, 2003 E-03CITY OFLODI � COUNCIL COMMUNICATION AGENDA TITLE: Approve, Plans and Specifications and Authorize Advertisement for Bids for White Slough Water Pollution Control Facility Aeration Blower Replacement MEETlNG DATE: April 16, 2003 PREPARED BY: Public Works Directof RECOMMENDED ACTION: That the City Council approve the plans and specifications for the White Slough Water Pollution Control Facility Aeration Blower Replacement project and authorize advertising for bids. BACKGROUND INFORMATION-. This project consists of replacing four 10+ -year -cold aeration blowers, which supply air to the facility's biological treatment process. The aeration blowers are critical to plant performance and are in need of replacement to maintain effluent quality. The four aeration blowers being replaced were installed during the 1989 plant expansion. Modeling peffovmed by our design consultant, West Yost & Associates, has determined that dissolved oxygen deficiencies are occurring due to lack of adequate aeration capacity. If the deficiency is not rectified, the low dissolved oxygen will ultimately lead to failure of the biological process and discharge violations, resulting in fines to ?he 'City. Staff and our con5u4tank nave determined that the best method to mitigate the situation involves replacement of the aeration blowers and partial replacement of the aeration diffusers. Partial replacement of the diffusers reduces the need for larger blowers to supply the ultimate air needs of the Facility. This not only saves initial capital cost, but long-range electric costs as well. The plans and specifications for the diffuser purchase will be submitted to the Council at a later date. As part of this bid, a guaranteed price quote for later purchase of the ancillary appurtenances is being sought. This quote 01. be used in choosing the lowest responsible bidder, but the ancillary appurtenances will not be purchased at this time. The project estimate listed below includes the cost of the blowers and appurtenances only. An installation contractor will be chosen to install the blowers- This contractor will purchase the appurtenances as part of their contract. This bid process has been chosen due to the lead-time needed to manufacture the blowers. The blower installation is Manned for the end of 2003. To meet this timeframe, the blower purchase needs to be undertaken very soon. The installation cost, the appurtenances, and the diffusers are intended to be purchased with a State Revolving Fund loan. -Prhe plans and specifications are on file in the Public Works Department. FUNDING The money for this project will be coming from the Wastewater Fund. A request for appropriation of funds will be made at contract award, Project Esfirnate: Budgeted: Planned Bid Opening Date Prepared by Doi Kerlin, Assistant Wastewater'Troatment Superintendent RCPIFEF1DK/mg cc: Purchasing Officer Water/Wastewater Superintendent H, Dixon Flynn GCO Asst. Wastewater Treatment Superintendent 04/08/03