AGENDA TITLE: Authorization to Remodel the Police Department
Communication Center
MEETING DATE: July 7, 1993
PREPARED BY: Police Chief
RECOMMENDED ACTION: That the City Council authorize the
remodeling of the Police Communication
Center, upgrading the "call taking" station
into a full dispatch position.
BACKGROUND INFORMATION: Renovation of the Police Communication
Center will promote greater efficiency,
and provide increased safety. Clearer
radio transmission, resulting from the
reduction in noise level will improve communications for police
and fire personnel. Please refer to the attached memorandum
from Captain James Schick for more detailed information.
The estimated cost is approximately $5,000.00
Captain Schick will be present at the Council Meeting to answer
any questions.
FUNDING: Contingent Fund
11AA ^0
L rry . Hans
Chief of Poli@
LDH:sm
ee: City Attorney
APPROVES -------
THOMAS A PETERSON ,@Cycled Dape,
City Manager
CC -1
L O D I P O L I C E D E P A R T M E N T
M E M O R A N D U M
To: Tom Peterson
City Manager
From: Captain James Schick
Date: June 10, 1993
Subject: Remodel of Communications Center
The communications center currently has two dispatch positions and one
separate telephone "call taking" station. I recommend upgrading the call
taking station into a full dispatch position. The additional position
will be adjacent to the existing dispatch positions.
The primary purposes of this renovation are to provide increased safety
and improved communications for police and fire personnel. An the burden
on dispatch continues to increase, we must seek alternatives to improve
communications. The addition of a third dispatch position will meet our
current and future needs. The cost for this project is $4,998.00.
we have three dispatchers assigned per shift. During emergency
situations and major fires, we receive an influx of 9-1-1 telephone
calls. At these times all three dispatchers are frequently in the
communications center answering emergency telephones while simultaneously
dispatching police and fire units. The two dispatch positions have
access to the Computer Aided Dispatch (CAD) terminals and emergency
radios. The third (telephone) position does not have radio
communications. S/he must take telephone information, hand write it, and
pass a slip of paper to the other dispatchers for CAD entry and radio
broadcasting. This is inefficient and increases the potential for
error. Fire protocol requires ona dispatcher to monitor the fire radio
during a fire. This third position will be designated as the fire
dispatch position. This will increase efficiency and improve employee
safety.
Replacing the existing equipment cabinets will not only provide the space
necessary for the third dispatch position, it will also reduce the
ambient noise level in the communications center. The new cabinets are
designed to enclose the two computer printers located in the center. An
average office environment produces a noise level of 55 decibels. The
noise level in dispatch was measured at 62 decibels when one of the
dispatch printers is in operation. when both printers were active, the
noise level was measured at 65 decibels. This is a substantial safety
issued. Lowering the noise level in the dispatch center will provide
superior communication with public safety units. This is especially
significant during crisis situations when it is imperative for emergency
responders to have clear communications. Recently, one of the two cAD
terminals went "down" for two days. we were reduced to one access point
for entering all police and fi-e information into our computer system.
The third position will eliminate such situations.
Installation of a third position entails the following:
1. Extending the counter/work area and remodeling
the present cabinets in the communications
center.
2. Relocation of the current "call taking"
telephone position.
3. Installation of an additional CAD terminal.
4. Installat-on of a third radio console.
The costs for this project are:
1.G 2. Building maintenance will extend the dispatch
counter (work arca), and remodel the cabinets
at a cost of $675.00.
3. In July, Pacific Hell will be installing new
9-1-1 telephone equipment in the communications
center. There is NO cost for this equipment
and it will be installed in whatever location
we choose.
4. Purchase one additional CAD terminal at a cost
of $723.00.
5. Lodi Fire Department has agreed to give us
their radio communications base station.
This equipment is identical to ours except
it has only Fire channels. The cost to
relocate the unit is $2,400.00.
6. Uparadinq with police radio channels will
cost an additional $1,200.00 ($3,600.00 total).
