Loading...
HomeMy WebLinkAboutAgenda Report - January 7, 2004 E-08AGENDA ITEM fol CITY OF LODI COUNCIL COMMUNICATION 1� AGENDA TITLE: Adopt Resolution Approving the Addendum to the AgroMmM f4w OW Public Improvements of Almondwood Estiiltlfs, Tract tis W3,;Wd appPapriate ($0,070) MEETING DATE: January 7, 2004 PREPARED BY: Public Works Director RECOMMENDED ACTION: That the City Council adopt a resolution approving the addendum to the improvement agreement for the public improvements of Almondwood Estates, Tract No. 3273, and direct the City Manager and City Clerk to execute the addendum to the improvement agreement on behalf of the City. BACKGROUND INFORMATION: The Almondwood Estates subdivision is located north of Almond Drive and east of Stockton Street, as shown on Exhibit A. Resolution No. 2003-98 approving the improvement agreement for the subdivision was approved by Council on June 4, 2003. As a condition of development, the developer, KB Home North Bay, Inc., is required to complete the installation of street frontage improvements along Stockton Street. However, due to the deteriorated condition of the existing pavement in Stockton Street, staff is recommending that the existing pavement along the project frontage be removed and replaced to the centerline of the street. The developer has agreed to perform this work and is eligible for reimbursement by the City for the work in conformance with LMC §16.40 Reimbursement for Construction. The cost of the additional work is $48,070, which includes 10% for engineering and administration. The developer is also required to install a reverse frontage masonry wall with landscaping and irrigation on Stockton Street and Almond Drive and street trees in the parkways along the interior subdivision streets. The developer paid a one-time fence and landscape maintenance and replacement fee in the amount of $76,244 to cover the ongoing maintenance costs for those improvements prior to approval of the final map. The developer subsequently elected to form the Almondwood Estates District Zone 1 Lodi Consolidated Landscape Maintenance Assessment District No. 2003-1 to finance those costs. The District was approved by Council on August 20, 2003. The previously paid one-time maintenance and replacement fee ($76,244) has been refunded to the developer. Since the City will not receive payment from the District until January 2005, the developer will be required to provide maintenance and replacement for those improvements until that time. The developer has furnished the City with the necessary addendum to the improvement agreement (Exhibit B) and provided improvement security for the additional work in Stockton Street. Staff recommends that Council approve the addendum to the improvement agreement and appropriate the necessary funds to reimburse the developer for the additional Stockton Street improvements. FUNDING: Local Street Impact Fees $48,070 Rc 6--.1 Vicky McAthie, Finance Directo "T Richard C. Prima, Jl . Public Works Direct Prepared by Lyman Chang, Associate Civil Engineer RCPILC/pmf Attachments cc. Senior Civil Engineer Fujitani K B Home, Inc. Senior Civil Engineer Welch David Evans & Assgciptes, Inc. APPROVED: CCIm pAgmtAddendum. doe H. Dixori Flynn, City"Manager 1 211 1 120 0 3 i CITY OF LODIPUBLIC WORKS DEPARTMENT ml T Y %CT[!ff1AN kr1NE WAVE AURIS rra. !_) ALMONDWOOD ESTATES W457E?rl F:.H�rl I l I c9N+ — PLA2P LLC C4..-510-0! II IIl I pR ��� B 10 m'v ROBETrf l;ULLEw I r�r'cn' r. `•s' os2-sla-02 I '1 a >a �I EVIN sr In saw; "CEO ! 