HomeMy WebLinkAboutAgenda Report - April 2, 2003 G-01 PH-"'ITY OF LOD! AGENDA TITLE: Public Hearing to Consider Resolution Approving the Initial Study and Mitigated Negative Declaration for the Lower Sacramento Road Widening, Harney Lane to Kettleman Lane, Project MEETING DATE. April 2,2003 PREPARED BY: Public Works Director RECOMMENDED ACTION: That the City Council conduct a Public Hearing to consider a resolution approving the Initial Study and Mitigated Negative Declaration for the Lower Sacramento Widening, Harney Lane to Kettleman Lane, project, BACKGROUND INFORMATIONThis joint project of the City of Lodi and San Joaquin County began in February 2001 with the award of a design oontract to Mark Thomas & Company, Inc. Included in that contract was the preparation of an Initial Study and Mitigated Negative Declaration for the project. The Mitigated Negative Declaration is based upon a finding that there is not substantial evidence that the project as proposed with mitigations will have a significant effect on the environment. The reasons supporting this finding, plus the mitigation measures, are documented in the initial study. The project consists of roadway improvements to approximately one mile of Lower Sacramento Road, from Harney Lane to Kettleman Lane, including the intersection of Century Boulevard/Lower Sacramento Road. This section of Lower Sacramento Road will be widened from a two-lane rural road to a four -lane arterial with a raised landscaped median. The project includes a new storm drain system that conforms to the City Storm Drainage Master Plan, As the lead agency, the City of Lodi agrees to implement ail of the mitigation measures. When approving a mitigated negative declaration, the lead agency must also adopt a mitigation -monitoring program for mitigation measures included in the initial study, A copy of the Draft Mitigation Monitoring Program is attached as Exhibit A, The next action by the City Council on this project is expected to be approval of plans and specifications and authorization to accept bids in June 2003, FUNDING.' Not Applicable Richard C. Prima, Jr. Public Works Director Prepared by Wally Sande in, City Engineer RCP/ FVVS/prnf Attachment cc; City Engineer City Planner Chris Rockway - Mark Thomas & Company 03/21/03 UAW,--R,TIM ME= � Draft Mitigation Monitoring Program Page I of 8 Timing or Frequency Monitoring Responsible of Mitigation Measure Requirements Agency Monitoring ----------------- is Replace Removed Trees. For each native oak and other significant tree renioved, the Review City oFlIod, Within 6 City shall plant a tree of a similar type along the project corrislos. Fifteen -gallon -size or larger landscaping plan, I months atter replace rrirru tree saplings will be used. Replacement trees shall be planted on the property from i verily conapharce 1 1 completion ot which trees ire removed, at the future cominunity park, or in the landscaped medians. with tree removals the project 2: Avoid and Minimize Air Quality Impacts. The proposed project shall be constructed in j Include mitigation City of Lodi Prior to and i accordance with SJVAPCD's Regulation Vill Fugitive PMlO Prohibitions. The City shall in construction during implement all feasible control measures specified in the Guide for Assessing Air Quality Impacts contract construction (San Joaquin Valley Air Pollution Control District 2002). The following air quality measures specifications shall be included it, the construction contract specifications to reduce air quality impacts during construction. The City of Lodi Department of Public Works shall monitor successful compliance with these measures. I. All disturbed areas, including storage piles, that are not being actively used for construction purposes, shall be effectively stabilized of dust emissions using water or chemical stabilizer/suppressant, or covered with a tarn or stockpile plastic sheeting or vegetative ground cover. 2, All onsite unpaved roads and offsite unpaved access roads shall be effectively stabilized of dust emissions using water or chemical stabilizer/ suppressant. 