HomeMy WebLinkAboutAgenda Report - August 6, 2003 G-01 PHf, CITY OF LODI w COUNCIL COMMUNWATION AGENDA TITLE-, Public Hearing to Consider Reimbursement Agreement RA -03-01 Establishing an Area of Benefit and Reimbursable Costs for Developer -Funded Public Improvements for 770 North Guild Avenue and a Resolution Establishing an Area of Benefit and Reimbursable Costs for City -Funded Improvements for the Project at 770 North Guild Avenue MEETING DATE_ ,august 6,2003 PREPARED BY" Public Works Director RECOMMENDED ACTION: That the City Council conduct a Public Hearing to consider the folio wing: 1 Reimbursement Agreement RA -03-01 for public improvements for 770 North Guild Avenue establishing an area of benefit and reimbursable costs for developer -funded public improvements for 770 North Guild Avenue. 2, A Resolution establishing an area of benefit and reimbursable costs for City -funded Improv . ements for the project at 770 North Guild Avenue. BACKGROUND INFORMATION: Construction of the Robert Mondavi warehouse facility located at 770 North Guild Avenue required the installation of all public improvements necessary to serve the project, including the installation of a master plan storm drain line in the Guild Avenue and Turner Road alignments, extension of a master plan sanitary sewer main from Guff Avenue.to Guild Avenue, installation of master plan water mains in Lime Street and southerly in Guild Avenue to Lockeford Street, as well as street pavement improvements in Guild Avenue. Due to the extensive nature of the public improvements required to serve the warehouse and in order to facilitate development in the area and minimize future disruption to residents and businesses, the developer, Lodi 2000 Distribution Trust, represented by Robert Mondavi staff, and City staff worked cooperatively to include the installation of all public underground improvements in Guild Avenue and the Turner Road alignment, as well as the extension of Turner Road street improvements to Guild Avenue in the warehouse project. The additional improvements included the master plan sanitary sewer main in Guild Avenue north and south of the Mondavi project site, extension of the master plan water main northerly in Guild Avenue from Lime Street and westerly in Turner Road, and pavement improvements in Turner Road from Guild Avenue to the existing terminus, The improvements installed with the project are shown on Exhibit 1. Under the terms of the improvement Agreement for the project approved by Council on May 16, 2001, it was agreed that the developer would be reimbursed by the City for the cost of those improvements not required to serve the warehouse project, as well as the cost of installation for the master plan storm drain facilities, excess width street pavement improvements in Guild Avenue, and oversize water and sanitary sewer mains required by LMC 15.64 Development Impact Mitigation Fees and 16.40 Reimbursements for Construction. Apppoyri�: H. Djxorr Flynn o-,- —City r4anaqer CC PH 770NGUkAve 07/28/03 Public Hearing to Consider Reimbursement Agreement RA -03-01 Establishing an Area of Benefit and Reimbursable Costs for Developer -Funded Public Improvements for 70 North Guild Avenue and a Resolution Establishing an Area of Benefit and Reimbursable Costs for City -Funded improvements for the Project at 770 forth Guild Avenue August 6, 2003 Wage 2 Further, since the installation of the underground utilities required the removal of all the existing pavement in Guild Avenue, it was agreed that the costs for pavement removal and replacement be apportioned to each of the underground utilities in Guild Avenue as follows: master storm drain, 50%; master ra ter main, 25%; master sewer main, 25%,. The pavement casts would then be paid by the party responsible for the cost of the underground utility. The public improvements for the project were accepted by Council in June 2001 and reirnbursement to the developer for the City -funded improvements was made in August 2001. Reimbursement A r°ee eat RA -03-01 In April 2002, the developer, Lodi 2000 Distribution Trust, requested a Reimbursement Agreement and establishment of an area of benefit in conformance with Chapter 16.40 of the Lodi Municipal Code for those improvements constructed with their project that benefit neighboring properties. A copy of the Reimbursement Agreement is attached as Exhibit 2. Exhibits attached to the Reimbursement Agreement include the proposed area of benefit (Exhibit A), itemized costs for the improvements reimbursable to the developer (Exhibit B), and the fair share amounts to be reimbursed to developers by each benefiting parcel (Exhibit C). As shown on Exhibit C, the public improvements fronded by the City are not eligible for reimbursement to Lodi 2000 Distribution Trust. installation of the Turner Road improvements shown as Schedule 1 on Exhibit B was required by the City in conjunction with the Mondavi project in conformance with the Improvement referral Agreement between the City and California Waste Removal Systems, Inc„ recorded June 11, 1998, as Instrument No, 96067664. Under the terms of the agreement, Central Valley Waste Services, Inc., successor in interest to California Waste: Removal Systems, Inc., was responsible for the design and installation of street frontage improvements along their property frontage upon request by the City. Central Valley Waste Services worked directly with the developer to include those improvements in the Mondavi project and rek-nbus sed the developer at the time of construction for all casts associated with those improvements. Therefore, those improvements are not included in the Reimbursement Agreement and the Central Halley Waste Services parcels are not included in the Area of Benefit. Resolution for Reirnbursernent to City In conformance with Chapter 16.40 of the Lodi Municipal Code, the City is eligible for reimbursement for the cost of those City -funded improvements that would be required as a condition of development for neighboring properties. The proposed area of benefit, itemized casts for the improvements reimbursable to the City and the fair share amounts to be reimbursed to the City by each benefiting parcel are shown on the attached Exhibits 3, 4, and 5, respectively. The areas of benefit for Reimbursement Agreement RA -03-01 and the Resolution are coincident: A Summary of Fair Share Reimbursement Amounts showing the reimbursement to the developer and the City for each benefiting parcel is attached as Exhibit 6. CC PH 770€ GuddAve 07/25/03 Public Hearing to Consider Reimbursement Agreement RA -03-01 Establishing an Area of Benefit and Reimbursable Costs for Developer -Funded Public Improvements for 770 North Guild Avenue and a Resolution Establishing an Area of Benefit and Reimbursable Costs for City -Funded Improvements for the Project at 770 North Guild Avenue August 6,2003 Page 3 The property owners within the area of benefit have been notified. The developer has paid the appropriate application fee and the fees to cover the cost of recording the Reimbursement Agreement, In conformance with LMC Section 16.40, staff recommends that Council conduct a public hearing to establish an area of benefit and reimbursable costs to recover the cost of public improvements covered under Reimbursement Agreement RA -03-01 and the Resolution. Pursuant to LLMC Section 16.40.50,A.3, the reimbursable amounts shall be recalculated annually to include an amount attributable to interest, using the Engineering News Record (ENR) 20 Cities Construction Cost Index. Similar adjustments to the reimbursable costs will be made each January until payment is received. The initial ENR index to be used in the calculations is 6581. In the event that the benefiting properties develop, the City will collect the appropriate amounts from the developers of the benefiting properties, and reirnburse the developer and City as appropriate. The charges for a benefiting property shall be paid in full at the time of the first development on that property. FUNDING: Applicant fees and reimbursement fees collected from future development. Richard C. Prima, Public Works Director Prepared by Sharon A. Welch, Senior Civil Engineer RCPISA\/V/pmf Attachments cc: Senior Civil Engineer-- Development Services Lodi 2000 Distribution Trust Siegfried Engineering Mailing List CC- PH__770NGuj1dAve .07/25103 When Recorded, Retum to: City of Lodi City Clerk's Office P.O. Box 3006 Lodi, CA 95241-1910 RESOLUTION NO. 2003-144 A RESOLUTION OF THE LODI CITY COUNCIL ESTABLISHING AN AREA OF BENEFIT AND REIMBURSABLE COSTS FOR PUBLIC IMPROVEMENTS FOR 770 NORTH GUILD AVENUE ------------------------------------------------------------------------ ------------------------------------------------------------------------ WHEREAS, construction of the Robert Mondavi warehouse facility located at 770 N. Guild Avenue required the installation of all public improvements necessary to serve the project, including the installation of a master plan storm drain line in the Guild Avenue and Turner Road alignments, extension of a master plan sanitary sewer main from Cluff Avenue to Guild Avenue, installation of master plan water mains in Lime Street and southerly in Guild Avenue to Lockeford Street as well as street pavement improvements in Guild Avenue; and WHEREAS, due to the extensive nature of the public improvements required to serve the warehouse and in order to facilitate development in the area and minimize future disruption to residents and businesses, the developer, Lodi 2000 Distribution Trust, represented by Robert Mondavi staff and City staff worked cooperatively to include the installation of all public underground improvements in Guild Avenue and the Turner Road alignment as well as the extension of Turner Road street improvements to Guild Avenue in the warehouse project. The additional improvements included the master plan sanitary sewer main in Guild Avenue north and south of the Mondavi project site, extension of the master plan water main northerly in Guild Avenue from Lime Street and westerly in Turner Road, and pavement improvements in Turner Road from Guild Avenue to the existing terminus. The improvements installed with the project are shown on Exhibit 1; and WHEREAS, under the terms of the Improvement Agreement for the project approved by Council on May 16, 2001, it was agreed that the developer would be reimbursed by the City for the cost of those improvements not required to serve the warehouse project as well as the cost of installation for the master plan