HomeMy WebLinkAboutAgenda Report - January 7, 2004 E-09AGENDA ITEM , 01
CITY OF LODI
COUNCIL COMMUNICATION
TM
AGENDA TITLE: Adopt Resolution Approving the Addendum to the Improvement Agreement
for the Public Improvements of Century Meadows Two, Unit No. 4,
Tract No. 3272; and Appropriate Funds ($58,400)
MEETING DATE: January 7, 2004
PREPARED BY: Public Works Director
RECOMMENDED ACTION: That the City Council adopt a resolution approving the Addendum to
the Improvement Agreement for the Public Improvements of
Century Meadows Two, Unit No. 4, Tract No. 3272, direct the
City Manager and City Clerk to execute the addendum to the
improvement agreement on behalf of the City, and appropriate funds for the required reimbursement.
BACKGROUND INFORMATION: The Century Meadows Two, Unit No. 4 subdivision is located east of
Mills Avenue, north of Harney Lane and south of the
Century Meadows Two, Unit No. 3 development, as shown on the
attached Exhibit A. Resolution No. 2002-252 approving the
improvement agreement for the subdivision was approved by Council on December 18, 2002. As a
condition of development, the developer, FCB Building Partners I, L.P., is required to complete the
installation of street frontage improvements along Harney Lane. At this time, Century Meadows One,
Unit No. 2 subdivision east of Century Meadows Two, Unit No. 4, as shown on Exhibit A, is also under
construction. When the two subdivisions are complete, the properties at 1683 and
1749 West Harney Lane, APN 058210-03 and 059-210-03, respectively as shown on Exhibit A, will be
the only properties on the north side of Harney Lane between Ham Lane and Mills Avenue without street
frontage improvements. In order to provide for orderly development and enhance public safety on
Harney Lane, staff recommends that the frontage improvements along these properties be completed at
this time. The developer of Century Meadows Two, Unit No. 4 has agreed to include the frontage
improvements for these properties in their project. The improvements include curb, gutter and asphalt
concrete pavement. The developer is eligible for reimbursement by the City for these improvements in
conformance with LMC §16.40 Reimbursement for Construction. Staff estimates the cost of the work to
be $49,040.74. The developer will be reimbursed based on verified claims for the work done by the
developer's contractor when the improvements are complete and accepted by the City.
In order to construct the frontage improvements along 1683 and 1749 West Harney Lane, additional
street right-of-way dedication on Harney Lane and public utility easements behind the right of way are
required from the owner, Nick Farros. The owner has agreed to dedicate the right-of-way (10 feet) in
exchange for the frontage improvements. Installation of the frontage improvements will include the
relocation of one existing tree, relocation of a wood fence, and installation of a new driveway (to replace
the old gate), as shown on Exhibit B. In addition, a chain link fence will be installed along the existing
orchard. The cost of the work on the Faros property is estimated to be $9,340.00. The owner will be
reimbursed based on verifiable claims for the improvements when the project is complete.
APPROVED:
xon Ptynn, City Manager
CCImpAgreementAddendundoc 12/22/2003
Adopt Resolution Approving the Addendum to the Improvement Agreement for the Public Improvements
of Century Meadows Two, Unit No. 4, Tract No. 3272; and Appropriate Funds ($58,400)
January 7, 2003
Page 2
The developer has furnished the City with the necessary agreement (Exhibit C) and provided
improvement security for the additional work in Harney Lane. Staff recommends that the City Council
approve the addendum to the improvement agreement and appropriate the necessary funds to reimburse
the developer for the additional Harney Lane street frontage improvements and the owner for the private
improvements necessitated by the Harney Lane work.