0'li }Y NUE CAGLC Co 062-510-G.3 f sr 11 r sI:v' oF:m. rY rs ' � r I � s v ico• . Irn' � 1 Lltixv.{LL a'• , 6 a 5 p b Y I a o. ( k 052-51C—Ca I '�• �•7 '»' !i J ( ra+' "' � TO3' � � m v � ! k 1 n . °• �. 'I Yt rr ,.• i n Iw• —�` GARY P.CVPI3Er CI. '3. O iC, zp I ' 062-050-12 � a x i > > r � , —• I O rcc• ywXWfLL STitECT1 y ! /•T fi w Y' '^. � mr�T I ' gYRON wti z I 4 . . li ---s:a' 1£�i �Irte,, 1 ViCl12a hdAP CATHY t- N •,. S IOC• °, I 2—tgcN 1 8:' u • F 51 V I r I H.T.S. 062—I90—'22 ll .. �rws/� u .. •. ^"r " i r � J PN $TEPNrnrs I 'J, �{�.�r'•.�°••�^� p pvr NWCq - ..r : .. _. „�,YLTiW004 052 -ISO ••2s t E' r �.{ rrw WAY ., „„. r. .. - WAY CL E, � 11 :.�V l ,r• ts=' 7I {' - " Qr� � i, _. 062-190-0•I ,_ r s 'Yp •�d_� oYi r i I N2 irhx•nC'L � xt 1 • �' a, r - PRCPEgRCS t '7t '• V C _�__� � -...l .^ ,s.T � may- �-.�_r-•�^' I C •�T,, T- r 0 R vl I I ` � 1 S� o� os� • k Ids eftfeman Ln n EI in Ave n f7 s oxwell Sl. � Vallayx- N y Ravla'.00d e 3 !n m Almond Dr ,o a .PR-rO�JECT � a a SITE n2vey SSv4 EXHIBIT B ADDENDUM to the IMPROVEMENT AGREEMENT for the PUBLIC IMPROVEMENTS of ALMONDWOOD ESTATES TRACT NO. 3273 THIS AGREEMENT is made and entered into by and between the CITY OF LODI, hereinafter referred to as "City", and K B HOME NORTH BAY, INC., A CALIFORNIA CORPORATION, hereinafter referred to as "Developer". WITNESSETH: WHEREAS, the parties have entered into an Improvement Agreement dated June 6, 2003, which Agreement covers the responsibilities of City and of Developer for the development of Almondwood Estates, Tract No. 3273; and WHEREAS, the Developer is responsible for the installation of street improvements in Stockton Street fronting the subject subdivision; and WHEREAS, the Developer is responsible for the installation of street pavement improvement up to the existing pavement along the Stockton Street frontage of the subject subdivision; and WHEREAS, the City has requested that the existing pavement east of the centerline of Stockton Street be reconstructed along the frontage of the subject subdivision; and WHEREAS, the City is responsible for reimbursing Developer for the reconstruction of the existing pavement in Stockton Street along the frontage of the subject subdivision in conformance with LMC 16.40 Reimbursements for Construction; and WHEREAS, the Developer is required to provide additional improvement security for the pavement reconstruction work as described in the Subdivision Map Act for faithful performance and the payment of all persons performing labor and furnishing materials for the installation of public improvements; and WHEREAS, the Developer has established Almondwood Estates District Zone 1 Lodi Consolidated Landscape Maintenance Assessment District No. 2003-1 to finance ongoing fence and landscape maintenance for the said subdivision. NOW THEREFORE, for and in consideration of the acceptance of the dedications offered, and in order to insure satisfactory performance by Developer of Developer's obligations under State law and City code, the parties agree as follows: 1. That this document is considered an addendum to the original Improvement Agreement between the two parties. 2. That the Developer shall reconstruct the existing pavement in Stockton Street east of the centerline of Stockton Street to the new pavement installed by the Developer as required in the original Improvement Agreement. 