storm drain facilities, excess width street pavement improvements in Guild Avenue, and oversize water and sanitary sewer mains required by LMC 15.64 Development Impact Mitigation Fees and 16.40 Reimbursements for Construction; and WHEREAS, since the installation of the underground utilities required the removal of all the existing pavement in Guild Avenue, it was agreed that the costs for pavement removal and replacement be apportioned to each of the underground utilities in Guild Avenue as follows: master storm drain, 50%; master water main, 25%; master sewer main, 25%. The pavement costs would then be paid by the party responsible for the cost of the underground utility. The public improvements for the project were accepted by Council in June 2001 and reimbursement to the Developer for the City -funded improvements was made in August 2001; and WHEREAS, in April 2002, the developer, Lodi 2000 Distribution Trust, requested a Reimbursement Agreement (RA -03-01) and establishment of an area of benefit in conformance with Chapter 16.40 of the Lodi Municipal Code for those improvements constructed with their project that benefit neighboring properties. A copy of the Reimbursement Agreement is attached as Exhibit 2. Exhibits attached to the Reimbursement Agreement include the proposed area of benefit (Exhibit A), itemized costs for the improvements reimbursable to developer (Exhibit B), and the fair share amounts to be reimbursed to developer by each benefiting parcel (Exhibit C). As shown on Exhibit C, the public improvements funded by the City are not eligible for reimbursement to Lodi 2000 Distribution Trust; and WHEREAS, installation of the Turner Road improvements shown as Schedule 1 on Exhibit B was required by the City in conjunction with the Mondavi project in conformance with the Improvement Deferral Agreement between the City and California Waste Removal Systems, Inc. recorded June 11, 1998 as Instrument No. 98067664. Under the terms of the agreement, Central Valley Waste Services, Inc., successor in interest to California Waste Removal Systems, Inc., was responsible for the design and installation of street frontage improvements along their property frontage upon request by the City. Central Valley Waste Services worked directly with the Developer to include those improvements in the Mondavi project and reimbursed Developer at the time of construction for all costs associated with those improvements. Therefore, those improvement costs are not included in the Reimbursement Agreement and the Central Valley Waste Services parcels are not included in the Area of Benefit; and WHEREAS, in conformance with Chapter 16.40 of the Lodi Municipal Code, the City is eligible for reimbursement for the cost of those City -funded improvements that would be required as a condition of development for neighboring properties. The proposed area of benefit, itemized costs for the improvements reimbursable to the City and the fair share amounts to be reimbursed to City by each benefiting parcel are shown on the attached Exhibits 3, 4 and 5, respectively; and WHEREAS, the areas of benefit covered by Reimbursement Agreement RA -03-01 and the Resolution are coincident. A Summary of Fair Share Reimbursement Amounts showing the reimbursement to the developer and the City for each benefiting parcel is attached as Exhibit 6. The property owners within the area of benefit have been notified. The Developer has paid the appropriate application fee and the fees to cover the cost of recording the Reimbursement Agreement; and WHEREAS, pursuant to Lodi Municipal Code Section 16.40.50.A.3, the reimbursable amounts shall be recalculated annually to include an amount attributable to interest, using the Engineering News Record (ENR) 20 Cities Construction Cost Index. Similar adjustments to the reimbursable costs will be made each January until payment is received. The initial ENR index to be used in the calculations is 6581. In the event that the benefiting properties develop, the City will collect the appropriate amounts from the developers of the benefiting property, and reimburse the Developer and City as appropriate. The charges for a benefiting property shall be paid in full at the time of the first development on that property; and WHEREAS, following the public hearing held August 6, 2003, in conformance with Lodi Municipal Code (LMC) Section 16.40, staff recommends that the City Council approve the following: 1) Reimbursement Agreement #RA -03-01 for public improvements for 770 N. Guild Avenue establishing an area of benefit and reimbursable costs for developer - funded public improvements for 770 N. Guild Avenue; and 2) Resolution establishing an area of benefit and reimbursable costs for City -funded Improvements for the project at 770 N. Guild Avenue. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby approve the following: 1) Reimbursement Agreement #RA -03-01 for public improvements for 770 N. Guild Avenue establishing an area of benefit and reimbursable costs for developer - funded public improvements for 770 N. Guild Avenue; and 2) Resolution establishing an area of benefit and reimbursable costs for City -funded Improvements for the project at 770 N. Guild Avenue. Dated: August 6, 2003 I hereby certify that Resolution No. 2003-144 was passed and adopted by the Lodi City Council in a regular meeting held August 6, 2003, by the following vote: AYES: COUNCIL MEMBERS — Beckman, Hansen, Howard, Land, and Mayor Hitchcock NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None Susan J. Blackston City Clerk 2003-144 EXHIBIT I uxr !tz l SANITARY SEWER EASEMENT SCHEDULE 4 c/) tp m 0 C M c) .. . . . . . . . . . . . . . . . ... C's rk,) IxkHwJ M F p Kj . . . . . . . . . . . PL LIME STREET PL 7. . m c/) x 0 10 V. I u 9 • WT 16 SCHEDULE 2 SCHEDULE 1 441 TURNER ROAD Pl. • m X CA w w ... , _ 7 W "MONDAVI PROJECT' SCHEDULE 4 R leso fa PL I I t I liI WT 14 GUILD AVENUE SCHEDULE 5 LOT 27 I _m lle IV I EXHIBIT 2 WHEN RECORDED, RETURN TO: City Clerk City of Lodi 221 West Pine Street Lodi, CA 95240 REIMBURSEMENT for PUBLIC IMPROVEMENTS for 770 N. GUILD AVENUE AGREEMENT # RA -03-01 THIS AGREEMENT is made by and between the CITY OF LODI, hereinafter referred to as "City", and LODI DISTRIBUTION TRUST 2000 hereinafter referred to as "Applicant". RECITALS: WHEREAS, Applicant is the developer of that certain parcel known as 770 N. Guild Avenue and entered into an Improvement Agreement with the City dated May 17, 2001, to construct public improvements needed to serve the development, and WHEREAS, the Applicant constructed certain public improvements on Guild Avenue and Turner Road (hereinafter "Improvements"), including street pavement, water, wastewater and storm drain lines, and other miscellaneous and related items, that will serve those properties, hereinafter "Benefit Area", that are designated and shown on the plan attached and labeled Exhibit A to this agreement and indicated thereon; and WHEREAS, the Applicant has filed a request with the Public Works Director in conformance with Chapter 16.40 of the Lodi Municipal Code requesting reimbursement for those improvements which benefit other properties in the Benefit Area or would be required of those properties upon development, and WHEREAS, the property owners of those properties shown in Exhibit A have been notified and the City Council has conducted a public hearing regarding the Applicant's request for reimbursement. NOW THEREFORE, in consideration of the mutual covenants and conditions herein contained and pursuant to Government Code Sections 66486 through 66489 and Title 16 of the Lodi Municipal Code, it is hereby agreed between the parties as follows: 1. The amount of the reimbursable costs due to the Applicant includes construction costs, including utility relocation costs, less any applicable credits plus administrative and engineering design costs (10%), engineering plan check fees, engineering inspection fees (2.5%) and the reimbursement application fee (1%). Total construction costs and costs attributable to the Benefit Area are shown on attached Exhibit B. 2. The reimbursable amount shall be recalculated annually to include an amount attributable to interest, using the Engineering News Record (ENR) 20 Cities Construction Cost Index. On uncollected reimbursements, the reimbursement Reimbursement Agreement • rates shall be calculated in January of each year beginning January 2004 by the following formula: (ENR Jan. 1 of current year) i (initial ENR) X (Balance due Jan. 1 of prior year less payments made during the previous year) The initial ENR index for this agreement is 6581. The initial reimbursable amounts for each property within the Benefit Area are shown on Exhibit C. 3. In the event that the benefiting properties shown on Exhibit A develop, the City shall collect the appropriate charges from the developers of the benefiting property and reimburse the Applicant or the Applicant's heirs, successors or assigns, for a period of fifteen (15) years. The charges for a benefiting property shall be paid in full at the time of the first development on that property. 4. The Applicant shall pay the City $5,030.83 for the preparation of this agreement prior to approval and recording of this agreement. This is based on one percent (1%) of the reimbursable construction costs, excluding engineering, administrative and other costs. 5. Upon each collection of reimbursement charges, an administrative charge shall be deducted and retained by the City for administering the reimbursement provisions of this agreement. This charge shall be established from time to time by resolution of the City Council. As of the date of this agreement, the current charge is $60.00. 6. This agreement shall inure to the benefit of the heirs, successors and assigns of the Applicant. The City shall mail the reimbursement to the last address of the Applicant on file with the Public Works Director of the City. In the event a reimbursement is returned or unclaimed after two (2) years from the date of mailing, the amount of the reimbursement shall revert to the City and be deposited in the appropriate development impact mitigation fee fund. 7. All correspondence and payments. herein required shall be in writing, and delivered in person or sent by registered mail, postage prepaid. Correspondence and payments to City shall be addressed as follows: Richard C. Prima, Jr. Public Works Director 221 West Pine Street P. O. Box 3006 Lodi, CA 95241-1910 Correspondence and payments to Applicant shall be addressed as follows: Reimbursement Agreement 8. This agreement is entered into pursuant to the provisions of Title 16 of the Lodi Municipal Code and the provisions of that section shall be deemed a part of this agreement. IN WITNESS WHEREOF, the Applicant and the City have caused their names to be hereunto affixed and the City of Lodi has caused its corporate name and seal to be hereunto affixed by its proper officers thereunto duly authorized. LODI DISTRIBUTION TRUST 2000, by First Security Bank, National Association, not in its Individual capacity but solely as Owner Trustee Date (CORPORATE SEAL) CITY OF LODI, A MUNICIPAL CORPORATION Bv: H. Dixon Flynn, City Manager Date ATTEST: Susan J. Blackston, City Clerk Date APPROVED AS TO FORM: Randall A. Hays, City Attorney Reimbursement Agreement 3 EXHIBIT A 4� L i � •.