CITY OF LODI
%W COUNCIL COMMUNICATION
TM
AGENDA TITLE: Adopt resolution to revise the current abatement fee schedule for rotating
contractor list
MEETING DATE: April 7, 2004
PREPARED BY: Community Development Department
RECOMMENDED ACTION: That the City Council adopt by Resolution the attached Abatement
Fee Schedule.
BACKGROUND INFORMATION: On December 20, 2000, the City Council adopted a Resolution
establishing an Abatement Fee Schedule and Policies and
Procedures for Rotating Abatement Contractor Listing.
That Fee Schedule has successfully been implemented since that time by the Community Improvement
Division through the code enforcement activity of boarding up vacant, unsecured buildings and the
removal of garbage, junk and debris in those cases where the owner has failed to voluntarily secure or
clean up their properties after having been given due notice.
The standardized fees based upon the size of window or door openings has streamlined that abatement
process considerably and ensured that costs assessed against properties are reasonable.
Since the original adoption of that Abatement Fee Schedule in 2000, material costs for plywood have
skyrocketed and contractors that participate in the rotation list for abatements have voiced concern that
the fees do not cover the current cost of providing the abatement service. Staff has researched and
verified that in the past four years, the cost of plywood has doubled.
Staff has reviewed the existing fee schedule and has calculated that an increase of $5 for every half -
sheet used and $10 for every full -sheet used would be an appropriate adjustment to account for the
increase in material costs. The revised Abatement Fee Schedule attached as Exhibit A reflects those
adjustments. Exhibit B provides a comparison on just those fees that are being revised or adjusted.
There are no revisions necessary to any other portion of the fee schedule.
FUNDING: None Required
KorYradt Bartlam
Community Development Director
KBljw
Attachment
APPROVED: L_gckzz
._
H. Dixon lynn, City Manager
cc: Joel Harris, Purchasing Agent
CITY OF LODI
COMMUNITY DEVELOPMENT DEPARTMENT
ABATEMENT FEE SCHEDULE FOR ROTATING CONTRACTOR LIST
(April 2004)
ITEM #
ITEM DESCRIPTION QUANTITY
UNIT PRICE TOTAL PRICE
SECURING STRUCTURES
1.
Plywood Board -Up, Door, 4'x8'
$80
2.
Plywood Board -Up, Double Door, 8'x8'
$170
3.
Plywood Board -Up, Window, <2'6"x 4'
$50
4.
Plywood Board -Up, Window, <4'x4'
$60
5.
Plywood Board -Up, Window, <4'x6'
$75
6.
Plywood Board -Up, Window, <4'x8'
$80
7.
Plywood Board -Up, Window, <8'x8'
$170
8.
Plywood Board -Up, Crawl Space Opening
$60
9.
Plywood Board Up, Exterior Basement Door, 6'x7'
Using 3/4" Material
$215
10.
Replace Single Car Garage Door
$270
11.
Replace Double Car Garage Door
$535
12.
Replace Sliding Glass Door, 6'
$360
13.
Replace Wood Basement Door, 6'x5'
$185
14.
Replace Front Double Wood Entry Doors
$465
15.
Replace Garage Pedestrian Door
$155
16.
Replace Under Floor Vents
$30
17.
Replace Attic Vents
$35
Securing Subtotal
PROPERTY CLEAN UPS
18.
Remove Garbage, Junk and Debris hour) rate Hrs.
$35
19.
Remove Weeds and Shrubbery hour) rate Hrs.
$25
Clean Up Subtotal
Total Amount
EXHIBIT A
Item # Description Current I Proposed
EXHIBIT B
Fees
Fees
1.
Plywood Board -Up, Door, 4'x8'
$70
$80
2.
Plywood Board -Up, Double Door, 8'x8'
$150
$170
3.
Plywood Board -Up, Window, <2'6"x 4'
$45
$50
4.
Plywood Board -Up, Window, <4'x4'
$55
$60
5.
Plywood Board -Up, Window, <4'x6'
$65
$75
6.
Plywood Board -Up, Window, <4'x8'
$70
$80
7.
Plywood Board -Up, Window, <8'x8'
$150
$170
8.
Plywood Board -Up, Crawl Space Opening
$60
$60
9.