FUNDING: Local Street Impact Fees $58,400.00
Vicky McAthi , Finance Director
iIA2
Richard C. Prima,
Public Works Dlrecto
Prepared by Lyman Chang, Associate Civil Engineer
RCPILCIpmf
Attachments
cc: Senior Civil Engineer Fujitani
Senior Civil Engineer Welch
FCB Building Partners I, LP
!Vick Farros
Baumbach & Piazza
MmpAgreementAddendum.doc 12122/2003
I
U .+
PUBLICCITY OF LODI
• . DEPARTMENT
mum
[]BUNNone NINON0Y
2417
EXHIBIT A
1 M �� !!!!!M MM
> N
434 402
149"0 M % 1g16 ^,jp'1' 73.ip
I Dr.
25,8
2524
� 2530
2536
2550
2560
N
Li
Boom
2417
EXHIBIT A
1 M �� !!!!!M MM
> N
434 402
149"0 M % 1g16 ^,jp'1' 73.ip
I Dr.
25,8
2524
� 2530
2536
2550
2560
N
Li
2417
EXHIBIT A
1 M �� !!!!!M MM
> N
434 402
149"0 M % 1g16 ^,jp'1' 73.ip
I Dr.
25,8
2524
� 2530
2536
2550
2560
N
I
PUBLICCITY OF LODI
• . DEPARTMENT
Z
ZD
O
m
Z
Z
Z
ZD
V
N FARRO
PROPER IES
EXHIBIT B
EXISTING EXISTING
ORCHARD RESIDENCE
PROPOSED It FENOCE co-
C AIN LINK I`00
FENCE
r
------------
PROPOSED
PROPOSED R/W
_ 10'._.. ...... _.._. -T. NY
--_--
EXISTING R/W� 1
DRIVEWAY GATE
HARN EY LANE RELOCATE TREE
Lv
Q
Z
ZD
0
m
Z
}
z
Lu
.,
ADDENDUM EXHIBIT C
to the
IMPROVEMENT AGREEMENT
for the
PUBLIC IMPROVEMENTS
of
CENTURY MEADOWS TWO, UNIT NO. 4
TRACT NO. 3272
THIS AGREEMENT is made and entered into by and between the CITY OF LODI, hereinafter
referred to as "City", and FCB BUILDING PARTNERS I, LP, hereinafter referred to as
"Developer".
WITNESSETH:
WHEREAS, the parties have entered into an Improvement Agreement dated December 27, 2002,
which Agreement covers the responsibilities of City and of Developer for the development of
Century Meadows Two, Unit No. 4, Tract 3272; and
WHEREAS, the Developer is responsible for installation of public improvements fronting the
subject subdivision on Harney Lane; and
WHEREAS, the City requested that the Developer install additional street frontage improvements
on Harney Lane which include curb, gutter, and street pavement along the properties known as
1649 and 1749 W. Harney Lane (APN 058-210-03 and 058-210-04, respectively); and
WHEREAS, the City is responsible for reimbursing Developer for the additional frontage
improvements along those properties in conformance with LMC 16.40 Reimbursement for
Construction; and
WHEREAS, the Developer is required to provide additional improvement security as described in
the State Subdivision Map Act for faithful performance and payment of all persons performing
labor and furnishing materials for the installation of public improvements.
NOW THEREFORE, for and in consideration of the acceptance of the dedications offered, and in
order to insure satisfactory performance by Developer of Developer's obligations under State law
and City code, the parties agree as follows:
1. That this document is considered an addendum to the original Improvement Agreement
between the two parties.
2. That the Developer shall install street frontage improvements along the Harney Lane street
frontages of the properties at 1649 and 1749 W. Harney Lane, including curb, gutter,
sidewalk and street pavement to the centerline of Harney Lane
3. That the Developer will be reimbursed based on verified claims for work done by Developer's
contractor when the development are complete and accepted by the City. The estimated
reimbursement amount is shown on the attached Billing Schedule Addendum and Cost
Estimate for Additional Improvement Security. The reimbursement includes ten percent
(10%) for engineering and administration in conformance with LMC 16.40 Reimbursement for
Construction.
