HomeMy WebLinkAboutAgenda Report - April 21, 2004 E-13AGENDA ITEM E011 CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Adopt Resolution Appropriating Additional Funds for Change Orders for White Slough Water Pollution Control Facility Year 2003 Interim Improvements ($250,000) MEETING DATE: April 21, 2004 PREPARED BY: Public Works Director RECOMMENDED ACTION: That City Council adopt a resolution appropriating additional funds for change orders for the White Slough Water Pollution Control Facility Year 2003 Interim Improvements. BACKGROUND INFORMATION: In accordance with the Contract Change Order Policy, the City Council is being informed of change orders approved by the City Manager for this project. The original contract for this project was $1,400,010. The total cost of change orders to date is $313,864, which is 22% of the original contract. The project is approximately 90% complete. Detailed below is a description of the work involved in the change orders. More detailed descriptions and backup information for these change orders are available in the Public Works Department. Change Order No. 1 - This change order is for the removal of organic solids from the equalization pond and the engineered fill for the Phase 2 building pad. This work was originally intended to take place during the Phase 2 project. Good weather conditions and the need to expedite the Phase 2 schedule necessitated this work being performed during the Phase 1 contract. ($192,800) Change Order No. 2 - This change order is to have the new chain link fence installed 8 feet high to match the existing fence, instead of the 6 -foot high fence called out in the contract. This change order also includes some mobilization costs not included in Change Order No. 1. ($3,191) Change Order No. 3 - This change order is to add four NEMA "4" electric junction boxes, one at each aeration blower motor, to allow the required electrical wiring to be ran to the motors. ($1,329) Change Order No. 4 - This change order is a credit for deleted asphalt and seal coat around the equalization pond. This work will be performed at the end of the Phase 2 project. ($11,565 CREDIT) Change Order No. 5 - This change order is for demolition and removal of the abandoned electrical duct bank in the south equalization pond levee. ($4,054) Change. Order No. 6 - This change order covers the cost of relocating existing electric transformer XFMR T-1 S and the associated primary electric feeds. During construction, it was discovered that the existing transformer could not be reused in its current location. After meetings with the electrical engineer and the City EUD, the decision was made to relocate and replace the existing transformer. One 4 -inch conduit was also added at the request of the EUD for future use. ($40,214) APPROVED: CC_CCOsAppropriatio n. doc H. Dixon Flynn, 4/1512004 Adopt Resolution Appropriating Additional Funds for Change Orders for White Slough Water Pollution Control Facility Year 2003 Interim Improvements ($250,000) April 21, 2004 Page 2 Chanw_Order No. 7 - This change order covers the cost of hauling and spreading the organic solids removed from the equalization ponds to the farm land. ($41,958) Change Order No. 8 - This change order is a value engineering credit for changing four valves, one at each of the aeration blower accessory piping. ($12,000 CREDIT) Change Order No. 9 - This change Order is for the secondary electrical feed needs between the relocated transformer XFMR T-1 S and the existing automatic transfer switch. ($53,052) Chan - e Order No. 10 - This change order covers the cost of providing and installing small electric transformers to the aeration blower local control panels (LCP's) to operate the LCP AC units. ($831) FUNDING: Appropriate $250,000 from the 2003 CSCDA Financing, which along with funds previously appropriated ($1,700,000) for the White Slough Water Pollution Control Facility Year 2003 Interim Improvements Project, will cover the remaining items. The total contract to date is $1,723,864. Vicky McAthile, Finance Director Richard C. Prima, Jr. Public Works Director Prepared by Gary W+man, Construction Project Manager RCPIGWIpf cc: Gary Wiman, Construction Project Manager Assistant Wastewater Treatment Superintendent, Del Kerlin CC_CCOsAppropriatic n.doc 4115!2004 RESOLUTION NO. 2004-67 A RESOLUT10N OF THE LODI CITY COUNCIL APPROPRIATING ADDITIONAL FUNDS FOR CHANGE ORDERS FOR WHITE SLOUGH WATER POLLUTION CONTROL FACILITY YEAR 2003 INTERIM IMPROVEMENTS NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby appropriate additional funds for Change Orders for the White Slough Water Pollution Control Facility Year 2003 Interim Improvements in the amount of $250,000. Dated: April 21, 2004 I hereby certify that Resolution No. 2004-67 was passed and adopted by the City Council of the City of Lodi in a regular meeting held April 21, 2004, by the following vote: AYES: COUNCIL MEMBERS — Beckman, Hitchcock, Howard, Land, and Mayor Hansen SUSAN J. BLACKSTON City Clerk