Plywood Board Up, Exterior Basement Door, 6'x7'
Using 3/4" Material
$190
$215
EXHIBIT B
RESOLUTION NO. 2OO4-62
ARESOLUTION {]PTHE LD0CITY COUNCIL ADOPTING THE
CODE ENFORCEMENT ABATEMENT FEE SCHEDULE
WHEREAS, the Lodi Municipal Code requires the City Council, byresolution, to set fees for various
services provided by the City of Lodi to recover those costa associated with providing specific services and
programs; and
WHEREAS, as part of the Code Enforcement function in eliminating Night. nuisances, and substandard
and dangerous building conditions, the CommunityDevelopment/Community Improvement Division issues
orders requiring the board -up and securing of vacant structures as welt as the removal and clean up of garbage,
junk, and debris from yard areas; and
WHEREAS, vacant, unsecured structures are required to be boarded up within one to ten days,
depending onthe severity ofthe hazardous condition; and
VVHEREAS, oumyntk( in the event that the structure is not secured or the yards are not oiouneU
voluntarily within the required time frame, the bid process is initiated in order toallow the City tu have the work
done and have costs billed tnthe property mmnar|and
WHEREAS, the City Council adopted Resolution 2000-235 on December 20. 2000. approving the
Abatement Fee Schedule; and
VVHEREAS. due 10rising costs for materials, staff now recommends increasing the Abatement Fee
Schedule osshown onExhibit Aattached hereto; and
NOW, THEREFORE, BE|TRESOLVED that the City Council finds aofollows:
1. That the increase in the Abatement Fee Schedule is hereby approved as shown on
Exhibit Aattached and made apart hwnao�and
2. All resolutions or parts of resolutions in conflict herewith are repealed insofar as such conflict
may exist; and
3. This naso\u0OD shall be published one time in the "Lodi News -Sentinel," a daily newspaper of
ggn8ra/n/nzu/aUonpr/nb*dendpub/kohed|nihaCityuƒLodi.sndnhmUbeinfomeandtakeefieut
immediately upon its adoption.
Dated: April 7, 2004
} hereby certify that Resolution No. 20O4 -G was passed and adopted by the City Council of the City of
Lodi in q regular meeting held April 7, 2004, by the following vote:
AYES: COUNCIL MEMBERS - Beckman, Hitchcock, Howard, Land, and Mayor Hansen
NOES: COUNCIL MEMBERS -None
ABSTAIN: COUNCILMEMBEHS-Nunm
SUSAN J.BLACK8TDN
City Clerk
2004-62
EXHIBIT A
CITY OF LODI
COMMUNITY DEVELOPMENT DEPARTMENT
ABATEMENT FEE SCHEDULE FOR ROTATING CONTRACTOR LIST
(Avril 2004)
ITEM #
ITEM DESCRIPTION QUANTITY
UNIT PRICE TOTAL
PRICE
SECURING STRUCTURES
1.
Plywood Board -Up, Door, 4'x8'
$80
2.
Plywood Board -Up, Double Door, 8'x8'
$170
3.
Plywood Board -Up, Window, <2'6"x 4'
$50
4.
Plywood Board -Up, Window, <4'x4'
$60
5.
Plywood Board -Up, Window, <4'x6'
$75
6.
Plywood Board -Up, Window, <4'x8'
$80
7.
Plywood Board -Up, Window, <8'x8'
$170
8.
Plywood Board -Up, Crawl Space Opening
$60
9.
Plywood Board Up, Exterior Basement Door, 6'x7'
Using 3/4" Material
$215
10.
Replace Single Car Garage Door
$270
11.
Replace Double Car Garage Door
$535
12.
Replace Sliding Glass Door, 6'
$360
13.
Replace Wood Basement Door, 6'x5'
$185
14.
Replace Front Double Wood Entry Doors
$465
15.
Replace Garage Pedestrian Door
$155
16.
Replace Under Floor Vents
$30
17.
Replace Attic Vents
$35
Securing Subtotal
PROPERTY CLEAN UPS
18.
Remove Garbage, Junk and Debris (hourly rate) Hrs.
$35
19.
Remove Weeds and Shrubbery (hourly rate) Hrs.
$25
Clean Up Subtotal
Total Amount