AGENDA TITLE: Adopt Resolution Accepting Development Improvements at 312 and
316 South Sacramento Street
MEETING DATE: April 21, 2004
PREPARED BY: Public Works Director
RECOMMENDED ACTION: That the City Council adopt a resolution accepting the development
improvements at 312 and 316 South Sacramento Street.
BACKGROUND INFORMATION: Improvements at 312 and 316 South Sacramento Street have been
completed in substantial conformance with the requirements of the
Improvement Agreement between the City of Lodi and Vic Meyers, Inc.,
as approved by the City Council on January 7, 2004, and as shown on
Drawing No. 003D058-01.
Dedication of street right-of-way and installation of street improvements along the Sacramento Street
street frontage were required as a condition of the building permit issuance. Since the developer
replaced the majority of the curb, gutter and sidewalk fronting the subject's parcels, staff received Council
approval to have Vic Meyers, Inc., widen the east side of Sacramento Street from the northerly boundary
of the developer's property to Lodi Avenue. Upon acceptance of this project, the City will reimburse
Vic Meyers, Inc., for the cost of the street improvements north of 312 South Sacramento Street. This
reimbursement cost is $10,106.98.
FUNDING: IMF — Local Streets $10,106.98
Prepared by Wesley Fujitani, Senior Civil Engineer
RCPMKFIpmf
cc: City Attorney
Senior Civil Engineer - Development Services
Senior Traffic Engineer
Engineering Technician Supervisor
Chief Building Inspector
APPROVED:
caccpt_312 S Sacramento_doc
uaa�Q
Richard C. Prima, Jr.
Public Works Director
H. Dion Flynn,
4/7/2004
When Recorded, Return to:
City of Lodi City ClerWs Office
P-0Box 8005
Lodi, CA 95241-1910
A RESOLUTION OF THE LODI CITY COUNCIL
ACCEPTING THE DEVELOPMENT IMPROVEMENTS INCLUDED
IN THE IMPROVEMENT AGREEMENT FOR 312 AND 316 SOUTH
SACRAMENTO STREET
The City Council of the City of Lodi finds:
1 That the requirements of the Improvement Agreement between the City of Lodi and Vic
Meyers, Inc., for the public improvements at 312 and 316 South Sacramento Street,
have been substantially complied with. The improvements are shown on Drawing No.
003D058-01 on file in the Public Works Department and as specifically set forth in the
plans and specifications approved by the City Council on January 7, 2004.
Dated: April 21, 2004
I hereby certify that Resolution No. 2004-68 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held April 21, 2004, by the following vote:
AYES: COUNCIL MEMBERS — Beckman, Hitchcock, Howard, Land, and
Mayor Hansen
ABSENT. COUNCIL MEMBERS — None
SUSAN J. BLACKSTON
City Clerk
CITY COUNCIL
LARRY D. HANSEN, Mayor
JOHN BECKMAN
Mayor Pro Tempore
EMILY HOWARD
SUSAN HITCHCOCK
KEITH LAND
Bank of Stockton
Attn: Mr. Kent Fyffe
P.O. Box 759
Lodi, CA 95241
CITY OF LODI
PUBLIC WORKS DEPARTMENT
CITY HALL, 221 WEST PINE STREET
P.O. BOX 3006
LODI, CALIFORNIA 95241-1910
(209)333-6706
FAX (209) 333-6710
EMAIL pwdept@lodi.gov
http:\\www.lodi.gov
April 22, 2004
SUBJECT: 312 and 316 South Sacramento Street
H. DIXON FLYNN
City Manager
SUSAN J. BLACKSTON
City Clerk
D_ STEPHEN SCHWABAUER
Interim City Attorney
RICHARD C. PRIMA, JR.
Public Works Director
The City Council of the City of Lodi, at its meeting on April 21, 2004, accepted the public
improvements in the subject project. A copy of the resolution is enclosed for your files.
This letter is your authorization to exonerate the portion of the Instrument of Credit
covering faithful performance, in the amount of $20,506.98. The portion of the
Instrument of Credit covering labor and materials ($10,253.49) must remain in effect
until July 20, 2004, in conformance with State law. You will receive no further
correspondence regarding the release of the Instrument of Credit.
If you have any questions, please contact Rebecca Areida, Management Analyst, at
333-6800, ext. 2658, or me at 333-6709.
Aaue
F. Wally Sandelin
City Engineer
FWSlpmf
Enclosures
cc: Jim Munro
City Cleric
Management Analyst
LBANK_312SSACRAMENTO. DOC
CITY COUNCIL
LARRY D. HANSEN, Mayor
JOHN BECKMAN
Mayor Pro Tempore
EMILY HOWARD
SUSAN HITCHCOCK
KEITH LAND
Mr. Jim Munro
P.O. Box 864
Lodi, CA 95241
CITY OF LODI
PUBLIC WORKS DEPARTMENT
CITY HALL, 221 WEST PINE STREET
P.O. BOX 3006
LODI, CALIFORNIA 95241-1910
(209)333-6706
FAX (209) 333-6710
EMAIL pwdept@lodi.gov
http:\\www.lodi.gov
April 22, 2004
SUBJECT: 312 and 316 South Sacramento Street
H. DIXON FLYNN
City Manager
SUSAN J. BLACKSTON
City Clerk
D. STEPHEN SCHWABAUER
Interim City Attorney
RICHARD C. PRIMA, JR.
Public Works Director
The City Council of the City of Lodi, at its meeting on April 21, 2004, accepted the public
improvements that were made in the subject project.
Enclosed for your files is a copy of the resolution accepting the public improvements.
From the date of the resolution, the City of Lodi will maintain the street and other public
improvements installed within rights-of-way and public utility easements as shown on the
approved plans.
The enclosed letter has been sent to your bank so the Instrument of Credit covering
faithful performance can be exonerated. The Instrument of Credit covering labor and
materials must remain in effect for a period of ninety days from the date of the
resolution, in conformance with State law. On July 20, 2004, this instrument can be
released if no claims have been filed.
If you have any questions, please contact Rebecca Areida, Management Analyst, at
333-6800, ext. 658, ar me at 333-6709.
A
F. Wally andelin
City Engineer