Respectfully submitted,
James Schi Captain
Support Servicen Division Commander
cc: Chief Larry Hansen
I
I`
Z --'I
(1
i(1 0 1;'•1.
�..1
ifl
..1
C..
.
• f"
i� a" fi;
t�17
t.iVj
'.i
r
L .1•
t Tl
•`
i11
t7 G")
ij +-•.
• l i
rri . H
r,-
n ai
.I 'T f r
`,:
"ii
+.:i ._ (•
TI
r.„., rr
.t:
�.
111 0
("t
t
f-.. 1:
i•, i-,
l
1,
I y (,? n
.•
1 i Z L')
rit -x
T
;ti t_t .fs til G7
t_i
rTI
i
nl c
o Cf o
I' t
-x rn
•: i
n1 i -i
(. i
:X r t G l
..�cm--i--1
n�
:ii 'L 0
.
,..1 ...i
.1 T7 fT,
i
L) 3' l,7
a rli
C:; i:7 11 Q
-
�t:iiw0Z
in+
IT,
ril r W ;n
•i).0
mClOT
-:alZr":1
i l
rr, +
to u) '13 is
rll
a r,L)m
11
t” +: r-1 M,,
G; t:i
,.1
in C
t, ;� i.t►
_, • i
u C'i r
Ill
z
[ i
i ffl al z
"
►-/ --t --t -t
=zz
c�mmm
r
c
v
m
to
COS" NND EQUIPMENT REOUIRF-'ENTS
• ..e.lewe.,.
OFF.: (200) 982-1008 •••.•• ••••••
COMMIUNrCATX3NS 2771 East French Camp Road {800) 448-22 0
Mentece. CA 86338 FAX: (200) 962-0235
PRE►AREO PORI CITY OF LODI POLICE DEPT.CeNtdar
••
•.iii
ATTN: CAPT. SCHICK �w
OTY. 0E3CRIPTION UNIT PRICE EIITENOEO
P/.ICES
1 I LABOR AND PARTS NECESSARY TO MOVE 2 CONSOLE II I I I
i POSITIONS FROM FIRE DEPT. TO POLICE DISPAT H
EXTENDED
TOTAL $2450 00
j INSTALLATION AND MAINTENANCE I
** Customer is to complete necessary con-
struction of closet to make room tor
i
positions ot trie console and o Z30 the
physical modification of cutting the counter
toD to size. I
REMARKS:
TERMS:__-
Net 15 days from complete w/ approved P.O. I
- �
PRICES QUOTED ARE F.O.B. FACTORY. QUOTATION GOOD FOR 1 rl_DAYS.
DELIVERY SHIPMENT FROM FACTORY IN APPROX.1 0 DAYS FRO -M -M OF ORDER.
.000TATION PREPARED BY: ! ACCt PT SD BY:
OA TE: 6-08-93 STEVEN K. FINCH DATE
_ 'S7r"'EH COPY
EXTENDED
TOTAL
SALES/USE
TAX
TOTAL IV
1$ 2450.00
PREPARED 10111
COST NNO EQUIPMENT REQUIREI"ENTS
OFF.: (200) 082-1 M
2771 Eaft Frmod I Camp Road (800) 448,2200
ManWm CA 06398 FAX: (200) ON -OM
CITY OF LODI POLICE DEPT.
ATTN: CAPT. SCHICK
s -
OWN
•
... a.N
•.•orw-
CUSTOMER COPY
EXTENDED
TOTAL
$ 836P.00
INSTALLATION AND MAINTENANCE
control wiring to base stations .
Instal
$1500.00
REMARKS: EXTENDED
TOTAL
SALES/USE
TAX
TERMS, Net 15 days from shipment w/ P.O. I
$ 648.
05
I
$1051
.05 -
CUSTOMER COPY
cGee
ommunications
lectronics, Inc.
June 9, 1993
Ludi P.D.