�o `\`♦ `\ ♦\`\`�`\ `♦`\ `��\ �\\� �\�\�\ ` 9c0 6i0'Ndyi \ . , ♦ \, \\ '0,0 F\ `�♦�\ `��♦�\ `♦ \``o ma\\` `mc \� `Li 090 6i0,Nd \ �`���c ;;�1` ♦;♦; �`♦`\`♦\�\♦; \<z '•\'9 I `12 080 8t0N • Ill♦\` \j\`�°�i \\`; .\ ;`♦♦\``\`♦`\ 1♦.V I V N LMIVj, ♦ ♦♦ Zp \♦\ \`\` \`♦ `♦`\ \ ♦ ` �\ �♦ \ ♦ \ tai \ ` ♦ ♦ \ ` \ `\ `\ `\ ♦6l 090 610.NdV j �♦\Jo� I \ ♦\\\\\ ` ` `� `\�\�\ 121380a 0Mf73L101Ye. \ J33HLS 3iln` m Z 3.; 0 W J m7KC13 a �9 NyF�91 a KVGC O N dip. 44a777c 421 � y�� W b oa Z zo � I Li. Q U— W Z W m Pap 1 ole GIBIT CIywL6dl B Publics Woks Department Development: 170 N. G118d Avenue Developer. Lod 2000 Dbwbjt on Trust DEVELOPER COSTS ATTRIBUTABLE TO TOTAL COST Of PROJECT IMPROVEMENTS'" DEVELOPER COSTS '^ COST OF CITY-FUNDED FACILITIES BUILT 6Y DEVELOPER ^' BENEFIT AREA'" ttem Gesclivice QUI11% and Eke low t1V8ttl87t Iblal 4umbl7 Igo OOIIWgt low Schedule 11Tumer Road Sts. 699.17,7 to Sla. 702.61.31 Stoat SSWm 1 MiKMantious GraQM 1 LS 5870.00 SB70.00 1 5870.00 0 $0.00 1 $070.0D 2 Asphan Removal 1 LS 40.00 40000 0.80 320.00 0.20 BOW 0.80 320.00 3 Clear6 Grub 1 LS 2.500.0 2300.00 0.85 2,125.00 015 375.00 0.85 2,125.00 4 Chain Line Fence Removal 1 LS 4,000.00 4,00.00 1 4,000.00 0 0.00 1 4,000.00 5 Roadway Evcavedon 620 CY 4.0 2.480.00 527 2.106.00 93 372.0 527 2,108.0 8 Compal OrgWtGrotad (O.SOI 21,240 SF 0.12 2.548.60 17.112 2.053.44 4,128 495.36 17,112 2,053.44 7 Cwq d Native Material(O.BO) 21,240 SF 0.14 2.973.60 17,112 2.395.66 4,128 577.92 17,112 2,395.68 8 AgWeple, Base, Class 1110.751 21.240 SF 0.85 18,054.00 17,112 14345.20 4,128 3308.80 17,112 14,545.20 9 AsphaB Concrete, Type 6(0.4(r) 21,240 SF 1.25 28,550.00 17,112 21,390.0 4,128 5,100.0 17,112 21,390.00 10 30Cmmnen:19Drbeway I0 2,200.0 2,20.0 1 2,20.0 0 O.W 1 2,200.0 11 voocal CUD. Wall a Sidewalk 309 LF 24.0 7,410.0 309 7.418.0 0 0.0 309 7A18.W 12 V&*al Curb A C-AW 344 LF 14.0 4,816.00 344 4.816.0 00.00 344 4,818.00 13 Comm. CGSW B AC Dike 76 LF 15.00 1,140.00 78 1,140.0 0 0.00 70 1,140.0 14 Concrete Subwade Compaction 3A40 SF 0.40 1,376.00 3.440 1,376.0 0 0.00 3,440 1,3711.00 15 Barricade 1 EA 30.0 30.00 1 30.0 0 0.0 1 30.0 18 Traffic Control Plan 1 LS 165.0 165.0 0.61 132.93 0.19 32.07 0.81 132.93 17 Tralk COniml Plan 1 LS 3,190.00 3,190.00 081 2370.02 0.19 619.98 0.81 2,570.02 18 PaverneM Marklog a S" 1 LS 1,281.17 1,281.17 0.61 1,032.17 0.19 219.0 0.81 1,0]2.17 19 Street lfpms 1 LS 9,80.0-_---9,800.00 1,..,__.._9, _x. O ... 0.00 1--- 9,800.00, Subtotal $92.060.57 Subtotal 580390.45 Subtotal $IIA70.12 Subtotal 31110=45 10% Enpkmerkt9 A Admnistration __1147.01 Subtotal Street System $12,817.13 StwitMalaSy7lem IW CIP 344 LF $99.0 534.05800 0 $0.0 344 $34,058.0 0 $O.W 2 1S s0 15 LF 35.0 525.00 15 525.0 0 0.0 15 525.0 3 1TSD 0 LF 33.0 0.00 0 0.0 0 OW 0 0.00 4 Pipe Marker i Flt "'o 00 180.0 1 180.00 O 0.00 1 180.00 5 Drop Intel Catch Basin 1 EA 1,200.0 __. _ 1,200,0 1 _ ___1.2M.OD 0 0.0 1 _ .._ _1,200.00, Subtotal $35,961.0 Sublotal $1.905.0 Subtotal $34,056.0 Subtotal 51.905.0 10% Erglneeirq a Admimsbali0n _-- 3,40.60 Subtotal storm Drain system $37,461.60 SaWi Smsee.Systam 1 Ir SanBary Sewer Pipe (VCP) 105 LF S31.W $3,253.00 105 53,255.0 0 $0.0 105 $3.255.00 2 Sanitary Sewer Manhole 1 EA 2,6W.00 2,8W.00 1 2,60.0 0 0.0 1 2.800.0 3 Pipe Marker 1 EA 180.00 180.00 1 180.0 0 0.00 1 180.0 4 Remove Us" Riser 1 EA 240.0._...._., 240.00 1240.0. 0 Subtotal 56,275.0 Subtotal 58,275.0 Subtotal $0.00 Submal 56,275.00 10% ErgMee" 6 Administration Subtotal SanOary Sewer System 50.0 1 WARBLUSkm IP Waley Pipe(PVC) 434 LF $25.00 $10,85000 434 f10,160.00 345 %Woo 434- s1o,1011110 2 1P Water Lateral (PVC) 35 LF 25.00 875.00 35 875.0 O 000 3S 875.00 3 10, WSW Valve 2 EA 1,100.0 2.200.00 2 1.700.00 2 50.0 2 I,7W.O0 4 1W WOW Lateral Valve 1 EA 1,10.00 1,10.00 1 1,10.00 0 Goo 1 1,100.00 5 8' Water Lateral Valve 1 EA 8W..0 moo 1 850.00 0 0.00 1 850.0 6 IV x 10' Cmas 1 EA 550.00 550.00 1 $50.00 0 0.00 1 530.00 7 IVr Reducer 1 EA 180.00 180.00 1 180.00 0 0.00 1 IW00 8 a- Fire N"anl Assembly 1 EA 2,7W.W 2,70.0 1 2,700.0 0 0.00 I 2,70.0 9 Pipe Market 1 EA 180.0 180.00 1 190.00 O 0.00 1 180.0 10 Blow on 1 EA 700.00---._-... 700,00 1 _. ..-_-.-- 700.00 0 __. ...--- 0.00 subtotal si0..,ikW. subtotal 518,993.0 subtolaf $1,190.01) Subtotal $18,995.00 f0%EeglneeMVAAdmWstralion _._._ 119.00 Subtotal Water system $1,309.00 Schedule 1 Total $154,481.57 Total $107,765.45 70161 351,387.73 Total 5107,765.45 Prepaid by Cal Waste ___(3107,783.131 Total $00 Pap 1 ole Puy 3 sr 6 COST OF CITY -FUNDED FACILITIES BUILT BY DEVELOPER rn DEVELOPER COS 0UTABLE TOBENEFIT AREA I" 4x3nJity W t 0 1 600.00 1 12.800.00 380 0 t3.024 TOTAL COST OF PROJECT IMPROVEMENTS "' 1.823.36 13.024 DEVELOPER STS Item Ossctl11110 Qt11111111pt Uri( Eft Mal Ouaodly bw Sehedup 2 (Turner Road Sla. 702-91.2 to Sta. 705#48) 135.00 1 2.61000 1 1.048.23 0 --0.00 ' BUULByslam 552.149.81 f0% Endre" 6 Admxasee6on .- 5,211,99 Subtotal Street System $57.364.80 280 1 Miscellaneous Grading 1 LS $530.00 $530.00 O $0.00 2 Aphall Removal 1 LS 600.00 600.00 0 0.00 3 Clear 6 Gosh 1 LS 12,800.00 12,800.00 0 0.00 4 Roadxay Excavation 380 CY 4.00 1,520.00 0 0.00 S Compact Original Ground (0.50) 13,024 SF 0.12 1,582.88 0 0.00 6 Compact Native Material (0.80) 13.024 SF 0.14 1,623.36 0 0.00 7 Aggregate, Base, Class 8 (0.75') 13,024 SF 0.65 11.070.40 0 0.00 8 AsOW Concrete, Type 8 (0.40) 13.024 SF 1.25 16,280.00 0 0.00 9 6' AspW Dike - 210 LF 5.00 1,050.00 0 0.00 10 Shoulder on I~ Road (N 6 S) 320 LF 2.50 600.00 00,00 11 Street Sign 6 Posts 1 EA 320.00 320.00 0 0.00 12 Tral k Cor" Plan 1 LS 135.00 135.00 0 0.00 13 Tool: Control Plan i LS 2.610.00 2.610.00 0 0.00 14 Pavement Markkp 6 SMpkn9 1 LS 1,048.23 1,046.23 0 0.00 IS SweetLlgles 0 LS 0.00._...-__---0.00 0-_------0.00. Subtotal 552,149.87 Subtotal 110.00 1 sremr Onto syum e0' CIP 280 LF $99.00 $27,720.00 0 $0.00 2 60' RCP 50 LF 160.00 8,000.00 0 0.00 3 15' Slorm Orakl 90 LF 35.00 3.150.00 90 3,150.00 4 12' Skxm Orale 88 LF 33.00 2,904.00 as 2,904.00 5 72' Storm Drain Manhole I EA 5,300.00 5,30D.00 0 0.00 8 Pipe Marker 4 EA 180.00 _ - _ 720.00. 4_. 720.00 Subtotal $47.79!.00 Subtotal 50,774.00 WALtL35510m 1 IV Water Pipe (PVC) 266 LF $25.00 $7,20(1.00 0 $0.00 2 1W Water Valve 1 EA 1,100.00 1,100.00 0 0.00 3 10' Water Lateral(PVC) 46 LF 25.00 1,150.00 0 001) 4 10' Water Lateral Valve 1 FA 1.100.00 /.100.00 0 0.00 5 8' Water Pipe (PVC) 30 LF 26.00 78000 0 0.00 6 8' Water Valve I EA 650.00 850.00 0 0.00 7 6' Water Pipe (PVC) 30 LF 24.00 720.00 0 O.OD 8 W WaterVane 1 EA 700.00 700.00 0 0.00 9 10' x 10' Cross 1 EA 550.00 550.00 0 0.00 10 IQ' x8'Reducer I EA 180.00 180.00 0 0.00 11 10' x 10' x 6' x 6' Cross 1 EA 180.00 160.00 0 0.00 11 Btolvoll 3 EA 700.W 2.10.00 0 0.011 12 pipe Marker 3 EA 180.00 _ _ 540.00 0 __.. _ . _ _ 0.00 SubroM7 $17,150.00 Subtotal $0.00 Schedule2Tolal $117,093.87 Total 58,774.00 Puy 3 sr 6 COST OF CITY -FUNDED FACILITIES BUILT BY DEVELOPER rn DEVELOPER COS 0UTABLE TOBENEFIT AREA I" 4x3nJity W t $530.00 1 600.00 1 12.800.00 380 1.620.00 t3.024 1.562.88 13.024 1.823.36 13.024 11.070.40 13.024 16.280.00 210 1.05000 320 800.00 1 320.00 1 135.00 1 2.61000 1 1.048.23 0 --0.00 ' Subtotal 552.149.81 f0% Endre" 6 Admxasee6on .- 5,211,99 Subtotal Street System $57.364.80 280 $27.720.00 50 6.000.00 0 0,00 0 0,00 1 5.300,OD 0 ....._ 000, Subtotal $41.020,00 10%EngkeerkgBAdmWstratkn _.- 1.102,00. Subtotal Storm Drain System $45.122,00 288 57.20100 1 1.100.00 45 1.150.00 1 1.100,00 30 780.00) 1 850.00 30 720,00 1 700.00 1 550.00 1 180.00 1 180.00 3 2.100.00 3 540.00 Subtotal $11.150.00 10% Engineering 6 Adminlseallon , 1,775.00 Subtotal Wallet System S78.865.W Total $121.351.85 0 SO.00 0 0.00 0 0.00 0 0.00 O 0.00 0 O.OD 0 0.00 0 0.00 0 0.01) 0 0.00 00.01) 0 0.00 0 0.00 0 0.00 0-_--- apo s0.00 280 $0.00 50 0.00 0 3,150.00 0 2.904.00 1 0.00 O 720.00 56.774.00 0 $000 0 0,00 0 0.00 0 a0D 0 O.OD 0 0.00 0 0.00 0 OW 0 0.00 0 0.00 0 0.00 0 0.00 ...__..__ $0.00 $6,774.00 ov.aora R COST OF CITKFUNDEO FACILITIES BUILT BY DEVELOPER le DEVELOPEBENEFR ABLETO re 4990ti1Y T>»al Ch.WM t Do 0.84 0.84 O.e4 1.075 14.684 14,664 14.684 14,684 3 515 0.84 0.64 0.84 0 Subtotal 10% Engk eerkg 8 Administration Subtotal $treat System 498 10 182 80 7 1 I 1 Subtotal 10% En"wai g 6 Adninistration Subtotal Storm DraM System 565 2 1 1 Subtotal 10% Engineering 8 Administration Subtotal Sanitary Sewer System SOB 4 0 0 0 0 0 0 0 0 0 Subtotal 10% Engineering 8 Administration Subtotal Water System Total $1,693.44 $553.60 22448 4.300.80 1,762.08 2.055.76 12,775.08 18,355.00 1.500.00 1 278.00 201.00 3,697,60 1.565,36 $52,124.80 5212,48 $57,337.28 $32,240.60 50000 8,738.00 2,640.00 9.300.00 5,698.26 360.00 1,20000 560,674.28 8,057.43 568,741.89 520.340.00 5.200.00 18000 240.00 525.960.00 2,598.00, $28.558.00 $1.018.00 1.000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 _ 0.00 S2A16.00 201.60 $2,217.60 $154,652.58 0.16 $322.68 0.16. 466.40 0.16 42.52 205 819.20 2,635 340.20 2.835 39690 2.635 2,466.45 2.835 3,54375 0 000 515 1.238.00 0.18 38.40 0.16 74240 0.16 298.16 0--000 $10,733.94 6 110.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 $000 0 $0.00 0 50.00 0 $0.00 $0.00 506 $11,664.00 4 3.400.00 58 1.456.60 2 1.70000 2 1,400.00 2 380.00 2 360.00 2 1,100.00 2 5,600.00 2 380.00 2.,__.. _ .. 