HomeMy WebLinkAboutAgenda Report - January 2, 2003 I-04(9) CiTy oF LODI
AGENDA TITLE: Adopt Resolution Authorizing Library Administration To Partner With Stockton -San
Joaquin County Public Library In The Acquisition, Implementation And Ongoing
Maintenance Of An Integrated Library System And Appropriate Funding For Initial
Costs ($125,000)
MEETING. DATE. January 2, 2003
PREPARED BY. Nancy C. Martinez, Library Services Director
RECOMMENDED ACTION: That the City Council adopt a resolution authorizing library administration to
partner with Stockton -San Joaquin County Public Library in the acquisition,
implementation and ongoing maintenance of an integrated library system
and appropriate funding for initial costs. ($125,000)
BACKGROUND INFORMATION: In the budget cycle for FY 2001-2003 library administration submitted
a Capital Improvement request for an upgraded integrated library
system, which is an online system that allows for the integration of
all the automated functions of the library — one comprehensive
system. The stated goals for this project were to:
1) Provide the public with computer stations allowing access to a variety of information sources, including
Internet access to search library catalogs for materials.
2) Provide the opportunity for library users to access the library and its resources from their home, school or
business via the Internet and to conduct library business
The need for an upgraded integrated library system is driven by our current Motorola Power PC server, which
houses the library's bibliographic and patron databases and runs our GEAC LibsPlus automated circulation
and cataloging system and online public access catalog software. The manufacturer Motorola suspended
support for the server in 1999, necessitating an upgrade, In the fall of 2001 Lodi Public Library
administration was informed by our present integrated library system vendor GAC that the company
would cease to support our Motorola PowerPC server, on March 31, 2002.
In addition our vendor GEAC is not developing the LibsPlus software product currently used by Lodi Public
Library.
The Process. In the fall of 2001 Lodi Public Library administration learned that the Stockton -San Joaquin
County Public Library (SSJCPL) was seeking a consultant to create a Request for Proposal (RFP) for the
upgrade of their integrated library system, At its November 19, 2001 meeting the Library Board of
Trustees authorized librapi administration to contract with consultant Richard Boss of Information Systems
Consultants (IS) to create an addendum to the Stockton San Joaquin County Public Library's integrated
system RFP for an upgrade to the Lodi Public Library's integrated system. The board also requested that
a second request for proposal be created for Lodi Public Library to have a stand alone system,
APPROVED', —/-v A' IV lz_�
&xoFlynn --
Two Requests for Proposal were issued in the spring of 2002—one for a joint project between Stockton -
San Joaquin County Public Library, Amador County Library and Lodi Public Library—and a second for Lodi
as a stand alone site. Responses were received from 5 vendors for the joint project and 4 vendors for Lodi
Public Library's stand alone, Three vendors responded to both RFP's.
After thoroughly evaluating the joint proposals, a joint committee from the three libraries invited three
vendors to demonstrate their software systems and contacted the vendors' customers in person and by
conference call. Following the rating of the systems for functionality, the Sirsi Unicorn system was chosen
by the committee. Subsequently City of Stockton for Stockton -San Joaquin County Public Library has
entered into negotiations with Sirsi.
After evaluating the capabilities and advantages of partnering with the Stockton -San Joaquin County
Public Library, library administration recommended that Lodi Public Library work jointly with Stockton in
sharing an integrated library system.
At its November 25, 2002 meeting, the Library Board of Trustees passed a motion recommending that
Lodi Public Library join Stockton -San Joaquin County Public Library in a consortium to acquire an
integrated library system and request funding for the project from City Council in the amount of $125,000.
FUNDING. General Fund $125,000
Nancy C. Mdrtinez
Library Services Director
OR
The Integrated Library System:
An explanation of its features and capabilities
Integrated ibra€~y System (ILS). an online computerized system that allows for the integration
of al l the autorxt.ated functions of the library -----one comprehensive syst(-,m.
Acquls fionsE a module for ordering new materials for the library, maintaining fund accounts
and payments, receiving materials from vendors, and entering preliminary information in the
catalog for patron access. This module will be new to Lodi Public Library
Currently: The library uses a combination of electronic and manual ordering and
ra eeiving procedures, to track receipts, invoices and Backorders.
Cataloging: a software module used to enter all the information (generally what was found on a
catalog card) about a new title or item into a .format that allows the library user to hrrd the
material in the online catalog.
