Agenda Report - July 16, 2003 E-09
AGENDA TITLE: Adopt Resolution Awarding Contract for Lodi Avenue Asphalt Concrete Resurfacing, Ham Lane bo Union PaCift Railroad, to Granite Construction Company of Stockton ($349,990) and Appropriate Funds MEET|NGDATE-1 July -16.2003 PREPARED8Yi Public Works Director REC()K4K4ENDEDACT{(}N� That the City Cound|adopt aresolution awarding the contract for the above project to Granite Construction Company, of Stockton, inthe amount mf$34g.985.08and appropriate funds in accordance with the recommendation shown below. 8ACK[SROUND{NFORK3AT|ON: This project consists ofinstalling approximately 3,000 tons of asphalt concrete and 24`850square yards of pavement reinforcementfabric-, concrete wheelchair ramps; pavement grinding; pavement striping; and otherinoiUenha| and related work, all as shown on the plans and specifications for the above project, Option prices for both weekend (Sunday) paving and nighttime paving were requested.The actual paving will be completed hR two days and wiU require closure of only the roadway being paved that day. The addUbuna|cost oYpaving nn Sundays ($30.80O)orpaving atnight (two nights) ($2O.000)does not seem tobawarranted. There were 242letters sent toaffected residences and businesses, To date, we have received only four inquiries voicing interest or concerns about the project. Plans and specifications for this project were approved onMay 21.2003. The City received the following five bids for this project. Acopy ofthe Bid Tabulation for this project is attached. The recommended appropriation amount includes the construction contract and an allowance for testing and related construction engineering expenses and contingencies. Bidder Enaineer's Estimate Granite Construction Company Tom Mayo Construction Martin Brothers Construction George Reed, Inc. Biondi Paving, Inc. FUNDING: Requested Appropriation Project Eotinnshw� Bid Opening Date: Funding Available: Location Stockton Stockton Rancho Cordova Lodi Sacramento Transportation Development Act Street Fund Measure Transportation Congestion Relief Funds $402,000 J|11113 Finance rector L�Jr. Richard C. Prima, Public Works Director ' // 01d $357.500�00 $349.985,00 $355.844.00 $376.659,25 $385.946AO $467.407.00 $ G.00O-O0 $ 11.000.00 $258,U00.N] $130.000-00 Street Superintendent Ff. Qix6nFlynn -- City'Manager CITY OF 1 ODJ Public Works Department Tabulation of kids receiver! July 2, 2003 PROJECT: LODi AVENUE ASPHALT CONCRETE RESURFAQNG Ham L.anie to Union Pacific Railroad E ngineel`s Estimate Gianilk,, oin'Ma yo consisrsction Sl ockton Stockton Item DescfipP Corn Oty Unit Price Total Price, otal {'rice Toiai 1 TratticConlrol 1 LS 15,000.00 $i 5,000.00 $30,000.00 530,0011.00 $42,€300.75 $12,000.75 2 Coraslruction Notification 1 Ls 5,000.00 $5,000.00 5,13110.170 Ss00&()0 500,00 $500.Go 3 Pavement Reinforcing Fabric .24,843 SY 1.50 $37,264.50 0.70 517,390.1.0 0.75 $18,632.25 4 Asphalt Concrete 3,000 Tsar: 45.09 $136,004.00 � 47.00 $141,000.00 47.00 $141,isN.00 5 Pavernenl Edge or End Grinding 9,436 LF 1.50 $14,154.00 ; 1.25 $11,795.04 1.00 $9,436:00 6 Adjust Manhole 1 -rump and Cuvet to Gra€le 50 FA'. 400.04 $20,000,00 ` 37 i $113,7`_50.00 250.00 $12.500,90 7 Adjust VVater `calve Frame anal Cover io Caad,� 50 EA 350.% $17,5.@0.00 3(14).{1(3 :x15,00(3.011 175.00 58,7SO.00 8 Adjust Survey Monument Box to Grade 1 EAS 20 ).00 '$200.00 3130.90 53€30.90 175.00 $115.00 9 Adjust Eie;ctric Vault Manhole Frame and Cover to Grade~ 1 UA1 4130.00 $4007.00 274 ,00 $2,749.00 650.414 $1150,061 10 Pavement 5!rri3lrac. Markings, Lecgen s arar3 R fEecbve Markers 1 t_S 37,0®[l.1i0 $37,000 00 43000.{)0 $43,000-0(3 4G1i00.fl0 $4G,0i3t7.g0 11 Traffic &&nal Modificagions t LS ` 761,000.00 �7s, .eta 6i.ti4i0.£kJ $�aS,D€30.