Loading...
HomeMy WebLinkAboutAgenda Report - February 18, 2004 E-08AGENDA ITEM &0% CITY OF LODI COUNCIL COMMUNICATION 1M AGENDA TITLE: Adopt Resolution Awarding the Bid and Authorizing the City Manager to Execute a Contract for City of Lodi/Lodi Unified School District Compressed Natural Gas (CNG) Fueling Station Construction with Performance Mechanical, Inc., of Sacramento ($315,310) and Appropriate Funds Upon Receipt of Written Funding Commitment from Lodi Unified School District MEETING DATE: February 18, 2004 PREPARED BY: Public Works Director RECOMMENDED ACTION: That the City Council adopt a resolution awarding the bid and authorizing the City Manager to execute a contract for the City of Lodi/Lodi Unified School District Compressed Natural Gas (CNG) Fueling Station Construction with Performance Mechanical, Inc., of Sacramento, in the amount of $315,312 (includes bid alternates) and appropriate funds upon receipt of a written funding commitment from Lodi Unified School District (LUSD). BACKGROUND INFORMATION: This project consists of providing the construction for LUSD's compressed natural gas (CNG) fueling station, located at the District's bus transportation facility, 820 South Cluff Avenue. The City of Lodi and LUSD are working in cooperation on this CNG project. The construction of the CNG facility for the District's on-site CNG fueling station is the next step in that process. Bidding the equipment separately from the construction was the most cost effective and efficient way to build the CNG station, as it reduces the cost of the equipment, since the manufacturers provide it. The bids for the installation of the equipment have been received and are to be awarded concurrent to the construction award. Additionally, staff is requesting that LUSD submit a written reimbursement funding commitment for the grant funds they received for this project. LUSD received a grant from the San Joaquin Valley Air Pollution Control District (SJVAPCD) to match the funds the City received on behalf of the School District from the San Joaquin Council of Governments. Staff is recommending awarding the Base Bid, as well as Alternates 1, 3, 4, 5, 6, 7, 8, 10 and 11 (see attached). In addition, staff is requesting that the City Council appropriate an additional $33,000 for the purchase of a pre -cast concrete wall and a methane detection system. These bid alternates were not selected for award but are required to be installed per code prior to operation of the fueling facility. Staff will work with the contractor to try to acquire these additional items. Should staff not be able to reach a consensus on price, staff will re -bid these items. APPROVED: CAward.doc H. Dixon Flynn, "City Manager 2/11/2004 Adopt Resolution Awarding the Bid and Authorizing the City Manager to Execute a Contract for City of Lodi/Lodi Unified School District Compressed Natural Gas (CNG) Fueling Station Construction with Performance Mechanical, Inc., of Sacramento ($315,310) and Appropriate Funds Upon Receipt of Written Funding Commitment from Lodi Unified School District February 18, 2004 Page 2 Plans and specifications for this project were approved on August 20, 2003. The City received the following two bids for this project: Bidder Location Engineer's Estimate Performance Mechanical, Inc. Sacramento Allsup Corporation Upland Bid $340,000 $256,647 $300,497 FUNDING: Requested Appropriation: Transit Fund 1250 $315,312 City will be reimbursed by the SJCOG CMAQ grant and the LUSD grant from the SJVAPCD. Project Estimate: $315,312 (includes contingencies and additional funding for wall and methane detection) Bid Opening Date: February 4, 2004 -Y2 Vicky cAthie, Finance Director Richard C. Prima, Jr. Public Works Director Prepared by Tiffani M. Fink, Transportation Manager RCPITFlpmf Attachment cc: Purchasing Officer Fleet and Facilities Manager Transportation Manager LUSD Superintendent LUSD Asst. Superintendent of Facilities and Planning LUSD Construction Project Manager CAward.doc 2/1112004 CITY OF LODI Public Works Department PROJECT: City of Lodi - Lodi Unified School District Compressed Natural Gas (CNG) Fueling Station Construction TOTAL Base Bid and Alternate Items LS NOTES/COMMENTS: Bid Alternates not being awarded have been bolded and italicized. Attachment: Construction $261,497 $370,015 Performance Mechanical, Inc. Allsup Corporation Sacramento, CA Upland, CA Item Description Qty Unit Price Total Price Total 1 Base Bid Items: 2 Base Bid Item 1 - Concrete pads & post bases 1 LS $41,896 $41,896 $59,533 $59,533 3 Base Bid Item 2 - Gas Piping/Tubing 1 LS $68,577 $68,577 $46,840 $46,840 4 Base Bid Item 3 - Electrical System 1 LS $64,422 $64,422 $77,880 $77,880 5 Base Bid Item 4 - Compressor Installation 1 LS $2,000 $2,000 $8,500 $8,500 6 Base Bid Item 5 - Gas Dryer Installation 1 LS $1,000 $1,000 $5,250 $5,250 7 Base Bid Item 6 - Priority Panel Installation 1 LS $1,000 $1,000 $1,850 $1,850 8 Base Bid Item 7 - Stainless Stl Tubing Installation 1 LS $8,654 $8,654 $22,850 $22,850 9 Base Bid Item 8 - Fast Fill Dispenser Installation 1 LS $2,000 $2,000 $2,250 $2,250 10 Base Bid Item 9 - Eight Slow Fill Posts Installation 1 LS $2,900 $2,900 $6,860 $6,860 