Loading...
HomeMy WebLinkAboutAgenda Report - July 16, 2003 E-10CITY OF Low 111111111111111111111 Jill HITk ... AGENDA TITLE: Adopt Resolution Awarding Contract for Fire Station 1 H10AC Design/Build Project, 210 West Elm Street, to Air Systems of Sacramento ($100,830); and Appropriate Funds MEETING DATE: July 16, 200.3 PREPARED BY: Public Works Director RECOMMENCED ACTION: That the City Council adapt a resolution awarding the contract for the: above project to Air Systems, of Sacramento, in the amount of $100,825 and appropriate funds in accordance with the recommendation shown be. taw. BACKGROUND INFORMATION: This project consists of the design and building (design, supply, and installation) an interim HVAC system for the Fire Station 1 living quarters. The living quarters consist of the following second flour spaces: dormitory, recreation room, kitchen, battalion chief and: women's dormitories and hallway (5 zones proposed). Project bids reflect the installation and materials in the engineer's estimate and the bidder's design costs. Alternate #1 is to remove existing ductwork, if necessary, for new system installation. An 8% contingency is requested for unanticipated structural work. Plans and specifications for this project were approved on March 19, 2003. The City received the following two bids for this project: Bidder Engineer's Estimate Air Systems Lodi Services beat & Cooling FUNDING: (requested Appropriation: Project Estimate: Bid Opening Date: Funding Available: Location Base Bid Alt #1 Sacramento $96,825 $4,000 Lodi $105,200 $28,905 General Capital Outlay Fund $110,0001 $70,000 (construction only) July 2, 2003 Financ irector f Richard C. Prirr� Jr. Public Warks Director Prepared by Dennis J. Callahan, Fleet and Facilities manager RCPIDJCIpmf cc: City Attorney Purchasing Officer Facilities Supervisor ri. i.Avvard Flynn -- City Bid Total $70,000 $100,825 $134,165: 07/09/03 RESOLUTION NO. 2003-125 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE BID FOR FIRE STATION #1 HVAC DESIGN/BUILD PROJECT, 210 WEST ELM STREET, AND FURTHER APPROPRIATING FUNDS FOR THIS PROJECT WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on July 2, 2003, at 11:00 a.m. for Fire Station #1 HVAC Design/Build Project, 210 West Elm Street, described in the specifications therefore approved by the City Council on March 19, 2003; and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as follows: Bidder Engineer's Estimate Air Systems Lodi Services Heat & Cooling Location Sacramento Lodi Base Bid $ 96,825.00 $105,200.00 Alt #1 $ 4,000.00 $ 28,965.00 Bid Total $ 70,000.00 $100,825.00 $134,165.00 WHEREAS, the City Manager recommends award of the bid for Fire Station #1 HVAC Design/Build Project, 210 West Elm Street, be made to the low bidder, Air Systems, of Sacramento, California, in the amount of $100,825.00. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the bid for Fire Station #1 HVAC Design/Build Project, 210 West Elm Street, be made to the low bidder, Air Systems, of Sacramento, California, in the amount of $100,825.00; and BE IT FURTHER RESOLVED that funds in the amount of $110,000.00 be appropriated from the General Capital Outlay Fund for this project. Dated: July 16, 2003 --------------- --- ------------------ I hereby certify that Resolution No. 2003-125 was passed and adopted by the City Council of the City of Lodi in a regular meeting held July 16, 2003, by the following vote: AYES: COUNCIL MEMBERS — Beckman, Hansen, Howard, and Land NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — Mayor Hitchcock ABSTAIN: COUNCIL MEMBERS — None SUSAN J. BLACKSTON City Clerk 2003-125