3, A-11 land clearing, grubbing, scraping, excavation, land leveling, grading, cut and fill, and demolition activities shall be effectively controlled for fugitive dust emissions by applying water or by presoaking. 4, When materials are transported off site, all material shall be covered, or material shall be effectively wetted to limit visible dust emissions, and at least 6 inches of freeboard space front the 'Lop of the container shall be maintained. 5. The accumulation of mud or dirt shall be limited or the dirt shall be expeditiously removed from adjacent public streets at least once every 24 hours during operations. The use qfdry rotary brushes is expressly prohibited except where preceded or accompanied by 6u#jenent wetting to Iimit visible dust emissions. Use of blower devices is expressly forbidden. Draft Mitigation Monitoring Progruro Page 2 of S 1 I 1 Timing or Frequency Monitoring Responsible �I of j Mitigation Measure � Requirements 1 Ageney ( Monitoring b. t^ollowing the addition of materials to, or the removal of materials nom. the swfaee of i outdoor storage piles, said piles shall be effectively stabilized of fugitive dust emissions using i t sufficient water or chemical stabil zeriscppressant. 3: Avoid Disturbance of hoarSpecial Status Nesting Migratory Birds and Swainson's Schedule chile City of Loma and, if , Prior to Hawks. To avoid impacts on nesting non-special-stains migratory birds and Swainson's hawks, i construction necessary, DFG construction the City shall either: outside of nesting X Conduct tree removal activities associated with project construction outside of the nesting season or conduct season for non-special-status migratory birds and Swainson'shawks. Potential nest trees preconstruction shall be removed after the young have Hedged and prior to nest-building activities in the survey and subsequent breeding season (trees would be removed between September 1 and February 28. implement additional OR measures, as a Retain a qualified biologist to conduct a preconstruction survey of all potential nest trees at necessary the project site when construction will continence during the breeding season. For tree removal activities beginning after February 28, one survey shall be conducted prior to the removal of potential nest trees at the project site. If an active nest is found at the project site , during the preconstruction survey, construction will cease until September 15 or until it has { been determined by a qualified biologist that the nest is no longer active. If no active nests are found at the project site, construction can proceed without any fitriher mitSgatiom 4: Avoid Indirect Impacts on Breeding and Wintering Burrowing Owls, To avoid adverse Include mitigation City of Lodi and, if Prior to impacts sit breeding or wintering burrowing owls, the City shall conduct preconstruction in construction necessary, DFG construction burrowing owl surveys in suitable habitat (i.e., annual grassland) adjacent to the project area. A specifications qualified wildlife biologist will conduct mie following preconstruction surveys 1--2 weeks before ground-disturbing activities begin. The surveys will involve visually checking all potential habitat � within 250 feet of the designated construction area. a Breeding Season Survey. For construction that is slated to begin during the breeding season (February 1 through August 31), a preconstruction survey shall be conducted before any J ground-disturbing activities take place in potential burrowing owl habitat. If no active burrows are found during the survey, no additional mitigation is required. If an active j Draft Mitigation Monitoring Program Page 3 of 8 Timing or Frequency Monitoring Responsible i of Mitigation Measure Requirements Agency Monitoring is L burrowing owl nest is found, the biologist shall establish a 250-firot-weie no -disturbance buffes zone around the active burrow. No construction activities shafl^be permitted within the specified buffer zone until after the breeding season (which is February I to/tugust3l" or until it is deterinumm by a qualified biologist that the young have fledged, Wintering Season Survey, Because adult burrowing owls can occupy burrows year-round, DFG mitigation guidelines for borrowing owls shall be implemented before