Loading...
HomeMy WebLinkAboutAgenda Report - September 17, 2003 E-04COUNCIL COMMUNICATtON AGENDA TITLE: Approve Plans and Specifications and Authorize Advertisement for Bids for the Main Street Storm Drain Improvement Project (Lodi Avenue to Flora Street); and Adopt Resolution Authorizing the City Manager to Award or Reject the Contract up to $240,000 and Appropriate Funds MEETING GATE: September 17, 2003 PREPARED BY: Public Works Director RECOMMENDED ACTON: That the City Council approve the pians and specifications for the above project and authorize advertising for bids; and adopt a resolution authorizing the City Manager to award or reject the contract uta to $240,000 and appropriate funds. BACKGROUND INFORMATION: Main Street south of Lodi Avenue is subject to street flooding during the winter storm months. The street flooding frequently occurs at the intersection of Lodi Avenue and Main Street and alone the easterty side of Main Street, affecting building access to businesses in this area. The existing storm drain facilities are not adequate to convey runoff flaws associated with the City's standard 2 -year storm event. In addition, the lack of surface improvements within the project area results in storm runoff not being channelized and directed into the storm drainage system, causing the nuisance flooding and poor roadway drainage performance. This storm drainage improvement project includes the installation of new storm drain facilities and surface improvements designed to accommodate the City's 2 -year design storm runoff and to improve the surface drainage within the project limits, as shown on the attached drawing. Using concept level information to estimate the project cost, Staff originally budgeted $90,000 for drainage. improvements. The thought was to carry street drainage; from the nodi Avenue/MainStreet intersection to the trunk Iine in Stockton Street. However, the long-term solution for drainage in the entire area is to replace substandard pipes (0 -inch) in Main Street and Flora Street. wring the design process, it was determined the project is located within a very congested underground corridor resulting in a more complex and expensive project. Additionally, Staff did not anticipate the extent of surface improvements required to effectively drain the area. However, the proposed hang -terra improvements are necessary to properly address the existing drainage deficiencies. To improve the current situation, Staff recommends Council approve the plans and specifications, authorize advertisement for bids, and authorize the City Manager to award the construction contract. FUNDING: Wastewater Fund Project Estimate Budgeters 2003-2005: Planned Bid Opening Date Funding Available: Less than $240,000 CIB E -3C October 15, 2003 r Finance; it for ichard C. Frim Public Works Direct Prepared by Charlie. Swimley, Senior Civil Engineer RCP.,'CES/Pn1f Attach hent cc: Randy Hays, City Attorney Joel Harris, Purchasing Officer Wes Fujitani, Senior Civil Engineer F. Wafly Sandelin, City Engineer Sharon Welch, Senior Civil Engineer George Bradley, Street Superintendent Paula Fernandez, Senior Traffic Engineer CPS&.A Awards€nc 09109103 CITY OF LODI pj 7 'PARTMENT SCALE: 1" = 100' PROPOSEDIMPROV EMENT PROPOSED 9D STORM DRA$N IMPROVEMENTS EXISTING �EX, D.,> STORM DRAIN SYSTEM MAIN STREF.r STORM DRAIN IMPROVEMENT PROJECT J -ODI AVENUE TO Fl...ORA STRFE'17) JLlll AVE MA0PEN\EXHJf31M03X049.dwg, 0910912003 11:13:53 Ahs, kpither RESOLUTION NO. 2003-103 A RESOLUTION OF THE LOD1 CITY COUNCIL APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING ADV RTiS M NT FCR :s IDS FOR THE MAIN STREET STORM DRAIN IMPROVEMENT PROD CT (LODI AV NUE TO FLORA STREET); AND FURTHER .AUTI- ORIZING THE CITY MANAGER TO AWAR( OR REJECT THE CONTRACT BJP TO $240,000.00 AND APPROP ATING FUNDS FOR THE PROJECT WHEREAS, MainStreet south of Lodi Avenue is subject to street flooding .during the winter storm months, and. street flood! ng frequently occurs at the intersection of Lodi Avenue and Main Street and along the easterly side of Main Street, effecting building access to businesses in this area; and WH R AS the :existing 'storm .drain .facilities are not adequate to convey runoff flows associated with the City's standard 2 -year st. r event, and the lack of surface improvements within the project area results in storm runoff not being chgrinelized and directed into the storm drainage system, causing the nuisance flooding and Poor roadway drainage performance; and WHEREAS; this storm drainage improvement project includes the installation of new storm drain facilities and surface improvements designed to accommodate the City's 2 -year design storm runoff and to improve the surface drainage within the project limits; and WHEREAS, the;long-term solution for drainage in the entire area is to replace substandard pipes (8-fth) in Main Street and Fiora Street, so therefore staff recommends that the City Council approve the plans and specifications and authorise advertisement for IAds for the Maim Street Storm Drain Improvement Project (Lodi Avenue to .Flora Street), authorizes the City Manager to award or reject the contract tip to $240,000.00 and further appropriate funds for this project. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby approve the plans and specifications and authorize. advertisement for bids for the Main Street Storm Drain Improvement Project (Lodi Avenue to Flora Street), and authorizes the City Manager to award or reject the contract up to $2404000.00, and BE IT FURTHER RESOLVED that funds in the amount of $,240,000.00 be appropriated from the Wastewater l=urid for this projedt. Dated. Septomber. 17, 2.003 I hereby certify that Resolution No. 2403-160 was passed and adopted by the City Council of the City of Lodi in a regular meeting held September 17, 2003, by the following vete: AYES: COUNCIL MEMBERS — Beckman, Hansen, Howard, Land, and Mayor Hitchcock NOES: RNone ABSENT COUNCIL MEMBERS ABSTAIN: COO NCIL MEMBERS — None SUSAN ,J. BLACKSTON City Clerk 2003-168