4. That the Developer shall furnish additional Improvement Security of at least 100% of the
estimated cost of the above referenced public improvements for the faithful performance of
said work; and an amount equal to at least 50% of the above costs as security for the
payment of all persons performing labor and furnishing materials in connection with this
agreement as more fully described in the State Subdivision Map Act.
impagmt (rev. 12/17/2003)
The City has determined these additional security amounts to be as follows:
Faithful Performance $49,040.74
Labor and Material $24.520.37
IN WITNESS WHEREOF, Developer and City have caused their names to be hereunto affixed
and the City of Lodi has caused its corporate name and seal to be hereunto affixed by its proper
officers thereunto duly authorized.
FCB BUILDING PARTNERS I, LP
Date
(CORPORATE SEAL)
CITY OF LODI, A MUNICIPAL CORPORATION
By:
H. Dixon Flynn, City Manager Date
ATTEST:
Susan J. Blackston, City Clerk Date
APPROVED AS TO FORM:
Randall A. Hays, City Attorney
impagmt (rev. 12/17/2003)
City of Lodi
Publics Works Department
COST ESTIMATE F(
ADDITION
IMPROVEMENT SECURI
Development: Century Meadows Two, Unit No. 4 Acres: 15.15
Developer: FCB Building Partners I, LP Date: 12/15/03
Engineer: Baumbach & Piazza
Subtotal $730,859.95 Subtotal $668,777.82 Subtotal Street System $59,292.12
10% Engineering & Administration 5,929.21
Total Street System $65,221.33
Future Park Site Improvements (Parcel"A")
TOTAL COST OF PROJECT IMPROVEMENTS
A. DEVELOPER COST
B. COST OF CITY -FUNDED FACILITIES TO BE BUILT BY DEVELOPER
Item
Description
Quanti
Unit
Price
Total
Quanti
Total
Quantity
Total
546.52
Street System
6.33
3459.47
4 Compact Original Ground (0.67')
6,373
SF
0.60
3823.80
5 Aggregate Base, Class II (0.35')
1
Clearing & Grubbing
12.46
AC
$500.00
$6,230.00
12.16
$6,080.00
0.3
$150.00
2
Lot Grading
12.49
AC
3,748.58
46,819.76
12.49
46,819.76
0
0.00
3
Roadway Excavation
9,731.48
CY
6.33
61,600.27
9,053.48
57,308.53
678
4,291.74
4
Sawcut & Remove Existing AC (interior)
336
SF
0.75
252.00
336
252.00
0
0.00
5
Sawcut & Remove Existing AC (Harney L•
4,330
SF
0.75
3,247.50
0
0.00
4,330
3,247.50
6
Compact Original Ground (0.50')
24,320
SF
0.28
6,809.60
7,782
2,179.07
16,538
4,630.53
7
Compact Original Ground (0.67')
99,497
SF
0.28
27,859.16
99,497
27,859.16
0
0.00
8
Compact Native Material (0.50')
24,320
SF
0.28
6,809.60
7,782
2,179.07
16,538
4,630.53
9
Aggregate Base, Class II (0.30')
25,348
SF
0.49
12,420.52
25,348
12,420.52
0
0.00
10
Aggregate Base, Class II (0.35')
64,829
SF
0.60
38,897.40
64,829
38,897.40
0
0.00
11
Aggregate Base, Class II (0.50')
2,950
SF
0.71
2,094.50
2,950
2,094.50
0
0.00
12