initiating construction activities it, potential burrowing owl habitat during the wintering season (September I through January 31 j. for construction that is slated to begin during the wintering season, a preconseruction survey shall be conducted before any ground -disturbing activities take place in potential burrowing owl habitat_ If no active burrows are found during the survev1 -9 no additional nuiti ation is required. If an active winter burrow is found, owls I shall be excluded from borrows in the immediate impact zone and within an approximately 160-firrot buffer zone by installing one-way doors in burrow entrances according to DFG mitigation guidelines for burrowing owls. The project area shall be monitored daily by a qualified wildlife biologist for I week to confirm owl use of burrows before excavating the burrows to prevent reoccupation. Avoid Disturbance of Nesting Swainson's Hawks, To avoid impacts on nesting Swainson's Include mitigation City of Lodi and, if Prior to and II hawks, the City shall retain a qualified wildlife biologist to conduct a precombustion Swainson's in construction I necessary, DFG during hawk survey. The survey shall be required for construction activities scheduled for the breeding specifications construction season (March 1 through August 15) and located next to suitable nesting habitat (i e., the habitat located east of Lower Sacramento Road, between Century Boulevard to the north and residential development to the south). If no Swainson's hawks are found to be nesting within 0.25 mile of the project site, no additional mitigation is required. If an active Swainson's hawk nest is found at the project site during the preconstruction survey, the contractor shall contact DFG to determine the need for a no -disturbance buffer or the need to monitor the nest. DFG's recommendations shall be implemented. Draft Mitigation Monitoring Program Page 4 of 8 "riming or Frequency Monitoring I Responsible of I Mitigation Measure i Requirements I Agency Monitoring 6: Prevent and Control the Spread of Noxious Weed Infestations. Tice following measures Include nutigatiorl City of Lodi Prior to, will be included in the construction contract specifications to prevent and control the spread of in construction 1 during, and noxious weed infestations. The City of Lodi Department of Public Works will itunnor successful specifications after compliance with these measures. construction a. Small, isolated noxious weed infestations will be treated with approved eradication methods at an appropriate time to prevent or destroy viable plant pans or seed. b. Surface disturbance at tire staging areas will be nourmazed to the greatest extent possible. x If erosion control is required at the end of construction, all disturbed areas will be. seeded with certified weed free native and nonnative seed mixes. Include rnftigation� n and Consult the City of Lod, site, it During 7: Stop Work if Cultural Resources are Discovered During Constructio C,7t, Appropriate Agencies to Minimize Impacts on Cultural Resources, If buried cultural in construction necessary, State construction resources, such as chipped or ground stone, historic debris, building foundations, or human bone, I specifications Office of Historic are inadvertently discovered during ground -disturbing activities, work shall stop in that area and Preservation and within 100 feet of the find until a qualified archaeologist car, assess the significance of the find Caltrans and, if necessary, develop appropriate treatment measures in consultation with the City of !,our Department of Public Works, State Office of Historic Preservation, and other appropriate agencies, 'Die project proponent shall implement die recommended treatment measures. Draf y�iUyaiinny4on�ohngPrograrn ` �� Page 5o/8 Draft glit�gafion lAGnitoiing Program Page 6 of 8 — -- -------------- - - — ------ - ----- Timing or- Yrequency Monitoring Responsible I of i Mitigation Measure Requirements Agency I Monitoring 1 10: Notify Emergency Service Providers of the Construction Schedule and Any Associated I I Include mitigation City o"Lodi Prior to and Lane Chesures� Before initiating construction, tire City shall notify all emergency service in construction during providers in the City o"Larfi, and the nearby communny within San Joaquin County, of the 1 specifications construction project construction schedule. The notice shall identify anticipated dates and times of construction, as viell as any anticipated Hunts on access, Notice shall be provided at least 5 days before construction begins, If temporary road closures or a detour is required, the City shall notify emergency service providers of the closures/detour and the expected duration. 