HomeMy WebLinkAboutAgenda Report - August 18, 1993 (54)os
CITY OF LODI COUNCIL COMMUNICATION -
AGENDA TME: Improvement Agreement Addendum for Lodi West, Unit No. 1, Tract No. 1904
MEETING DATE: August 18, 1993
PREPARED BY: Public Works Director
RECOMMENDED ACTION: That the City Council approve the Improvement Agreement Addendum for Lodi
West, Unit No. 1, Tract No. 1904, authorize the City Manager to execute the
Agreement, appropriate the necessary funds from the Street Development Impact
Mitigation Fee Fund and authorize the Finance Director to make the necessary
refunds for engineering and inspection fees.
BACKGROUND INFORMATION: Lodi Municipal Code Section 16.24.040 provides for reimbursement to
developers for the cost of street improvements in owess of 68 feet in width.
The reimbursement is to include right -of --way costs.
The right -of --way credit on Elm Strut for the subject subdivision was inadvertently omitted from the original
Improvement Agreement between the City and the developer and the reimbursement for street improvements on Elm
Street was incomplete.
In addition, the developer is not required to pay engineering or inspection fees for the portion of the street
improvements to be fundcl by the City. These costs are usually deducted from the portion of the Cost Estimate for
Improvement Security (Schedule A) on which the engineering and inspection fees are based. Since the
reimbursements were incotnpiete, the developer was overcharged for engineering and inspection and a portion of
these fees needs to be refunded.
Staff has prepared the attached Improvement Agreement Addendum to address these items which has been signed by
the developer.
The Lodi West Addendum also includes the following:
• A correction on the Billing Schedule to include a credit engineering and administration (10% of oversize
cost) for oversize water mains. This item was included in the Cost Estimate for Improvement Security, but
was omitted from the Billing Schedule attached to the Improvement Agreement and needs to be refunded to
the developer. Sufficient funds have already been appropriated from the Water Development Impact
Mitigation Fee Fund to cover this item; no additional appropriations are required.
APPROVED ` � t J
THOMAS A. PETERSON recycieo paper
City Manager
CC -1
COUNCOW1 DOC 0&'04,93
Improvement AgrearxeAddendum for Lodi West, Unit No. 1, Tract No. 1904
August 18, 1993
Page 2
• A correction in the quantities shown on the Cost Estimate for Improvement Security and the resultant
payments shown on the Billing Schedule for street improvements on Evergreen Drive to be made at the
time of acceptance of the subdivision iuvrov aneab. The original quantities and payments shoum were
too high.
Staff recommends Council approve this Agreement addandum.
FUNDING. 510,144.30 Street Development impact Fee Fund
$ 58.50 Engineering Fees
$ 97.50 Inspection Few
ack L.
biic
=Dire=
hgesed by Sheerer► A. Welch. Associate civil Engiam
IIR/SAW/im
M city Attaaey
Robert Batch
BaumbWh - Pia za
Fwamn & Mvdmb Bank
CMTNC )W DOC OVOW93
0
r" -
IMPROVEMENT AGREEMENT ADDENDUM
Lodi West, Unit No. 1
Tract No. 1904
THIS AGREEMENT, entered into as of this day of . 1993, between the
CITY OF LODI, hereinafter referred to as "City", and Robert Batch, hereinafter referred to as
"Developer".
WITNESSETH:
WHEREAS. the parties have entered into an Improvement Agreement, dated June 2, 1993, which
Agreement covers the responsibilities of city and of Developer for the development of Lodi
West, Unit No. 1. Tract No. 1904; and
WHEREAS, the City is responsible for reimbursing Developer for the following items from the indicated
funds:
1. Excess street width. including right of way, on Elm Street from the Street Development Impact
Mitigation Fund;
2. Half the street improvements on the portion of Evergreen Drive which fronts the Westgate
Basin/Park parcel from the Storm Drain Development Impact Mitigation Fund (881/6) and the
Parks and Recreation Development Impact Mitigation Fund (12%);
3. The difference in cost between the 10 -inch water main to be constructed in Evergreen Drive and
an 8 -inch diameter main, including 10% of the cost for engineering and administration from the
Water Development Impact Mitigation Fund; and
WHEREAS, the Developer is not required to pay engineering fees on the cost of improvements to be
reimbursed by the City; and
WHEREAS, the Developer has dedicated excess right of way on Elm Street for which reimbursement was
not included in the Improvement Agreement; and
WHEREAS, the reimbursement for the street improvements on Elm Street included in the Improvement
Agreement was incomplete;
WHEREAS, the reimbursement for engineering and and administration fees for oversize water mains %%-as
not included in the Improvement Agreement; and
WHEREAS, the quantities shown on the Cost Estimate for Improvement Security and the resultant
payments shown on the Billing Schedule for street improvements on Evergreen Drive to be
trade at the time of acceptance of the subdivision improvements were too high,
NOW THEREFORE, it is agreed between the parties hereto as follows:
1. That this document. including the attached Cost Estimate for Improvement Security and Billing
Schedule, is considered an addendum to the original Improvement Agreement bctwwcen the two
parties;
2. That the attached amended Cost Estimate for Improvement Security and Billing Schedule replace
the original documents submitted with the original Improvement Agreement between the two
parties:
3. That the City will reimburse Developer S7.000.00 for the excess right of way on Elm Street;
4. That the City will reimburse Developer $3,144.30 ($5,149.38 - $2,005.08) for unreimbursed
street improvements on Elm Street;
5. That the City will rcfund 558.50 in Engineering Fees ($10,842.50 - $10,784.00) and S97.50 in
Inspection Fees (512,237.50 - 512340.00);
6. That the City will reimburse Developer $596.50 for unreimbursed engineering and
administration fees for oversize water mains; and
7. That the estimated quantities and payments for the frontage improvements along Westgate
Basin/Park are as shown on the attached Cost Estimate for Improvement Security and Billing
Schedule.