400.00 $28,220.00 1138.953.94 0 TOTAL COST OF PROJECT IMPROVEMENTS n" DEVEL OSTS111 Dom aludot 91111001 Uta bw I" 9uoo t I" Schedule 3 (GuNd Avemu Sia. 114.13.610 S1a. 119.26.7) 1 MiscellaneousGrading Miscellaneous 1 LS $2,018.00 $2,01800 018 $322.56 2 AS" Removal 1 LS 3.040.00 3.060.00 016 408.40 3 Clear A,Gnrb 1 LS 272.00 272,00 016 43$2 4 Roadway Excavation 1,280 CY 4.00 5,120.40 205 819.20 5 Compact Orig W Ground (O.SOT 17,519 SF 0.12 2,102.28 2,833 340.20 8 Compact Native Material (0.W) 17,519 SF 0.14 2,452.66 2,835 396.90 1 Aggregate Base, Class 0 (0.80') 17,519 SF 0.87 15,241 53 2,635 2,466 45 6 Asphalt Concrete, Type B (0.40) 17,519 SF 1.25 21,898.75 2,835 3,543.75 9 DrivewayArpak 3 EA 50000 1,500.00 0 0.00 10 Stioulder(E6W) 1,030 LF 2.40 2,472.00 515 1,238.00 11 Trask Control Plan f LS 240.00 240.00 0.16 38.40 12 Traffic Control Plan 1 LS 4,640.90 4,64000 0.16 742.40 13 Pavemem Marking 8 Striping 1 LS t,963.52 1,863,52 0.16 290,16 14 Street Lwft 0 EA 0.00 -___-562,658.74 _ _0.00_ O -- -- 0.00 Subtotal Subrolof 310,733.94 Slaml?nln3ffiem 1 42'CIP 498 LF 585.00 $32,240.00 0 $0.00 2 24' Stam Orain t0 LF 50.00 500.00 0 0.00 3 Ir Storm Drain 182 LF 48.00 8,736.00 0 0.00 5 IT Storm Drain 80 LF 33.00 2,640.00 0 0.00 8 48' Stam Oram Manitole 3 EA 3,100.00 9,300.00 0 0.00 7 Relocate Double fir SO 1 LS 5.608.26 5,608.26 0 0.00 8 Pipe Marker 2 EA 190.00 360.00 0 0.00 9 Side trial Catch Basin 1 FA 1,200.00._.__.1,100:00. 0 0.00 Subtotal 560,674.28 Subtotal $0.00 SanbaAr M ILSYa12M 1 8' Sanitary Sewer P" (VCP) 565 LF 538.00 $20.340,00 0 50.00 2 Saniteq Sewer Marmole 2 FA 2,600.00 5,200.00 0 0.00 3 Pipe Marker 1 EA 180.00 180.00 0 0.00 4 Swillary Sewer Wser 1 FA 24000 _ _ 240.00 0 ._.. ------0.00 Subtotal $25,9600 Subtotal $0.00 )WaleL5y4tam 1 10' Water Pipe(PVC) 508 LF 525.00 512,700.00 508 1111,684.00 2 fir wale $ Valve 4 EA 1,100.00 4,400.00 4 3,400.00 3 r water 4(PVC) 58 LF 26.00 1,456.00 55 1,456.00 4 8• Water Valve 2 EA 850.00 1,700.00 2 1,700.00 4 8' Water Valve 2 EA 700.00 1.400.00 2 1.400.00 5 f0' a 6 Reducer 2 EA 100.00 360.00 2 360.00 5 10' a r Reducer 2 EA 180.00 390.00 2 360.00 6 l0'al0'CmsSAssembt 2 EA 5w.00 1,100.00 2 1,100.00 7 6' Fire Hydrant Assembly 2 EA 2,500.00 5,000.00 2 5.000.00 8P" Marker 2 EA 180.00 360.00 2 360.00 9 Blow ON 2 EA 700.00_. - 1,400.00 _ Subtotal $30.236.00 Subtotal $28.220.08 Schedule 3 Total $179,729.00 Total 538,953.94 ov.aora R COST OF CITKFUNDEO FACILITIES BUILT BY DEVELOPER le DEVELOPEBENEFR ABLETO re 4990ti1Y T>»al Ch.WM t Do 0.84 0.84 O.e4 1.075 14.684 14,664 14.684 14,684 3 515 0.84 0.64 0.84 0 Subtotal 10% Engk eerkg 8 Administration Subtotal $treat System 498 10 182 80 7 1 I 1 Subtotal 10% En"wai g 6 Adninistration Subtotal Storm DraM System 565 2 1 1 Subtotal 10% Engineering 8 Administration Subtotal Sanitary Sewer System SOB 4 0 0 0 0 0 0 0 0 0 Subtotal 10% Engineering 8 Administration Subtotal Water System Total $1,693.44 $553.60 22448 4.300.80 1,762.08 2.055.76 12,775.08 18,355.00 1.500.00 1 278.00 201.00 3,697,60 1.565,36 $52,124.80 5212,48 $57,337.28 $32,240.60 50000 8,738.00 2,640.00 9.300.00 5,698.26 360.00 1,20000 560,674.28 8,057.43 568,741.89 520.340.00 5.200.00 18000 240.00 525.960.00 2,598.00, $28.558.00 $1.018.00 1.000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 _ 0.00 S2A16.00 201.60 $2,217.60 $154,652.58 0.16 $322.68 0.16. 466.40 0.16 42.52 205 819.20 2,635 340.20 2.835 39690 2.635 2,466.45 2.835 3,54375 0 000 515 1.238.00 0.18 38.40 0.16 74240 0.16 298.16 0--000 $10,733.94 6 110.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 $000 0 $0.00 0 50.00 0 $0.00 $0.00 506 $11,664.00 4 3.400.00 58 1.456.60 2 1.70000 2 1,400.00 2 380.00 2 360.00 2 1,100.00 2 5,600.00 2 380.00 2.,__.. _ .. 400.00 $28,220.00 1138.953.94 0 TOTAL COST OF PROJECT IMPROVEMENTS DEVELOPER COS TABLE TO OEVEL R COSTS "' I COST OF CITY -FUNDED FACILITIES BUILT BY DEVELOPER "' I BENEFIT 'o Bem OCSGtlR1100 (3ullow U08 Edo Intal ! I91a1 Schedule 4 (Gulld Avenue Sta. 119.28.7 to Six. 124.14.8; Mondavl Pr*ct) $90.00 $56.160.00 0 $0.00 2 a8' CIP 921 ouseGrading 80.00 73,680.00 0 0.00 3 42'RCP 40 1 M'nsM3ane2 1 LS $8,215.20 $8.215.20 0.35 S3,0W.71 2 AspAaB Removal 1 LS 12.388.00 12,388.00 0.38 4,645.52 3 Clear dGrub 1 LS 1,106.40 1,108.40 0.36 415.65 4 Roadway Excavalla 5,216 CY 4.00 20.684.00 1,958 7,824.04 5 Compact Original Graved 10.501 71,333 SF Al2 81559.96 26,750 3,210.00 6 Compact Native Malerlal(080) 71,333 SF 0.14 9,90662 26,750 3,745.00 1 Aggregate Base, Gass 0 (0.60) 71,333 SF 0.87 62,059.71 26,750 23,272.50 6 Asphalt Concrete. Type 810.40) 71,333 SF 1.25 89,18625 28,750 33.437.50 9 100 commercial ercial OrWeway 1 EA 4.800.00 4,800.00 1 4.800.00 10 170Commerdalorwo ay 2 EA 9,000.00 18.000.00 2 18,000.00 11 Vertical Curb, Gueer 8 Sidewalk 1,160 LF 24.00 27,840.00 1,160 27,640.00 12 Concrete Subgrade Compaction 11,146 SF 0.40 4.458.40 11,146 4,45840 13 Shoulder (W) 1,486 LF 2.40 3,566.40 1.406 3588.40 14 Barricade 2 EA 300.00 000.00 2 800.00 15 Mae Box Rebcatbn 1 EA 150.00 150.00 1 150.00 18 Driveway Overlay 3 EA 50000 1,500.00 3 1,500.00 11 Traffic Control Plan 1 LS 690.00 690.00 0.38 258.75 18 Traffic Control 1 LS 13,340.00 13,340.00 0.38 5,002.52 19 Pavement Marking 8 Sidling 1 LS 5,357.62 5,357.62 0.38 2,009.12 20 Street Lights 1 LS 21,800.00 21,600.00 1 21,600.00 46 LF 300.00 !3,800.00 Subtotal -� $31450.56 Subtotal -� ---'Si69,116.12 519rm.Ql "Iflitem low OxaO90t Im 0.62 $5,134.49 0.08 1 54' CIP 824 LF $90.00 $56.160.00 0 $0.00 2 a8' CIP 921 LF 80.00 73,680.00 0 0.00 3 42'RCP 40 LF 65.00 2,800,00 O 0.00 4 t8'Storm Drain 108 LF 48.00 5,184.00 108 3,181.00 S IS' Storm Drain 45 LF 35.00 1,575.00 45 1,575.00 8 t2'storm Oram 60 LF 33.00 1,98000 80 1,980.00 7 72' Storm Drain MaMble 0 EA 5,300.00 0.00 0 0.00 0 60' Storm Oram Manhole S EA /,200.0021,000,00 0 2 8,/00.00 9 Pipe Market 8 EA fe"D 1.440.00 8 1.440.00 t0 Safe brill Caleb Basin 1 EA 1.200.00,.,. 1,200.00 1 1200.00 3.348.50 0.08 446.44 Subtotal _ 1164,81900 Subtotal"- -519,779.00 bitiltagts8ati LSystem 5144,834,44 SublWal ----548,128.36 10% Engmeerbtp 6 Administration _-- 14,483,44 1 1SSanitary5ewerpOe(VCP) 683 LF $75.00 $51,225.00 663 534150.00 2 12' Sail" Sewer Pipe (VCP) 351 LF 67.00 23,51700 35t 12,63600 3 t0'Smatary Sewer POO (VCP) 1,022 LF 50.00 51,100.00 1,022 51,100.00 4 8' Sanitary Sewer Pipe IVCP) 743 LF 36.00 28,748,00 743 26,748.00 S 6' Saralary Sewer Pipe (VCP) 50 LF 31.00 1,550.00 50 1,550.00 6 Sanitary Sewer Manhole 5 EA 2,800.00 13,000.00 5 11000.00 7 Pipe Marker 8 EA 180.00 IA40.00 6 1,44000 8 Sanitary Sewer Riser 2 EA 240.00 480.00 2 480.00 693 $17,075.00 Subtotal $189,060.00 Subtdtar - -� $W.ID4.00 WWatmWem 12,636.00 0 0.00 1,022 51,10000 0 1 10' Water Pipe (PVC) 2,924 LF S25.00 $73,100.00 2,924 167,252.00 2 iPWaterp"(04P) 70 LF 27.00 1,890.0 70 1,750.00 3 10' WSW Valve 24 EA 11100.00 26,400.00 24 21,900,00 4 RR Xing Jack 8 Bore 18' Casing 46 LF 300.00 !3,800.00 23 6,900.00 S 10'x IW Cross 3 EA 550.40 1.650.00 3 1,850.00 6 Fill - e10'x 10'Cross t LS 1,049.89 1,049.89 1 1,049.69 7 10' x t0' x 8' a G' Cross Assembly 3 EA 420.00 1,260.00 7 1,260.00 8 10'. 1(rx 10'Tm 4 EA 300.00 1200.00 4 1200.00 9 10'x10':Or Too 4 EA 180.00 120,00 4 720.00 70 f0'BW Flange 3 EA 90.00 270.0 3 27000 11 8' Bard Flange 3 EA 30.00 150.00 3 150.00 12 GGare Valve 7 EA 700.0 4.900.00 7 4.900.00 13 6' Fire Hydrant Assembly 7 EA 2.500.00 17,500.00 7 17,500.00 14Pipe Marker S EA 180,00 900.00 5 900.00 i5 Blow ON 5 EA 700.00 3,500.00 5 3,500.00 Subfonl -V46.29169 Subtop/ ---Si311.80/:69 Schedule 4 Total $798,419.25 Told 5461,200.81 Petr 4N4 Q909--ty low OxaO90t Im 0.62 $5,134.49 0.08 5684.55 0.62 7,742.48 0.06 11032.26 0.62 692.75 0.08 92.36 3,260. 13,039.96 435 1,738.54 44583 5.349.96 5,944 713.28 44.583 8,241.62 5,944 832.16 44,583 38.787.21 5,944 5,171.28 44,583 55.728.75 5.944 7,430.00 0 0.00 0 0.00 0 0.00 0 &OD 0 0.00 0 0.00 0 0.00 0 0.0D 0 0.00 1,486 3.588.40 00.00 0 0.00 0 0.00 1 150.00 0 O.OD 3 1,500.00 0.62 431.25 0.08 57.50 0.62 8.337.48 0.08 1,111.59 0.62 3.348.50 0.08 446.44 0_ 0.00 1 21,600,00 Subtotal 5144,834,44 SublWal ----548,128.36 10% Engmeerbtp 6 Administration _-- 14,483,44 Subtotal Street System 5759,317,09 624 556.860.00 0 $0.00 921 73,680.00 0 0.00 40 2.600.00 0 0.00 0 0.00 108 5,184.00 0 0,00 45 1,575.00 0 0.00 80 1.900.00 0 0.00 0 0.00 3 12,600.00 2 8.400.00 0 0.00 6 1.440AD 0 0.00 1 1,200.00 Subtotal S14504000, Subtotal 519,779.00 to% Englnoenng A Administration 14,504.00 Subtotal Stam Main System $159,544.00 693 $17,075.00 663 534,13000 351 10,881.00 351 12,636.00 0 0.00 1,022 51,10000 0 0.00 743 26,748.00 0 0.00 50 1,550.00 0 0.00 5 13.000.00 0 0.00 8 1.440.60 0 0.00 2 480.60 Subtotal S27,458.OD Subtotal S1f,tOb.i)0 10% Etganeerag B Adniisualon 2,795.60 Subtotal Sanitary Sewer System $30.751,60 2.924 $5.848.00 2,924 587,252.00 To 140.00 70 1,150.00 18 4,500.00 24 21.11MOD 23 6.900.00 23 6,900.00 00.00 3 1,650.00 0 0,00 1 1,049.89 0 0.00 3 1,280.40 0 0.00 4 1,200.0 0 0.00 4 720.00 0 0.00 3 270.00 0 000 3 MOOD 0 O.OD 7 4,900.00 0 0.00 7 17,500.00 0 0.0 5 900.00 0 0.00 5 3.500.00 Subtotal . _-Iltft08' Subtotal -------f110,901.89 10% ftinee" 8 A&T"fralbn - 1,738.80 Subtotal WaterSysteut S19.126.80 Total $368.740.29 ITatal 53371911.05 F".4de COST OF CITY -FUNDED FACILITIES BUILT BY DEVELOPER 41) 4ul6titx 9 1 S f,600.2D f 2,413.00 7 215.90 1,016 TONAL COST OF PROJECT IMPROVEMENTS j° 13,860 1,663,20 OEVELCOSTS'n teem D lLMM lt16 Eft stir $Ml law Schedule 5 (Guild Avenue Sax. 134.14,8 to S1a. 177.44.6) 1 150 00 1 2,900.00 1 1,164.70 Stmel.dxltem Subtotal $47,436.8(i f0%Ergineering 8 Administration 4,743.88 Subtotal Street System $52,180.26 t Mlsttllanoous Grading I LS 51,600.20 $1,600.20 0 50.00 2 Asphalt Removal .1 LS 2,413.00 2,413.00 0 0.00 3 Clear b Grub 1 LS 215.90 215.90 0 0,00 4 Roadmay Excavation 1,018 CY 4.00 4,064.00 0 0.00 5 Congest Original Ground (0.50') 17,860 SF 012 1.663.20 0 0.00 6 Comgaa Native Materia/(0.80'1 13.680 SF 0.14 1,940.40 0 0.00 7 Aggregate Base, Class 1110.80) 13,863 SF 0.87 12.058.20 O 0.00 8 on Asphalt Ccrete, Type 9(0.40 ) 13060 SF 1.25 17,325.00 0 0.00 9 Shoulder (E 8 W) 370 LF 2.40 792.00 D 0.00 10, 61 Asphalt Dike 230 LF 5.00 1,150.00 0 0.00 1 f Traffic COM" Plan 1 LS 150.00 150.00 O 0.00 72 Traffic Control ILS 2,900.00 2,900.00 0 0.00 I3 PavementMatkig B Striping 1 LS 1,164.70 1,161,70 0 0.00 14 Street Lights 0 EA 0.00 0.00 0 0.00 Subtotal 547,476.80 Subtotal 50.00 Sta unmuh iatsm 1 By Cil' 326 LF $99.00 $32,274.00 0 $0.00 2 241 Slarm Drain 45 LF 50.00 2.250.00 45 2,250.00 3184 Storm Oram 45 LF 46.00 2,180.00 45 2,161.00 4 121 Sbnn Drain 70 LF 33.00 2,310.00 70 2,310.00 5 721 Stown Drah Maoluole 1 EA 5,300.00 5,300.00 0 0.00 8 Pipe Marker 2 EA 180.00 360.00 2 360.00 1 Sloe Noel Catch Basin 1 EA 1200.00 ----1,200.00, Subtotal 545,854.00 Subtotal 18280,00 SN*&Y8MLBYslem 1 61 Sanitary Sewer Pipe (VCP) 352 LF $36.00 S 12.672.00 0 $0.00 2 61 Sanlim Sewer Pipe (VCP) 60 LF 71.00 1.660.00 0 0.00 3 Ser4lary Sewer MaNnle 1 EA 2,600.00 2,600.00 0 0.00 4 Pipe Maher 1 EA 180.00 _ _ 10000 O _. _ _ _ ._. _ _ _ _ O,OD Subtotal $17,312.00 Subtotal $0.00 waleLSllllem t 101 Water Pipe (PVC) 397 LF 525.00 (9,923.00 0 50.00 2 10, water Valve 4 EA 1,100.00 4.400.00 0 0.00 3 101x10-CroSSAssenbly f EA 550.0 550.00 0 0.00 4 Pipe Maher 2 EA 180.00 360.00 0 0.00 5 Blow 00 2 EA 700.00 _ 1,400.00 0 _ _ _ 0.00 Subtotal $16,635.00 Subtotal $0.00 Schedule 5Total 5127,237.60 Total $8,280.00 F".4de COST OF CITY -FUNDED FACILITIES BUILT BY DEVELOPER 41) 4ul6titx Law 1 S f,600.2D f 2,413.00 7 215.90 1,016 4,064.00 13,860 1,663,20 17.663 1,940.40 13,11M 12,058.211 13,680 17,325,00 330 792.00 230 1,150.00 1 150 00 1 2,900.00 1 1,164.70 _ 0.00 Subtotal $47,436.8(i f0%Ergineering 8 Administration 4,743.88 Subtotal Street System $52,180.26 326 $32,274.00 0 0.00 0 0.01) 0 0.00 1 5,300.00 0 0.00 0..... 