3. That the City shall reimburse Developer in the amount of $48,070 for the street reconstruction, including miscellaneous utility frame adjustments, as shown on the attached Billing Schedule Addendum and Cost Estimate for Additional Improvement Security. Said reimbursement includes ten percent (10%) for engineering and administration in conformance with LMC 16.40 Reimbursements for Construction. Reimbursement shall be made when the work is complete and accepted by the City. impagmt (rev. 12/11/2003) 4. That the Developer shall furnish additional improvement Security of at least 100% of the estimate cost of the above referenced public improvements for the faithful performance of said work; and an amount equal to at least 50% of the above costs as security for the payment of all persons performing labor and furnishing materials in connection with this agreement as more fully described in the State Subdivision Map Act. The City has determined these additional security amounts to be as follows: Faithful Performance $48,070.00 Labor and Materials $24,035.00 5. That the City has refunded to the Developer the previously paid one-time fence and maintenance fee in the amount of $76,244.00 6. That the Developer remains responsible for the regular maintenance of the public wall, landscape and irrigation improvements on Stockton Street and street tree improvements in the subdivision parkway until January 2005 when the first revenue will be received by the City from the Almondwood Estates District Zone 1 Lodi Consolidated Landscape Maintenance Assessment District No. 2003-1. In Witness Whereof, Developer and City have caused their names to be hereunto affixed and the City of Lodi has caused its corporate name and seal to be hereunto affixed by its proper officers thereunto duly authorized. K B HOME NORTH BAY, INC. Date (CORPORATE SEAL) CITY OF LODI, A MUNICIPAL CORPORATION Bv: H. Dixon Flynn, City Manager Date ATTEST: Susan J. Blackston, City Clerk Date APPROVED AS TO FORM: Randall A. Hays, City Attorney impagmt (rev. 12/11/2003) City of Lodi Publics Works Department Development: Almondwood Estates Developer: K B Home North Bay, Inc. Engineer: David Evans and Associates, Inc. Subtotal $86,232.00 Subtotal $86,232.00 Subtotal Storm Drain System 10% Engineering & Administration Total Storm Drain System TOTAL COST OF PROJECT IMPROVEMENTS") A. DEVELOPER COST B. COST OF CITY -FUNDED FACI Item Description Quanti Unit Price Total Quanti Total Quanti Street System 1 Earthwork 14,852 CY $2.50 $37,130.00 14,852 $37,130.00 0 2 Roadway Excavation 754 CY 14.00 10,556.00 0 0.00 754 3 Demolition 1 LS 17,500.00 17,500.00 1 17,500.00 0 4 Asphalt Concrete (0.25') 90,059 SF 0.75 67,544.25 90,059 67,544.25 0 5 Asphalt Concrete (0.40') 37,214 SF 1.40 52,099.60 26,214 36,699.60 11,000 6 Aggregate Base (.33') 56,806 SF 0.55 31,243.30 56,806 31,243.30 0 7 Aggregate Base (.40') 26,214 SF 0.60 15,728.40 26,214 15,728.40 0 8 Aggregate Base (.42') 33,253 SF 0.65 21,614.45 33,253 21,614.45 0 9 Aggregate Base (AT) 11,000 SF 0.65 79150.00 0 0.00 11,000 10 Compact Original Ground (0.67') 90,059 SF 0.24 21,614.16 90,059 21,614.16 0 11 Compact Original Ground (0.5') 37,214 SF 0.15 5,582.10 26,214 3,932.10 11,000 12 Compact Native Material (0.5') 37,214 SF 0.20 7,442.80 26,214 5,242.80 11,000 13 Vertical Curb & Gutter 5,535 LF 9.00 49,815.00 5,535 49,815.00 0 14 Vertical Curb, Gutter & Sidewalk 1,398 LF 12.00 16,776.00 1,398 16,776.00 0 15 Sidewalk (6) 29,037 SF 3.00 87,111.00 29,037 87,111.00 0 16 Wheelchair Ramps (Labor Only) 19 EA 250.00 4,750.00 19 4,750.00 0 17 Residential Driveways 6,354 SF 14.50 92,133.00 6,354 92,133.00 