Currently: The library staff rases batch processing to load cataloging information fron-i
0CLC, an international bibliographic utility, into our database. Charges are levied for
each bibliographic record used.
Ser jalsm a module for recording what magazines issues we have, when they arrived, the
amicipated arrival date of the next issue, and to automatically claim those issues that were not
received. This information is accessible to patrons through the catalog. Some systems allow for
laser scanning of an issue's UPC code to automatically enter the information into the Library's
catarlog
Currently: Library staff use manual methods to track the necessary information.
Magazine information is entered into the current catalog as if each .issue were a copy of a
book. The process for claiming issues not received is inefficient and time consduning.
"Web -based C PAC (Online Public Access Catalog): the online module that allows people to
search holdings and availability of the library collection. Web access allows people. to find. this
information from home or office as well as in the library. The system also allows users to access
their personal accounts and place reservations on library materials. This online capability is
available 24 hours a day over the; Internet. These capabilities are frequently requested by visitors
to the library's home page. In fact the; library's LearnaTest link (a subscription to a site for
studying for career and academic standards test such as SAT arrd AS`s A.B) is the second most
frequently visited page on the City of Lodi horne:page.
C:uiTently: Out online public access catalog's technology is based on dumb terminals in
the library building that allow access to materials only awned by nodi Public Library.
Visitors to the library's horns page; ca not find a catalog of the library's holdings.
Circulation. the .most basic module in any automated library system.; it allows library materials
to be c:hoQked in and out of the library. The system generates notices for overdue materials, lost
matcriais, collections, telephone, reserves, and damaged materials. The system keeps trach of the
location of material, Includes interface: for self -check station. Has the ability to e-mail overdue
and reserve notices.
Currently-, Our present system allows for several of these functions. It is not flexible
enough. to enable multiple questions and services from. one patron to be handled quickly,
effr.cientiy, and accurately.
Web portals: a nodule that allows our library patrons to use at home, the proprietary
subscription databases the library offers (e.g, Ebsco Host -a subscription to over 3,000
magazines). Tlie portal allows for the; integration of extemal electronic resources within the
library website. Patron authentication is a factor in this capability.
Currently: The library's subseriptiora databases arc only available in the library.
Report generator: a feature that support the creation of reports based on information and
transactions recorded its the databaseA,e. how many children's boobs were cheeped out daring
the; `u nmer Reading Program, which books have not been checked out since 1990, etc.
Currently: Our current reports generator is limited to a handful of canned reports. The
ability to generate more involved reports requires the ability to write UNIX scripts or pay
our currant vendor to create the reports for us, The wealth of data is not e=asily accessible.
Information and Referral. a module system allows our patrons to access conunu.nity
information about agencies and their services within the city, county or private sector. This is a
separate searchable database; apart from the library materials databases. This module is an option
ire the Lodi Only RFP
Currently: This type of irr.formatio.€r is available through print reference materials at the
1. brary information counter.
fuveatory; a software module that allows the library to scan the collections by barcode as items
sit can the ;shelf amd compares the items that are shelved against the database and the checkout
records to derterratue what is missing and misfiled.
Currently: This manual activity could be performed by comparing the shelved items
against computer printouts, but it is very labor- intensive and costly.
"`I`.h.e; niodule with the capabilitie=s that library users and visitors to the library's home page
request most often.
Staff Report
January 3, 2003
Integrated Library System—Start Up Costs
Tho integrated library system includes several cost areas:
Telecommunications --S7,000
Initial installation and start tap of a T-1 data litre between Stockton and Lodi will be neccssasy as
wQ]l as routers at each card of the line. We may also need to pull additional cabling to be able to
install public; stations in locations that are deemed. necessary to provide needed services.
Peripheral Equipment—tire units (PC's, terminals, etc.) connected to the central site server
A-$42,00€3
The library currently has 20-1 dumb temi.inals connected to the current Geac ILS. Approximately
35 public and staff I'Cs ars: connected through the library's server and routers to the Internet.
Nearly all the dumb terminals and approximately half of the current PCs will need to be replaced
with newer F'p`s to connect to the new integrated library system. In discussing the project with.