230 W. Elm Street
Lodi, CA 95240
Attn: Capt. Shick
^c�P42 'r --2: =09 333 6792 P01
P.O. Box 8750
Stockton. CA 95208
(209)477-8989 8alp West Lane
(209)466-9744 Sales -Fremont St
(209)•(78.2003 Service -Hammer T.rno
Thank you for allowing McGee to bid on your Communication
requirements.
.ne cost to move the Fire Dispatch Console from the present
location to the dispatch area
Labor $1100.00 Parts $175.00
The cost to install. extra channels in console is $925.00
in parts, 624'.0.00 labor for one channel. If you wish to
add more than one channel the cost would be $925.00 times
the numner of channels, plus $50.00 in labor per channel.
Respo ctfully Submitted,
Jerry Kornbau
JKiks
1 C
V •
+
1 7 5 +
925•+
l.2:•+
925•+
l.2:•+
2 1 0 +
j J • +
- ^J • +
5 n • +
5,:35•*
z
IN
TO: Finance Director
FROM: City Clerk
CITY OF LODI
SPECIAL ALLOCATION REQUEST
DATE: July 7, 1993
PROJECT NUMBER:
Request is made for funds to accomplish the following project which was not
included in the current budget:
Description of Proiect Estimated Cost
Renovation of the Police Communication Center, upgrading the "call taking"
station into a full dispatch position.
$5,000.00
Approved by the City Council - June 7,1993
(If you need more space, use additional sheet and attach to this form)
FUND OR ACCOUNT TO BE CHARGED
Current Budget $ Prior Year Reserve $
Contingent Fund $ Genera3 Fund Surplus $
Capital Outlay Reserve $ Gas Tax Fund $
Utility Outlay Reserve $ Other (Election) $
Hotel/Motel Tax Reserve - $
General Fund Operating Reserve $
r `
Dixon Flynn, ifer M, Perrin
Finance Director City Clerk
Submit this form in duplicate to the Finance Director. Distribution after
approval will be as follows: 1) Originating Department 2) Finance
Department
OI �
CITY OF LODI
COUNCIL COMMUNICATION
AGENDA TITLE: Authorization to Remodel the Police Department
Communication Center
MEETING•DATE: July 7, 1993
PREPARED BY: Police Chief
RECOMMENDED ACTION: That the City Council authorize the
remodeling of the Police Communication
Center, upgrading the "call taking" station
into a full dispatch position.
BACKGROUND INFORMATION: Renovation of the Police Communication
Center will promote greater efficiency,
and provide increased safety. Clearer
radio transmission, resulting from the
reduction in noise level will improve communications for police
and fire personnel. Please refer to the attached memorandum
from Captain James Schick for more detailed information.
The estimated cost is approximately $5,000.00
Captain Schick will be present at the Council Meeting to answer
any questions.
FUNDING: Contingent Fund
LDH:sm
cc: City Attorney
APPROVED
L rry . Hans
Chief of Polie
THOMAS A. PETERSON
City Manager
I1
t
lecyci.a oaoer
CC -1
CI
L O D I P O L I C E D E P A R T M E N T
M E M O R A N D U M
To: Tom Peterson
City Manager
From: Captain James Schick
Date: June 10, 1993
Subject: Remodel of Communications Center
The communications center currently has two dispatch positions and one
separate telephone "call taking" station. I recommend upgrading the call
taking station into a full dispatch position. The additional position
Cwill be adjacent to the existing dispatch positions.
The primary purposes of this renovation are to provide increased safety
and improved communications for police and fire personnel. As the burden
on dispatch continues to increase, we must seek alternatives to improve
communications. The addition of a third dispatch position will meet our
current and future needs. The cost for this project is $4,998.00.
