Loading...
HomeMy WebLinkAboutAgenda Report - April 21, 2004 E-17AGENDA ITEM E6467 CITY OF LODI ,. COUNCIL COMMUNICATION TM AGENDA TITLE: Adopt Resolution Accepting Development Improvements at 312 and 316 South Sacramento Street MEETING DATE: April 21, 2004 PREPARED BY: Public Works Director RECOMMENDED ACTION: That the City Council adopt a resolution accepting the development improvements at 312 and 316 South Sacramento Street. BACKGROUND INFORMATION: Improvements at 312 and 316 South Sacramento Street have been completed in substantial conformance with the requirements of the Improvement Agreement between the City of Lodi and Vic Meyers, Inc., as approved by the City Council on January 7, 2004, and as shown on Drawing No. 003D058-01. Dedication of street right-of-way and installation of street improvements along the Sacramento Street street frontage were required as a condition of the building permit issuance. Since the developer replaced the majority of the curb, gutter and sidewalk fronting the subject's parcels, staff received Council approval to have Vic Meyers, Inc., widen the east side of Sacramento Street from the northerly boundary of the developer's property to Lodi Avenue. Upon acceptance of this project, the City will reimburse Vic Meyers, Inc., for the cost of the street improvements north of 312 South Sacramento Street. This reimbursement cost is $10,106.98. FUNDING: IMF — Local Streets $10,106.98 Prepared by Wesley Fujitani, Senior Civil Engineer RCPMKFIpmf cc: City Attorney Senior Civil Engineer - Development Services Senior Traffic Engineer Engineering Technician Supervisor Chief Building Inspector APPROVED: caccpt_312 S Sacramento_doc uaa�Q Richard C. Prima, Jr. Public Works Director H. Dion Flynn, 4/7/2004 When Recorded, Return to: City of Lodi City ClerWs Office P-0Box 8005 Lodi, CA 95241-1910 A RESOLUTION OF THE LODI CITY COUNCIL ACCEPTING THE DEVELOPMENT IMPROVEMENTS INCLUDED IN THE IMPROVEMENT AGREEMENT FOR 312 AND 316 SOUTH SACRAMENTO STREET The City Council of the City of Lodi finds: 1 That the requirements of the Improvement Agreement between the City of Lodi and Vic Meyers, Inc., for the public improvements at 312 and 316 South Sacramento Street, have been substantially complied with. The improvements are shown on Drawing No. 003D058-01 on file in the Public Works Department and as specifically set forth in the plans and specifications approved by the City Council on January 7, 2004. Dated: April 21, 2004 I hereby certify that Resolution No. 2004-68 was passed and adopted by the City Council of the City of Lodi in a regular meeting held April 21, 2004, by the following vote: AYES: COUNCIL MEMBERS — Beckman, Hitchcock, Howard, Land, and Mayor Hansen ABSENT. COUNCIL MEMBERS — None SUSAN J. BLACKSTON City Clerk CITY COUNCIL LARRY D. HANSEN, Mayor JOHN BECKMAN Mayor Pro Tempore EMILY HOWARD SUSAN HITCHCOCK KEITH LAND Bank of Stockton Attn: Mr. Kent Fyffe P.O. Box 759 Lodi, CA 95241 CITY OF LODI PUBLIC WORKS DEPARTMENT CITY HALL, 221 WEST PINE STREET P.O. BOX 3006 LODI, CALIFORNIA 95241-1910 (209)333-6706 FAX (209) 333-6710 EMAIL pwdept@lodi.gov http:\\www.lodi.gov April 22, 2004 SUBJECT: 312 and 316 South Sacramento Street H. DIXON FLYNN City Manager SUSAN J. BLACKSTON City Clerk D_ STEPHEN SCHWABAUER Interim City Attorney RICHARD C. PRIMA, JR. Public Works Director The City Council of the City of Lodi, at its meeting on April 21, 2004, accepted the public improvements in the subject project. A copy of the resolution is enclosed for your files. This letter is your authorization to exonerate the portion of the Instrument of Credit covering faithful performance, in the amount of $20,506.98. The portion of the Instrument of Credit covering labor and materials ($10,253.49) must remain in effect until July 20, 2004, in conformance with State law. You will receive no further correspondence regarding the release of the Instrument of Credit. If you have any questions, please contact Rebecca Areida, Management Analyst, at 333-6800, ext. 2658, or me at 333-6709. Aaue F. Wally Sandelin City Engineer FWSlpmf Enclosures cc: Jim Munro City Cleric Management Analyst LBANK_312SSACRAMENTO. DOC CITY COUNCIL LARRY D. HANSEN, Mayor JOHN BECKMAN Mayor Pro Tempore EMILY HOWARD SUSAN HITCHCOCK KEITH LAND Mr. Jim Munro P.O. Box 864 Lodi, CA 95241 CITY OF LODI PUBLIC WORKS DEPARTMENT CITY HALL, 221 WEST PINE STREET P.O. BOX 3006 LODI, CALIFORNIA 95241-1910 (209)333-6706 FAX (209) 333-6710 EMAIL pwdept@lodi.gov http:\\www.lodi.gov April 22, 2004 SUBJECT: 312 and 316 South Sacramento Street H. DIXON FLYNN City Manager SUSAN J. BLACKSTON City Clerk D. STEPHEN SCHWABAUER Interim City Attorney RICHARD C. PRIMA, JR. Public Works Director The City Council of the City of Lodi, at its meeting on April 21, 2004, accepted the public improvements that were made in the subject project. Enclosed for your files is a copy of the resolution accepting the public improvements. From the date of the resolution, the City of Lodi will maintain the street and other public improvements installed within rights-of-way and public utility easements as shown on the approved plans. The enclosed letter has been sent to your bank so the Instrument of Credit covering faithful performance can be exonerated. The Instrument of Credit covering labor and materials must remain in effect for a period of ninety days from the date of the resolution, in conformance with State law. On July 20, 2004, this instrument can be released if no claims have been filed. If you have any questions, please contact Rebecca Areida, Management Analyst, at 333-6800, ext. 658, ar me at 333-6709. A F. Wally andelin City Engineer F W Slpmf Enclosures cc: Electric Utility Department Water/Wastewater Division Street Division City CIS* Management Analyst Bank of Stockton LACCEPT 312SSACRAMENTd.DOC