City of Lodi Information System Division, staff m=bers concur that the library will creed
approximately 25 new personal computers for the project,
Central Site Hardware and Software Licenses, Data Migration and Training -475,000
The central server that houses the database: and processes the various transactions alid the
software and the licenses (stations allowed) to use the .software. In sharing the system with
Stockton -San Joaquin County Public Library, the central site hardware will be located at
Stockton's main library. The manipulation and transferring of the Lodi Public Library data files
to the system is included Dere. The cost of training Lodi Public Library staff both in joint "train
the trainer" sessions with Stockton staff and on site at Lodi is included.
Generally on a shaved system the fee charged to a consortia n i ember is a percentage of the cast
based on the: percentage; of stations (licenses) the individual member has in relationship to the
pro_wt as a whole. The fees cover software maintenance, hardware maintenance (no charge in
initial year) from the vendor and information system service from Stockton library I5 staff, The
hollowing estimate is lase on Stockton -San Joaquin County Public Library preliminary
nogotiations with Sirsi Corporation.
FY 2003/03 $22,000
Subsequent ;ears: $30,000
Staff Report
January 3, 2003
Integrated Library System --Start Up Costs
The integrated library system includes several cost areas;
Telecommunications -47,000
Init:ia.l installation ared start up of a T-1 data lite between Stockton and Lodi will be necessary as
well as routes: at each end of the line. We may also need to pull additional cabling to be able to
install public. stations in locations that are deemed necessary to provide needed services.
Peripheral Equi. m.ent--the units (PCs, terminals, etc.) connected to the central site server
--S42,060
The librate currently has 20+ dumb tenni teals connected to the current Geac ILS, Approximately
35 public and staff ks are connected through the library's server and routers to the Internet.
Nearly all the dumb terminals and approximately half of the current PCs will need to be replaced
wit,, ni wer PC,, to connect to the mw integrated library system... In discussing the project with
City of Lodi Infoirnation Systcrn Division, staff members concur that the library will need
approxin-lately 25 new personal computers for the project.
Central Site Hardware and Software Licenses, Data Migration and Training --$75,000
The central server that houses the database and processes the various transactions and the
software anti the Licenses (stations allowed) to use the software. In sharing the system with
Stockton—Sart Joaquin County Public Library, the central site hardware will be located at
Stockton's main library, The manipulation and transferring of the Lodi Public Library data files
to the syst:ern is included here. The cost of training Lodi .Public Library staff both in joint "train
the trainer" sessions with Stockton staff and on site at Lodi is included.
Generally on a shaved system the fee charged to a consortium member is a percentage of the cost
based on the percentage of stations (licenses) the individual member has in relationship to the
project as a whale. The fees cover software maintenance, hardware; maintenance (no charge in
initial year) from the vendor and information system service from. Stockton library IS staff. The
following estimate is base on Stockton -San Joaquin County Public Library preliminary
nQgotiations with Sirs] Corporation,
FY 211113/03 $229000
Subsequent years: .$30,000
AGREEMENT BETWEEN CITY OF STOCKTON AND CITY OF LODI FOR USE OF
THE STOCKTON-SAN JOAQUIN COUNTY PUBLIC LIBRARY - SIRSI, CORP.
INTEGRATED LIBRARY SYSTEM
THIS AGREEMENT is made effective as of 2002, by and between
the CITY OF STOCKTON, a municipal corporation, herein referred to as "CITY" on behalf
of the Stockton -San Joaquin County Public Library, herein referred to as "SSJCPL," and
CITY OF LI, herein referred to as "L DI!'
DESCRIPTIVE INFORNILTIQ P 8
I -IN AND DECL&RAIIQ19 I
IPA
CITY, having installed and maintained an integrated, computerized online library
system (herein referred to as the "System") at the SSJCPL Chavez Central Library,
recognes the desirability of making such a system available for use by other libraries in
the 49-99 Cooperative System. The CITY will extend to LOCM the full range of services
available from its automated system, subject to the terms and conditions of the, greement.
At all times hereunder CITY shall own all rights in and to all central System
hardware and software, except for telecommunications equipment directly linking LODI to
the System located at JCPL Chavez Central Library. LOM shall own the terminals.,
personal computers, printers, bar code scanners, other computer peripherals, and
telecommunications devices located at its premises,
Shared databases shall be jointly owned. Any separate JCPL databases
resident on the System shall be owned by the CITY. Any separate LORI databases
resident on the System shall be owned by LODI. LODI retains the right to remove its
databases or portions of the shared databases from the System, at its sole cost and
expense, in the event of cancellation. CITY retains the right to remove or collect a rental
fee for any LODI separately -owned database on the System in the event that storage
space is impacting System performance.