IN WITNESS WHEREOF, the parties have caused this Agreement to be executed on the date first above
written.
DEVELOPER(S):
Date
CITY OF LODI, A MUNICIPAL CORPORATION
By:
Thomas A. Peterson. City Manager Date
ATTEST:
By:
Jennifer M. Perrin, City Cleric Date
APPROVED AS TO FORM:
Bob McNatt, City Attorney
BILLING SCHEDULE
Development Lodi West, Unit No. 1 Gross Acreage: 12.92
Developer: Robert Batch No. of Units- 53
Engineer: Saumbach & Piazza
Date: Amended 7/6!93
DEVELOPER
COST CREDITS
ENGINEERING
Engineering Fee (4.5% of $50,000) $ 2,250.00
(25%01 5200.000) 5,000.00
(1.5% of $235.600) 3.534.00
Inspsclion Fee (2.5% of 5485.600) 12,140.00
Engineering Fee Paid (7 sheets ® 3150WWO) 3 5,250.00
ENGINEERING SUBTOTAL S 22,924.00 $ 5,250.00
STREET SYSTEM
Fees:
DrnbpmwdkrpwK
Mitigation Fee - Streets 12.92 AC C $ 5,440.00 $70.264.80
Credrts:
Elm Street Improvements per Item B of attached Cost Estimate for Improvement Security
Excess Right of Way on Elm Street (0.07 ac)
Charges for work by City Forces.
Seal Coat
120,507
SF ® $
0.02
Street Name Sign
4
EAC $
125.00
Regulatory & Wameg Signa: Large
(111)
4
EA C $
95.00
Regulatory & Wing Signs: Small
(R26)
1
EAC $
70.00
Centerline and Lane Line Striping ($150 min.)
Double C Wftrfne
215
LF C $
0.18
8' Solid White
65
LF @ 5
0.11
12' Solid White
170
LF 0 S
0.16
Single I ckxIing Skip
1000
LF C $
0.09
Carnitine aid Lane Line Striping Removal
Dpi Cwftrkw
65
L F ®S
1.15
4- Traffic Stripe
120
LF C $
0.58
Pavement Markers: ($40 min.)
Lanefne or Fre Hydrant
56
EA C $
8.00
Pavement Marker Removal
64
EA 0 S
0.50
Remove Bollards
22
EA C $
1.25
Legends (Stop. Left Tum. Speed Limit)
1
EA C $
50.00
6
EA C $
35.00
STREET SYSTEM SUBTOTAL
P,
$2,410.14
500.00
380.00
70.00
38.70
7.15
27.20
90.00
74.75
69.60
448.00
32.00
27.50
50.00
210.00
$74,719.84
S
5,149.38
7,000.00
$12,149.38
DEVELOPER
COST CREDITS
SEWER SYSTEM
Fees:
•.ir ,ry Sewer Lift Station Reimbursement
;.an Agreement No. 86SO2 11.07 AC C $ 806.00 $8,911.35
Develolpment Impact
Mitigation Fee - Sewer 12.92 AC ® S 1,060.00 $13,695.20
SEWER SYSTEM SUBTOTAL $22.606.55 $0.00
WATER SYSTEM
Fess:
Water Reirnbursement per
Agreement No. 83W01
Devallownent Impact
Mitigation Fee - Water
165 LF @ $ 30.17 $4,978.05
12.92 AC Q $ 5,690.00 73,514.80
Credits:
Oversize Mains and Valves per Schedule B of attached Cost Estimate for
kr prw mwd Security
$8.561.50
WATER SYSTEM SUBTOTAL $78,492.85
36,561.50
STORM DRAIN SYSTEM
Fees:
Derrebprtrent Impact
Mitigation Fee -
Storm Drainage 12.92 AC 0 $ 7,630.00 $98,579.60
$98.579.60
(Fees to be applied toward Westgate BaskVPark purchase agreement dated 1/6493)
Payments:
Payments for the master storm drain Ines (529,146.70) and for frontage improvements
along Westgate Basin/Park 1$46,552.38) will be paid at the time of acceptance of the
subdivision improvements (LMC 15.64.080(A)(31).
STORM DRAIN SYSTEM SUBTOTAL $98,579.60
$98,579.60
ELECTRICAL SYSTEM
To be billed separately by Electric Utility Department
TOTAL AMOUNT OF BILLING SCHEDULE $297,322.84
$122,540.48
NET AMOUNT TO BE PAID BY DEVELOPER TO CITY $174,782.36
PRIOR TO PROJECT APPROVAL
2
DEVELOPER
COST CREDITS
DEFERRED DEVELOPMENT IMPACT MITIGATION FEES
Polies Protection Facilities. 12.92
AC ®
$1,130.00
$14,599.60
Fire Protection Facilities 1292
AC a
5540.00
56.976.80
Parks & Recreation Facilities; 1292
AC @
$11,830.00
$152,643.60 $152.843.60
(cre fts to be appied toward Westgate Basi vvrk Purchase agreement dated 1/6193)
General City Facilities; 12.92
AC
$6,830.00
$88.243.60
TOTAL AMOUNT OF DEFERRED FEES TO BE PAID BY $262,663.60 $152,843.60
DEVELOPER PRIOR TO PROJECT ACCEPTANCE OR 1 YEAR
WHICHEVER OCCURS FIRST
• Payments for the frontage irnprwernerts along Westgate BwxVPark (36,348.05) will be
paid at the time of acceptance of the wA&, m wwwements (LMC 15.64.080(Ax3)).