Aggregate Base, Class II (0.60')
24,320
SF
0.81
19,699.20
7,782
6,303.75
16,538
13,395.45
13
Asphalt Concrete, Type B (0.20')
93,463
SF
0.76
71,031.88
93,463
71,031.88
0
0.00
14
Asphalt Concrete, Type B (0.40')
24,320
SF
1.48
35,993.60
7,782
11,517.97
16,538
24,475.63
15
Rolled Curb, Gutter, & Sidewalk
211
LF
34.00
7,174.00
211
7,174.00
0
0.00
16
Vertical Curb & Gutter
5,575
LF
10.90
60,767.50
5,245
57,170.50
330
3,597.00
17
Sidewalk (4')
5,003
LF
8.00
40,024.00
5,003
40,024.00
0
0.00
18
Meandering Sidewalk (5')
242
LF
25.00
6,050.00
242
6,050.00
0
0.00
19
Curb Return (R=25') Incl. Compaction
2
EA
1,865.00
3,730.00
2
3,730.00
0
0.00
20
Curb Return (R=20') Incl. Compaction
11
EA
1,635.00
17,985.00
11
17,985.00
0
0.00
21
Bow -out Curb Return (R=20') Incl. Compacti,
6
EA
2100.00
12,600.00
6
9810.00
0
0.00
22
Concrete Subgrade Compaction
45,317
SF
0.55
24,924.35
44,492
24,470.60
825
453.75
23
Residential Driveway
1,556
LF
15.00
23,340.00
1,528
22,920.00
28
420.00
24
Commercial Driveway
31
SF
64.50
1,999.50
31
1,999.50
0
0.00
25
Survey Monument
12
EA
230.00
2,760.00
12
2,760.00
0
0.00
26
Sidewalk Dead End Barricade
2
EA
158.00
316.00
2
316.00
0
0.00
27
Dead End Barricade (Standard Plan 139)
3
EA
1,565.00
4,695.00
3
4,695.00
0
0.00
28
Remove Existing Barricade
4
EA
250.00
1,000.00
4
1,000.00
0
0.00
29
Remove Temporary Fire Turnaround
2
EA
500.00
1,000.00
2
1,000.00
0
0.00
30
Street Sign Posts/Block Signs
11
EA
236.00
2,596.00
11
2,596.00
0
0.00
31
Concrete Block Retaining Wall
776
LF
26.00
20,176.00
776
20,176.00
0
0.00
32
Masonry Wall
296
LF
70.00
20,720.00
296
20,720.00
0
0.00
33
Landscaping & Irrigation
2,370
SF
4.00
9,480.00
2,370
9,480.00
0
0.00
34
Pedestal Street Lights (100W)
34
EA
2,360.00
80,240.00
34
80,240.00
0
0.00
35
Street Lights (100W)
1
EA
1,940.00
1,940.00
1
1,940.00
0
0.00
36
Street Lights (250W)
2
EA
1,970.00
3,940.00
2
3,940.00
0
0.00
37
Traffic Striping
1
LS
5,600.00
5,600.00
1
5,600.00
0
0.00
38
Painted Stop Bar & Legend
2
EA
130.00
260.00
2
260.00
0
0.00
39
Regulatory Signs (RI)
2
EA
157.00
314.00
2
314.00
0
0.00
40
Erosion Control/Winterization
1
LS
3,800.00
3,800.00
1
3,800.00
0
0.00
41
G -Basin Excavation
10,390
CY
3.24
33,663.60
10,390
33,663.60
0
0.00
Subtotal $730,859.95 Subtotal $668,777.82 Subtotal Street System $59,292.12
10% Engineering & Administration 5,929.21
Total Street System $65,221.33
Future Park Site Improvements (Parcel"A")
1 Clearing & Grubbing
2.99
AC
$500.00
$1,495.00
2 Lot Grading
2.66
AC
3,748.58
9,971.23
3 Roadway Excavation
546.52
CY
6.33
3459.47
4 Compact Original Ground (0.67')
6,373
SF
0.60
3823.80
5 Aggregate Base, Class II (0.35')
6,373
SF
0.60
3823.80
6 Asphalt Concrete, Type B (0.20')