Ill.
CITY RESPONSIBILITIES
A. In System administration CITY agrees to-.
RRAFT
I Contract with vendors for purchase and maintenance of all central site
hardware and software, work as a liaison between LODI and System
vendors to provide hardware configurations for the central components ofthe
System and to explore, in consultation with LODI, cost-effective alternatives
to meet LODI's library computing needs,
2. Maintain "all-risk" insurance coverage on all central site equipment and
communications devices owned by CITY;
1 Review and adjust the monthly usage fee on an annual fiscal year basis and
at the time of any major System upgrade, in consultation with LODI.
13In System operation the CITY agrees to:
Operate and maintain central site equipment in a responsible manner; all
regular routines for System maintenance receive top priority according to
schedule.
2e Respond to LODI System operations questions and investigate operational
problems as prioritized below:
a. Priority 1: LODI Library is without any System service, a situation to
receive immediate attention,
b. Priority 2: LODI Library is experiencing difficulty with a System
function that results in significant impairment in one area or LODI
Library has an operational deadline, situations to receive special
attention,
G, Priority 3: LODI Library experiences a minor loss of functionality., a
situation that CITY staff will handle on a first -in -first -out basis.
CITY staff will accommodate service within context of overall system operations.
1 CITY agrees to run and mail notice forms or daily reports, or purchase
supplies 'for LODI, if so requested, and CITY will charge LODI for these
services on a time -and -materials basis,
C. In System software maintenance, CITY agrees to:
Provide LODI with the use of an integrated online library system, whi
I
provides LODI with the following online and batch functions: acc •I
(12/31,98) 2
P 11 Z A Fr
cataloging, Z39,50 protocol, online public access catalog, serials, circulation,
and management report functions;
2. Install updates and enhancements to the automated system as provided by
the vendors;
3, Assist LODI in preparing circulation, acquisitions, serials, and online catalog
policy file information;
4Prepare user accounts for L and set up screen displays specific to
LODI's need; (Note-, Any optional changes not required by the CITY or the
vendor in set ups and screen displays after initial set up are LODI's
responsibility,)
5, Assist LODI in developing the management and accounting reports
necessary for the effective utilization of the system.
D_ In order to provide database integrity:
CITY agrees to run routine programs and reports that allow LORI and CITY
staff to maintain accurate database records;
2. LODI and CITY agree to maintain the bibliographic database in accordance
with current national cataloging standards;
E In order to provide access to the System CITY agrees to:
Staff the central site so that SSJCPL Automation Services staff are available
for consultation and other transactions during the following hours:
2. Provide access to the System (all databases) through the Internet 21 hours
per day (6 am. to 3 am.), except during periods of routine maintenance,
hardware and software installation, or public utility interruption;
3. Maintain the System, by means of hardware and software maintenance
contracts, in a fashion as to provide for downtime and response time not to
exceed the limits specified in CITY's vendor contract(s); however, no liability
shall be assumed by CITY if these limits are exceeded;
4Provide LODI with prior notice of System unavailability whenever possible.
Such suspension shall not be deemed an unreasonable prevention or
postponement of System use by LODI
f 1 2r&qa) 3
1) R'� k F r
6, Include LD] staff in decision process for System function and System policy
revisions that will jointly affect LOBI and SSJCPL;
7, Provide to LODI local System user and, as needed, operational
documentation to supplement vendor -supplied documentation.
LCI agrees to:
Purchase and maintain its own system hardware to be used on its premises or to
link LORI to the System including, by not limited to, terminals and personal
computers, printers, barcode readers or laser scanners, routers, and related
telecommunications equipment;
20 Purchase and maintain the data communications link between LODI and the
SSJCPL computer System;
3, Use the Library of Congress Machine Readable Cataloging. (LOMARC) approved
standards for the entering of bibliographic data into the System database;
4, Use mutually agreed upon standards for input of patron records and other policy
standards in related procedural documentation;
5. Limit total user processes on the System, including branch network access, to no
more than 46 simultaneous users at any given time;
6, Pay CITY a service fee as established according to the formula and schedule set
forth in Appendix A. The fee shall be paid within 30 days of receipt of quarterly
Invoice;
7. Pay the entire purchase and maintenance costs for any software to be used
exclusively by L on the System;
& Pay on a time -and -materials basis, exclusive of this Agreement, for daily System
notice and report printing or for special projects requiring CITY staff time beyond the
terms of this Agreement.
