HomeMy WebLinkAboutAgenda Report - November 3, 1993 (57)CCITY OF LODI COUNCIL COMMUNICATION
AGENDA TITLE: Request for Proposals - Lodi Lake Soil Removal
MEETING DATE: November 3, 1993
PREPARED BY: Public Works Director
RECOMMENDED ACTION: That the City Council approve the request for proposals on Lle removal of
soil at Lodi Lake and authorize advertising for bids.
BACKGROUND INFORMATION: Almost one year ago, the Parks and Recreation Department
requested'that Lodi Lake be deepened and regraded. They have had
problems during boating events with the shallow depth and wanted to
see the Lake deepened to 10 feet. They also had other concerns
about the condition of the Lake. The Council appropriated $10,000 toward the project and the
Engineering Division has done a number of things on the project.
The Fish and Game Department and Corps of Engineers were contacted to find out their reqs 'cements.
For the work we contemplated at the Lake, a Corps permit is not needed. We applied for and recei ,ed
a Fish and came agreement for the work (not in time to do any serious work in 1992/93). We took soil
samples and had various engineering and chemical tests conducted. Finally, we surveyed the Lake
and researched various publications and reports and prepared a short report, attached as Exhibit A.
With regard to the depth issue, the report noted the high cost of excavating and regrading the Lake
($200,000 to $400,000). It was noted that we may be able to find someone who wished to use the soil
to do the work at little or no cost to the City. That is the focus of this request for proposals.
After that report was written, we received the Fish and Game i greement. Some of their conditions are:
• the bottom be graded such that fish will not be trapped (i.e., eliminate the ponds that form
when the Lake is drained)
• any tules in the way of the grading be transplanted
no silt be allowed to run into the River
We have also gone through another summer. This time we had fairly high water levels, after last years
wet season which ended the drought, to the point where there was concern by Parks and Recreation
staff over the condition of the levee near Pig's Lake.
Given the above, staff feels it is worth the effort to see if there is some interest in excavating the Lake
at little or no cost to the City. The main drawbacks to proceeding are the typical construction
inconveniences and the wear and tear on the access roads within the Park, which could be significant.
APPROVED.
THOMAS A PETERSON 1 cytlee Paw
City Manager
cal
LAKESOIL.DOC 10/27/93
Request for Proposals - Lodi L.Ke Soil Removal
November 3, 1993
Page 2
Although the long-term plans for the Lake involve building a land bridge which will need dirt, there
should be enough left within the Lake area assuming we can have the Lake bottom below the bottom of
the River.
We have prepared a plan and specifications that attempt to be flexible in methods and timing and ask
that the proposer outline their basic plan of excavation and cost (or royalty) to the City, if any.
The specifications allow for a multi-year cont act and waive bonding and other typical contract
requirements if the cost to the City is less than $5.000. Otherwise, it will be a formal public works
contract As of this writing (October 26, 1993�the plan and specifications are not ready for inclusion in
the Council packeL The plan and specifications will be ready in time for the November 3 Council
Meeting to allow persons to submit a proposal for review by thf + Council on December 1 and still get
some work done on the Lake this year.
FUNDING: Lodi Lake Capital Outlay Fund.
pl
ck . Ronsko
ublic orks Director
Prepared by Richard C. Prima, Jr., Assistant City Engineer
JLR/RCPAm
Attachment: Exhibit A, Lodi Lake Report on Operational Problems Summer'92
cc: Parks and Recreation Director
Purchasing Officer
LAKESOIL.DOC
10!27!93
Exhibit A
LODI LAKE
REPORT ON UPMUMtSAAL PROBLEMS
SUMMER '92
Prepared by the City of Lodi Engineering Division, January 1993
Probl em
The Parks and Recreation Department has indicated the four problems
listed below in operating Lodi Lake:
1. Shallow areas in the east end of the Lake where boat
propellers drag the bottom.
2. High bacteria counts in the Lake which required closing
the beach swimming area.
3. The presence of floating weeds, a nuisance to swimmers
and, to some extent, boaters.
4. The Parks and Recreation Department also voiced the
Department of Fish and Game concern that the shallow Lake
was too warm to support cold -water sport and migratory
fish, such as trout and salmon.
Below is a brief discussion of the four problems. Conclusions and
suggestions are detailed at the end of the report.
Depth
Initially, the Parks and Recreation Department felt most of the
problems stemmed from the idea that the Lake has silted up several feet
over the years and it should be dredged to its original depth. They
also thought it would be good to have the Lake be 8 to 10 feet in
depth, or more. The current Lake depth is between 5 and 10 feet.
To determine if the Lake had silted up, the City surveyed the bottom of
the Lake. A comparison to a Lake -bottom survey done in 1959 showed
little or no change had occurred in the overall depth of the Lake.