11: Employ Noise -Reducing Construction Methods. The following noise control measures Include rinfigation Uty or Lodi During shall be included in the construction contract specifications to reduce and control noise generated I in construction Construction by construction -related activities. The City ofLodi Department of Public Works shall monroe specifications successful compliance with these measures. I � Construction equipment shall have appropriate mufflers, silencers, and noise control features. 2. Vehicles and other gas- or diesd-powered equipment shall be prohibited from unince--- warmung up, idling, and engine revving. 1 Except under special circurnatances, the normal working day for construction activities shall be between the hours of 7:00 a.m. and 8:00 p,m, on weekdays. No construction shall occur on weekends, state or federal holidays, or at night, unless written pannission is granted by the City of Lodi Field Engmeer. Draft Mitigation Monitonng Program Page 7 of 8 Timing or Frequency Monitoring 1 Responsible 1 of Miti-ation Measure — - — --------- I Requirements Agency Mon ittring — ------ 12: Prepare a Traffic Handling Plan to Minimize Traffic Delays and Hazards During I include untigation City of Lodi Prior to and Construction, The City shall require the construction contractor to prepare a traffic handling plan I in construction during to immunize traffic delays and hazards during construction. The following traffic handling specifications I construction measures shall be considered by the construction contractor in the traffic handling plan. The City, of Lodi Department of Public Works shall monitor successful compliance with the traffic handling plan. 1, Through -access for emergency vehicles shall be provided at all times. 2. For work parallel to the roadway and all other activities, traffic flow in one direction krevc,sibleshall beniaintained, For work perpendicular to the roadway, flag persons will control crossing traffic. 3. Road or lane closures shall be limited to the immediate area of work, 4. When sidewalks are blocked, pedestrian detours shall be provided. 5. Standard construction warning signs shall be installed in advance of construction and at any intersection that provides access to the construction corridor. 6. Access for residential multiunit housing and commercial driveways shall be maintained i during construction. Steel plates or temporary backfill may be required to maintain access. i 7. Affected residents, schools, and businesses shall be notified at least 5 days before construction activities begin and at least 24 hours before construction activities that will limit I access/parking for fronting properties- 8.City of Lodi and San Joaquin County law enforcement, fire, and public works departirents Draft, hAffigation Monitoring Program Page 8 Of 8 Timing or i Frequency Monitoring Responsible of Mitigation Measure Requirements Agency Monitoring 13: Prepare and Implement a Resident and Business Notification Plan, Bezme construction Include mitigation City of Loth PrtoT to and begins, the City shall prepare and implement a resident and business notification plan that shall I in construction during include the measures below, specifications construction a, Residents and businesses located in the project corridor shall be contacted and advised concerning construction activities before the initiation of construction activities. li. During construction, contractors, including equipment opeTwors, shall avoid blocking or limiting access to residences and businesses located along the Project corridor during business hours, to the extent possible, Optional Mitigation Measure I: Construct