6,373
SF
0.76
4843.48
7 Concrete Subgrade Compaction
3,309
SF
0.55
1819.95
8 Vertical Curb & Gutter
509
LF
10.90
5,548.10
9 Sidewalk (4')
509
LF
8.00
4,072.00
10 Pedestal Street Lights (100W)
2
EA
2,360.00
4,720.00
11 Side Inlet Catch Basin
0.50
EA
850.00
425.00
12 12" Storm Drain
89
LF
21.50
1913.50
13 48" Storm Drain Manhole
0.25
EA
1130.00
282.50
14 6" Sanitary Sewer Pipe
24
LF
21.20
508.80
15 8" Sanitary Sewer Pipe
49.50
LF
23.10
1,143.45
16 Sanitary Sewer Manhole
0.50
EA
1,580.00
790.00
17 10" Water Pipe
127.50
LF
16.00
2040.00
18 4" Water Service w/Meter Box
1
EA
4,000.00
4,000.00
Subtotal
$54,680.08
Storm Drain System
0 $0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
Subtotal $0.00
2.99
2.66
546.52
6,373
6,373
6,373
3,309
509
509
2
0.50
89
0.25
24
49.50
0.50
127.50
1
Subtotal Park Site Improvements
10% Engineering & Administration
Total Park Site Improvements
$1,495.00
9,971.23
3,459.47
3,823.80
3,823.80
4,843.48
1,819.95
5,548.10
4,072.00
4,720.00
425.00
1,913.50
282.50
508.80
1,143.45
790.00
2,040.00
4,000.00
$54,680.08
$5,468.01
$60,148.08
TOTAL COST OF PROJECT IMPROVEMENTS
A. DEVELOPER COST I B. COST OF CITY -FUNDED FACILITIES TO BE BUILT BY DEVELOPER
Item
Description
Quanti
Unit
Price
Total
Quanti
Total
Quantity
Total
1
12" Storm Drain Pipe
1,773
LF
$21.50
$38,119.50
1,773
$38,119.50
0
$0.00
2
15' Storm Drain Pipe
197
LF
21.20
4,176.40
197
4,176.40
0
0.00
3
48" Storm Drain Manhole
6.75
EA
1,130.00
7,627.50
6.75
7,627.50
0
0.00
4
Side Inlet Catch Basin
13.50
EA
850.00
11,475.00
13.50
11,475.00
0
0.00
Subtotal
$61,398.40
Subtotal
$61,398.40
Subtotal Storm Drain System
$0.00
10% Engineering & Administration
0.00
Total Storm Drain System
$0.00
Sanitary Sewer System
1
6" Sanitary Sewer Pipe
1,232
LF
$21.20
$26,118.40
1,212
$25,694.40
20
$424.00
2
8" Sanitary Sewer Pipe
1,941.50
LF
23.10
44,848.65
1,941.50
44,848.65
0
0.00
3
Sanitary Sewer Manhole
8.50
EA
1,580.00
13,430.00
8.50
13,430.00
0
0.00
4
Sewer Cleanout
1
EA
$200.00
$200.00
0
$0.00
1
$200.00
5
Sanitary Service with Cleanout
67
EA
375.00
25,125.00
67
25,125.00
0
0.00
6
Remove Existing Lamphole
1
EA
100.00
100.00
1
100.00
0
0.00
7
Lamphole
1
EA
460.00
460.00
1
460.00
0
0.00
Subtotal
$110,282.05
Subtotal
$109,658.05
Subtotal Sanitary Sewer System
$624.00
10% Engineering & Administration
62.40
Total Sanitary Sewer System
$686.40
Water System
1
6" Water Pipe
445
LF
$13.50
$6,007.50
445
$6,007.50
0
$0.00
2
8" Water Pipe
2,118
LF
16.00
33,888.00
2,118
33,888.00
0
0.00
3
8" Water Pipe (Cl. 200)
171
LF
16.00
2,736.00
171
2,736.00
0
0.00
4
10" Water Pipe
1,147.50
LF
18.60
21,343.50
1,147.50
18,360.00
0
0.00
5
10" Water Pipe (Cl. 200)
40
LF
19.00
760.00
40
640.00
0
0.00