0.0. Subtotal ..._ 337,574.00 10% Ergneerkg r AdniNsuallon 3,757.40 Subtotal stamnDraM System $41.331.40 352 $12,67200 W 1,680.00 f 2,600.00 1 180.00 Subtotal $17,312.00 10%Engheerkg 6 Administration 1,731.20 Subtotal Sanaa y Sews. System 319.043.20 397 $9,925.00 4 4.400.00 1 550.00 2 360.00 2 1,400.00 Subtotal $16,635.00 10% Engheerkg 6 AdHrxsnation Subtotal Wolf System S1a298.50 Total $130.853.36 DEVELOPER COSTA&.E TO OENEFfT 'n amum I" 0 $0.00 0 0.00 0&W 0 000 0 0.00 0 0.00 0 0.00 0 000 O 0.00 00.000 O 0.00 0 0.00 0 O.OD 0 O.OD I - •--- i0.00 0 50.00 :5 2,250.00 45 2,18000 70 2,310.00 0 0.00 2 MOD I --- �� $8,280.00 0 50.00 0 0.00 0 0.00 0 0.00 $0.00 0 $0.00 0 000 0 0.00 0 0.00 0 000 5000 $6.280.00 i TOTAL COST OF PROJECT IMPROVEMENTS o' OEVEQCOSTS "n am Descrl�0 Schedule 6 (Guild Avenue Sim. 137-44.8 to Sim. 139#811 $768.60 SIMI-Syslam 1 Mlscebneous Grading 2 Asphas Removal 3 Clear Gnb 4 Roadway Excavation 5 Corrylact Drifting Ground (0.507 6 Comes Has" Material (0.80) 7 Aggregate One. Class II (0.80) 6 Asphaf Concrete, Type 8 (0.407 9 sun" Monument 10 Traffic Control Man it Traffic Caul 12 Pavement Marking 6 Sft" 13 Street Lights Stas100ni""Itm 1 80" CIP 2 WRCP 3 39' Shan train 4 16' Storm Dram 5 72* storm Drain MaNgle 6 Pipe Market Vwn6anr Sewer Svsl6m 1 it Sanitary Sewer P4e(VCP) 2 6' Sanitary Sewer PIPs (VCP) 3 Sanitary Sewer Marotok 4 4- Sanitary Sewer Service (55 LF) 5 PIPs Market Y alff irilem 1 10' Wain Pipe (PVC) 2 Ur Water Valve 3 10' x18' Cross Assembly 4 Blow Off 011111 0f une Erie TJttal I LS $768.80 $768.60 I LS 1,159.00 1,159.00 1 LS 103.70 103.70 486 CY 4.00 1,95200 6,70D SF 0.12 904.00 8,700 SF 0.14 938.00 6,700 SF 0.87 5,829.01) 6,700 SF 1.25 8.375.00 1 EA 550.00 550.00 1 LS 120.00 120.00 1 LS 2,320.00 2,320.00 1 LS 931.76 931.76 0 EA 0.00 0.00 0 0.00 Subtobt $23,BS1.06 155 LF $99.00 $15,345.00 10 LF 160.00 1,600.00 M LF WAD 4.488.00 30 LF 48.00 1.440.00 1 EA 5.300.00 5,300.00 2 EA 18000. 360.00 Subtotal Subtotal 528,533.00 230 LF $36.00 58280.00 80 LF 31.00 2.480.00 1 EA 2,6110.OD 2,600.00 1 EA 2,000.00 2,000.00 3 EA 180.00__ 540.00 Subtotal 515,900.00- 244 LF $25.00 $6.100.00 4 EA 1,100.00 4,400.00 1 EA 55010 550.00 2 EA 700.00 1,400.00 0 0.00 Subtotal $12,450.00 0080001 IOU 0 $0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 000 0 0.00 0 0.00 0 0.00 0 0.00 0 000 0 000 0 ow $0.00 0 $0.00 0 000 68 4,468.00 30 1,410.00 0000 2 .. _ _ 360.00 t $6,288.00 0 50.00 0 0.00 0 000 0 0.00 0-,_ _ -_---0.00 $0.00 0 $0.00 0 0.00 0 0.00 0___^'___0.00 5010 Schedule 6 Total $80.734.06 I1'o1al 58.288.00 TOTAL COST OF IMPROVEMENTS $1.455.695.35 jTOTAL 5629,262.20 PGE Relocation Fee $57,333.30 Pacllfe Bell Relocatlon Fee $47,5 2.41 TOTAL CONSTRUCTION COSTS 5734.137.61 "I The arnou11B shown are based on contract and change order prices padded by Steg8led EngkleerkV. ere Developer's englnea. e.f. 0.1 e COST OF CITY -FUNDED FACILITIES BUILT BY DEVELOPER QVIlplity I" DEVELOPER COSIUTABLE TO BENEFIT i' Ota1o601 low 1 $766.80 0 $0.00 I 1,159.OD 0 0.00 1 103.70 0 0.00 488 1,952.00 0 0.00 6,700 804.00 0 0.00 6,700 938.00 0 0.00 6,700 5,829.00 0 0.00 8,700 8,375.00 0 0.00 1 550.00 0 0.00 1 120.00 0 0.00 t 2.320.00 0 0.00 1 931.75 0 0.00 0 0.00 0 Subtotal $23.051.00 Subtotal 50.00 10%Engaieering 8 AMllnisustion 2,385.11 Subtotal Street System 526.236.17 155 $15.345.00 0 $0.00 10 1,800.00 0 0.00 00,0D 80 4,488.00 0 0.00 30 1.440.00 1 5,300.00 0 0.00 0 0.00 2 36 010 Subtotal $22.245.00 Subtotal - 58.299.00 10% Engto oolog 6 Administration 2,;2150 Subtotal Storm Drain System $24.489.50 270 $8260.00 0 50.00 s0 2.480.00 0 3000 I 2,600.00 0 50.00 1 2.000.00 0 $0.00 3 540.00 0 $0.00 -515.900.00 - '- --$0.00 10%Ergineering 8 Admirxstralimr 1,590.00 Subtotal Subtotal Sanitary Sewer System $17,490.00 244 $6.10(110 0 $0.00 4 4.400.00 0 0.00 1 550-00 0 000 2 1,400.W 0 0.00 .__ $12,450.00 $0.00 10% Engineering 8 Admlnistraeon _ -....1.245.00 Subtotal wow System �S13.695.00 Total 561.890.67 Total 30,211800 TOTAL $909,076,47 TOTAL $3f6,206.69 PGE Relocation Fee SST.333.30 Pacllie BM Rttocatlon Fe _ -, __,$17,542.41 TOTAL CONSTRUCTION COSTS ATTRIBUTABLE TO BENEFIT AREA $303.062.70 10%Engineering B Administration 130.620.70 Enghworliq Plan CMck Fee 56,177.Sf Engineering InSpection Fee (2.3%) $9.955.17 RelmbureenrM Applicallee FN (1116) S.90.65 TOTAL DEVELOPER COSTS ATTRBIUTABLE TO BENEFIT AREA $!64.066.66 LEGEND PROPERTIES BENEFITING FROM GUILD AVE. ,A / / 2E /�// IMPROVEMENTS PROPERTIES BENEFITING / / �/ '' LORI 2000./ ®FROM GUILD AVE; AND //// ' // / s ,' /�� ON TRUST/�Yi, TURNER ROAD IMPROVEMENTS APN:049 080 28 _ AREA OF IMPROVEMENT , / Am /WARD ATR LT APH ASSESSOR'S PARCEL. NUMBER �/ � , AC:, 15.00 / AC ACRES 33 / / / APN:049 080 0 / LODI. $TOi{ACE/,\(. �, ,', , /LOOT .2000 77, / , / ,' , DISTIDUTION / 32 / •I�APN-049 080 33,APN:049 080 83/ ASSOC IAES ,\ ' I 3� o\�\'�• ,' �/�/i'�/./,///i/i�i�./,' '�//,','�y�,/,6 °//// AA�� 7.09-V APN:049 080 321. �oSo�m\I"fir �, ' ,',',',',' ' .MTCH,•DEI.IAAR� 1 I�rii G GUILD AVENUE STREET' , , , ( AC:4.521 , ' ' 'AND INFRASTRUCTURE / / . , 1 / / aa..•z, ' ' / , ' APN:049 040 06' /IMPROVEMENTS 1'i CIfICO AVENUE•',t' Ix xo.i' . ��' ,e e{,/.iii 7 vi 62 74 T m00/1 ^�' m. ��� 1 METRER 0 R/d M" y?-�()� T ,0 7'/$, I / .o /o.Y i 14D 2001 TRUST/ o ,('ij o' 0 1 0,g./ 0 IAC: 4.49. '0 ' / �$/0,,�1 ' ;'^,/rn'� � vi ,'�/(APNy049 OBO 07 I � v Y /s, LODI STORAGE ASSOCIATES LP •�' c', ao/o, (i icy /o v v '� f LORI STORAGE~ 1 ��p.. AC:5.19 o.z,' APN:049 080 81 ASSOCkflT3 LP �• °.{ AC: .55 LODI STORAGE APN:049 080 82 ASSOC ATES LP I TURNER ROAD STREET' AC.: 2.59 { AND INFRASTRUCIURE AP14:049 080 74 IMPROVEMENTS BENEFIT AREA 0 m x a .i LIE EXHIBIT C TCTX oo".siwct+3.�oosiaresa SSSfpM.13 IEaWA5E4iM URC+Tcn FE! 33,3%.33 TO:K G9NMnYCTgn C.OMS •FEET F-�3 T le3t 2e. ylTN3+)tgn rgvfl 333f,e33.33 Fcrs.l:ulewTc:rloxccsr ion aoa Rex asrwanwn :nuEi Jft33,397.i31 nEa.ti,�q�frtr*C•A SC3!:1V 6Ktw3ur3:n 1nJ5i SWS,f]lh 31 1.m =.—M SI.TO./1 +A»+ 300 Ae W 3+!»t] —. PON MMOSS )MAN sm. 0)i . s'". 5M3. 51 SM. 3+.w2, sAS" SIl 1f +0 . tLl:410 iM:: s s+ . S11.S1ee+ +D56 SO" 1_12 SOSM Stu N . SIASS. slow M?3 SQ . WON M.m 0-... P,T W0 »+l so, S+.a ., $0,. 31,n N 540 SIMV $LGWAS ) f4%.M `i. ee f1.S11.t0 MSSt]! W. WAS,A +efri W .7M.m 41MIS. $7.19 SO l 91 61,11j. MTS. M. b W. U-1. SR.I..T SY1 f06 RS S)IfTW MIS, fW.-13 W. ..4e 1S ! 1IM. +.T+iP.O. MF11 A SS W. aMa 36.4i.M SL.0 31.M1.O S,_% ml.'s W. ... IS W. sr.S W. WSMI. wWx M. fl 3 +f 3".fb+3 S.. sl- +.Ye% W2,19 6-1. R.I.. stni54 Mlm Wx .Mtb T^.. $133M W. sr,m, 5W... AS VM AM>? tASAll W."» S. S+....5 P.S.u S.,. SM1.79 ._" MAIO. llsA ls W0 i. IS ++SV: flus W. mmu MSAS SAAM.? :7131 SIX,m LLatl RAIN » 1 ilE»tSl f+:1A%14 fl. . f+R.16i e1 0430 f+A7M »t Se S.'"51 5.)55)3 :,]»N SIA1.13 Ml.h ft+.+�t]+1.314 f3W.CN1) slfR.er3x TL3Y Sm,So 31ANW SECT. fl..m]a IfWS.STATII f1.i4% l..6t6» flS.tReM W. }:!.'RW T+P: S1a1."e"AO NAfI f]a.M1... f�haAS safMiie Mm ASW. - _jW�Mi.T3 I_fti TAs fSMS1T im.uxW Mi.sgwl sSsSAm.0 ffWAM.t) 1)NAM.T+ I 1...1+ M.oWAa _ _ MpW.u_ slf fTS.T fMe MSh TCTX oo".siwct+3.�oosiaresa SSSfpM.13 IEaWA5E4iM URC+Tcn FE! 33,3%.33 TO:K G9NMnYCTgn C.OMS •FEET F-�3 T le3t 2e. ylTN3+)tgn rgvfl 333f,e33.33 Fcrs.l:ulewTc:rloxccsr ion aoa Rex asrwanwn :nuEi Jft33,397.i31 nEa.ti,�q�frtr*C•A SC3!:1V 6Ktw3ur3:n 1nJ5i SWS,f]lh Clly of LodOl Desr_riptio! EXHIBIT Pinb6cs works Department Ptilm Iofal Development: 770 N. Guild Avenue 10161 4uan0ly Developer. Lad 2000 Distribution Trust Schedule I (Turner Road Sts. 699+17.7 to Sta. 702+61.3) Engineer: Baumbach b Piazza TOTAL COST OF PROJECT IMPROVEMENTS rrr I COST OF CITY -FUNDED IMPROVEMENTS tin I REIMBURSABLE IMPROVEMENTS rrn Item Desr_riptio! aimfily !1lllS Ptilm Iofal QuaNdy 10161 4uan0ly 29161 Schedule I (Turner Road Sts. 699+17.7 to Sta. 702+61.3) 1 Street sysip Miscellaneous Grading 1 LS $870.00 $870.00 0 $0.00 0 $0.00 2 Asphalt Removal 1 LS 400.00 400.00 0.20 80.00 0 0.00 3 Clear AGrub I LS 2,500.00 2,500.00 0.15 375.00 0 0.00 4 Chain Link Fence Removal 1 LS 4,000.00 4,000.00 0 0.00 0 0.00 5 Roadway Excavation 620 CY 4,00 2,480.00 93 372.00 0 0.00 6 Compact Original Ground (0.50') 21,240 SF 0.12 2,548.80 4,128 495.36 0 0.00 7 Compact Native Material (0.817) 21,240 SF 0.14 2,973.60 4,128 577.92 0 0.00 a Aggregate Base, Class II (0.75') 21,240 SF 0.85 18,054.00 4,128 3,568.80 0 0.00 9 Asphalt Comets. Type B (0.M 21,240 SF 1.25 25,550.00 4,126 5,180.00 0 0.00 10 30' Commercial Driveway f FA 2,200.00 2,200.00 0 0.00 0 0.00 1 f Vertical Curb, Cutter d Sidewalk 309 LF 24.00 7,416.00 0 0.00 0 0.00 12 Vertical Curb &Gutter 344 LF 14.00 4,816.00 0 0.00 0 0.00 13 Comm. CGSW d AC trice 76 LF 15.00 1,140.00 0 0.00 0 0.00 14 Concrete Subgrade Compaction 3,440 SF 0.40 1,376.00 0 0.00 0 0.00 15 Barricade 1 EA 300.00 300.00 0 0.00 0 0.00 16 Traffic Control Plan 1 LS 165.00 165.00 0.19 32.07 0 0.00 17 Traft Control Plan 1 LS 3,190.00 3,190.00 0.19 619.98 0 0.00 18 Pavement Marking 8 Striping 1 LS 1,281.17 1,261.17 0.19 249.00 0 0.00 19 Street Lights 1 LS 9,800.00 9,800.00 0 0.00 0 0.00 Subtotal 592,060.57 Subtotal $11,470.12 Subtotal _ $0.00 10% Engineering d Administration _ 1.147.01 10% Engineering d Administration 0.00 Subtotal Street System 912,617.13 Subtotal Street System 50.00 Storm oraln SyytllB 1 6(' CIP 344 LF $99.00 $34,056.00 344 $34.056.00 0 $0.00 2 15' SD 15 LF 35.00 525.00 0 0.00 0 0.00 3 12' SD 0 LF 33.00 0.00 0 0.00 0 0.00 4 Pipe Marker 1 EA 180.00 180.00 0 0.00 0 0.00 5 Side Inlet Catch Basin 1 EA 1,200.001,200.00 0 ___0.00 0 _ 0.00_ Subtotal $35,961.00 Subtotal $34,056.00 Subtotal $0.00 10% Engineering b Administration 3,405.60 10% Engineering 6 Administration 0.00 Subtotal Storm Drain System $37.46f.60 Subtotal Stomr Drain System $0.00 Ila Sewer Sy;Lam 1 e' Sanitary Sewer Pipe (VCP) 105 LF 531.00 $3,255.00 0 50.00 0 $0.00 2 Sanitary Sewer Manhole 1 EA 2,600.00 2.600.00 0 0.00 0 0.00 3 Pipe Marker 1 EA 160.00 180.00 0 0.00 0 0.00 4 Remove Existing Riser 1 EA 