We have three dispatchers assigned per shift. During emergency
situations and major fires, we receive an influx of 9-1-1 telephone
calls. At these times all three dispatchers are frequently in the
communications center answering emergency telephones while simultaneously
dispatching police and fire units. The two dispatch positions have
access to the Computer Aided Dispatch (CAD) terminals and emergency
radios. The third (telephone) position does not have radio
communications. S/he must take telephone information, hand write it, and
pass a slip of paper to the other dispatchers for CAD entry and radio
broadcasting. This is inefficient and increases the potential for
error. Fire protocol requires one dispatcher to monitor the fire radio
during a fire. This third position will be designated as the fire
dispatch position. This will increase efficiency and improve employee
safety.
Replacing the existing equipment cabinets will not only provide the space
necessary for the third dispatch position, it will also reduce the
ambient noise level in the communications center. The new cabinets are
designed to enclose the two computer printers located in the center. An
average office environment produces a noise level of 55 decibels. The
noise level in dispatch was measured at 62 decibels when one of the
dispatch printers is in operation. when both printers were active, the
noise level was measured at 65 decibels. This io a substantial safety
issued. Lowering the noise level in the dispatch center will provide
superior communication with public safety units. This is especially
significant during crisis situations when it is imperative for emergency
responders to have clear communications. Recently, one of the two CAD
terminals went "down" for two days. We were reduced to one access point
for entering all police and fire information into our computer system.
The third position will eliminate such situations.
Installation of a third position entails the following:
1. Extending the counter/work area and remodeling
the present cabinets in the communications
center.
2. Relocation of the current "call taking"
telephone position.
3. Installation of an additional CAD terminal.
4. Installation of a third radio console.
The costs for this project are:
1.6 2.
Building maintenance will extend the dispatch
counter (work area), and remodel the cabinets
at a cost of $675.00.
C 3.
In July, Pacific Bell will be installing new
9-1-1 telephone equipment in the communications
center. There is NO cost for this equipment
and it will be installed in whatever location
we choose.
4.
Purchase one additional CAD terminal at a cost
of $723.00.
S.
Lodi Fire Department has agreed to give us
their radio communications base station.
This equipment is identical to ours except
it has only Fire channels. The cost to
relocate the unit is $2,400.00.
6.
Upgrading with police radio channels will
cost an additional $1,200.00 ($3,600.00 total).
Respectfully submitted,
Gin...,__
James Schi � Captain
Support Services Division Commander
cc: Chief Larry Hansen
ARGIL 29 19g3
TO i :APT SCHICK
_ODI POLICE LEFT
95*0-4- E. 'AHISLER
,eTOIROL A INC
:.B30��aa F IELU r4 -,E
..Toc l.Trl
J
:-:-EA;; CAPT 3.:HICK:
7!i -Z F=°LLOWING QUCTE
1S M CONFIRM THE =UQT=
_--sN ON THE
TELEPiCNE . 7HE COST TO TrOVE
7HE CONSOLE PBS _I T! 3- !
taS 15 -'C .THE
NEW LOCATION IS S2400.uC:-
THE ADDITIONAL COST TO
1vcREAsE THE
CONSOL= Fee 7HE ADD I T I OMNL
=10UR MODULES !S 1:1120').')11.
"HIS INCLUDES'
'.:.;E .:t nUL ES AND WIF.E=i,,lr -HEr-
!'473 THE CONSOLE
RE 1:7
.:R THE ..,EQ JEST CCP A
il- C R G M
OTCPGLA . .F YOU HAVE ;4N Y
= UEST ' ONS PLEASE SIVE
31E .. ;:ALL.
Ttrf=NK YOU.
SINCERELY
i'if::J E. LMISLE..:'.
1 : �� CE ITcF
s,.
COS"" IND EQUIPMENT REQUIRP04ENTS
® -
. OFF.: (209) 982-1993-
27 ....«.......«
�/fIJMCATIOMS 71 East French Camp Road (800) 448-2290
Manteca. CA 95338 FAX: (209) 982-0235
PRE►ARcO TORI CITY OF LODI POLICE DEPT.
CAMular
..