5
10" Water Pipe Oversizing Costs
1,315
LF
19.00
24,985.00
0
0.00
1,315
3,435.00
6
6" Water Valve
1
EA
550.00
550.00
1
550.00
0
0.00
7
8" Water Valve
17
EA
770.00
13,090.00
17
13,090.00
0
0.00
8
10" Water Valve
7
EA
1,050.00
7,350.00
7
5,390.00
7
1,960.00
9
Fire Hydrant Assembly
7
EA
1,850.00
12,950.00
7
12,950.00
0
0.00
10
Blowoff
3
EA
300.00
900.00
3
900.00
0
0.00
11
Remove Blowoff
5
EA
2,000.00
10,000.00
5
10,000.00
0
0.00
12
1" Water Service w/Meter Box
67
EA
400.00
26,800.00
67
26,800.00
0
0.00
13
1" Water Service w/Meter Box (Hamey Lane
1
EA
400.00
400.00
1
400.00
0
0.00
14
3" PVC Conduit (Irrigation Street Crossing)
180
LF
7.00
1,260.00
180
1,260.00
0
0.00
Subtotal
$163,020.00
Subtotal
$132,971.50
Subtotal Water System
$5,395.00
10% Engineering & Administration
539.50
Total Water System
$5,934.50
Total
$1,065,560.40
Total
$972,805.77
Total Construction Cost Subject to Engineering Fee Calculation (A. Developer
Cost)
$972,805.77
Less Previousl Total Construction Cost Subjectto Engineering Fee Calculation
($972,805.77)
($82,949.58)
TOTAL COST FOR ENGINEERING FEE CALCULATION
A. Total
$0.00
B. Total
$49,040.73
TOTAL ADDITIONAL IMPROVEMENT SECURITY AMOUNTS:
Faithful Performance: 100% ofA, B & C
$49,040.74
Labor & Materials: 50% of A & B
$24,520.37
3INTI2191&Y6la:IBill 4 W_1CCA21Bill 8
Developmen Century Meadows Two, Unit No. 4 Gross Acreage: 15.15
Developer: FCB Building Partners I, LP No. of Units: 60
Engineer: Baumbach & Piazza
Date: 12/15/03
DEVELOPER
COST CREDITS
STREET SYSTEM
Reimbursement by City
Street Improvements per Item B of attached Cost Estimate for Additional Improvement Security
(327004.7720;MTS1014) $ 48,354.34
STREET SYSTEM SUBTOTAL $0.00 $48,354.34
SEWER SYSTEM
Reimbursement by City
Sanitary Sewer System per Item B of attached Cost Estimate for Additional Improvement Security
(327004.7720;MTS1014) 686.40
SEWER SYSTEM SUBTOTAL $0.00 $686.40
DEFERRED DEVELOPMENT IMPACT MITIGATION FEES
Police Protection Facilities (12151.6122) 12.16
AC @ $1,130.00 $13,465.98
(12141.6127)
$274.82
Fire Protection Facilities (12161.6122) 12.16
AC @ $540.00 $6,435.07
(12141.6127)
$131.33
Parks & Recreation Facilities (12171.6122) 12.16
AC @ $11,830.00 $140,975.74
(12141.6127)
$2,877.06
Less Future Park Site Improvements (1217004.1836.2400;MPR059) ($60,148.09)
General City Facilities (12181.6122) 12.16 AC @ $6,830.00 $81,391.74
(12141.6127) $1,661.06
DEVELOPMENT IMPACT MITIGATION FEES SUBTOTAL $187,064.71
HARNEY LANE LIFT STATION FEES
Estimate based on lift station construction cost estimate available $90,387.00
at time of execution of improvement agreement. Actual fee to be
determined by City Council and paid prior to project acceptance.
