RECOMMENDED ACTION: That the City Council review the schematic design for the Indoor Sports
and Activity Complex project, review progress to date, and consider
approval for the design work to proceed with design development
phase,
BACKGROUND INFORMATION: Based upon the conceptual plan approved by Council the
schematic design phase for the Indoor Sports and Activity Complex
project has now moved forward to completion. The plans have
been circulated to City staff and Departments and made available
at our Parks and Recreation office for review.
The design incorporates a multi -use facility of roughly 39,000 square feet. Facility features include
space for three full size basketball courts/volleyball courts, multi-purpose rooms, skylights in the
gyrnriasium areas, restrooms, kitchen, lobby, offices, storage, a second story aerobic/exercise area, etc.
(the site plan and a schematic phase cost estimate submitted by ELS is attached for your review and
information;.
The City has moved forward to acquire a portion of the property needed for the project site, Per Council
direction, efforts are under way to acquire the remainder needed. The site under consideration for the
project is bounded by Elm Street, Locust Street, and Main Street in the downtown area. Upon
acquisition of the property desired there will be site clearing and preparation work needed. (An
informational sheet is attached for your review). The project construction budget is just over $9.4 million.
The project was presented and approved by the Site Plan and Architectural Review Committee (SPARC)
on December 2, 2002. The project status was reported to the Parks and Recreation Commission at their
meeting of January 7, 2003, The Parks and Recreation Commission took action to recommend moving
forward with the project.
The design work for this project was approved by Council to proceed in phases. Funding for all the
design work phases has already been approved by prior Council actions. The phases of design work
Planning
Schematic Design
Design Development
APPROVED:
H. Dixon Flynn -- City Manager
01
A"
%,,ITY OF LODI
0 Construction Documents
0 Bidding
0 Construction
COUNCIL COMMUNICATION
The next phase which needs to occur for this project to continue to move forward is the. Design
Development phase which will be followed by the Construction Document phase. Per our existing
contract approved by City Council with ELS, not to exceed fees in the amount of $171,785 are
authorized for the Design Development phase once proceeding is approved in writing by the City.
The Design Development phase work will move forward Will zing.the schematic documents to fix and
describe the size and character of the project as to architectural, s tructural, mechanical and electrical
systems, materials and other elements. Design Development documents will include plans and
elevations, site engineering systems wall sections., structural framing, mechanical and electrical systems,
and a landscape plan, This work will resWt in full size Design Development drawings and outline
specifications as well as a Design Development level cost estimate update of the project.
Authorization to proceed with the design development phase is needed at this time to continue with
design of the project. The Council has already authorized an amount not to exceed $171,785 for the
design development phase of the project to occur with our consulting firm of ELS,
am
City Attorney
APPRovf-D�
Roger Baltz
Parks and Recreation Director
n City manager
01
t
a jt'
i
f
-I
9i &i Q9
0
;4 �.idt
!--1 -F-...
2 qpm ,
�All a
��
q$' $@
eeu�'
llile" WAY
4
co
rdA
. .... -; 4
fat w JnZT2 all 44
' �,�;co
f I '"O +
Qy
outdoor
seating
0
upper level
Downtown Community
Indoor Sports Complex
parks and rec. masterplan
ZMEMEMMM
southeast corner
fug
bai�i�t§t2lial� CauxC[t.
y y8
t A �
8-v Griew S-8 COr er
south-east view
Lodi Downtown Community
Complete parks and rec.
...masterplan
4, w
ground level
y y8
t A �
8-v Griew S-8 COr er
south-east view
Lodi Downtown Community
Complete parks and rec.
...masterplan
R
Cost Part Amendment
November 27, 2002
Page 2
Description of Cost Amendments
Reference Master Plan Cost Model by DSA date November 15, 2002
Description
Cast
Remark
Project Budget, 10/31102 datum
$9,404,413
Scope not included in Master Plan budget:
Demolition of existing structures $111,500
C if its utiilties $18,70Q
subtotal $136,200
g fc�f glyirr � C f fi�, c�ggrtt,jgi4 -f 0
�cYsmen. dsqBtj _..:._--'"__.._--•.... _.w,__'_____�, —
[{$164,80_2
.. e'�y , f -.
_._.. = __..._w-..� ___...._.—..- _._.......__W _._ __. ,..__— ....,._..
C est Estimate, 1013110 datum
"Gy ^+nasium Building"
$9,127,000
"Fite Work"
1 18%0 900
�._._.
`otl
$10,307,0061
Pr€ posed scope reductions
_..
Reduce 41,000 building area to the
Reduce building size; 2,000 sf $221,000
original approved 39,000 gsf.
irsclude architectural grade finish at west
Reduce architectural grade tilt -up $24,600
elevation only.
Defer caf6 entirely, reduce kitchen
Food service equipment $39,000
equipment per attachment _
Omit skylights at south end of malagym;
Gym rout skylights $39,780
keep at east, west. _
Keep wood floor in large gym, install
Wood floors to synthetic flooring $48,050
synthetic flooring elsewhere
interior gym waif finish shall be painted lilt
Gyp ted, gyre interiors $156,000
.. .. ... __ ----_._____......_._. -___.._.._.,_---.-_...___,T
up, not gypsum beard,
__.. __...
Operab€e partition. in multi use room $76,500
Additive alternate
Revise speoiai pavers to concrete %200
Pavers may be additive alternate
Subtotal $676,930
total, incl C H&P conning. (21 f)- $819,085
($819,085)
eilusted Cost
1%487,915
Main Street Recreational Mali $530,000
Additive Alternate
_._.....__ -._..
_.__ �..____.____
__ __-.�-
ow
Prt�lectbrd�et sha[l be increased to ailow-
Cast'Escalation beyond 10/31102 tbd
Cost
for escalation from 10131102 to bid date
Geotechnical recomrnend tions tbd
Received too late for inclusion