3
City of Lodi
Publics Works Department
`ro i UN =
AMENDED COST ESTIMATE
FOR
IMPROVEMENT SECURITY
Development: Lodi West, Unit No. 1 Acres: 12.92
Developer. Robert Batch Date: 7/6193
Engineer. Baumbach & Piazza
A. COST OF PROJECT IMPROVEMENT
Item
Description
Quantity
Unit
Price
Total
Street System
I
Lot Grading
53
LOTS
$260.00
$13,780.00
2
Roadway Excavation
13,123
CY
1.75
22,965.25
3
Compact Original Ground (0.507
85,498
SF
0.05
4,274.90
4
Compact Original Ground (0.67)
33,970
SF
0.06
2.038.20
5
Compact Native Material (0.50)
85,498
SF
0.10
8.549.80
6
Aggregate Base, Class 11(0.65)
31,638
SF
0.40
12.655.20
7
Aggregate Base, Class 11(0.80)
25,628
SF
0.55
14,095.40
8
Aggregate Base, Class ti (0.90)
59,870
SF
0.60
35,922.00
9
Asphalt Concrete, Type B (0.177
2,332
SF
0.35
816.20
10
Asphalt Concrete. Type B (0.2(r)
31,638
SF
0.40
12,655.20
11
Asphalt Concrete, Type 8 (0.337
85,498
SF
0.65
55,573.70
12
Rolled Curb, Gutter, & Sidewalk
4,018
LF
13.00
52,234.00
13
Vertical Curb, Gutter & Sidewalk
444
LF
14.00
6,216.00
14
Concrete Subgrade Compaction
38,717
SF
0.20
7,743.40
15
Survey Monument
5.5
EA
160.00
880.00
16
Dead End Barricade with Swing Gate
1
EA
400.00
400.00
17
Dead End Barricade (Standard Plan 139)
2
EA
375.00
750.00
18
Street Sign Posts
5
EA
110.00
550.00
19
Asphalt Concrete Walkway
3,310
LF
1.25
4,137.50
20
Vertical Curb & Gutter
661
LF
7.50
4,957.50
21
Street Lights
15
EA
1,500.00
22,500.00
Subtotal
$283,694.25
Storm Drain System
1
12" Storm Drain Pipe
501
LF
$15.50
$7,765.50
2
18" Storm Drain Pipe
943
LF
23.00
21,689.00
3
24" Storm Drain Pipe
140
LF
26.00
3,640.00
4
48" Storm Drain Manhole
3
EA
1.100.00
3,300.00
5
Side Inlet Catch Basin
11
EA
500.00
5,500.00
6
Drop Inlet Catch Basin w/Conc rete Apron
2
EA
650.00
1,300.00
7
Remove Existing Drop Inlet Catch Basin
1
EA
800.00
800.00
8
24" Riser
3
EA
800.00
2.400.00
Subtotal
$46,394.50
Sanitary Sewer System
1
8" Sanitary Sewer Pipe
1,471
LF
$20.50
$30,155.50
2
Standard Sanitary Sewer Manhole
4
EA
2,000.00
8,000.00
3
Drop Sanitary Sewer Manhole
2
EA
2,500.00
5,000.00
4
Sanitary Service with Cleanout
56
EA
350.00
19,600.00
5
Sanitary Sewer Riser
1
EA
2,300.00
2,300.00
_
Subtotal
$65,055.50
TOTAL COST OF PROJECT IMPROVEMENTS 5470,872.25
Construction Engineering & Staking a 3% 3 $14,127.75
As -built Plans & Certifications S600.00
TOTAL COST FOR ENGINEERING FEE CALCULATION 5485.600.00
B. COST OF CITY -FUNDED FACILITIES TO BE BUILT BY SUBDIVIDER/DEVELOPER
Street System (Elm Street)
1 Roadway Excavation
2 Compact Original Ground (0.50')
3 Compact Native Material (0.50')
4 Aggregate Base, Class It (0.90')
5 Asphalt Concrete. Type B (0.37)
Storm Drain System (Master Storm Drain Lines)
1 30" Storm Drain Pipe
2 36' Storm Drain Pipe
3 48" Storm Drain Manhole
Water System (Oversize Portion)
i 10' Water Pipe
2 10" Valves
107
CY
$1.75
T
3.210
SF
tem
Description
`
Quantity
vrAf
Price
Total
3.210
Water System
0.60
1.926.00
3.210
SF
1
8" Water Pipe
2,165
LF
13.00
28,14500
2
10' Water Pipe (8" price)
641
LF
13.00
8,333.00
3
8" Water Valve
10
EA
450.00
4,500.00
4
10" Water Valve (8" price)
5
EA
450.00
2,250.00
5
Fire Hydrant Assembly
5.5
EA
1,600.00
8,800.00
6
Blowoff
4
EA
500.00
2;000.00
7
1" Water Service w/Meter Box
56
EA
350.00
19,600.00
8
8" Fire Service
1
EA
2.100.00
2.100.00
& Administration
596.50
Subtotal
575.728.00
TOTAL COST OF PROJECT IMPROVEMENTS 5470,872.25
Construction Engineering & Staking a 3% 3 $14,127.75
As -built Plans & Certifications S600.00
TOTAL COST FOR ENGINEERING FEE CALCULATION 5485.600.00
B. COST OF CITY -FUNDED FACILITIES TO BE BUILT BY SUBDIVIDER/DEVELOPER
Street System (Elm Street)
1 Roadway Excavation
2 Compact Original Ground (0.50')
3 Compact Native Material (0.50')
4 Aggregate Base, Class It (0.90')
5 Asphalt Concrete. Type B (0.37)
Storm Drain System (Master Storm Drain Lines)