a Soundwall, The City may consider, at its ovm No monitoring City of Lodi During or after discretion, future construction of a soundwall along Lower Sacramento Road to shield sensitive required because construction receptors (typically residential uses) from the expected permanent increase in noise levels in the project area. measure is optional RESOLUTION NO. 2003-55 A RESOLUTION OF THE LODI CITY COUNCIL APPROVING THE INITIAL STUDY, THE MITIGATED NEGATIVE DECLARATION, AND THE MITIGATION LOWERMONITORING PROGRAM FOR THE SACRAMENTO ROAD WIDENING, HARNEY LANE TO KETTLEMAN LANE, PROJECT WHEREAS, this joint project of the City of Lodi and San Joaquin County began in February 2001 with the award of a design contract to Mark Thomas & Company, Inc.; and WHEREAS, included in the contract was the preparation of an initial Study and Mitigated Negative Declaration for the project; and WHEREAS, the Mitigated Negative Declaration is based upon a finding that there is not substantial evidence that the project as proposed with mitigations will have a significant effect on the environment. The reasons supporting this finding, plus the mitigation measures, are documented in the Mitigated Negative Declaration; and WHEREAS, the project consists of roadway improvements to approximately one mile of Lower Sacramento Road, from Harney Lane to Kettleman Lane, including the intersection of Century Boulevard/Lower Sacramento Road. This section of Lower Sacramento Road will be widened from a two-lane rural road to a four -lane arterial with a raised landscaped median. The project includes a new storm drain system that conforms to the City Storm Drainage Master Plan; and WHEREAS, the City of Lodi, as lead agency, agrees to implement all of the mitigation measures. Therefore, staff recommends that the City Council approve the Initial Study, certify the filing of a Mitigated Negative Declaration as adequate environmental documentation for the Lower Sacramento Road Widening Project, and further approve the Mitigation Monitoring Program, NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council has reviewed Declaration as adequate environmental documentation for the Lower Sacramento Be Widening Project, and further approves the Mitigation Monitoring Program. i Dated: April 2, 2003 I hereby certify that Resolution No. 2003-55 was passed and adopted by the City Council of the City of Lodi in a regular meeting held April 2, 2003, by the following vote: AYES. COUNCIL MEMBERS -- Beckman, Hansen, Howard, Land, and Mayor Hitchcock ABSTAIN: COUNCIL MEMBERS — None SUSAN J.BLACKSTON City Clerk '10 Please immediately confirat receipt ofthisfaxbyealling333-6702 CITY OF LOD] P.O. BOX 3006 LO I, CALIFORNIA 95241-1910 IMEEM'iflam L A 111ij, TEAR SHEETS WANTED: Three{ l 3 _please DATED. THURSDAY, MARCH 20, 2003 JACQUELINE L. TAYLOR DEPUTY CITY CLERK N - V 1 A '�- 0 ADMINISTRATIVE CLERK JENNIFER M. PERRIN DEPUTY CITY CLERK Foxed to the Sentinel at 369-1084 at _t��(tirne )n 3 Phoned to confirm receipt of A pages at (Wnu) Jac PV.Tdcia Jen i rotn�s\�tivisss. enc '71 ell 0=6 Z NW -00 Hsu 110[ "My a On Thursday, March 20, 2003, in the City of Lodi, San Joaquin County, California, of a set Public Hearing to consider a resolution approving the Initial Study and Mitigated Negative Declaration for the Lower Sacramento Road Widening,Harney Lane to Kettleman Lane Project, and (attached hereto, marked Exhibit "A") was posted at the following four locations: Lodi Public Library Lodi City Clerk's Office Lodi City Hall Lobby Lodi Carnegie Forum I declare under penalty of perjury that the foregoing is true and correct. Executed on March 20, 2003, at Lodi, California. --WA&LL Patricia choa Administrative Clerk CITY CLERK Jacqueline L. Taylor Deputy City Clerk Jennifer M. Perrin Deputy City Clerk LUXINXOMX�l 0 On March 20, 2003, in the City of Lodi, San Joaquin County, California, I deposited. in the United States mail, envelopes with first-class postage prepaid thereon, containing a pubilc hearing notice to consider a resolution approving the initial study and mitigated negative declaration for the Lower Sacramento Road widening, Harney Lane to Kettleman Lane, Project, marked Exhibit "N', said