0 18 Bus Stop & Shelter Pads 676 SF 15.00 10,140.00 676 10,140.00 0 19 Concrete Subgrade Compaction 59,714 SF 0.55 32,842.43 59,714 32,842.43 0 20 Survey Monument 16 EA 150.00 2,400.00 16 2,400.00 0 21 Adjust Survey Monument to Grade 1 EA 300.00 300.00 0 0.00 1 22 Adjust Manhole Frame & Cover to Grade 3 EA 400.00 1,200.00 0 0.00 3 23 Adjust Valves to Grade 6 EA 250.00 1,500.00 5 1,250.00 1 24 Dead End Barricade (Standard Plan 139) 105 LF 40.00 4,200.00 105 4,200.00 0 25 Remove Existing Barricade 1 EA 300.00 300.00 1 300.00 0 26 Street Sign/Block Signs & Posts 10 EA 300.00 3,000.00 10 3,000.00 0 27 Regulatory Signs 3 EA 125.00 375.00 3 375.00 0 28 1' Block Retaining Wall 1,446 LF 8.00 11,568.00 1,446 11,568.00 0 29 Masonry Wall (7') 1,556 LF 53.00 82,468.00 1,556 82,468.00 0 30 Masonry Wall (9') 634 LF 68.00 43,112.00 634 43,112.00 0 31 Street Lights (100W Decorative Luminaire) 31 EA 2,000.00 62,000.00 31 62,000.00 0 32 Street Lights (100W HPS Luminaire) 9 EA 1,800.00 16,200.00 9 16,200.00 0 33 Sidewalk Barricade 1 EA 200.00 200.00 1 200.00 0 34 Landscaping & Irrigation 13,755 SF 3.00 41,265.00 13,755 41,265.00 0 45 Signing & Striping 1 LS 8,246.00 8,246.00 1 8,246.00 0 36 Traffic Control 1 LS 7,994.00 7,994.00 0.4 3,000.00 0.6 37 Winterization, Erosion Control 1 LS 4,000.00 4,000.00 1 4,000.00 0 Subtotal $879,100.49 Subtotal $835,400.49 Subtotal Street System 10% Engineering & Administration Total Street System Storm Drain System 1 12" Storm Drain Pipe 1,695 LF $20.00 $33,900.00 1,695 $33,900.00 0 2 15" Storm Drain Pipe 406 LF 22.00 8,932.00 406 8,932.00 0 3 48" Storm Drain Manhole 13 EA 1,300.00 16,900.00 13 16,900.00 0 4 Side Inlet Catch Basin 16 EA 1,500.00 24,000.00 16 24,000.00 0 5 24" Riser 1 EA 1,000.00 1,000.00 1 1,000.00 0 7 Connect to 54" Storm Drain Line 1 EA 1,500.00 1,500.00 1 1,500.00 0 Subtotal $86,232.00 Subtotal $86,232.00 Subtotal Storm Drain System 10% Engineering & Administration Total Storm Drain System TOTAL COST OF PROJECT IMPROVEMENTS") I A. DEVELOPER COST Item Description Quantity Unit Price Total Quanti Total Sanitary Sewer System 1 8" Sanitary Sewer Pipe 2,665 LF $25.00 $66,625.00 2,665 $66,625.00 2 Sanitary Sewer Manhole 14 EA 1,500.00 21,000.00 14 21,000.00 3 Sanitary Service with Cleanout 74 EA 450.00 33,300.00 74 33,300.00 Subtotal $120,925.00 Subtotal $120,925.00 Water System 1 8" Water Pipe 2,769 LF $20.00 $55,380.00 2,769 $55,380.00 2 8" Water Valve 23 EA 750.00 17,250.00 23 17,250.00 3 Fire Hydrant Assembly 9 EA 2,600.00 23,400.00 9 23,400.00 4 Blowoff (Permanent) 4 EA 500.00 2,000.00 4 2,000.00 5 Blowoff (Temporary) 2 EA 500.00 1,000.00 2 1,000.00 6 1" Water Service w/Meter Box 74 EA 400.00 29,600.00 74 29,600.00 7 Connect to Existing Water 3 EA 5,000.00 15,000.00 3 15,000.00 Subtotal $143,630.00 Subtotal $143,630.00 Total $1,229,887.49 Total $1,186,187.49 Revised Total Construction Cost (A. Developer Cost) $1,186,187.49 Less Previous Total Construction Cost Subject to Engineering Fee Calculation ($1,186,187.49) REVISED TOTAL COST FOR ENGINEERING FEE CALCULATION A. Total $0.00 ADDITIONAL IMPROVEMENT SECURITY AMOUNTS: Faithful Performance: 100% of A & B $48,070.00 Labor & Materials: 50% of A & B $24,035.00 ") Work Items shown in bold print have been revised B. COST OF CITY -FUNDED FACI Quanti 0 0 0 Subtotal Sanitary Sewer System 10% Engineering & Administration Total Sanitary Sewer System 0 0 0 0 0 0 0 Subtotal Water System 10% Engineering & Administration Total Water System B. Total BILLING SCHEDULE ADDENDUM