1 30" Storm Drain Pipe
2 36' Storm Drain Pipe
3 48" Storm Drain Manhole
Water System (Oversize Portion)
i 10' Water Pipe
2 10" Valves
107
CY
$1.75
$187.25
3.210
SF
0.05
1E3.50
3.210
SF
0.10
321.00
3.210
SF
0.60
1.926.00
3.210
SF
0.65
2A8E.50
Subtotal
$4.681.25
10% Engineering & Administration
468.13
TOTAL
S5,149.38
389
LF
$32.00
512.448.00
289
LF
41.00
11.849.00
2
EA
1,100.00
2,200.130
Subtotal
$266.497.00
10% Engineering
& Administration
2,649.70
TOTAL
529.146.70
983
LF
$5.00
$4,915.00
7
EA
150.00
1,050.00
Subtotal
55,965.00
10% Engineering
& Administration
596.50
TOTAL
$6.561.50
Rem
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Description Quantity Unit Price Total
Westgate Satin/Park Frontage Improvements (Evergreen Drive)
Roadway ExcavL'ion
Compact Original Ground (0.50
Compact Native Material (0.501
Aggregate Base, Class 11 (0.801
Asphalt Concrete, Type B (0.331
Vertical Curb, Gutter & Sidewalk
Concrete Subgrade Compaction
Survey Monument
Commercial Driveway
Street Lights
8' Sanitary Sewer Pipe
Standard Sanitary Sewer Manhole
12' Storm Drain Pipe
Side Inlet Catch Basin
10' Water Pipe 18' price)
10' Valves (8' price)
Fire Hydrant Assembly
1365
CY
$1.75
$2,388.75
13,972
SF
0.05
698.60
13,972
SF
0.10
1,397.20
13,972
SF
0.55
7,684.60
13,972
SF
0.65
9,081.80
669
LF
14.00
9,366.00
5,243
SF
0.20
1,048.60
2.50
EA
160.00
400.00
30
LF
14.00
420.00
2
EA
1,500.00
3,000.00
249
LF
20.50
5.104.50
1
EA
2,000.00
2,000.00
48
LF
15.50
744.00
2
EA
500.00
1.000.00
342
LF
13.00
4,446.00
2
EA
450.00
900,.00
0.50
EA
1,600.00
800.00
Subtotal
$48.051.30
10% Engineering
& Adminxtration
4,809.13
TOTAL
$52,900.43
Storm Drain System 88%
$46,552.38
Parks & Recreation 12%
$6,348.05
TOTAL COST OF CITY -FUNDED FACILITIES $93,758.01
C. DEFFERED DEVELOPMENT IMPACT MITIGATION FEES
1. Police Protection Facilities 12.92 ac. @ $ 1.130.00/acre $14,599.60
2. Fire Protection Facilities 12.92 ac. @ $ 540.00/acre $6,976.80
3. Parks & Recreation Facilities (Fees applied to Westgate Basin/Park purchase
agreement dated 1/6193)
4. Genera( City Facilities 12.92 ac. @ $ 6,830.00/acre _ $88,243.60
TOTAL DEFERRED FEES $109,820.00
TOTAL IMPROVEMENT SECURITY AMOUNTS:
Faithful Performance: 100°% of A B & C $689,178.01
Labor & Materials: 50°% of A 8 B $289,679.00
CITY COUNCIL
PHILLIP R. PENNING, Mayor
JACK A SIEGIOCK
Mayor Pro Tempore
RAY G DAVE NPORT
STEPHEN i MANN
IOHN R (Randy) SNIDE R.
.CITY OF LODI
CITY HALL, 221 NEST PINE STREET
P O BOX 3006
LODI. CALIFORNIA 95241-1910
'209) 334-5633
1AXQw)) I I 1 01141
August 11, 1993
THOMAS A. PETERSON
City Manager
IENNIFER M. PERRIN
City Clerk
60R MCNATT
City Attorney
SUBJECT: Improvement Agreement Addendum for Lodi West, Unit No. 1,
Tract No. 1904
Enclosed is a copy of background information on an item that is on
the City Council agenda of Wednesday, August 18, 1993, at 7:00 p.m.
The meeting will be held in the City Council Chamber, Carnegie Forum,
305 West Pine Street.
This item is on the consent calendar and is usually not discussed unless
a Council Member requests discussion. The public is given an opportunity
to address items on the consent calendar at the appropriate time.
If you wish to write to the City Council, please address your letter to
City Council, City of Lodi, P. 0. Box 3006, Lodi, California, 95241-1910.
Be sure to allow time for the mail. Or, you may hand -deliver the letter
to "ity Hall, 221 West Pine Street.
If you wish to address the Council at the Council Meeting, be sure to
fill out a speaker's card (available at the Carnegie Forum immediately
prior to the start of the meeting) and give it to the City Clerk. If you
have any questions about communicating with the Council, please contact
Jennifer Perrin, City Clerk, at (209) 333-6702.
If you have any questions about the
at (209) 333-6706.