240.00 240.00 0 0.00 0 _ 0.00 Subtotal $6.275.00 Subtotal SO.00 Subtotal 50.00 10% Engineer" & Administration _,_._.. _ _ 0.00 10% Engineering 6 A 1ministration _ 0.00 Subtotal Sanitary Sewer System 50.00 Subtotal San7tery Sewer system 50.00 Fial9[.Syskm 1 10' Water Pipe (PVC) 434 LF $25.00 $10,850.00 345 $690.00 0 $0.00 2 10' Water Lateral (PVC) 35 LF 25.00 575.00 0 O.DD 0 0.00 3 f 0' Water Velve 2 EA 1.100.00 2,200.00 2 500.00 0 0.00 4 10' Water Lateral Valve 1 EA 1.100.00 1.100.00 0 0.00 0 0.00 5 8' Water Valve 1 EA 850.00 850.00 0 0.00 0 0.00 6 10' x 10' Cross 1 EA 550.00 550.00 0 0.00 0 0.00 7 10'x 8' Reducer 1 FA 180.00 180.00 0 0.00 0 0.00 8 8' Fire Hydrant Assembly 1 FA 2,700.00 2,700.00 0 0.00 0 0.00 9 Pipe Marker 1 EA 180.00 180.00 0 0.00 0 0.00 10 Blowoff 1 EA 700,00700.00 0 0.00 0 0.00 Subtotal $20,185.00 Subtotal 51,190.00 Subtotal 50,00 10% Engineering 6 Administration 119.00 10% Engineering 6 Admintstration0.OD _ Subtotal Water System $1.309AO Subtotal Water System $0.00 Schedule 1 Toldt $154,481.57 Total $51,387.73 Total $0.00 1\ • Ot'LO9'09S 19101 99't5C'tzts 10101 00'95wL1,S -alsASraleMlelal9nS 00'999'8tt uralsASjaleMfelolQns -6i;7 z& >'ZE9'l u0gerlslulwpy q 6uuaaul6u3 °LOl 00'911' 1 u09e4slulwpV y BuuaaulBu3 9101 006ZE'9IS 19101909 00'091'LLS lelolgnS 00"045 E 00'065 f 00'OOVZ f 00'00t'Z E 00'081, l 00'081 L wool I. wool I 00.099 t 00'059 1 WOOL L WOOL I. 00"OZL OE 00'OZL Of 00"058 t 00'058 L WOOL OC 00'091 OE 00'001.1 t 00'00L't t 00'051'1 9y 00'09VI, 91, Wow L' 00.001'1 t ,u 00'6Z9'9S OR 00'00z'LS a9z 00.05 walsAS uler0 wims Ielol9nS 00'ZZl*S6S rualsAS Meta uuo1S 1e1o14aS OO'p ----- uollegsluwpy g6upaaLOu3 %Ot 00'ZOt'6 - u011BAsIupPV 9 6uyaaul6u3 %Ot 0005 lelot9nS 00'0Z0'LYS 101OWS .p ------ --- 0 00'0--- - "- -- 0 00'0 t 00'OOC'S L 00'0 0 00'0 0 00"0 0 00'0 0 00,0 0 00'000'8 09 00'05 0 00'OZL'LZS OBZ OL'09974 uralsAS I—IS /elo79nS 99'"C'LSS uralsAS I"Jis lelot9nS ZS'S68'C -- ..-. - uo!leAslu"py y BuNaaulfw3 9101 66'►tZ'S - -. _ ualerislulwpy p 6ultaaul6u3 %DL Bt'956'93 Molgns L9'61,VMS MOMS 00.0 -- O :�------ 0 051LL 9E1"0 CZ'BYO'I L 95-OZ6't 9EL'O 00'OL9'Z t 9E"66 9£1'0 00'561 L 00'0ZE L 00'OZE t 00.009 Oze 00'909 Oze 00'090'L Olz 00'0904 Olz 80796'tt 99'SB9'6 00'099'99 YZO'EI 1,VOV@ 99189'6 01'OLO'lI 1ZO'Et 66-t9E't 99S89'6 9E'EZB't 6Z0'El BZ'OSI'L 99"98S'5 98'Z951 t'ZD'£I ZL"Btt't 09'61Z 00'099'1 OBC 06'Ozt*6 9CL'Q 00'008'21 t 09'160 9EL'O 00'009 L 9WO6ES 9EL'O 00'OfSS 1 mi xg1WID m 1g11am L8'£60'LILS lelol Z alnp84aS 00'09VLIS MOWS 00'OVS 00'OBL V3 E ra>Neyyad"y E1 OD'OOI'Z 00'00L V3 E IJOMOIB z 00'081 00'091 V3 t miz).9 x.9 x.01 x Al LI 00'091 00'08L V3 t ra2npaa.9x.0t Ot 00'095 00'099 V3 L SSOJ3 AL x .01, 6 00'001 WOOL V3 t aMeAMOM .9 9 00"0Z1 DOW 31, OE (OM) adld raleM .9 L 00'059 00'OSB V3 l aNBAJDAM.9 9 WOOL 0092 31 Of (3Ad) adld ia1BM.9 S 00'0011 00'001'1 V3 t aAWAIM191rateM.01 00'OSL'I 00'9Z ji 96 Md) E 00'OOL't DO'001't V3 1 6AleAiateM.01 Z OO'DOZ'LS 00-SZS dl eez (:)Ad) ad!d i818M At t (,09'0)pww><JIeuIBP0pedwo3 S 00'029'1 0011 A3 00'y6L'L6S Ielol9nS 00'OZL --- 00061 V3 Y ra4jeW adld 9 00'00£'5 00'00£'5 V3 I a104ueW ulerp uWIS Zi S 00'1,067 00'£C dl Be 01BrOwrO1S.ZL f 00'091,'£ 00'5£ dl 06 uler0 uuolS .5I C WOMB DO'091, :#1 09 d3d.09 Z 00'OZL'LZS 00-665 dl OBZ d13.09 L t I 00'009 OS'Z dl wMixguma-mals LB'60179S letol9nS 00:0 --- - 00'0 Sl 0 st4611 Warts St CZ"86D'L £Z'01104 Sl 1 BuldlllS960PIreWluaWaned iL 00-OL9'Z OD"Ot97 Sl 1 ueldlorlu03Oj19r1 fl 00'90 00'SCI Sl t ueldprlu000Jlar1 z 00'OZC WON V3 1 slsod p u61S Waris t I 00'009 OS'Z dl OZC (S 4 N) P -U raurn100 API -4S Ol 00'0901 00'9 dl OLZ am NewsV.9 6 00'08Z'91. SZ't dS VZO'Cl (AYO) 8 adLl'alaruo311eWsV B 01'OLO'L1, 98'0 :is VZOVI (.SL'0)11Ssel3'aSBSOIB6ar86V L 9VEZ8't 01,'0 :is 490'£ L (.OB'O) Ieualeyl DABON gedaa3 9 892991 ZVO dS VZOU (,09'0)pww><JIeuIBP0pedwo3 S 00'029'1 0011 A3 08C u09enWx3xe"000 y 00'00971, 00'ODB'Zt Sl t Qnl94rei13 E 00'009 00'009 51 L I—>i Be4dV Z 00'OCSS 00'OCSS Sl l 6u1per0 slx)aueLWMslyy L W019KCI3071y` (96*90L'01S 01 E't9*ZDL'etS Peoa wwnL) Z a1nPa43S Imi aid p015 x11108116 01>lumm WIN IuS1N3W3A0adW1319VS2MOVON I (,lS1NMOAOI1dWl03dW13j01S03 1 IuS1N3W3AOtldW1133f011dZ101S03WWI Am W TOTAL COST OF PROJECT IMPROVEMENTS r4 I COST OF CAWD IMPROVEMENTS Irl I REIMBURSABLE IMPROVEMENTS /e Hem Description Quantity at teka Iola) QM* raw Ouanlity 19W Schedule 3 (Guild Avenue Sta.114+13.8 to S1a.119+23.7) Street System 1 Miscellaneous Grading 1 LS $2,016.00 $2,016.00 0.84 $1,693,44 0.42 $846.72 2 Asphalt Removal 1 LS 3,040.00 3,040.00 0.84 2.553.60 0.42 1,276.W 3 Clear d Grub I LS 272.00 272.00 0.64 228.48 0.42 114.24 4 Roadway Excavation 1,280 CY 4,00 5,120.00 1,075 4,300.80 536 2,150.40 5 Compact Original Ground (0.50') 17,519 SF 0.12 2,102.28 14,684 1,762.08 1,342 881.04 6 Compaq Native Material (0.80') 17,519 SF 0.14 2,452.66 14,684 2,055.76 7,342 1,027.86 7 Aggregate Base, Class If (0.80') 17,519 SF 0.87 15,241.53 14,684 12,775.08 7,342 6,387.54 8 Asphalt Concrete, Type B (0.401) 17,519 SF 1.25 21,898.75 14,664 18,355.00 7,342 9,177.50 9 Driveway Repair 3 EA 500.00 1,500.00 3 1,500.00 1.5 750.00 10 Shoulder (E 6 W) 1,030 LF 2.40 2,472.00 515 1,236.00 257.5 618.00 11 Traffic Contra Plan 1 LS 240.00 240.00 0.84 201.60 0.42 100.80 12 Traffic Control Plan 1 LS 4,640.00 4,640.00 0.84 3,897.60 0.42 1,948.80 13 Pavement Marking b Striping 1 LS 1,863.52 1,863.52 0.84 1,565.36 0.42 782.68 14 Street Lights 0 EA 0.00._^__ _ 0.00 0 -_ _ 0.00 0 0.00 Subtotal $62,658.74 Subtotal $52,124.60 Subtotal 526,062.40 10% Engineering 9 Administration 5,212.48 10% Engineering E Administration _ 2,6.24 06 Subtotal Street System $57,337.28 SubtotatStreet System $26,668.64_ SIamr Drsln Syeeem 1 42' CIP 496 LF $65.00 532,240.00 496 $32,240.00 0 $0.00 2 24' Storm Drain 10 LF 50.00 500.00 10 500,00 0 0.00 3 18' Slam Drain 182 LF 48.00 8,736.00 182 8,736.00 0 0.00 4 12' Storm Drain 80 LF 33.00 2,640.00 80 2,640.00 80 2,640.00 5 48' Storm Drain Manhole 3 EA 3,100,00 9,300.00 3 9,300.00 0 0.00 6 Relocate 18' Double SO 1 LS 5,696.26 5,698.26 1 5,698.26 0 0.00 7 Pipe Marker 2 EA 180.00 360.00 2 360.00 2 360.00 8 Side Intel Catch Basin 1 EA 1,200.00 1,200A0 1 1,200.00 1 1,200.00 Subtotal $60,674.26 Subtotal $60,674.26 Subtotal $4,200.00 10% Engineering 8 Adminisiralion _ 6.067.43 10% Engineering d Administralion_ 420.(0 Subtotal Storm Drain System $66,741.69 Subtotal Storm Drain System $4,620.00 Sapltaty Sewer Sy3tem 1 8' Sanitary Sewer Pipe (VCP) 565 LF $36.00 $20,340.00 565 $20,340.00 565 $20,340.00 2 Sanitary Sewer Manhole 2 EA 2,600.00 5,200.00 2 5,200.00 2 5,200.00 3 Pipe Marker 1 EA t80.00 11)0.00 1 180.00 1 180.00 4 Sanitary Sewer Riser 1 EA 240.00 _-_ 240.00 1 _... 240.00 1 240,00 Subtotal $25,960.00 Subtotal 525,980.00 Subtotal $25,960.00 10% Engineering b Administration 2,596.00 10% Engineering b Administration Subtotal Sanitary Sewer System $28,556.00 Subtotal Sanitary Sewer System --,---2.%596.00 $28,556.00 Watet Sys 1 to' Water Pipe (PVC) 508 LF $25.00 St2,700.00 508 $1,016.00 0 $0.00 2 10' Water Villve 4 EA 1,100.00 4,400.00 4 1,000.00 0 0.00 3 8' Water Pipe (PVC) 56 LF 26.00 1,456.00 0 0.00 0 0.00 4 8' Water Valve 2 FA 850.00 1,700.00 0 0.00 0 0.00 5 6' Water Valve 2 EA 700.00 1,400.00 0 0.00 0 0.00 6 10' x 6' Reducer 2 EA 180.00 360.00 0 0.00 0 0.00 7 IT x 8' Reducer 2 FA 180.00 360.00 0 0.00 0 0.00 8 10' x10' Cross Assembty 2 EA 550.00 1,100.00 0 0.00 0 0.00 9 W Fire Hydrant Assembly 2 EA 2,500.00 5,000.00 0 0.00 0 0.00 10 Pipe Marker 2 EA 180.00 360.00 0 0.00 0 0.00 11 Blow 00 2 FA 700.00 1,400.00 0 0.000 0.00 1.$0.00 Subtotal $30,236.00 Subtotal $2,016.00 Subtotal 10% Engineering d Administration _ 201.60_ 10% Engineering 6 Administration 0.00 Subtotal Water System $2,217.60 Subtotal Water System $0.00 Schedule 3 Total $179,729.00 Total $154,652.56 Total $61,844.64 • is 1W TOTAL COST OF PROJECT IMPROVEMENTS"' COST OF CAWDED IMPROVEMENTS "l REIMBURSABLE IMPROVEMENTS"' UM DescdMn Qmth 1108 wits IM l21ta081Y 79118 CluantitY IOlal Schedule 4 (Gulid Avenue S1a.119+28.7 to Sta.134+14.8, Mondavi Project) &MI SyJitam 1 Miscellaneous Grading 1 LS $8.215.20 58,215.20 0.62 S5,134.49 0 SO.00 2 AsphaB Removal 1 LS 12,368.00 12,388.00 0.62 7,742.48 0 0.00 3 Clear 6 Grub 1 LS 1,108.40 1,108.40 0.62 692.75 0 0.00 4 Roadway Excavation 5,216 CY 4.00 20.664.00 3,260 13,039.96 0 0.00 5 Compact Original Ground (0.50') 71,333 SF 0.12 8,559.96 44,583 5,349.86 0 0.00 6 Compact Native Material (0.80y 71,333 SF 0.14 9,988.62 44,583 6,241.62 0 0.00 7 Aggregate Base, Class 11 10.87) 71,333 SF 0.87 62,059.71 44,583 38,767.21 0 0.00 a Asphalt Concrete, Type 9 (0.40') 71.333 SF 1.25 89,166.25 44.583 55,728.75 0 0.00 9 100' Commercial Driveway 1 EA 4,800.00 4,600.00 0 0.00 - 0 0.00 10 170' Commercial Driveway 2 EA 9.000.00 16,000.00 0 0.00 0 0.00 11 Vertical Curb, Gutter d Sidewalk 1,160 LF 24.00 27,640.00 0 0,00 0 0,00 12 Concrete Sullgrade Compaction 11,146 SF 0.40 4,458.40 0 0.00 0 0.00 13 Shoulder (W) 1,486 LF 2.40 3,566.40 0 0,00 0 0.00 14 Barricade 2 EA 300.00 600.00 0 0.00 0 0.00 15 Mail Box Relocation 1 EA 150.00 150.00 0 0,00 0 000 16 Driveway Oveday 3 EA 500.00 1,500.00 0 0.00 0 0.00 17 Traffic Control Plan 1 LS 690.00 690.00 0.62 431.25 0 0.00 18 Traffic Control 1 LS 13,340.00 13,340.00 0.62 8,337.48 0 0.00 19 Pavemem Marking 3 Striping 1 LS 5.357.62 5,357.62 0.62 3,348.50 0 0.00 20 Street Lights 1 LS 21,600.00 21,600.00 0 0.00 0 0.00 Subtotal 5314,250.56 Subtotal $144,834.44 _ _ Subtotal $0.00 10% Engineering 6 Administration _ _ 14,483.44 f0% Engineering d Administration Subtotal Street System $159,317.89 Subtotal Street System $0.00 Storm Oratn $Ygtm 1 54'CIP 624 LF $90.00 $56,160.00 624 $58,160.00 0 $0.00 2 48' CIP 921 LF 80.00 73,680.00 921 73.680.00 0 0.00 3 42' RCP 40 LF 65.00 2,600.00 40 2,600.00 0 0.00 4 1 e' Storm Drain 108 LF 46.00 5,184,00 0 0.00 0 0.00 5 1S' Storm Drain 45 LF 35.00 1,575.00 0 0.00 0 0.00 6 12' Storm Grain 60 LF 33.00 1,980.00 0 0.00 0 0.00 7 72' Storm Drain Manhole 0 EA 5.300.00 0.00 0 0.00 0 0.00 a 00' Storm Drain Manhole 5 EA 4,200.00 21,000.00 3 12,600.00 0 0.00 9 Pipe Marker 8 EA 100.00 1,440.00 0 0.00 0 0.00 10 Side Inlet Catch Basin 1 EA 1.200.00t,200.00 _ 0 _ _ 0.00 0 _ _0.00 _ Subtotal 5164,819.00 Subtotal $145,040.00 Subtotal $0.00 10% Engineedng d Administration _ 14,504.00 10% Engineering 8 Administration i _0.00 Subtotal Storm Draln System $159,544.00 Subtotal Storm Drain System $0.00 sanitary Sewer Sy;Iem 1 15' Sanitary Sewer Poe (VCP) 683 LF $75.00 $51,225.00 683 S17,075,DD 0 $0.00 2 12* Sanitary Sewer Pipe (VCP) 351 LF 67.00 23,517.00 351 10,681.00 0 0.00 3 10' Sanitary Sewer Pipe (VCP) 1,022 LF 50.00 51,100.00 0 0.00 0 0.00 4 8' Sanitary Sewer Pipe (VCP) 743 LF 36.00 26,748.00 0 0.00 0 0.00 5 6' Sanitary Sewer Pipe (VCP) 50 LF 31.00 1,550.00 0 0.00 0 0.00 6 Sanitary Sewer Manhole 5 EA 2,600.00 13,000.00 0 0.00 0 0.00 7 Pipe Marker 6 EA 180.00 1,440.00 0 0.00 0 0.00 8 Sanitary Sewer Riser 2 EA 240.00 _...480.00. 