Developmen, Almondwood Estates Developer: K B Home North Bay, Inc. Engineer: David Evans and Associates, Inc. Date: 12/3/03 STREET SYSTEM Reimbursement by City Street Improvements per Item B of attached (327027; MTS1027) STREET SYSTEM SUBTOTAL TOTAL AMOUNT OF BILLING SCHEDULE NET AMOUNT TO BE PAID BY DEVELOPER TO CITY PRIOR TO PROJECT APPROVAL DEFERRED DEVELOPMENT IMPACT MITIGATION FEES Water Facilities (1821.6122) 14.40 (12141.6127) Sewer Facilities (1731.6122) 14.40 (12141.6127) Street Improvement Facilities (3271.6122) 14.40 (3321.6122) (12141.6127) Gross Acreage: 14.40 No. of Units: 74 DEVELOPER COST CREDITS 48,070.00 $48,070.00 $0.00 ($48,070.00) AC @ $4,105.00 $57,929.76 $1,182.24 AC @ $525.00 $7,408.80 $151.20 AC @ $8,249.00 $67,517.74 $48,892.15 $2,375.71 Storm Drainage Facilities (3261.6122) 14.40 AC @ $ 11,813.00 $166,705.06 TOTAL AMOUNT OF DEFERRED FEES NET AMOUNT OF DEFERRED FEES TO BE PAID BY DEVELOPER PRIOR TO PROJECT ACCEPTANCE Page 1 of 1 $3,402.14 AC @ $1,613.00 $22,762.66 $464.54 AC @ $1,577.00 $22,254.62 $454.18 AC @ $20,249.00 $285,753.89 $5,831.71 AC @ $6,517.00 $91,967.90 $1,876.90 $786,931.20 $738,861.20 $48,070.00 $48,070.00 (12141.6127) Police Protection Facilities (12151.6122) 14.40 (12141.6127) Fire Protection Facilities (12161.6122) 14.40 (12141.6127) Parks & Recreation Facilities (12171.6122) 14.40 (12141.6127) General City Facilities (12181.6122) 14.40 (12141.6127) TOTAL AMOUNT OF DEFERRED FEES NET AMOUNT OF DEFERRED FEES TO BE PAID BY DEVELOPER PRIOR TO PROJECT ACCEPTANCE Page 1 of 1 $3,402.14 AC @ $1,613.00 $22,762.66 $464.54 AC @ $1,577.00 $22,254.62 $454.18 AC @ $20,249.00 $285,753.89 $5,831.71 AC @ $6,517.00 $91,967.90 $1,876.90 $786,931.20 $738,861.20 $48,070.00 $48,070.00 When Recorded; Please Return to: Midi City Clerk..` k': XBP 3006 Lodi, CA.: 95241-1910 RESCQLUT)ON NO. 004-03 WHEREAS, the Almondwood Estates Subdivision is located north of Almond Drive and east of .Stockton Street and was approved by the City Council on June 4, 2003; and WHEREAS, as a condition of development, the developer, K13 Home North Bay, Inc., is required to complete the installation of street frontage improvements along Stockton Street; and WHEREAS, due to the deteriorated conditions of the existing pavement in Stockton Street, staff is recommending that the existing pavement along the project frontage be removed and replaced to the centerline of the street; and r WHEREAS, the developer turas agreed to perform this work a � is eligible for reimbursement by the City for the work in conformance with Lodi Municipal Code §16.40 Ile! mburse ment for Construction," at a cost of $43,070.00; which includes i ifi%far engineering and administration nests; and WHEREAS, the developer is also required to install a reverse frontage masonry wail with landscaping and irrigation on Stockton Street and Almond Drive and street trees in the parkways along the interior subdivision streets; and WHEREAS;. the developer paid a one-time fence and landscape maintenance and replacerne.nt fee in the amount of $7 ,244.00 to cover the ongoing maintenance costs for those improvements prior to approval of the final asap; and I,tllhl REAS, the developer has elected to form the Almondwood Estates District Zone.1 Lodi Consolidated Landscape Maintenance Assessment District No. 2003-1 to finance those costs, which was approved by the City Council on August 20, 2003; and WHEREAS, the one-time maintenance and replacement fee hes been refunded to the developer, and since the City will. not