Loading...
HomeMy WebLinkAboutAgenda Report - July 16, 2003 E-0607 . IJNCIL COMMUNICATION AGENDA TITLE: Adopt Resolution Rejecting All Bids, Approving Revised Specifications, and Authorizing Advertisement for Bids for Sidewalk Repair Program and Miscellaneous Repair Program, Fiscal Year 2003/04, and Further Authorizing the City Manager to Award or Reject the Contract up to $38,000 MEETING DATE: July 16, 2003 PREPARED BYPublic Works Director RECOMMENDED ACTION-, That the City Council adopt a resolution rejecting all bids, approving the revised specifications for the above project, authorizing advertisement for bids, and further authorizing the City !Manager to award or reject the contract up to $38,000 BACKGROUND INFORMATION: The specifications provide for the placing of concrete at various locations within the City. Concrete placement includes removal of curb, gutter, and sidewalk with all removal performed by City forces. Specifications for this activity were approved on April 16, 2003, with the adoption of Resolution No. 2003-56. The City received the following bids for this project: Bidder Location Total Bid Engineer's Estimate $30,000 Jeff Case Construction Lodi $71,065 Popuch Concrete Lodi $75,450 Funds ($30,000) have been appropriated in the 2003/2004 Financial Plan and Budget. In the past, costs fr r th.e annual sidewalk repair program included removal of the concrete. In a cost-saving effort, the removal of concrete was eliminated from the contract with all removal work to be performed by City forces. Removal has been an integral part of the contractor's bid, allowing for a reduced cost for concrete installation. This resulted in a higher cost of installation, Since the bid was higher than the Engineer's Estimate, the specifications have been revised to eliminate items and reduce quantities in order to get costs down to the allocated amount. The amount of $38,000 is to allow for any unforeseen increase in costs due to the smaller quantities, which can be adjusted down by contract change order, The revised specifications are on file in the Public Works Department. Staff requests that Council authorize the City Manager to award or reject the project up to $38,000. FUNDING: Funds have been appropriated in the 200312004 Financial Pian and Budget (Page D-13, Summary of Significant Expenditures and Staffing Changes, 105031 Account) Project Estimate: Planned Bid Opening Gate Funding Available: $30,000 July 29, 2003 Vicky I Afhie„ •in irecf r Ridhard C. Prima., Public Works Director Prepared by Curt Juran, Assistant Street Superintendent RCPICMBICJidsg cc: Fundy !"lays, City Attorney George Bradley, Street Superintendent Curt Juran, Asst. Street Superintendent F, Wally Sandelin, City Engineer Joel Harris, Purchasing Officer AFPRovFD: ... , H ixon Flynn City Manager CRejectFtsE id.dac 07!07/03 RESOLUTION NO. 2003-122 A RESOLUTION OF THE LODI CITY COUNCIL REJECTING ALL BIDS, APPROVING THE REVISED SPECIFICATIONS, AND AUTHORIZING ADVERTISEMENT FOR BIDS FOR SIDEWALK REPAIR PROGRAM AND MISCELLANEOUS REPAIR PROGRAM, FISCAL YEAR 2003-04; AND FURTHER AUTHORIZING THE CITY MANAGER TO AWARD OR REJECT THE CONTRACT UP TO $38,000.00 WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on June 17, 2003, at 11:00 a.m. for Sidewalk Repair Program and Miscellaneous Repair Program, Fiscal Year 2003-04, described in the specifications, therefore approved by the City Council on April 16, 2003; and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as follows: Bidder Location Total Bid Engineer's Estimate $30,000.00 Jeff Case Construction Lodi $71,065.00 Popuch Concrete Lodi $75,450.00 WHEREAS, in a cost-saving effort, the removal of concrete was eliminated from the contract with all removal work to be performed by City forces. Removal has been an integral part of the contractor's bid, allowing for a reduced cost for concrete installation. This resulted in a higher cost of installation; and WHEREAS, because the bids submitted were higher than the engineer's estimate, staff recommends rejecting the bids and re -advertising with revised specifications eliminating items and reducing quantities; and WHEREAS, staff recommends that the City Manager be authorized to award or reject the contract up to $38,000.00. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council hereby rejects the bids for Sidewalk Repair Program and Miscellaneous Repair Program, Fiscal Year 2003-04; and BE IT FURTHER RESOLVED that the Lodi City Council hereby approves the revised specifications and authorizes advertisement for bids for the Sidewalk Repair Program and Miscellaneous Repair Program, Fiscal Year 2003-04; and further authorizes the City Manager to award or reject the bid up to $38,000.00. Dated: July 16, 2003 I hereby certify that Resolution No. 2003-122 was passed and adopted by the City Council of the City of Lodi in a regular meeting held July 16, 2003, by the following vote: AYES: COUNCIL MEMBERS — Beckman, Hansen, Howard, and Land NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — Mayor Hitchcock ABSTAIN: COUNCIL MEMBERS — None SUSAN J. BLACKSTON City Clerk 2003-122