Jack L. Ronsko
Public Works Director
JLR/lm
Enclosure
cc: City Clerk
LCOUNCO2/TXTW.02M
item itself, please call Sharon Welch
N
MEMORANDUM, City of Lodi, Public Works Department
0
To: City Council
From: Public Works Director
Date: August 20.1993
Subject» Transmittal of Information Requested by City Council at Its
August 1$.1993 Meeting
The following items are included or attached per City Councirs request:
1. Copy of purchase agreement between the City of Lodi and Robert Batch
This agreement includes the provisions for the use of the dirt at Westgate Park and
outlines the responsibilities of the seller. Robert Batch. and the buyer, the City of
Lodi.
2. Documentation on Underground Fuel Storage Tank Removal contract at 125 North
Stockton Street
Enclosed is a copy of the final contract payment form showing the unit prices and
the total work accornpiished. Also attached is a copy of the signed contract
agreement which outlines the bid unit prices and shows the additional items of work
which may have to be included as part of contract payment if contaminated soil is
found.
3. Signed Hate Park Improvements Contract Change Omer No. 6
The change order included in the Council packet was not signed and the Council
wanted to see a signed &.ange order.
4. No -parking zone on Kettleman Lane fronting Flame liquors and the City's Municipal
Service Center
The staff recommendation for no parking fronting the Municipal Service Center and
west of Flame Liquors is shown on the attached sheet. The staff recommendation
provided for a 22 -foot parking zone west of Flame Liquors' driveway. Also attached
is a copy of Council mkxxtes showing that Council extended the 22 -foot panting area
to 42 feet for the purpose of providing for additional on -street parking andfor truck
panting.
5. Improvement Agreement Addendum for Lodi West Unit No. t .wC,
As requested by Council, staff has confirmed that the figures in both the Agreement
and the Council Communication are correct.
If you have any estions concerning any of this material, please contact me.
Jack . Ronsko
Public orks Di ector
Robert Ba" Agrewrwt (9)
Underground Fud Storage Tank (5)
Hale Park Improvements (1)
KeWanan Lane No-Partdng Zone (3)
cc: City Manager
City Geek
CC936t.DOC
A
THIS , entered into this 6th day of January, 1393, by and
between RQBERT BATM. hereinafter *seller*, and the CZ17 OF LODI, a
municipal corporation, hereinafter 'Buyers or •City".
WITNESSETH:
wHEREAS, Seiler is the owner of that certain parcel of land, more
particularly described below. constituting fifteen and ninety-nine
one -hundredths (15.99) acres more or less, which the City desires to
acquire for purposes of a storm drainage basin; and
WHSREA.S, said land is a portion of a larger parcel constituting one
hundred and one-tenth (100.1) acres owned by Seller which he intends to
develop within the City; and
WHEREAS, in order to provide storm drainage for (among other
properties) the balanc', of Seller's land.at this location, it is necessary
that City acquire such parcel; and
WHM ?AS, the most practical .way to compensate Seller may be by a
combination of cash, credits, and future reimbursements as other
properties, which will pay storm drainage fees, develop;
i. Seller agrees to sell and Buyer to purchase that certain parcel of
land more particularly described below.
in consideration of the actual covenants, teras and conditions herein
contained, it is mutually agreed that:
IM
9.0
f� L
C
ncCaRQERVS OFFICE
JAMES IML JOHNSTONE
93 M —Z AN -89-00
FwCu�� T I F
�c :mowFEE
TSIS AGS, entered into this 6th day of January, 1993, by and
between ROBERT BATCH, hereinafter 'Seller•, and' the CITY OF Uml, a
municipal corporation, hereinafter 'Buyer* or •City .
•�
W I T V 2 S SETH:
WMMEAS, Seller is\ the owner of that certain parcel of land, more
particularly desarired \below, constitutinq fifteen and ninety -sine
one -hundredths (25.99) acres more or less, which the City desires to
acquire for purposes of a storm drainage basin; and
w mtvAS, said land is a portion of a larger parcel constituting one
hundred and one-tenth (100.1) \des owned by Seller which he intends to
develop within the City; and
wHERSAS, in order to provide storm drainage for (among ether
properties) the balance of R•t' s land at this location, it is necessary
that City acquire such parcel; &rA
WHEREAS, the most prazical way to ccmpensate Seller may be by a
ccmbination of cash, credits, and future reimbursements as other
properties, which will pay a�orm drainage fees, develop;
WOW, THEREFORE, BE IT AGREED AS FOLLOWS:
i. Seller agrees to sell and Buyer to purchase that certain parcel of
land more particularly described below.
_n consideration of the muc%al covenants, terms and ccndit_cr_s herein
I
°3025394
A. Grantor` shall deliver to City a grant Ed for that certain real
property in the County of San Joaquin, State of California, as shown
on Exhibit A attached hereto, more particularly described as follows:
The Tmx POINT OF BEGIIRrMG being S 89. 29' 40. 2,
_ 137.50 feet distant from the Southwest corner of the
Northwest quarter of Section 3, T. 3N., R. 6 1.,
as filed fce record May 17, 1984, *Lodi
Park West, Chit Ito. 3, in Book of Maps and Plats,
Volume 26, Page 137, San Joaquin County Records and
also on the centerline of Applewood Drive; thence
continuing S 890 29' 40' E, 1082.08 feet to the
centerline of Evergreen Drives thence S 060 24' 42' 8,
81.46 feet to the beginning of a curve; thence along a
tangent curve to the right having a radius of 750
feet, a central angle of 09. 35', 180 and arc.length of
125.51 feet; thence S 030 10' 36" W, 248.62 feet to
the beginning of a curve, thence along a tangent curve
to the left having a radius of 1000 feet, a central
angle of 050 10, 36" and arc length of 90.35 feet;
thence S 02. 00' 00" S, 149.01 feet; thence S 88' 00'
006 W, 30.00 feet; thence N 890 29' 40" W, 812.78
feet; thence N 480 38' 40• W, 126.00 feet; thence N
009 02' 00' W, 288.00 feet; thence S 89. 58' 000 W,
147.50 feet; thence N 000 02' 00" W, 326.00 feet to
the POINT OF BRAG.