envelopes were addressed as is more particularly shown on Exhibit "B" attached hereto. There is a reguiar daily communication by mail between the City of Lodi, California, and the places to which said envelopes were addressed. I declare under penalty of perjury that the foregoing is true and correct Executed on March 20, 2003, at Lodi, California, JACQUELINE L. TAYLOR DEPUTY CITY CLERK PATRICIA C7 HOA ADMINISTRATIVE CLERK 1, orrisidec moi Ldoc W&IMa" jE-NNIFERKi _PEk_R_1N DEPUTY CITY CLERK II€183FI€I6€I Id14I€€I€€I#I i9PI#I II#I€iSlil€t€Ikl€1€EI@3I€IIEEI[1 II€II€II1I kdiISIEIl FIST IIII@€I€I NEOMANN WILLIAM D & BONNIE R WOOD BRUCE D & JANEEN OCCUPANT 865 KRISTEN CT 857 TEHAMA DR 868 E TEHEMA DR LOD! CA 95242 LORI CA 95242 LOW CA 95242 II€II€#III I k€I#Id I, 11tIIII1€€I#I SONTRA MILDREmD E 871 E HARNEY LN LODt CA. 95242 €IIIi[illli30I418II[I€il€III#Iii STElNGRABER SHARIE 889 TEHAMA DR L,01)E CA 95242 III€I€I€II€ €III3ItIIIII€IIt#1[i NORDWWIC,K FLOYD H & LACE ATR 895 KRISTEN CT LCIDI CA 95242 1E9I€€EI3I11€IIIEII€III€IIIIIkII JENKINS LEON & MAE 909TEHAMA EHAMA DR LODE CA 95240 II€I I I I I I A € € I i I B 1161311111€IIII MARTIN JOHN A & LINDA 1- 880 880 E HARNEY LN LOCH CA 95242 II I I € F i I I I I I I I I I I I I I I I I I I i I I I I I I TR YAMASHITA KENNETH K & Y 884 KRISTEN CT LODt CA 95240 ILII€iIEIIEEI€IIII€I t,1111III1I HATHAWAY ROBERT & ROSE MARY 890 TEHAMA DEQ LGDt CA 95242 I,I1i11iIi1€I€Ili€€II IhiI1€Id SANCHEZ JOB & ELENA 909 E HARNEY LN LC)DE CA 95242 II111iIIIIIIIIIIIIIiIIIIfIII#€EI LOUIE SAM K & LORNA L 910 KRISTEN CT LODt GA 95240 II[I€IIIiII14111EItIII€I IIIIIIII STICE LARRY & G©RETI 893 E HARNEY LN LODI CA 95242. Iltl#IIIElttll[I[It€IIIIdIIE€III AZEVEDO STEVEN A & KIM HUTSON 9019 KRISTEN CT LODI GA 95242 II€I1IEIdII151[IIII1IIiItIIIIIII LEE ANDREW 910 TEHAMA DEQ LODI CA 95242 II€IPPII115kIIIIIIItl1[IIIII1111 iIIIIIII€IIIIIII€II€IIIIIIIII€II IIII€[II[1121111II€IIIIEIIII11$1 UNA1100 TAMARA L ETAL LUND GAR`(& GAIL ALBERG FRED 931 E HARNEY LN PO BOX 22 PO BOX 575 LODL CA 95242 LUDO CA 95241 LODI CA 95241 ROGAN WILLIAM &A ETL 12620 N DAVIS RD LODI CA 95242 I1 I 1 I l I I p i I € p i p I i I I K I t ; 1 9 i i € i I I i OCCUPANT 13410 N LOWER SACRAMENTO RD LODI CA 95242 II t I I I I I I 1 8 4 : I 8 1 1 1 1 1 I 1 1 1 , i 1 4 t I 1 1 OCCUPANT 13537 N LOWER SACRAMENTO RD LODI CA 95242 I i 0 1 1 l I I B i i € I I I I I I I I I I f I 8 I I I s I I i LEAR WOODBURN L & CLAIRE L'i R 13696 N HARTLEY I,.N LODI CA 95242 11111111€1... I'l, I, 'I, OCCUPANT 13-(86 N LOWER SACRAMENTO RD L013! CA 95242 II I I i t P I € I I ! i I i I I I £ I I I € I T I I i I I t I KU301 A -1-SUC710 TR ETAL 1500 VISTA DR LODI CA 95242 SAN JOAQUIN COUNTY OF 222 E WEBER AVE STOCKTON CA 95202 I I t 1 4 i $ 1 1 1 1 1 1 1 j I I 1 4 1 111 N € 1 11 € p 1 1 HERNANDEZ STEVEN & M ETAL 668 E HARNEY LN LODI CA 95240 I I : I t $ 1 1 € I k i € I € I t I l I I t , I € I I i I I £ I OCCUPANT 791 E KIRSTEN CT LODI CA 95242 I I I I € .I 1 1. l I I 8 I I I.. I I I € I I I k d SCHUMACHER WELDON & BONNIE 1303 RIVERGATE DR LODI CA 95240 I I I I ! I € I € I I I l I I 11h 11 . I I I I I £ I € I PA OS PETE N & PENNY TR 1,3420 SHATTUCK TRACT RD LODI CA 95242 I I I I I s I i I I 14 1 1 1 1 f I k I I I i I I I I f I I I I ILUU NHI & MINH H 13625 HARTLEY LN LODI CA 95242 11.1 ... I 61, . J, 1, 1,, 111 . I I ... I OCCUPANT 13705 N HARNEY LN L.00CA 95240 I I l I I I € I I I € i £ I a I 1 1 $ 1 1 f I I € I I & I I z I OCCUPANT 13814 N LOWER SACRAMENTO RD LODI CA 95242 I I I I ! e I I I I t I 1 1 $ 1 1 1 11 1 t l I t I I I I I p I FUJINAKA STEVE & BARBARA TR E 2016 E ARMSTRONG RD LODI CA 95242 I I 1 I I ? I I I I I I I I I I t I t I I I I I I I I I I I I I OCCUPANT 641 Fz HARNEY LN LODI CA 95242 I I I I I I , 111 I I I I, 1€ I t I I I I I I I I I f 4 11 WILLIAMS GLENN L & BARBARA TR 692 E HARNEY LN LODE CA 95240 I I I I I 1 I I I I I I I I I I I I I € I -I I 1 11. 