€1il 761,1103.110 $713,000,00 TOTAL $357,51&5() $3=19:985.0+3 $355,644.0€1 03PTiONAL WORK ITEMS A Pare on Sunday(s) Cost 19if erenfial 1 LS 10.000.130 $ 10,000.00 30,004.00 530,000 00 20,000.00 $20,000.00 4 Pave ill the Evesin€3 Hours 1 LS 10,000.00 $ 10,000,00 , 213,0001 06 $20,000.00 10,4100.00 $10,040.00 Martin 13r9alefs Construct. Georv3 Meed, lnc. Biondi Paving, inc. Rarns;llo Cordova Lada sacrimenin nem DescriplY on Oly Unit p6r-e To%c i Price Total Price Totaa 1 Traffic Control t f.S 10,1300.00 $10,0003 00 57,000.00 $57,£100.00 011,500,430 $6125()(Wfl 2 r-onstrtiction Nolificati€an a LS,� 2,500.00 $2,500.00 2,0WD0 $2,1300.510 10,175,010 $10,175.00 3 Pavement Reinforcing Fabric 24,843 SYi 0.75 $18,632.25 0.80 $19,874.40 1,00 $24,134100 4 Asphalt Concrete 3,000 Ton, 56.00 $168,000.00 42.75 $,128,20103.010 54.170 $162,000DO 5 Pavement Edge or End Gfinding 9,436 LF! 0.75 $7,077.00 2.00 51$,872,00 2.75 $25;134.9.(3(1 6 Adjust Ni3nhOle Franle and Cover to Grads: aft 1-X x)503 cto $27,5€.0.00 3x1';.00 $ I7,7;i€3.{31) 750,00 $37,5013.00 7 Adjust mater Valve Frame and Coves to Grade 50 FA 450.13(} $22.500.00 350,00 517,rko.00 400 00 $20,€300.40 8 Adjust Survey Monument Box to Grade 1 CA % 750,0.3 $750.00 250.00 $250.01D 500.00 3600,00 9 Adjust Electric Vault Manhote Frame and Cover io Grade 1 1"Ai 2,500.00 $2,500.00 450.Uo $450.00 ; 2,800.00 $2x800.00 101 Pavement Sl6pinsd, Markings, Legends and Reflective Markers 1 LS1 46,700.00 $46,70.0.00 52,0W00 $52,000.00 48,6200.00 $48,6410,110 11 Traffic 5ignai Modifications 1 LS11?0,50.0.00 $70,500.00 72,1700.0© $72.,000.00 73,500.00 $73,500.00 TOTAL $376,659.25 $38' '946.49 $467,467.00 OPTIONAL WORK ffEM.S A. Pave on suiaday(s) Goss D iferentlal 1 €..S 8,40(L00 $ 8.400.00 16,500.1363 $ tri,5004 00 13,090,00 5 131000:()0 B Pave in the Eversirisg Flours 1 L5 4,500.110 $ 4,500.00: 10,000.W $ 10,000.00 7,550,€ 0 $ 7,550.40 RESOLUTION NO. 2003-124 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE BID FOR LODI AVENUE ASPHALT CONCRETE RESURFACING, HAM LANE TO UNION PACIFIC RAILROAD, AND FURTHER APPROPRIATING FUNDS FOR THIS PROJECT WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on July 2, 2003, at 11:00 a.m. for Lodi Avenue Asphalt Concrete Resurfacing, Ham Lane to Union Pacific Railroad, described in the specifications therefore approved by the City Council on May 21, 2003; and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as follows: Bidder Location Bid Engineer's Estimate $357,500.00 Granite Construction Company Stockton $349,985.00 Tom Mayo Construction Stockton $355,644.00 Martin Brothers Construction Rancho Cordova $376,659.25 George Reed, Inc. Lodi $385,946.40 Biondi Paving, Inc. Sacramento $467,467.00 WHEREAS, the City Manager recommends award of the bid for Lodi Avenue Asphalt Concrete Resurfacing, Ham Lane to Union Pacific Railroad, be made to the low bidder, Granite Construction Company, of Stockton, California, in the amount of $349,985.00. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the bid for Lodi Avenue Asphalt Concrete Resurfacing, Ham Lane to Union Pacific Railroad, be made to the low bidder, Granite Construction Company of Stockton, California, in the amount of $349,985.00; and BE IT FURTHER RESOLVED that funds be appropriated as follows: Transportation Development Act $ 5,000.00 Street Fund $ 11,000.00 Measure K $256,000.00 Transportation Congestion Relief Funds $130,000.00 Dated: July 16, 2003 --------------------------------------------------------------------------------- ------------------------------------------------------------------------------- I hereby certify that Resolution No. 2003-124 was passed and adopted by the City Council of the City of Lodi in a regular meeting held July 16, 2003, by the following vote: AYES: COUNCIL MEMBERS — Beckman, Hansen, Howard, and Land NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — Mayor Hitchcock ABSTAIN: COUNCIL MEMBERS — None SUSAN J. BLACKSTON City Clerk 2003-124