Loading...
HomeMy WebLinkAboutAgenda Report - April 2, 2003 E-05AGENDA TITLE, Approve specifications and authorize advertisement for bids for wood utility poles (EUD) MEETING DATE. April 2, 2003 PREPARED BY: Electric Utility Director RECOMMENDED ACTION: That the City Council approve the specifications and authorize advertisement for bids for thirty 45 -foot, and twenty-five 50 -foot Class 3 wood utility poles. BACKGROUND INFORMATION: These poles are needed to replenish inventory for replacement of damaged or deteriorated poles, and for routine line maintenance and upgrades. BID OPENING: Prepared by Joel Harris, Purchasing Officer Electric Utility Department's Fiscal Year Plan, Pages D-37,38, Estimated Cost, $23,000 April 16, 2003 Alan N. Vallow, Electric Utility Director = Manager, EUD Engineering and Operations APPROVED' H, DAM ..... .. ...... 1.0 SCOPE These specifications cover the minimum acceptable quality of full-length wood poles for use in the City of Lodi's overhead distribution and subtransmission system. X Poles and methods of manufacturing shall be in accordance with American National Standards Institute (ANSI), Rural Electrification Administration (REA) and American Wood Preservers Association (AWPA) latest revision, except �kxceed on B. of shall be cut, marked and bored as specified in Section 6.0 of this specification. 111111111_­111111&"�� 11111MAIM APrior to treatment, poles shall be seasoned to a maximum of twenty-five percent (25%) moisture content of the sapwood based upon the oven - dried weight. B, Poles shall be Douglas Fir and press u re -treated with pentachlorophenol in accordance with the requirements of AWPA Standards C1, "All Timber Products - Preservative Treatment by Pressure Processes," and G4, "Poles - Preservative Treatment by Pressure Processes," or the latest revisions thereof. CThe pentachlorophenol shall meet the requirements of AWPA Standard P8, "Standards for Organic Preservative Systems," or the latest revision thereof. The carriers shall be a petroleum solvent in conformance with the latest edition of AWPA Standard P9, "Standard for Hydrocarbon Solvents for Oil -Borne Preservative." 04/29/97 The following requirements shall be met. The following requirements shall beret: ira Poles shall be permanently marked on the face and the batt of each pale in accordance with ANSI Standards. 11111!11 IN 11 !111:1 111 11 IIIINIM I I! 111 111111 :. r 04/29197 2