1 1 1 VAUGHN FRED L & KHRISTINA L 805 KRISTEN CT LODI CA 95242 PHiaff_a; I I I I I I I I I I I I 1 I l I I I I z 1 4 5 1 1 11 1 1 I I I OCCUPANT 13520 N LOWER SACRAMENTO RD LODI CA 95242 WRIGHT RICHARD 0 & VICTORIA T 13675 N HARTLEY LN LODI CA 95242 I I I I I I t I I I I I t I I I I I I f I I I I I I B I € I LANGWORTHY ELMER D & S M 13710 HARTLEY LN LOD'I CA 95240 I I l I I 10 1 t I I ; I I a I I I t 1 1 8 £ 1 $ 11 1 I I f I OCCUPANT 13837 N LWR SACRAMENTO RD LODI CA 95242 II f I ! I ! I £ I I € 4 1 1 1 1 1 11 1 1 € I I I I I I I I I MARTIN MARILYN ANN 2150 OXFORD WAY LODI CA 95242 IIE I I I I I I I I t I I 1 I I I ; I I I 1 9 t 0 11 f f I I GEI'ST CLIFFORD & M D 650 W HARNEY LANE LODI CA 95240 I I I I £ i I I I I I I I I S I I I I I I I I I I I I I I 1 I I LAUCHLAND JAMES R &CAROL 700 E ARMSTRONG RD LODI CA 95240 I I I I I I I I I 1 1 $ 1 1 1 1 1 1 11 111 - I I I I € I l I WISENOR GERALD L & L M 808 TEHAMA LODI CA 95240 11 1 1 1 3 1 1 1 1 1 11 1 ! I I I f I t i € I a I I I l I i I I I I I € I t I € I I I i I i I I I I f I f I I I I I I I I I I I I I I - I . I I I € I , I I I I I i I I I l I i I I I I I I I BELL LYNDLE_. A TR HANNA GARY 0 & SHARON L TR FAUGHT MICHAEL& T 614 E HARNEY LN 830 TEHEMA DR 860 E KRISTEN CT LODI CA 95242 LODI CA 95242 LODI CA 95242 For information regarding this notice please contact: Susan J, Blackston City Clerk Telephone: (209) 333-6702 NOTCE OF PUBLIC HEARING NOTICE l HEREBY GIVEN that on fed esday, April 2, 2063 at the hour of 7-A p.rn., or as soon thereafter as the matter r ay be beard, the City Council will conduct a Public Hearing at the Carnegie Forum, 305 West Bine Street, Lodi, to consider the following matter: a) To consider a resolution approving the Initial Study and Mitigated negative [declaration for the Lower Sacrarnenlo Goad Widening, Marney Lane to Kei.tleman Mane, Project Information regarding this item may be obtained in the office of the Public Works Department, 221 Vest Pine Street, Lodi, California. All interested persons are invited to present their views and comments on this matter. Written statements may be flied with the City Clerk at any time prior to the hearing scheduled herein, and oraf statements may be Evade at said heaving. it you challenge the subject matter in court, you may be limited to raising only those issues you or someone else raised at ttro Public Heartng described in this notice or in written correspondence delivered to the City Clerk, 221 West Pine Street, at or prior to the Public Hearing. 13v Order of the Lodi Citv Council'. Susan J,Blackston City Clerk Dated: March 19, 2003 Approved as to form Randall A. Hays City Attorney j1C1TYCLRKW0RM8INo1pwros.doc 3120103 CITY CCUNC« SUSAN HITCHCOCK, Mayor Eta LY HOWARD MFyor Pro Tompore JOHN BECKMAN LARRY D. HANSEN KEITH LAND C 1. PU1311C WORKS DEPARTMENT CITY HALL. 221 VVEST PINE STREET P.O. BOX 3006 LOD�, CAtAFORNIA 95241-1910 (2©5)'333-6706 FAX (209) 333-6710 EMIAIL pvvdapt#_Iodi.gov h I ttp:F�www.loch.gov March 27, 21303 Chris Rockway Mark Thomas & Company 7300 Folsom Blvd., Ste, 203 Sacramento, CA 95826 H. DIXON FILYNN city Manager S LJ' , AN J. BLACKSTON City Clerk RANDALL A. HAYS City Attorney RICHARD C. PRIMA, JR. Public Works Director SUBJECT: Public Hearing to Consider Resolution Approving the Initial Study and Mitigated Negative Declaration for the Lower Sacramento Road Widening, Harney Lane to Kettleman Lane, Project Enclosed is a copy of background information on an item on the City Council agenda of Wednesday, April 2, 2003. The meeting will be held at 7 p.m, in the City Council Chamber, Carnegie Forum, 305 West Pine Street, I The Council will conduct a public hearing on this itern. You are welcome to attend and speak at the appropriate time. If You wish to write to the City Council, please address your letter to City Council, City of Lodi, P. 0, Box 3006, Lodi, California, 95241-1910, Be sure to allow time for the mal, Cr, you may hand -deliver the letter to City Hall, 221 West Pine Street, If you wish to address the Council at the Council Meeting, be sure to fill out a speaker's card (available at the Carnegie Forum immediately prior to the start of the meeting) and give it to the City Clerk. If you have any questions about communicating with the Council, please contact Susan Blackston, City Clerk, at (209) 333-6702. If you have any questions about the iiern itself, please call Wally Sandelin, City Engineer, at (209) 333-6709. R�,-_hard C. Prima, Public Works Director ROPIpnif Enclosure W.*:..:C Clark NG PHINITIALST UDYNEGDECLARATION