0 0.00 0 Subtotal $169,060.00 Subtotal $27,956.00 Subtotal 50.00 10% Engineering d Administration 2,795.60 10% Engineering 8 Administration _ 0.00 Subtotal Sanitary Sewer System $30,751.60 Subtotal Sanitary Sewer System $0.00 WatllL,smtm 1 10' Water Pipe (PVC) 2,924 LF $25.00 $73,100.00 2,924 $5,846.00 0 $0.00 2 110' Water Pipe (DIP) 70 LF 27.00 1,690.00 70 140.00 0 0.00 3 10' WaterValve 24 EA 1,100.00 26,400.00 16 4,500.00 0 0.00 4 RR Xing Jack 8 Bore 18' Caskrg 46 LF 300.00 13,1100.00 23 6.900.00 0 0.00 5 10' x 10' Cross 3 EA 550.00 1,650.00 0 0.00 0 0.00 5 Relocate 10' x 10' Cross 1 LS 1,049.69 1,049.69 0 0.00 0 0.00 6 10'x t0' it 6' x 6' Cross Assembly 3 FA 420.00 1,260.00 0 0.00 0 0.00 7 10' x 10' x 10' Tee 4 EA 300.00 1,200.00 0 0.00 0 0.00 8 10' x 10'x 6' Tee 4 EA 100.00 720.00 0 0.00 0 0.00 9 10' Blind Flange 3 EA 90.00 270.00 0 0.00 0 0.00 10 6' Blind Flange 3 FA 50.00 150.00 0 0.00 0 0.00 11 6' Gale Valva 7 FA 700.00 4,900.00 0 0.00 0 0.00 12 6' Fire Hydrant Assembly 7 EA 2.500.00 17,500.00 0 0.00 0 0.00 13 Pipe Marker 5 EA 100.00 900.00 0 0.00 0 0.00 14 SlowOff 5 FA 700.003,500,00 0 0.00 0 0_00 Subtotal $148,289.69 Subtotal $17,388.00 Subtotal S0.00 10% Engineering 6 Administration _ _ . _. 1,738.80 10% Engineering & Administration _ ___ __ 0.00 Subtotal Water System $19,126.80 Subtotal water System 50.00 T.1.1 $368.740.29 Total $0.00 is TOTAL COST OF PROJECT IMPROVEMENTS "' COST OF CITWO IMPROVEMENTS "' REIMBURSABLE IMPROVEMENTS or 0 llem Description Quatlfilll unit Rdo low ovanlilY 711Ifl1 (hwtdy Ilya! Schedule S (Guild Avenue Sta.134+14.8 to Sta. 137+44.5) - 5:tta5LSyslem 1 Miscellaneous Grading 1 LS $1.600.20 51,600.20 1 51,600.20 0.5 51100,10 2 Asphalt Removal 1 LS 2,413.00 2,413.00 1 2,413,00 0.5 1.206.50 3 Clear d Grub 1 LS 215.90 215.90 1 215.90 0.5 107.95 4 Roadway Excavation -1,016 CY 4.00 4,064.00 1,016 4,064.00 508 2,032.00 5 Compact Original Ground (0.50') 13,860 SF 0.12 1,663.20 13,860 1,663.20 6.930 831.60 6 Compact Native Material (0.80') 13,860 SF 0.14 1,940.40 13,860 1,940.40 6,930 970.20 7 Aggregate Base, Class II (0.80') 13,880 SF 0.87 12.05820 13.860 12,058.20 6,930 6,029.10 a Asphalt Concrete, Type 8 (0.4(Y) 13,860 SF 1.25 17,325.00 13.860 17,325.00 6,930 6,662.50 9 Shoulder (E d W) 330 LF 2.40 792.00 330 792.00 165 396.00 10 6'Asphalt Dike 230 LF 5.00 1,150.00 230 1,150.00 115 575.00 11 Trak Control Plan 1 LS 150.00 150.00 1 150.00 0.5 75.00 12 Traffic Control 1 LS 2.900.00 2,900.00 1 2,900.00 0.5 1,450.00 13 Pavement Marking b Striping 1 LS 1,164.70 1,164.70 1 1,164.70 0.5 582.35 14 Street Lights 0 EA 0.00__,_ - 0.00 0 _ 0:00 0 _ 0.00 Subtotal $47.436.60 Subtotal $47,438.60 Subtotal __ - 523,718.30 10%Engineering d Administration 4,743.66 10% Engineering b Administration _Z,371.83 Subtotal Street System $52,180.26 Subtotal Street System $26,090.13 $►orm Dnln Svstam 1 SO' CIP 326 LF $99.00 $32,274.00 326 $32,274.00 0 $0.00 2 24' Storm Drain 45 LF 50.00 2,250.00 0 0.00 0 0.00 3 f8'SiormDrain 45 LF 48.00 2,160-00 0 0.00 0 0.00 4 12' Storm Drain 70 LF 33.00 2.310.00 0 0.00 0 0.00 5 72' Sloan Drain Manhole 1 EA 5,300.00 5,300.00 1 5,300.00 0 0.00 6 Pipe Marker 2 EA 180.00 360.00 0 0.00 0 0.00 7 Side Intel Catch Basin 1 EA 1,200.00 1,200.00 0 0.00 0 0.00 Subtotal $45,854.00 Subtotal $37,574.00 Subtotal $0.00 10% Engineering ti Administration 3.757.40 10% Engineering d Adminislralion Subtotal Storm Drain System $41,331.40 Subtotal Storm Drain System .--0.00 $0.00 $aLUlaty 45>ecRcSYttlm 1 8' Sanitary Sewer Pipe (VCP) 352 LF 536.00 512.672.00 352 $12,672.00 352 $12,672.00 2 6' Sanitary Sewer Pipe (VCP) 60 LF 31.00 1.060.00 60 1,860.00 60 1,860.00 3 Sanitary Sewer Manhole 1 EA 2,600.00 2,600.00 1 2,600.00 1 2.600.00 4 Pipe Marker 1 EA 180100 180.00 1 .180.00 1 Subtotal $17,312.00 Subtotal $17,312.00 Subtotal $17,312.00 10% Engineering S Administration _ .1 731 20 10%Engmeering d Administration _- 1,731.20 Subtotal Sanitary Sewer System $19,043.20 Subtotal Sanitary Sewer System $19,043.20 Water Svs1081 I 10' Waley Pipe (PVC) 391 LF $25.00 $9,925.00 397 59,925.00 397 $9,285.00 rrr 2 10' Water Valve 4 EA 1,100.00 4,400.00 4 4,400.00 4 3,900.00 m 3 10' x 10' Cross Assembly 1 EA 550.00 550.00 1 550.00 1 550.00 4 Pipe Marker 2 EA 180.00 360.00 2 360.00 2 360.00 5 Blow OI( 2 EA 700.00 1,400.00 2 1,400.00 2 1,400.00 Subtotal 516,635.00 Subtotal $16,635.00 Subtotal $15.495.00 10% Engineering 8 Administration _ 1,663_50 10% Engineering 8 Administration Subtotal Water System 518,298.50 Subtotal Water System $17,044.50 Schedule 5 Total $127.237.60 Total $130,853.36 Total $62,177.63 W TOTAL COST OF PROJECT IMPROVEMENTS "' I COST OF CW6D IMPROVEMENTS n1 I REIMBURSABLE IMPROVEMENTS 11) bill 0=9101ke Quen111Y unk PICC I" QuanglX 7�lel 4u8Nitz Inial Schedule 6 (Guild Avenue Sta.131#44.8 to Sta.139+81) Street By to 1 Miscellaneous Grading 1 LS 5768.80 $768.60 1 $768.60 0.5 5384.30 2 Asphalt Removal 1 LS 1,159.00 1,159.00 1 1,159.00 0.5 579.50 3 Clear 6 Grub 1 LS 103.70 103.70 1 103.70 0.5 51.85 4 Roadway Excavation 488 CY 4.00 1,952.00 488 1,952.00 244 976.00 5 Compact Original Ground (0.50') 6,700 SF 0.12 804.00 6,700 804.00 3,350 402.00 6 Compact Native Material (0.80') 6,700 SF 0.14 938.00 6,700 936.00 3,350 469.00 7 Aggregate Base. Gass II (0.80 6,700 SF 0.117 5.629.00 6,700 5,629.00 3,350 2,914.50 6 Asphalt Concrete, Type 8 (0.40y 6.700 SF 1.25 8,375.00 6,700 6.375.00 3,350 4,187.50 9 Survey Monument 1 EA 550.00 550.00 1 550.00 0.5 275.00 10 Traffic Control Plan 1 LS 120.00 120.00 1 120.00 0.5 60.00 it Traffic Control 1 LS 2.320.00 2,320.00 1 2,320.00 0.5 1.160.00 12 Pavement Marking 8 Striping 1 LS 931.76 931.76 1 931.76 0.5 465.86 13 Street Lights 0 EA 0.00 -'0.0 0 0 0.00 0 _ __ 0.00_ Subtotal $23,851.06 Subtotal $23.851.06 Subtotal $11,925.53 10% Engineering 8 Administration 2,385.1 f 10% Engineering 6 Administration Subtotal Street System $26,236,17 Subtotal Street System 513,118.08 Storm Drain Syslem 1 60' CIP 155 LF 599.00 $15,345.00 155 115,345.00 0 $0.00 2 60* RCP 10 LF 160.00 1,600.00 to 1,600,00 0 0.00 3 30' Storm Drain 68 LF 66.00 4,488.00 0 0,00 0 0.00 4 18' Storm Drain 30 LF 46.00 1,440.00 0 0.00 0 0.00 5 72' Storm Drain Manhole 1 EA 5,300.00 5,300.00 1 5,300.00 0 0.00 6 Pipe Marker 2 EA 180.00 _ 360.00 0 _0:00 0 0.00 Subtotal 526,533.00 Subtotal 522,245.00 Subtotal 50.00 10% Engineering b Administration 2,224,50 _ 10% Engineering B Administration Subtotal Storm Drain System $24,469.50 Subtotal Storm Drain System $0.00 SiNlilty Sewer sYiltM 1 8' Sanitary Sewer Pipe (VCP) 230 LF 536.00 $8.280.00 230 $8,280.00 230 S8280.00 2 6' Sanitary Sewer Pipe (VCP) 80 LF 31.00 2.480.00 80 2,480.00 80 2.480.00 3 Sanitary Sewer Manhole 1 EA 2,600.00 2.600.00 1 2.600.00 1 2,600.00 4 4' Sanitary Sewer Service (55 LF) 1 EA 2,000.00 2.000.00 1 2,000.00 1 2.000.00 5 Pipe Marker 3 EA 180.00 _.... 540.00. 3 _ ... ___,540.00 3 _-- 540.00_ Subtotal $15,900.00 Subtotal $15,900.00 Subtotal 515,900.00 10% Engineering b Administrallon __ 1,590.00 10% Engineering 6 Administration � 1,590.00 Subtotal Sanitary Sewer System $17,490.00 Subtotal Sanitary Sewer System $17,490.00 1(Ift"ItAtem 1 10' Water Pipe (PVC) 244 LF $25.00 $6,100.00 244 $6,100.00 244 $5.660.00 int 2 10' Water Valve 4 EA 1,100.00 4,400.00 4 4,400,00 4 3,900.00 m 3 10' x 10' Cross Assembly 1 EA 550.00 550.00 1 550,00 1 550.00 4 Blowoff 2 EA 700.00.__ 1,400.00 2 1,400.00 2 _1,400.00 Subtotal S12,450.00 Subtotal 512,450.00 Subtotal 511,510.00 10% Engineering 8 Administration 1,245.00 10% Engineering d Admifuslration _ _ 1,151.00 Subtotal Water System $13,695.00 Subtotal Water System $12,661.00 Schedule 6 Total $80,734.06 Total $81,890.67 Total $43,269.08 Total Cost of Improvements $1,455,695.35 Total $909,076.47 Total $228,098.65 Engineering Plan Check Fee (1.5%) $3,110.44 Engineering Inspection Fee 12.5%) $5,164.06 Reimbursement Application Fee 52.073.62 TOTAL REIMBURSABLE COSTS $238,466.77 111 The amounts shorn are based on contract and change order prices provided by Siegfried Engineering, the Oeve(operls engineer. In Reimbursable costs for 10* PVC Water Pipe and 10' Water Valve have been adjusted to include credit for oversize mains. • EXHIBIT C R 53539.01 526126 5+.760 s0 510187.50 51.018.75 5166.06 5310.13 511,702.0 s.96% 512405 SIIA2&SD 523663.01- 32 33,530.84 5251.26 5+,780.09 $10.187.50 51.018.75 SI86.08 $310.13 511.702.45 s,98:L $124.05 511,826.50 R $3.539.84 $251.25 54J80.69 510.187.5U 51.018.75 SIS6.08 5310.13 511.702.45 5.98% W,ID5 511826.30 51fA2&60 R 13.339.84 3251.26 54,700. s9 510187.60 51,018.75 5106.08 5310.43 511,70245 598%5124.05 511,026.50 S11 50 4 $771.93 51A3384$000 ,00 5130.15 $0.00 52.06.50 52.62174 5&073.30 60 5733 596.39 5160.65 510.017.67 3.10% 564.26 S10A81.93 1 5163.93 53"30 50.00 SV -54 5000 533394 538064 SI.473.43 5147.38 52047 531.11 51.675.36 0.66% S136S SIA99.01 91 51,346.86 $3,674.36 50.00 5260.80 5000 $3.151.23 53.593.71 $13.90386 $1.3W.39 $193.15 5321.91 $16.SD&30 6.21% 5128.76 515.938.06 St2a.268.6T D 8.113.16 S50t9.5D 5000 5356.28 SD 00 54,30486 54.909.32 518.993.91 SIAN 39 5263.85 5439.76 521.596.91 8.48% 517&90 S21,iT2.91 71 SSA2979 SW47.86 3000 5982.91 $000 S11.076.30 513.543.91 S52A00.66 55.240.07 5727.93 51.213.21 $59.581.86 23.40% 5405.28 $60.487.16 17 $1.427.64 53,391,17 50.00 5240.70 3090 52,908.36 33318.73 S72A3Zr Sy283.2] 51782 6 297 5.10 314.590.06 573% 5118.64 514,709.70 SS $4,470.70 $10.619.53 50.00 575377 50.00 S9,t07.59 310.386.43 540/04.67 54.018.46 5558.23 5930.36 535.691.63 17.05% $372.15 54&053.76 UGAU76' $0.00 50.00 $0.00 So.Do So.Oo So.00 50.00 So.a0 o.on $0.00 $0.00 $ao9.�,- $0.00 50.00 Woo $0.00 50.00 SOAo so.DD 50.00 0.00% 50.00 11 $3058.42 $217.09 $4,130.69 $8,802.00 S$BD.20 5160.77 5267.95 510,110.92 517% $107.18 51021&10 610211110 00 $16,324.00 $52,172.W SOAD S4.2".D0 50." 561 70623 SN 955.16 5207,36i.