TOTAL AMOUNT OF BILLING SCHEDULE ADDENDUM $277,451.71 $49,040.74
ADDITIONAL NET AMOUNT TO BE PAID BY DEVELOPER $228,410.97
TO CITY PRIOR TO PROJECT ACCEPTANCE
1
A RESOLUTION OF THE L
TO THE IMPROVEMENT
OF CENTURY MEADOW
AUTHORIZING THE CITY
IMPROVEMENT AGREE
FURTHER APPROpi
W
WHEREAS, Century Meadows Two, Unit No. 4 Subdivision is located east of Mills
Avenue, north of Harney Lane and south of the Century Meadows Two, Unit No. 3
development; and
WHEREAS, as a condition of development, the developer, FCB Building Partners 1,
L4P.,. is reqluire . d to complete the installation of street frontage improvements along Harney
Lane; and
WHEREAS, at this time, Century Meadows O.ne,.Unit No. 2 Subdivision east of Century
Meadows TW6,.Unit. No. 4, as shown on exhibit
xhibit A attached, is also under construction, and
whoa both subdivisions are complete, the properties at 1683 and 1749 West Harney lLane will
beffie onlyproperties on the north side of Harney Lane between Ham Lane and Mills Avenue
without street ftontage.improvement.8; and
WHEREAS, staff recommends that the frontage improvements along these properties
be completed at this
is time, and the developer of Century Meadows Two, Unit No, 4 has agreed
to include :th . e frontage improvements for these properties in its project; and
WHEREAS, the improvements include curb, gutter, and asphalt concrete pavement, and
the developer is eligible for. reimbursement by the City for these improvements in conformance
with Lodi Municipal Code §16.40 "Reimbursement for Construction"; and
WHEREAS, staff estimates the cost of the work to be $49,040.74, and the developer will
be reimbursed based on verified claims for the work done by the developer's contractor when
the improvements are complete and accepted by the City; and
WHEREAS, in order to construct the frontage improvements along 1683 and 1749 West
Harney Lane, additional street right-of-way ded ica.ti on on Harney Lane and public utility
easements behind the right of way are required from the owner, Nick Farros; and
WHEREAS, the owner has.agreed to dedicate the right-of-way (ten feet) in exchange for
the frontage improv . ements, which include relocation of one existing tree, relocation of a wood
fence, and installation of a new driveway as shown on Exhibit B attached hereto; and
WHEREAS, in addition, a chain link fence will be installed along the existing orchard.
The cost of the work on the Farro.s property is estimated to be $9,340.00, and the owner will be
reimbursed based on verifiable claims for the improvements when the project is complete; and
WHEREAS, the. developer has furnished the City with the Addendum Agreement and
has provided improvement security for the additional work in Harney Lane; and
WHEREAS, staff therefore recommends that the City Council take the following action
with regard to the Century Meadows Two, Unit 4, Tract Na. 3272, development:
Approve the Addendum to the Improvement Agreement for the Public
Improvements of Century Meadows Two, Unit 4, Tract No. 3272, and direct the
City Manager and City Clerk to execute the Addendum to the Impr ovement
Agreement on behalf of the City; and
2. Appropria.te.$58,400.00 from the Local Street Impact Fees fund to reimburse the
developer for.the additional Harney Lanestreet frontage impr . ovements and the
owner for the private improvements necessitated by the Harney Lane work.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Lodi hereby
finds as follows:
1 That the Addendum to the Improvement Agreement for the Public Improvement
of Century M . eadows Two, Unit 4, Tract No. 3272, is hereby approved and further
authorizes the City Manager and City Clerk to execute said Addendum.
2. That. $58,400.00 is hereby appropriated from the Local Street Impact Fees fund
to reimburse the developer for the additional Harney Lane street frontage
improvements and the owner for the private improvements necessitated by the
Harney Lane work.
Dated: January 7, 2004
I hereby certify that Resolution No.. 2004-0.4 was .passed. and adopted by the City
Council of the City of. Lodi in a regular meeting hold January 7, 2004, by the following vote:
AYES: COUNCIL MEMBERS — Beckman, Hitchcock, Howard, Land, and Mayor
Hanson
NOES- COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS
SUSAN J. BLACKSTON
City Clark
I
U .+
PUBLICCITY OF LODI
• . DEPARTMENT
mum
[]BUNNone NINON0Y
2417
EXHIBIT A
1 M �� !!!!!M MM
> N
434 402
149"0 M % 1g16 ^,jp'1' 73.ip
I Dr.