receive payment from the District until January 2005, the developer is required to provide maintenance and replacement for those improvements until that time; and WHEREAS, staff recommends that the City Council take the following action with regard. to Afmondwo.od Estateg, Tract No. 3273: Approve the Addendurn to the Improvement Agreement for the Public o . Imprvementsof Alm.ondwood Estates, Tract No. 3273, and direct the City Manager and City Clerkto execute the Addendum to the Improvement Agreern ent on behalf of the City; and 2. Appropriate the necessary funds to reimburse the developer for the additional Stockton Street improvements from Local Street Impact Fees. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Lodi hereby finds as follows: Approves the Addendum to the Improvement Agreement for the. Public Improcements ;of Almondwood Estates, Tract No. 3273, and directs the city Manager and City Clerk to execute the Addendum to the Improvement Agreement on behalf of the City of Lodi; and 2. Appropriates $48,070.00 to reimburse the developer for the additional Stockton Street improvements from Local Street Impact Fees. Dated, January 7, 2004 I hereby :certify that Resolution No. 2004"03 was passed and adopted by the City Council of the City of Lodi in a regular meeting held January 7, 2004, by the following vote: AYES: COUNCIL MEMBERS — Beckman, Hitchcock, Howard, Land, and Mayor Hansen i 11 ZIA1.41111 M06001111 M! 111 ; I ABSENT. COUNCIL MEMBERS — None ABSTAIW: COUNCIL MEMBERS —None SUSAN J...BLACKSTON City Clerk 2004-03 CITY COUNCIL LARRY D. HANSEN, Mayor JOHN BECKMAN Mayor Pro Tempore SUSAN HITCHCOCK EMILY HOWARD KEITH LAND K B Home, Inc. 611 Orange Drive Vacaville, CA 95687 CITY OF LODI PUBLIC WORKS DEPARTMENT CITY HALL, 221 WEST PINE STREET P.O. BOX 3006 LODI, CALIFORNIA 95241-1910 (209) 333-6706 FAX (209) 333-6710 EMAIL pwdept@lodi.gov http:\kwww.lodi.gov December 31, 2003 David Evans & Associates, Inc. 5311 Pirrone Road, Ste. B Salida, CA 95368 H. DIXON FLYNN City Manager SUSAN J. BLACKSTON City Cleric RANDALL A. HAYS City Attorney RICHARD C. PRIMA, JR. Public Works Director SUBJECT: Adopt Resolution Approving the Addendum to the Improvement Agreement for the Public Improvements of Almondwood Estates, Tract No. 3273 Enclosed is a copy of background information on an item on the City Council agenda of Wednesday, January 7, 2004. The meeting will be held at 7 p.m. in the City Council Chamber, Carnegie Forum, 305 West Pine Street. This item is on the consent calendar and is usually not discussed unless a Council Member requests discussion. The public is given an opportunity to address items on the consent calendar at the appropriate time. If you wish to write to the City Council, please address your letter to City Council, City of Lodi, P. O. Box 3006, Lodi, California, 95241-1910. Be sure to allow time for the mail. Or, you may hand -deliver the letter to City Hall, 221 West Pine Street. If you wish to address the Council at the Council Meeting, be sure to fill out a speaker's card (available at the Carnegie Forum immediately prior to the start of the meeting) and give it to the City Clerk. If you have any questions about communicating with the Council, please contact Susan Blackston, City Clerk, at (209) 333-6702. If you have any questions about the item itself, please call Lyman Chang, Associate Civil Engineer, at (209) 333-6800, extension 2665. Richard C. Prima, Jr. i Public Works Director RCPlpmf Enclosure cc: City Clerk NCOMPAGWADDENDUM.DOC