Contact with the WID, who controls the water surface elevation of the
Lake, showed that during the summer there were occasions when the water
surface elevation was as low as 38.5 feet instead of 41.0 feet. **
This means the Lake depths would vary from 2.5 to 1.5 feet rather than
the much deeper figures mentioned earlier.
*This is the range of depths when the water surface is at 41.0 feet.
**41.0 feet is the maximum water surface elevation allowed at
Woodbridge Dam.
LODILA KE/TXiW.02M -I-
Lodi Lake Report on Operational Problems, Sumner 192
Page 2
Bacteria
The second problem was high bacteria counts which forced the closing of
the beach swimming area. The Parks and Recreation Department thought
that a combination of the shallow Lake, warm water and Tack of
circulation of water from the river were the cause of the problem. In
June 1985, an extensive round of bacteria testing in and around the
Lake was performed by the Water/Wastewater Division. The results of
the tests did not locate a source of the bacteria nor a relationship to
temperature or lack of circu±ation of water from the River. It did
show that overall the bacteria counts in the River were higher than
those in the Lake. Therefore, circulating more River water through the
Lake would not necessarily lower the bacteria count.
Weeas
The third problem identified was the presence of floating weeds. The
Parks and Recreation Department first thought these were plants that
were anchored and growing from the Lake bottom and that deepening the
Lake would discourage their growth. However, examination of the Lake
bottom showed no indication of plant life anchored to the Lake bottom
other than the tule reeds near the edge. Therefore, deepening the Lake
would have little effect on the floating weeds. Page 12 of the Spink
report on Lodi Lake covers the factors controlling algae. The Urban
Land Institute's Bulletin 72 on Lakes and Ponds, Page 61, covers
aquatic vegetation and lake maintenance. Bulletin 72 suggests some
stopgap chemical treatments for vegetation control. It also indicates
physical removal of the weeds for control. Generally speaking, when
the conditions of sunlight, temperature and nutrients in the Lake are
proper, plant life will grow.
Fish
The fourth problem is really stated as a question, "Is the Lake too
warm to support cold -water fish?". The Federal Energy Regulatory
Commission (FERC) EIR on the Lower Mokelumne River Project indicated
that the whole river area near the Woodbridge Dam was too warm for
several summer months in hot and dry years. This report also indicates
remedial alternatives which do not involve Lodi Lake.
Conclusions and Suggestions
1. Shallow Areas - It has been fairly well established that
the Lake has not silted up to any large extent and the
shallow area was created by the low water levels of a
6 -year drought. Though this condition may occur again
from time to time, the cost to deepen this shallow area
and remove the 4,000 cubic yards of dirt could be as high
as $200,000 to $400,000, at $5 to $10 a cubic yard.
These prices would apply on a contract for removal of
soil. We are also exploring the possibility of having
the excavation done in exchange for the value of the
dirt. This would be a performance -type contract and
LODILAKE/TXTW.02M ---
Lodi Lake Report on Operational Problems, Summer '92
Page 3
would have to give the contractor great latitude in when
and how much material is to be removed. Tests of the
lake -bottom soil for street or fill purposes showed a
range of values from good to fair. However, Department
of Fish and Game requires permits for this type of
excavation. With this and the heavy rains, it is
unlikely that any work could be started before the Lake
is filled again in March.
2. Hi h Bacteria Counts and Beach Closings - This
multipurpose laKe is hardly the i ea ccation for a
swimming area. The water is subjected to contaminants
from the storm drains that empty into the Lake, from
ducks and geese that live on the Lake, from wastes from
the cattle operation on the river adjacent to the Lake,
and likely contamination from the swimmers using the
beach. It was thought that the Wading Pool, which is
drained daily into the Lake, may also be a source of
contamination. Though it is still drained daily, it is
generally kept chlorinated. Any or all of these could be
contributing to the problem.
To minimize the amount of days the beach is closed, all
of the above mentioned sources of contamination may need
to be eliminated or at least minimized.
3. Floating Weeds - Occasional blooms of floating plants can
e controlled with chemicals and then physical removal of
the plants. Proper identification of the plants and a
recommendation of treatment should be from experts in
this field.
4. Warm Water and Fish Mortality - No recommendation will be
made here. The problem is not isolated to Lodi Lake but
is a problem of the entire river system and the solution
to the overall problem may not even involve the Lake
itself.
Materials Sited
Feasibility Report/Lodi Lake Modification, The Soink Corporation,
April 1974.
Lakes and Ponds Technical Bulletin 72, The Urban Land Institute,
TM
Lodi Lake. Bacteria Testing, Frank Beeler, Senior Laboratory Technician,
1985.
Proposed Modifications to the Lower Mokelumne River Project,
California, Draft Environmental Impact Statement, Federal Energy
Regulatory Commission, Project 42916-004, October 1992.
LODILAKE/TXTW.02M -3-