-1 t 520 71_!.14 5,31 IQ." _ $1_164.06�._S23y393.15_ 100.00% $2,073_62 S23e 4".76 U.4".76 TOTAL CONSTRUCTION COSTS 6 FELS 5236,393.7! REIMBURSEMENT PREPARATION FEE $2,073.62 REIMBURSEMENT GUS CIT' OF LO01 $238,666.76 sivawanojdwl peonj aawnl pue anuany p!!n0 10 sivawanoidwl anuany pl!n0 0 �t1 Lb'OtW909S 19L'99b'8£Z$ I LL'£L9'69£$ I:S1Nnoviv 1N3W3S2if18W1323 Td1O1 S0*0W6Z$ OL'8LZ'OL$ 96'LU'6L$ Z£', LW 401e8 0 90170-6b0 00'0$ 00'0$ 00'10S E9'8£ LW Isnj1 'Isla OOOZ !Pol 0 £8-80-6tO 00'0$ 00'0$ 00'0$ 00'9 LW isnjl 'Isla OOOZ !Poi 8Z-80-6tO 091ZW$8L'E9O'9b$ Z8'LS8'99$ 00'9L ZIN poohgv 10 90-80-6b0 OE'OVL'SE$ OL*', 09'0£0'LZ$ 6L't, ZW dl'oossy a6eJOIS !pol 10 LL-80-6tO LL'Sb6'svL$ LL'L90'09$ 09'8L8'98$ 99'6L ZIN dl -flossy a6eJolS 1Po-1 10 ££-80-6W L9' OWES$ L8'ZLL' LZ$ 08'82 L' L£$ 60'L ZW dl 'flossy 968JOIS !pol 10 Z£ -80-6t O 8931EL`8E$ LO'8£6'9L$ L9'98L'ZZ$ 6L'S ZW dl -flossy o6eJols 1pol 10 L8-80-6tO 08'£06`1+$ L0'689' L$ 6L't,L v'Z$ 99*0 ZW dl -oossy a6eJOIS !pol 10 Z8 -80-6b0 E9'0004ZZ$ Z6' 680'0 l$ L9'9 WL L$ 69'Z LW dl -flossy 86eJolS !pol 10 bL-80-6b0 s6'9sVi►E$ 05'9Z8'LLs 99'8Z£'ZZ$ 00'9 m puelejolN 0 6L-80-6VO S V99 VVE$ 09'9Z8' L L$ 99'8Z£'ZZ$ 00'9 LN PuelaJoW 0 SL -80-6170 SL 99VVE$ 09'9Z8'LL$ 99'8Z£'ZZ$ 00'5 LW 43Ie8 J LL -80-6b0 sVSS6`t+£$ 05'9Z8'LLs 99'8Z£`ZZ$ 00'9 LW 40189 J 9L-80-00 EE'6L9Ocs OZ'OZ9'OL$ £L'LSO'OZ$ 6Vt, 0 LO-80-6tO 4 H101 F��ooz10 OWH1N3 3 �Jf19W13 3 �/HS2lI�d�S32l�d �N�NO213NM0, 60.a� 114. t 91181 HX3 0 S1Nnowv 1N3W3sNnsW13N 3NvHS uiv:A iO kNvwWf1S 0 Set Public Hearing for August 6, 2003 to consider Reimbursement Agreement RA -03-01 establishing an area of:benefit and reimbursable costs for developer -funded pu bile improvements for 770 North Guild. Avenue and a resolution establishing an area of benefit and reimbursable costs for City -funded improvements for the project at 770 North Guild Avenue On Thursday, July 3, 2003, in the City of Lodi, San Joaquin County, California, a copy of the notice to a set Public Hearing for August 6, 2003 to consider Reimbursement Agreement RA -03-01 establishing an area of benefit and reimbursable costs for developer -funded' public improvements for 770 North Guild Avenue and a resolution establishing an area of Benefit and reimbursable costs for City -funded improvements for the project at 770 North Guild Avenue (attached hereto, marked Exhibit "A") was posted at the following four locations: Lodi Public Library Lodi City Clerk's Office Lodi City Hall Lobby Lodi Carnegie. Forum I declare under penalty of perjury that the foregoing is true and correct. Executed on July 3, 2003, at Lodi, California. Patricia Ochoa Administrative Clerk f0nIIS,dtGP0St.d()C Jennifer M, Perrin Deputy City Clerk 0 DECLARATION OF M&ILING Set Public Hearing for August 6, 2003 to consider Reimbursement Agreement RA -03-01 establishing an area of benefit and reimbursable costs for developer -funded public improvements for 770 North:Guild Avenue and a resolution establishing an area of benefit and reimbursable cos ts for City -funded improvements for the project at 770 North Guild Avenue On July 3, 2003, in the City of Lodi, San Joaquin County, California, I deposited in the United States mail, envelopes with first-class postage prepaid thereon, containing a Public Hearing notice to set a Public Hearing for August 6, 2003 to consider Reimbursement Agreement RA -03-01 establishing an area of benefit and reimbursable costs for developer - funded public improvements for 770 North Guild Avenue and a resolution establishing an area of benefit and reimbursable costs for City -funded improvements for the project at 770 North Guild Avenue, marked Exhibit "A"; said envel ere addressed as is more particularly shown on Exhibit "B" attached hereto. = :\ - There is a regular daily communication by mail between the City of Lodi, California, and.the places to which said envelopes were addressed. I declare under penalty of perjury that the foregoing is true and correct, Executed on July 3, 2003, at Lodi, California. .IN TAY CIT LER Forms/&cmail.doc For information regarding this notice please contact: Susan J. Blackston City Clerk Telephone. (209) 333-6702 NOTICE OF PUBLIC HEARING NOTICE IS HEREBY GIVEN that on Wednesday, August 6, 2003 at the hour of 7:00 p.m., or as soon thereafter as the matter may be heard, the City Council will conduct a Public Hearing at the Carnegie Forum, 305 West Pine Street, Lodi, to consider the following matter: a) Reimbursement Agreement RA -03-01 establishing an area of benefit and reimbursable costs for developer -funded public improvements for 770 North Guild Avenue and a resolution establishing an area of benefit and reimbursable costs for City -funded improvements for the project at 770 North Guild Avenue information regarding this item may be obtained in the office of the Public Works Department Director, 221 West Pine Street, Lodi, California, All interested persons are invited to present their views and comments on this matter. Written statements may be filed with the City Clerk at any time prior to the hearing scheduled herein, and oral statements may be made at said hearing. It you challenge the subject matter in court, you may be limited to raising only those issues. you or someone else raised at the Public Hearing described in this notice or in written correspondence delivered to the City CIerk, 221 West Pine Street, at or prior to the Public Hearing. By Order of the Lodi City Council: Susan J. Blackston City Clerk Approved as to form: 'or Randall A. Hays City Attorney 711103 IE3�iiibtaPCE�B$Eid€�i€EflfEE6E� BATCH D L AAR D & DOWS TR 11174 N DAVIS RCS LORI CA 95242 )ooc� 16-)o fame 441b liko �iiiE€SISdi €1 E6EIaEIII€Bd}k€HHI MOR LAND ROBERT MORTON ETAL 775 N GUILD AVE LODI CA 95240 k6a9aE8E4EtE�aBfIE€IIS€Eta€€S� M TTLER OLE R & DOROTHY M TR 17900 N CHERRY RD LORI CA 95240 l[[ aac 4(WiAQ oocQ "4M pp 4l3q ii€I€PEI€�EIEi€IEIEf�i€Etl€IEE¢ ATWOOD EDWARD L TR ETAL 13179 MCDOLE ST SARATOGA CA 95070 ] (( pp—XQW& 16-10 owu j 1 91.03 itt[lfftE€�EICICEI€€$tE�$EF[3€� LORI 2000 DISTRIBUTION TRUST 901 KAISER R0 NAPA CA 94558 [E:X H I B =lT B Ila�aaa�E�efal�aa�a�aa��eaEa:�a�� LODI STORAGE ASSOCIATES LIQ 4701 SISI{ RD SUITE '101 MODESTO CA 95356 i . —MP.e� � % i 'dna k mitw",xAA ) CITY OF LODI P. Q. BOX 3006 LOM, CALIFORNIA 95241.-1910 �j-UBJECTSet Public Hearing for August 6, 2003 to consider Reimbursement Agropment RA -03-01 establishing developer -funded public improvements for 770 North Guild Avenue'and a resolution establishing an area of benefit and reimbursableo for City - funded Improvementsthe project 'i NorthGuild Avenue DATED_ THURSDAY, JULY 3, 2003 LAS, form-, adVIns .do-- .. CITX COUNCIL SUSAN HITCHCOCK, Mayor EMILY HOWARD Mayor Pro Tempore JOHN BECKMAN LARRY D. HANSEN KEITH LAND CITY OF LODI PUBLIC WORKS DEPARTMENT CITY HALL, 221 WEST PINE STREET P.O. BOX 3006 LODI, CALIFORNIA 95241-1910 (209)333-6706 FAX (209) 333-6710 EMAIL pwdept@todi.gov http:\\www.lodi.gov Lodi 2000 Distribution Trust 901 Kaiser Road Napa, CA 94558 July 31, 2003 Siegfried Engineering 4045 Coronado Ave. Stockton, CA 95204 H. DIXON FLYNN City Manager SUSAN J. BLACKSTON City Clerk RANDALL A. HAYS City Attorney RICHARD C. PRIMA, JR. Public Works Director Interested Parties "Zin&Zd SUBJECT: Public Hearing to Consider Reimbursement Agreement RA -03-01 Establishing an Area of Benefit and Reimbursable Costs for Developer -Funded Public Improvements for 770 North Guild Avenue and a Resolution Establishing an Area of Benefit and Reimbursable Costs for City -Funded improvements for the Project at 770 North Build Avenue Enclosed is a copy of background information on an item on the City Council agenda of Wednesday, August 6, 2003. The meeting will be held at 7 p,m. in the City Council Chamber, Carnegie Forum, 305 West Pine Street. The Council will conduct a public hearing on this item. You are welcome to attend and speak at the appropriate time. If you wish to write to the City Council, please address your letter to City Council, City of Lodi, P. O. Box 3006, Lodi, California, 95241-1910. Be sure to allow time for the mail. Or, you may hand -deliver the letter to City Hall, 221 West Pine Street. If yQu W15h tQ address the Council at the Council Meeting, be sure to fill out a speaker's card (available at the Carnegie Forum immediately prior to the start of the meeting) and give it to the City Clerk. If you have any questions about communicating with the Council, please contact Susan Blackston, City Clerk, at (209) 333-6702. If you have any questions about the item itself, please call Sharon Welch, Senior Civil Engineer, at (209) 333-6800, extension 2659. 7L ?U7�2,� Richard C. Prima, Jr. �r Public Works Director RCPlpmf Enclosure cc: City Clerk NCC_ PH_770NGUILDAVE IIJI1111111J IIIIIIIIIIIIIIIII I 111 1111 11 11 II 1111 111111 1111 11411 11 FI11111111111i11111II111111111 BATCH DELMAR D & DORIS TR ATWOOD EDWARD L TR ETAL MORELAND ROBERT & SANDRA 11174 N DAVIS RD 13179 MCDOLE ST 17611 N GUILD AVE LODI CA 95242 SARATOGA CA 95070 LODI CA 95240 IIII1111111111111I11111111111111 MORELAND ROBERT MORTON ETAL 775 N GUILD AVE LODI CA 95240 I I I I I I I I I I I I I I I I II 11111111111111 METTLER OLE R & DOROTHY M TR 17900 N CHERRY RD LODI CA 95240 1111111111i111k111Ekl1llll},IIII LODI 2000 DISTRIBUTION TRUST 901 KAISER RD NAPA CA 94558 1111111III111111 E11111111 EIIIIII LODI STORAGE ASSOCIATES LP 4701 SISK RD SUITE 101 MODESTO CA 95356 CITY COUNCIL SUSAN HITCHCOCK, Mayor EMILY HOWARD Mayor Pro Tempore JOHN BECKMAN LARRY D. HANSEN KEITH LAND CITY OF LODI CITY HALL, 221 WEST PINE STREET P.O. BOX 3006 LODI, CALIFORNIA 95241-1910 (209)333-6702 FAX (209) 333-6807 citycirk@lodi.gov August 7, 2003 TO: ALL INTERESTED PARTIES � Sem CITY COUNCIL PUBLIC HEARING — RA -03-01 H. DIXON FLYNN City Manager SUSAN J. BLACKSTON City Clerk RANDALL A. HAYS City Attorney This is to notify you that at the City Council meeting of August 6, 2003, the Council voted to: 1) approve the Reimbursement Agreement RA -03-01 for public improvements for 770 North Guild Avenue establishing an area of benefit and reimbursable costs for developer -funded public improvements for 770 North Guild Avenue; and 2) establish an area of benefit and reimbursable costs for City - funded improvements for the project at 770 North Guild Avenue. A copy of the City Council resolution pertaining to this matter is attached for your records. Should you have any questions regarding this, please contact the City Clerk's Office at (209) 333-6702. Sincerely, Susan J. Blackston City Clerk cc w/o encl: Sharon Welch, Senior Civil Engineer PON Works Popartment BATCH DELMAR D & DORIS TR 11174 N. DAVIS ROAD LODI, CA 95242 ATWOOD EDWARD L TR ETAL 13179 MCDOLE STREET SARATOGA, CA 95070 MORELAND ROBERT & SANDRA 17611 N GUILD AVENUE LODI, CA 95240 MORELAND ROBERT MORTON ETAL 775 N GUILD AVENUE LODI, CA 95240 LODI 2000 DISTRIBUTION TRUST 901 KAISER ROAD NAPA, CA 94558 LODI STORAGE ASSOCIATES LP 4701 SISK ROAD, SUITE 101 MODESTO, CA 95356 METTLER OLE R & DOROTHY M TR 17900 N CHERRY ROAD LODI, CA 95240