4
V,
DISASTER RECOVERY ASSISTANCE
LODI, through it computer system, and the CITY, through the SJ PL computer system,
agree to provide mutual disaster recovery assistance, provided that backup methods and
devices are compatible and that sufficient capacity is available to handle basic operations
for the guest system without significant degradation of the host system.
VL
DETERMINATION OF FEES
The basis for establishing fees for LODI's use of the CITY's Integrated Library System as
detailed in Appendix A are as follows:
Hardware and software usage fees will be based on total workstations connected to
the System, as a percentage of combined CITY and LORI workstations. The basis
for System use shall be open to renegotiation on an annual fiscal year basis, based
on need, actual usage patterns, and System resource availability. An increase in
LODI's percentage of System use will not negatively affect LODI's usage fee if this
increase is caused solely by reductions in SSJCPL's usage pattern,
2. Personnel costs in the first year will be based on estimated direct costs for key
SSJCPL personnel involved in the L automation project. In subsequent years,
the basis for pricing staff fees will be determined by mutual consent either by a
study of actual time spent or by application of the percentage of pmeesses used to
total key staff salaries and benefits,
3. CITY indirect costs are re -calculated periodically. For 2003-2004, the rate is 9.5%,
X111.
TERMS OF AGREEMENT
This Agreement shall be effective from the date of the execution of the Agreement.
Fees and services shall be reviewed and renewed annually, for July ® June (fiscal year)
implementation. The Agreement shall continue in force from year to year unless one or
both parties shall elect to terminate the Agreement as provided under CANCELLATION.
Vill.
CANCELLATION
This Agreement. may be canceled by either party at the end of any one year renewal
period provided that at least one hundred eighty (180) days written notice is given to the
other party. Either party has the right to terminate this Agreement if the other party
breaches or is in default of any obligation hereunder, which default is incapable of cure or
(1213%361 5
which, being capable of cure, has not been cured within sixty (60) days after receipt of
notice of such default from the non -defaulting party or within such additional cure period as
the non -defaulting party may authorize. Should either party cancel through no fault of the
other party, the canceling party shall pay all costs to separate the System databases.
6
Software fee (See one-time costs)
($O Simi software maintenance x .1204.)
DRAnet access fee ($38,790 x.1204) 4,096.00 1,024.00
Staff fee" 8,395.65 2,098.91
City indirect costs (9.5% staff costs only) 797.59 199.40
TOTAL FEE $ 21,71724 $ 5,429.31
PAYABLE QUARTERL429.31 PER QUARTER
Total hours of project time for key staff were estimated at straight time up to a level
considered supportable by SSJCPL within regular hours, for the period July 1, 2003 - June 30,
2004,
KEY STAFF
Deputy Director
Librarian 11, Cataloging
Computer Applications Programming Supervisor
Sr. Applications Program mer/Ana lyst
Applications Progranimer/Analyst
HOURS
TOTAL COST
5
$ 286,05
20
723.00
60
2,646.60
60
2,37.8.40.
40
1,08120
Senior Library Assistant (Circ) 40 11,280-40
TOTAL 8,395.65
—1G—N A -TO- —RI E—S'11 -N"- - Iff—I —AL S
City of Stockton Date City of Lodi Date
APPENDIX A (contd)
FIRST YEAR -ONE-TIME COSTS DIR-A&Ii
Software License and 1 -yr, Maintenance $38,698
(Direct from Sirsi/Stockton agreement)
Migration 20,485
(Direct from Sirsi-Stockton agreement)
Training (10% x $23,975) 2,398
(Assume 1 Lodi staff at each 10 -person training) -
Total (in full in first quarter payment) $61,581
RESOLUTION NO. 2003- DRAFT
NOW, THEREFORE., BE IT RESOLVED, that the Lodi City Council does hereby
authorize the Library Administration to partner with the Stockton -San Joaquin County
Public Library in the acquisition, implementation and ongoing maintenance of an
integrated library system; and
BE IT FURTHER RESOLVED, that the City Council hereby appropriates funding
for initial costs in the amount of $125,000.00 from the General Fund balance.
Dated, January 2, 2003
I hereby certify that Resolution No. 2003- was passed and adopted by the
City Council of the City of Lodi in a regular meeting held January 2, 2003, by the
following vote, -
ABSENT: COUNCIL MEMBERS —
RM