Loading...
HomeMy WebLinkAboutAgenda Report - April 7, 2004 E-18AGENDA ITEM SPI CITY OF LODI %W COUNCIL COMMUNICATION TM AGENDA TITLE: Adopt resolution to revise the current abatement fee schedule for rotating contractor list MEETING DATE: April 7, 2004 PREPARED BY: Community Development Department RECOMMENDED ACTION: That the City Council adopt by Resolution the attached Abatement Fee Schedule. BACKGROUND INFORMATION: On December 20, 2000, the City Council adopted a Resolution establishing an Abatement Fee Schedule and Policies and Procedures for Rotating Abatement Contractor Listing. That Fee Schedule has successfully been implemented since that time by the Community Improvement Division through the code enforcement activity of boarding up vacant, unsecured buildings and the removal of garbage, junk and debris in those cases where the owner has failed to voluntarily secure or clean up their properties after having been given due notice. The standardized fees based upon the size of window or door openings has streamlined that abatement process considerably and ensured that costs assessed against properties are reasonable. Since the original adoption of that Abatement Fee Schedule in 2000, material costs for plywood have skyrocketed and contractors that participate in the rotation list for abatements have voiced concern that the fees do not cover the current cost of providing the abatement service. Staff has researched and verified that in the past four years, the cost of plywood has doubled. Staff has reviewed the existing fee schedule and has calculated that an increase of $5 for every half - sheet used and $10 for every full -sheet used would be an appropriate adjustment to account for the increase in material costs. The revised Abatement Fee Schedule attached as Exhibit A reflects those adjustments. Exhibit B provides a comparison on just those fees that are being revised or adjusted. There are no revisions necessary to any other portion of the fee schedule. FUNDING: None Required KorYradt Bartlam Community Development Director KBljw Attachment APPROVED: L_gckzz ._ H. Dixon lynn, City Manager cc: Joel Harris, Purchasing Agent CITY OF LODI COMMUNITY DEVELOPMENT DEPARTMENT ABATEMENT FEE SCHEDULE FOR ROTATING CONTRACTOR LIST (April 2004) ITEM # ITEM DESCRIPTION QUANTITY UNIT PRICE TOTAL PRICE SECURING STRUCTURES 1. Plywood Board -Up, Door, 4'x8' $80 2. Plywood Board -Up, Double Door, 8'x8' $170 3. Plywood Board -Up, Window, <2'6"x 4' $50 4. Plywood Board -Up, Window, <4'x4' $60 5. Plywood Board -Up, Window, <4'x6' $75 6. Plywood Board -Up, Window, <4'x8' $80 7. Plywood Board -Up, Window, <8'x8' $170 8. Plywood Board -Up, Crawl Space Opening $60 9. Plywood Board Up, Exterior Basement Door, 6'x7' Using 3/4" Material $215 10. Replace Single Car Garage Door $270 11. Replace Double Car Garage Door $535 12. Replace Sliding Glass Door, 6' $360 13. Replace Wood Basement Door, 6'x5' $185 14. Replace Front Double Wood Entry Doors $465 15. Replace Garage Pedestrian Door $155 16. Replace Under Floor Vents $30 17. Replace Attic Vents $35 Securing Subtotal PROPERTY CLEAN UPS 18. Remove Garbage, Junk and Debris hour) rate Hrs. $35 19. Remove Weeds and Shrubbery hour) rate Hrs. $25 Clean Up Subtotal Total Amount EXHIBIT A Item # Description Current I Proposed EXHIBIT B Fees Fees 1. Plywood Board -Up, Door, 4'x8' $70 $80 2. Plywood Board -Up, Double Door, 8'x8' $150 $170 3. Plywood Board -Up, Window, <2'6"x 4' $45 $50 4. Plywood Board -Up, Window, <4'x4' $55 $60 5. Plywood Board -Up, Window, <4'x6' $65 $75 6. Plywood