ATTN: CAPT. SCHICK ori'
OT!'.I OCSCRI'TION I UNIT MCC I EXTEN !O
(
LABOR AND PARTS NECESSARY TO MOVE 2 CONSOLE I I
POSITIONS FROM FIRE DEPT. TO POLICE DISPAT H I I I I --
INSTALLATION AND MAINTENANCE
i ** Customer is to complete necessary con-
struction of closet to make room or
pose ions or the conso e anct to do the
physical modification of cutting the counter
top to size.
REMARKS.
TERMS: Net 15 days from complete w/ approved P.O.
PRICES QUOTED ARE F.O.B. FACTORY. QUOTATION GOOD FOR _DAYS.
DELIVERY. SHIPMENT FROM FACTORY IN APPROX. 100 DAYS FROM RECEIPT OF ORDER.
IOUOTA TION PREPARED BY: ACCEPTED BY.
r
!DATE: 6-08-93 STEVEN K. FINCH I DATE:
STC'".Ea CCPY
EXTENDED
TOTAL $2450 00
EXTENDED
TOTAL
SALES/USE
TAX
TOTAL
$ 2450.00
COST OND EQUIPMENT REQUIREMENTS
OFF.: (200)1182-1M
T 2M Earl Fowid Camp Road (800) 446-2200
TIL'TIS
Manteca, CA 06336 FAX (200) 0882-0235
►RE►ARED FOR/ CITY OF LODI POLICE DEPT.
•.tN•NN MM.•
A
A A/M11,06080WAir
CAULAW
••AAM
ATTN: CAPT. SCHICK
**Cost to instal 2 additional tx/rx modules
QTY. Oz%C!RI►TION UNIT►RICE EXTZNDrtO
P ..0
21 Transmit and recieve modules for tone remote $ 2824.00 5648.00
control of base stations for police and
sheriff departments.
m/n B1313AACS81
21 Positive mode control m/n OLN2849A $ 586.100 $1172 00
1
21 Positive mode control encoder m/n OLN2852A IS 771.100 $1542 00
INSTALLATION AND MAINTENANCE
I
Instal radio hardware and hookup tone remote
I control wiring to base stations .
REMARKS;
TERMS: Net 15 days from shipment w/ P.O.
PRICES QUOTED ARE F.O.B. FACTORY. QUOTATION 0000 FOR 30 DAYS.
rOELIVERY: SHIPMENT FROM FACTORY IN APPROX. 30 DAYS FROM RECEIPT OF ORDER.
I QUOTATION PREPARED BY: ACCEPTED BY:
i
1DATE: 6-8-93 STEVEN K. FINCH I DATE:
CUSTOMER COPY
EXTENDED
TOTAL 1 $ 834.0
Instal { $1500L00
EXTENDED
TOTAL
SALEVUSE
TAX 1$ 648. 05
TOTAL I
I $1051 .0
cGee
ommunications
lectronics, Inc.
June 9, 1993
Ludi P.D.
230 W. Elm Street
Lodi, CA 95240
Attn: Capt. Shick
4 , 71?8a2 7: _t - 333 6792 Pal
P.O. Box H750
Sta ktnn, CA 95208
(20.4)477-8989 Solos -West Lane
t209M66-9744 Sales -Fremont St
(209)478-2003 Sernce-Hammer Lars,
Thank you for allowing McGee to bid on your communication
requirements.
_ne cost to move the: Fire Dispatch Console from the present
location to the dispatch area
Labor 51100.00 Parts $175.00
The cost to install extra clrannels in console is $925.00
in parts, S210.0C• labor for orae channel. If you wish to
add more than one channel the cost would be 5925.00 times
the number of channels, plus $50.00 i:s labor per channel.
Respectfully Submitted,
Jerry Kornbau
JK/ks
ti •
i,I G0 •+
175•+
? 2 s +
92:+
925•+
>2;•+
2 1 0 • +
53+
;J+
+
I- : 5 11 . *
r
Ci
R
'
Q
w
I
W
r2
�o I
0
Ci
R