Containing 15.99 aces more or less.
2. The sales price shall be one Hundred Fifteen Thousand Dollars
($115,000) per ace for a total of one Billion Sight Hundred and
Thief flight Thousand Eight Hundred and Fifty Dollars ($1,838,850),
which shall be payable as follows:
(A) Seller shall receive Ten Thousand Dollars ($10,000) in cash at
the time the deed is recorded by City.
.2-
x3025394
(B) Seller ...,all receive credit for any arta all stotmt drainage tees
due and payable on the eighty-four and eleven one -hundredths
(s4_li) acre remainder of the entire parcel owned by Seller
payable at the storm drainage fee rate in effect at the time of
development.
(C) Seller shall also receive =edit for park fees due and payable on
the first eighteen and twenty one -hundredths (19.20) acres on the
remainder parcel owned by Seller based an the portion of the
upland basin property to be used as a park at the parks and
Recreation fee rate in effect at the time of development.
(D) Insofar as such cash payment and credits for storm drainage and
Wks and recreation- fees described above de not cover the
purchase price to be paid by Buyer, Seller will be reimbursed the
balance from storm drainage tees, paid by other properties at such
time as said properties develop. it is understood that payment
of such storm drainage fees by other properties shall be the sole
source of revenue for reimbursement of the balance due seller,
and such reimbursement shall not be payable until funds are
actually received by City.
3. (A) Seller shall be entitled to interest on the balance owed him in
an amount equal to the annual percentage change of the Engineering
News Record (ENR) 20 Cities Construction Cost Index. The balance due
shall be calculated in January of each year beginning January 1994 by
the following forsnla: (ENR January 1 of current year divided by ENR
January 1 of prior year) Z (balance due January 1 of the prior year
less credits and payments made during the previous year). City shall
provide a summary of balance credits, payments and adjustments to
Seller each year.
(B) Until paid in full, Seller shall be entitled to not less than
fomy percent (404) of all available net drainage fee revenues
received by the City during any year for reimbursement purposes
cc=mencing cn the effective date of this agreement. Seller
-3-
,J025394
acknowledges zaat City presently has otter rec.srsemmt agreements in
place vhich- shall have priority for repayment from such fees.
4. Seller, pursuant to plans _approved in advance by City, shall at his
ova expense be responsible for preparation of plans and excavation of
the drainage basin to City's specifications. Such excavation shall
include:
f (A) Stripping and stockpiling of the top fifteen (15) iacdses of soil
for use in the surface of the basics;
(B) Over -excavation of basin by nine (9) inches;
(C) .Ripping the bottom of the basin to a depth of two (2) feet in one
direction only;
(D) The placement and rolling of the topsoil stockpiled; Seller will
not be required to provide additional topsoil in the event the
fifteen (15) inches stockpiled does not provide nine (9) inches
of fill due to natural losses and/or compaction. Any soil in
excess of the above nine (9) inches required for backfill may be
disposed of by the Seller in any fashiaa he desires.
(S) provision by Seller of adequate sprinklers or other dust control
=thods during excavatica of such basin;
(F) installation of temporary fencing during constsuctioa.
Seller may delegate this duty to an agent or a third party mutually
agreed upon by the City. All other soil excavated may be retained,
sold or disposed of by Seller. During such excavation, Seller or his
designated agents shall provide proof of liability coverage, naming
the City of Lodi as additional named insured in an amount of One
Million Dollars (51,000,000).
S. Title to the property demised hereunder shall pass free of any liens
or encumbrances except current taxes due, if any. Seller shall obtain
-4-
93025394
and provide o Buyer at the time title pack. -a, a release of say and
all liens. mortgages, or encumbrances on the portion of his property
conveyed to the City under this agreement. Title insurance.-
documentary
nsurance.doc mentary stamps, and escrow fees (if any) shall be the
respomsibility of Buyer. Title to the demised premises shall pass on
execution of this agreement.
6. The rights to any reimbursements hereunder are deemed personal to
• Seiler and shall not run with the lead on the remainder of Seller s
property, except the tee credits described is Section 2 above.
7. Excavation of the basin by Seller shall be ac limbed prior to the
acceptance by City of the first unit of any subdivision of the
remainder parcel or not more' than one year after execution of this
agreement, whichever comes first.
8. City shall be responsible for installation of and all costs associated
with the following items-.
a) Six-foot (61) permanent chain link fence and mor strip;
b) Drainage system in the bottom of basin;
C) Basin turf and landscaping; and
d) portion of street construction within the basin parcel and fifty
percent (SoU of the street lights, water, sewer and storm lines
fronting the basin parcel in accordance with applicable City
ordinances;
e) All other on-site improvements.
City agrees to diligently pursue the completion of the basin/park
including turfing and irrigation on a schedule compatible with
Seller's development plans, taking into account the availability of
funds for such projects.
-5-
9. It is agreed that
recorded and shall
assigns of Seller.
Seller at:
93025394
time is of the essence. This agreement may be
enure to the benefit of the heirs, successors, or
in conaection therewith, notice may be mailed to
Robert R. Batch
1819 South Cherokee Lane, Unit &67
Lodi, Ca 95248
In the event a reimbursement due hereunder is unclaimed for two (2)
years from the date of mailing, it shall revert to the City. It shall
be Seller's responsibility to notify City of any change of address.