Base Bid Item 10 - Electrical Switchboard & Svc. 1 LS $20,005 $20,005 $20,600 $20,600 11 Alternate Bid Items: 12 Alternate #1 - 2nd Compressor Installation 1 LS $7,520 $7,520 $7,860 $7,860 13 Alternate #2a - Two Gas Detection Systems 2 EA $1,350 $3,240 $55,207 $55,207 14 Alternate #2b - One Additional Transceiver 1 LS $1,610 $1,610 $1,360 $1,360 15 Alternate #3 - Two Rooftop Exhaust Fans 2 EA $2,278 $4,556 $1,410 $2,820 16 Alternate #4 - Three Louvered Metal Doors 3 EA $575 $1,725 $940 $2,820 17 Alternate #5 - Two Wall Louvers 2 EA $128 $256 $95 $190 18 Alternate #6 - Two Fire -rated Dampers 2 EA $41 $82 $145 $290 19 Alternate #7- Five Slow Fill Post Installation 1 LS $10,229 $10,229 $12,720 $12,720 20 Alternate #8- Pressure Vessel Assembly Install 1 LS $14,354 $14,354 $15,480 $15,480 21 Alternate #9- Remove 8 posts and install 1 wall 1 LS N/A N/A $13,950 $13,950 22 Alternate #10- Two Yard Lights- Furnish/Install 2 EA $3,910 $3,910 $2,040 $4,080 Alternate #11- Two ESD Installation 1 LS $1,561 $1,561 $825 $825 Total Alternate Bid Items $49,043 $117,602 TOTAL Base Bid and Alternate Items LS NOTES/COMMENTS: Bid Alternates not being awarded have been bolded and italicized. Attachment: Construction $261,497 $370,015 WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on February 4, 2004, at 11:00 a.m, for the City of Lodi/Lodi Unified School District (LUSD) Compressed Natural Gas (CNG) Fueling Station Construction described in the specifications therefore approved by the City Council on August 20, 2003, and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as follows: 910—or Locatign mitt! Performan . ce Mechanical, Inc. Sacramento $ 2569647.00 Allsup Corporation Upland, CA $ 300,497.00 WHEREAS, the City Manager recommends award of the bid for the City of Lodi/LUSD CNG Fueling Station Construction be made to the low bidder, Performance Mechanical, Inc., of Sacramento, California. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council hereby awards the bid for the City of Lodi/LUS.D CNG Fueling Station Construction with Performance Mechanical, Inc., of Sacramento, California, in the amount of $256,647.00; and BE IT FURTHER RESOLVED that the City Manager is hereby authorized and directed to execute the contract for this project on behalf of the City of Lodi; and BE IT FURTHER RESOLVED that funds in the amount of $315.,312-00 be appropriated from the Transit Fund 1250 for this project upon receipt of a written funding commitment from LUSD. Dated: February 18, 2004 I hereby certify that Resolution No. 2004-24 was passed and adopted by the C4 Council of the City of Lodi in a regular meeting held February 18, 2004, by the following vote: AYES: COUNCIL MEMBERS – Beckman, Howard, Land, and Mayor Hansen NOES: COUNCIL MEMBERS – None ASSENT: COUNCIL MEMBERS – Hitchcock ABSTAIN: COUNCIL MEMBERS – None SUSAN J. BLACKSTON City Clerk CITY COUNCIL LARRY D. HANSEN, Mayor JOHN BECKMAN Mayor Pro Tempore SUSAN HITCHCOCK EMILY HOWARD KEITH LAND CITY OF LODI PUBLIC WORKS DEPARTMENT CITY HALL, 221 WEST PINE STREET P.O. BOX 3006 LODI, CALIFORNIA 95241-1910 (209) 333-6706 FAX (209) 333-6710 EMAIL pwdept@lodi,gov http:\\www.lodi.gov February 12, 2004 H. DIXON FLYNN City Manager SUSAN J. BLACKSTON City Clerk D. STEVEN SCHWABAUER Interim City Attorney RICHARD C. PRIMA, JR. Public Works Director Lodi Unified School District Lodi Unified School District Lodi Unified School District Superintendent Asst. Supt. Facilities/Planning Construction Project Mgr. 1305 E. Vine Street 1305 E. Vine Street 1305 E. Vine Street Lodi, CA 95240 Lodi, CA 95240 Lodi, CA 95240 SUBJECT: Adopt Resolution Awarding the Bid and Authorizing the City Manager to Execute a Contract for the City of Lodi/Lodi Unified School District Compressed Natural Gas (CNG) Fueling Station Construction with Performance Mechanical, Inc., of Sacramento ($315,310) and Appropriate Funds Upon Receipt of Written Funding Commitment from Lodi Unified School District Enclosed is a copy of background information on an item on the City Council agenda of Wednesday, February 18, 2004. The meeting will be held at 7 p.m. in the City Council Chamber, Carnegie Forum, 305 West Pine Street. This item is on the consent calendar and is usually not discussed unless a Council Member requests discussion. The public is given an opportunity to address items on the consent calendar at the appropriate time. If you wish to write to the City Council, please address your letter to City Council, City of Lodi, P. O. Box 3006, Lodi, California, 95241-1910. Be sure to allow time for the mail. Or, you may hand -deliver the letter to City Hall, 221 West Pine Street. If you wish to address the Council at the Council Meeting, be sure to fill out a speaker's card (available at the Carnegie Forum immediately prior to the start of the meeting) and give it to the City Clerk. If you have any questions about communicating with the Council, please contact Susan Blackston, City Clerk, at (209) 333-6702. If you have any questions about the item itself, please call Tiffani Fink, Transportation Manager, at (209) 333-6800, extension 2678. Richard C. Prima, Jr. r ' Public Works Director RCP/prof Enclosure cc: City Clerk NCAWARD.DOC