25,8
2524
� 2530
2536
2550
2560
N
Li
Boom
2417
EXHIBIT A
1 M �� !!!!!M MM
> N
434 402
149"0 M % 1g16 ^,jp'1' 73.ip
I Dr.
25,8
2524
� 2530
2536
2550
2560
N
Li
2417
EXHIBIT A
1 M �� !!!!!M MM
> N
434 402
149"0 M % 1g16 ^,jp'1' 73.ip
I Dr.
25,8
2524
� 2530
2536
2550
2560
N
I
PUBLICCITY OF LODI
• . DEPARTMENT
Z
ZD
O
m
Z
Z
Z
ZD
V
N FARRO
PROPER IES
EXHIBIT B
EXISTING EXISTING
ORCHARD RESIDENCE
PROPOSED It FENOCE co-
C AIN LINK I`00
FENCE
r
------------
PROPOSED
PROPOSED R/W
_ 10'._.. ...... _.._. -T. NY
--_--
EXISTING R/W� 1
DRIVEWAY GATE
HARN EY LANE RELOCATE TREE
Lv
Q
Z
ZD
0
m
Z
}
z
Lu
.,
CITY COUNCIL
LARRY D. HANSEN, Mayor
JOHN BECKMAN
Mayor Pro Tempore
SUSAN HITCHCOCK
EMILY HOWARD
KEITH LAND
CITY OF LODI
PUBLIC WORKS DEPARTMENT
CITY HALL, 221 WEST PINE STREET
P.O. BOX 3006
LODI, CALIFORNIA 95241-1910
(209)333-6706
FAX (209) 333-6710
EMAIL pwdeptQlodi.gov
http:k%www.lodi.gov
December 31, 2003
H. DIXON FLYNN
City Manager
SUSAN J. BLACKSTON
City Clerk
RANDALL A. HAYS
City Attorney
RICHARD C. PRIMA, JR.
Public Works Director
FCB Building Partners I, LP Nick Farros Baumbach & Piazza
clo Frontiers 1619 W. Harney Lane 323 W. Elm Street
3247 W. March Lane, Ste. 220 Lodi, CA 95242 Lodi, CA 95240
Stockton, CA 95219
SUBJECT: Adopt Resolution Approving the Addendum to the Improvement Agreement
for the Public Improvements of Century Meadows Two, Unit No. 4,
Tract No. 3272; and Appropriate Funds ($58,400)
Enclosed is a copy of background information on an item on the City Council agenda of
Wednesday, January 7, 2004. The meeting will be held at 7 p.m. in the
City Council Chamber, Carnegie Forum, 305 West Pine Street.
This item is on the consent calendar and is usually not discussed unless a
Council Member requests discussion. The public is given an opportunity to address
items on the consent calendar at the appropriate time.
If you wish to write to the City Council, please address your letter to City Council,
City of Lodi, P. O. Box 3006, Lodi, California, 95241-1910. Be sure to allow time for the
mail. Or, you may hand -deliver the letter to City Hall, 221 West Pine Street.
If you wish to address the Council at the Council Meeting, be sure to fill out a speaker's
card (available at the Carnegie Forum immediately prior to the start of the meeting) and
give it to the City Clerk. If you have any questions about communicating with the
Council, please contact Susan Blackston, City Clerk, at 333-6702.
If you have any questions about the item itself, please call Lyman Chang,
Associate Civil Engineer, at 333-6800, extension 2665.
Richard C. Prima, Jr.
Public Works Director
RCPIpmf
Enclosure
cc: City Clerk
NCCIMPAGRE£MENTADDENDUM.DOC