10. It is understood between the parties.hereto that this sale/purchase
agreement is executed under threat of eminent domain for the City's
acquisition of land for a storm drainage basin. Had the parties
hereto been usable to reach a mutually -agreeable resolution, the City
Attorney was prepared to recommend to the City Council that a
Resolution of Necessity to acquire said parcel by condemnation, be
adopted by the City Council of the City of Lodi.
11. Herein is set forth the entire agreement between the parties. The
performance of these conditions constitutes full performance and shall
relieve City of all further obligations or claims.
12. In the event either party hereto breaches the terms, conditions and
covenants of this Agreement. then, the prevailing party in any suit to
enforce this Agreement or restrain the breach thereof, shall in
addition to any other relief or damages awarded, be entitled to a
reasonable attorney's fee and all costs of suit to be set and
determined by any court of competent jurisdiction and added to any
judgment obtained.
IN WITNESS WHEREOF, the parties 'hereto have set their hands the day
and year first hereinabove mentioned.
.6-
v v —,, v .i -r
. - °3025394*
ssssasssssssasass:ssassssssssssssassaasssasssasssss:sssssassasassssssasasasa
CITY OF LODI, a =lnicipal
corporation
THC29iS A. PETERSON
City Manager
ATMEST:
RdSM R. BAT01
APPROVED AS TO FORM:
ALICE M. r 808 MCNA7."
City Clerk City Atto=ey
(2)
AGREP.ASN/T=. 0 I
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT Itos,as
State of GliCCr4 Q
County of
On before me, 57 d r0`1 Z�4 L,4 e parr ,4 21
OATS MMAL TMA OF - rr.G sad OOL Norow KMJV
personally appearerlJ"L�' %! ••�••� �- I Ge ,.��c.�
Ppersonally known to me - OR - ❑ proved to me on the basis of satisfactory evidence
to be the person(s) whose name(s) Ware
subscribed to the within instrument and ac-
knowledged to me that betsba tt,ey exe=ed
the same in tri0;r/their authorized
9VXNetAtM t capacity(tes), and that by !their
CC -LOA signature(s) on the instrument the person(s),
00mv
NotaryRbWc-CcrdariiaSAN-IoAQW4COUNIV or the entity upon behalf of which the
comm. exoww mAY 03.1996 person(s) acted, executed the instrument.
OPTIONAL SECTION
CAPAC17Y CLAIMED BY SIGNER
flg in the a.n 13«e... dWV so ffW prove
InwAable 10 parser fwpv an a* aoasrom
13INOrn
An�irW
ERTE OFFICERS)
mtsss�
p PARTNErim p UUTTED
p GENERAL
p ATTORNEY -BV -FACT
p TausTEe(s)
GUARDIANK;ONSERVATOR
OTHER:
SIGNER IS REPRESENTING:
WITNESS my hand and official seal. MAW OFPEASONS►ORQrR,YItE$►
wwmmm of Hamm
OPTIONAL SECTION
THIS CERTIFICATE MUST BE ATTACHED TO T ITLE OR TYPE CF DOCUMENT
HE DOCUMENT DESCRIBED AT RIGHT: �/
NUMBER OF P4GES % y� -� � GATE CF DOCUMENT
S -hougn me aso rem*stea hers is f+a reounea vv Law.
;} I cou+a prevent trauo - i reanac fnem d m,s toren. SIGNER(') OTHER THAN NAMED ABOVE 2111>�'
:1992 NAIICNAL NOTARY ASSOC LA nCN • ?236 Rnmmat Ave.. P 0. Pox 7184 - Cancga P3r%. CA 91309.7 t 2
1 0^ 25394 ?' 1
CITY OF LO D I GRANT DEED
187 N. Lower Sacramento Rd.
PUBLIC FORKS DEPARTMENT 029-030-33
S 274 r
Q
U
Q
F3
Southwest comer of the Northwest
Guorter of Section 3
r- TRUE POINT OF BEGINNING
vegnme p"K
( a-*+ )
'2rWr 1082.08'
SW24.41'E 81.SW* J&Igr 4!
or 0=0.0 326.00' O
NeQ• 49'2{'14
Sag' 38T(rw
14730'
PROPOSfO S03'10' "-
B A S I N 245.62
.g
yv,dW'sW4dpW
1146' 38'4CrW O 588' 49'ZiE{!
126.00' MOO 00-W!Ef
SO2'00%
812.7r 14"1'
CURT A4TA
C'� We boe
WWII III il.l
i EIm Street
1
R=750'
$ =
9° 35'1 T
L =
125.5.'
T =
62.90'
R =
1000'
'I =
5° 10'36"
L =
90.35'
T =
4.5.21'
1
S +F C 4 i Y OF LOD r
FCONTIRACT-PAYME:EDNTI
rUBL.IC 'rlCnKS 0 .PQATM`N T
I*,,-- ESTIMATE NUMSES Z
UNDERGROUND FUEL STORAGE TANK REMOVAL
125 North Stocxton Street ACCIUN T NUMEE;S
A 121.0-760.09
CpNTnAC'CR James C. Bateman Petroleum Servic s g
08A SEMCO C :7.:-400.05
431 Wes: Hatcn Road 0 • g . + —450.07
Modesto. CA 95351 E Scl:t accounts as indicated
+;1.4
i TOTAL Wow
ccHE To oAra�
uHZtS
:TEM
+
AC, --T l�
UNIT
PRICE,
AMOUNT
1
II 0 LS 11 Removal of zuei Tank. Pioind. 1 11 + N s
1! 1 tl
1I Pumo Island, Eawoment Venicle ! 11 ! d !
