Loading...
HomeMy WebLinkAboutAgenda Report - April 3, 1991 (65)� of o CITY OF LOCI COUNCIL COMMUNICATION r'gc�Fo��r AGENDA TITLE: Retain consultant to evaluate City telephone system .MEETING DATE: April 3, 1991 PREPARED BY: Assistant City Manager RECOMMENDED ACTION: The City Council authorize Northern California Communications Network to conduct a telecommunications feasibility study and a needs assessment for the current telephone system (Exhibit A). BACKGROUND INFORMATION: The recommendation for this study is based on the following factors: 1) Current hardware is antiquated and has limited potential for continuing to meet the City's growing demand for telecommunication services. 2) Telephone problems arise daily and are being solved in a "band-aid" fashion with further problems ensuing. 3) City employees are experiencing phone lines going dead during the middle of conversations, diminishing volume, squealing noises, inability to reach outside service area lines, and numerous other problems which ultimately results in additional staff timen returning phone calls, and/or lost time from work while lines are being checked for repair. 4) The City currently uses Pacific Bell, AT&T, Executone, AmeriCall, and Contel to support its system. The juggling act of keeping applicable services in order is cumbersome and costly. To resolve the telephone problems which are nearing crisis levels, a needs assessment and feasibility study must be conducted to give the City direction for planning improvements. Northern C,.lifornia Communications Network (NCCN) has the expertise and ability to put together such a study for the City of Lodi. THOMAS A. PETERSON City Manager CC -1 AGENDA TITLE: Retain consultant to evaluate City telephone system MEETING DATE: April 3, 1991 Page Two NCCN has demonstrated a thorough knowledge of the City of Lodi's telephone syste+r, and has also demonstrated knowledge of options which the City may pursue to resolve the telephone problems. NCCN does not represent any one particular telephone company, so they will not be advocating or selling a product from their company. Once the study is completed, NCCN will present the City with three to four options at which time the City will review and take into consideration the most feasible solution. NCCN estimates that the time to complete the study will range from 50 to 60 hours. Their cost is $100.00 per hour. NCCN is currently conducting a telecommunications feasibility study and a needs assessment for the City of Placerville. Placerville's system is similar to Lodi's; however, it is a few year's older and is not as heavily overloaded as Lodi's system. Placerville has expressed much respect for NCCN and recommended the company to help Lodi meet its objectives for expansion. Staff recommends that the City Council find it is in the best interest of the City to contract with NCCN and not go to formal bid. FUNDING: $6,000 Contingency Fund Respectfully submitted, pry L. Glenn Assistant City Manager Prepared by: Janet S. Keeter Administrative Assistant to the City Manager JLG:br Attachment 3 '91 City manager's C;ficz { f % J ETWORK NORTHERN CALIFORNIA COMMUNICATIONS NETWORK March 12, 1991 Janet Keeter City of Lodi 221 West Pine Street Lodi, CA. 95241-1910 Dear Janet, Enclosed is the proposal and Schedule A that you requested for our services. if you have any questions, or need to make any changes let me know. Sincerely, Robin P. Hara?n 134 Rhoades Way • Folsom. California 95630 9 (916) 983-0955 TELEMLIUNICATIQNS FEASIBILITY STUDY k,*Jjj,1,Fj:jjjjj 11 :VIE IQ; , I I i Services shall consist of analyzing current and future telecommunication needs, along with a written report for the following locations. TELEPHONE SYSTEM CITY HALL MUNICIPAL SERVICE CENTER HUTCHINS STREET SQUARE PUBLIC SAFETY CARNEGIE FORUM PARKS AND RECREATION WELLS/SUB-STATIONS LIBRARY FIRE STATION �2 FIRE STATION -r3 ASSORTED PARKS AREAS OF RESEARCH - EXiSTING EQUIPMENT -CURRENT VENDOR - FEATURE APPLICATIONS - TRAFFIC NETWORK - CABLE PLANT - EOUIPMENT CAPACITY AND GROWTH - UPGRADE OPTIONS - T- I APPLICATIONS - LUNG DISTANCE OPTIONS - BUDGETARY FIGURES (IF NEEDED) VOICE MAIL/AUTOMATED ATTENDANT - POSSIBLE APPLICATIONS AND BENEFITS - CURRENT PRODUCTS ON THE MARKET - INTEGRATION CAPABILITIES - BUDGETARY FIGURES (IF NEEDED) Nh�yr'46JETWGAK 1WerMge CJII�MIIa CCYMYaRCtrYIOMe KayWORR 134 Rhoades Way F.:lsoi.t, CA 95630 (916) 983-0955 Pace No. T of T Paoes PROPOSAL SUBMITTED TG PHONE j DATE City of Lodi (209) 333-6700 ^ March 12, 1991 STREET 10B NAME I 221 West Pine Street _ CITY. STATE AND IIP CODE 108 LOCATION Lodi, CA 95241-1910 1_ X OUX EAI£ OF PLANS 110B PHONE Janet KeeterTBA _-- L j we ne,,"y propose 10 Own— n ve,,alf and Vpor necessary lot the compbtion Or SERVICES PROVIDED Teleco-mmunications Feasibility Studv and :Deeds Assessment (See Schedule A) Estimated Hours: 50 - 60 Hourly Rate: $100.00 WE PROPOSE hereby to furnish material and labor — complete in accordance with above specitications, tot the aim of: cola-, i s 2 , 000.00 !. ayment w ora made as touow,: Retainpr Progress Payments Will be billed In 20 hoilr increments, All material is guaranteed to be as specified. All work to be COntpleted in a sub- ! L ! stantief workmanlike manner according to specifications tubmitled, par standard Authorized / (i practices. Any alteration or deviation from above soeCtflcations involving extra costs will be et ecuted only upon written orders, and will become an extra charge —� over and above the estimate_ An agreements contingent upon stnkos. accidentsor Note: TAri proposal may be delay, beyond our Control. Owner to Carry fire, tornado and other necessary in• %oran ze. Our workers are fully Covered Dy Workmen's Compensation lnsurJnCe. .rthdrsxn by vs f not accepted within cars, ACCEPTANCE OF PROPOSAL Trio above once,, soaurlcallon, and conot- trons are Satisfactory and are nereby accepien. You are outnonaeo to do trio work as soecir{ed. Payment will De made as outline above. (t Date of AccttYance.l