Board -Up, Window, <4'x8' $70 $80 7. Plywood Board -Up, Window, <8'x8' $150 $170 8. Plywood Board -Up, Crawl Space Opening $60 $60 9. Plywood Board Up, Exterior Basement Door, 6'x7' Using 3/4" Material $190 $215 EXHIBIT B RESOLUTION NO. 2OO4-62 ARESOLUTION {]PTHE LD0CITY COUNCIL ADOPTING THE CODE ENFORCEMENT ABATEMENT FEE SCHEDULE WHEREAS, the Lodi Municipal Code requires the City Council, byresolution, to set fees for various services provided by the City of Lodi to recover those costa associated with providing specific services and programs; and WHEREAS, as part of the Code Enforcement function in eliminating Night. nuisances, and substandard and dangerous building conditions, the CommunityDevelopment/Community Improvement Division issues orders requiring the board -up and securing of vacant structures as welt as the removal and clean up of garbage, junk, and debris from yard areas; and WHEREAS, vacant, unsecured structures are required to be boarded up within one to ten days, depending onthe severity ofthe hazardous condition; and VVHEREAS, oumyntk( in the event that the structure is not secured or the yards are not oiouneU voluntarily within the required time frame, the bid process is initiated in order toallow the City tu have the work done and have costs billed tnthe property mmnar|and WHEREAS, the City Council adopted Resolution 2000-235 on December 20. 2000. approving the Abatement Fee Schedule; and VVHEREAS. due 10rising costs for materials, staff now recommends increasing the Abatement Fee Schedule osshown onExhibit Aattached hereto; and NOW, THEREFORE, BE|TRESOLVED that the City Council finds aofollows: 1. That the increase in the Abatement Fee Schedule is hereby approved as shown on Exhibit Aattached and made apart hwnao�and 2. All resolutions or parts of resolutions in conflict herewith are repealed insofar as such conflict may exist; and 3. This naso\u0OD shall be published one time in the "Lodi News -Sentinel," a daily newspaper of ggn8ra/n/nzu/aUonpr/nb*dendpub/kohed|nihaCityuƒLodi.sndnhmUbeinfomeandtakeefieut immediately upon its adoption. Dated: April 7, 2004 } hereby certify that Resolution No. 20O4 -G was passed and adopted by the City Council of the City of Lodi in q regular meeting held April 7, 2004, by the following vote: AYES: COUNCIL MEMBERS - Beckman, Hitchcock, Howard, Land, and Mayor Hansen NOES: COUNCIL MEMBERS -None ABSTAIN: COUNCILMEMBEHS-Nunm SUSAN J.BLACK8TDN City Clerk 2004-62 EXHIBIT A CITY OF LODI COMMUNITY DEVELOPMENT DEPARTMENT ABATEMENT FEE SCHEDULE FOR ROTATING CONTRACTOR LIST (Avril 2004) ITEM # ITEM DESCRIPTION QUANTITY UNIT PRICE TOTAL PRICE SECURING STRUCTURES 1. Plywood Board -Up, Door, 4'x8' $80 2. Plywood Board -Up, Double Door, 8'x8' $170 3. Plywood Board -Up, Window, <2'6"x 4' $50 4. Plywood Board -Up, Window, <4'x4' $60 5. Plywood Board -Up, Window, <4'x6' $75 6. Plywood Board -Up, Window, <4'x8' $80 7. Plywood Board -Up, Window, <8'x8' $170 8. Plywood Board -Up, Crawl Space Opening $60 9. Plywood Board Up, Exterior Basement Door, 6'x7' Using 3/4" Material $215 10. Replace Single Car Garage Door $270 11. Replace Double Car Garage Door $535 12. Replace Sliding Glass Door, 6' $360 13. Replace Wood Basement Door, 6'x5' $185 14. Replace Front Double Wood Entry Doors $465 15. Replace Garage Pedestrian Door $155 16. Replace Under Floor Vents $30 17. Replace Attic Vents $35 Securing Subtotal PROPERTY CLEAN UPS 18. Remove Garbage, Junk and Debris (hourly rate) Hrs. $35 19. Remove Weeds and Shrubbery (hourly rate) Hrs. $25 Clean Up Subtotal Total Amount