!I 51 ap . Asona i t Pavi no 1A ;IS 3,325 71 V � z z -i w
?
II qe % II
GAL i Fuel and Ri nsate Di soosa 1 / 1 11 1
u 1
11 ! 11
11Hazaraous waste Manifest IA 11 1 95
11 1 G
3.
11 „,,? I -*0 LS 110isoosal of Fuel Tank and Tank I !I I
4 1
1 1
il 11 Track ino IA 11 200 00
A zcc Ivy
4.
11 1 c
11 EA 11 Sdi 1 s T est Est. IA 11 250 00z�
0 1 .
I 5.
it 1
0 LS 11 Soils Reoort I !I Included 1
0 I
6.
11 /ten 17,.1 LS liPermi t Closure of Underground 1 11 1
dI
11 1
II II Tank) IA it 234 00
11 -- 1
7.
If t e-,)
tl HR I Health Inspector Fees/Rate (Est. 11A 78 00 .q
Ie&-
8.
It ,t4/ IzzN TON h Imoort Borrow IA 11 25 R2
U i si 17
9.
11 f T !zz 11 TON II Comoaczion of 3ackfi i led Imoort 1 11 1
11 1
!I !
q !I Borrow 1A 11 36 95
II 2.3 1 7
10.
II zG' I G H TON 1lnsonalt Concrete Paving IA !1 214 71
0 yZ5 y 1'
11.
11 !
LS l Excavation Safety 1 11 Included 1
11 i
II I
11 !I t II +
q !
iI ADOI T IONAL i T EMS OF WORK ! 1! I
!!
!1 !
II 11 I !I t
!I t
it 1
11 CY Il Additional Excavation (as
I 1
11 1t recu i red to remove contaminated 1 11 i
11 I
II 1
r
II 11 Soi 11 ! `•IS 25 00
11 i
3.
!I -Z !
1! Cy 4 4andl i no and Disposal of 1 It 1
11 1
!I i
11 11 Contaminated Soil A1 115 00
11 ?.
C.
II 1
11 HR 11 Crew Standbv Charge for
+I !
11 I► Samul ina -Soil (for samoles in
I) !
11 n excess of 6 samples) ! II i S 0 00
4
S WORK Chai=—
/"
MACE 3Y
.0 ay
TOTAL VALUE OF WORK OCHE TO OA ��
t.°5S .0 PE—,CENT 7E-;E
TOTAL OUE TO OATS
L°SS PREVICUS PiY"9NTS
! ; /QAYs a 5 /GAY) L= -S L:CU:3A T E] '�S+1AGES
__ =�A--
I /*
11 /S 12 Z
!) 12-7
11 -
II �� ;� !9�rtv
- 3Y ///,:
UNDERGROUND FUEL STORAGE TANK REMOVAL SECTION 4
125 North Stockton Street CO"TRACT
CITY OF LODI, CALIFORNIA
THIS CONTRACT made by and bet6een the City of Lodi, State of California,
herein referred to as the "City," and James C. Bateman Petroleum
Services, Inc., DBA SEMCO, herein referred to as the "Contractor."
WITNESSETH:
That the parties hereto have mutually covenanted and agreed, and by these
presents do covenant and agree with each other, as follows:
The complete Contract consists of the following documents which are
incorporated herein by this reference, to -wit:
Notice Inviting Bids
Information to Bidders
General Provisions
Special Provisions
Bid Proposal
Contract
Contract Bonds
Plans
The January 1988 Edition,
Standard Specifications,
State of California,
Business and Transportation Agency,
Department of Transportation
All of the above documents, sometimes hereinafter referred to as the
"Contract Documents," are intended to cooperate so that any work called
for in one and not mentioned in the other is to be executed the same as if
mentioned in all said documents.
ARTICLE I - That for and in consideration of the payments and agreements
hereina ter mentioned, to be made and performed by the City and under the
condition expressed in the too bonds bearing even date with these presents
and hereunto annexed, the Contractor agrees with the City, at Contractor's
cost and expense, to do all the work and furnish all the materials except
such as are mentioned in the specifications to be furnished by the City,
necessary to construct and complete in a good workmanlike and substantial
manner and to the satisfaction of the City the proposed improvements as
shown and described in the Contract Documents which are hereby made a part
of the Contract.
ARTICLE II - The City hereby promises and agrees with the Contractor to
employ, and does hereby employ, the Contractor to provide all materials
and services not supplied by the City and to do the work according to the
terms and conditions for the price herein, and hereby contracts to pay the
same as set forth in Section 5.600, "Measurement, Acceptance and Payment,"
of the General Provisions, in the manner and upon the conditions above set
forth; and the said parties for themselves, their heirs, executors,
administrators, successors and assigns, do hereby agree to the full
perfo rnance of the covenants herein contained.
4'
FUELTANK.CON/TXTW.02M
46
ARTICLE III - The Contractor agrees to conform to the provisions of
Cfiapter-F,—Part 7, Division 2 of the Labor Code. The Contractor and any
Subcontractor will pay the general prevailing wage rate and other employer
payments for health and welfare, pension, vacation, travel time, and
subsistence pay, apprenticeship or other training programs. The
responsibility for compliance with these Labor Code requirements is on the
prime contractor.
ARTICLE I`J - And the Contractor agrees to receive and accept the following
prices as full compensation for furnishing all materials and for doing all
the work contemplated and embraced in this agreement; also for all loss or
damage arising out of the nature of the work aforesaid or from the action
of the elements, or from any unforeseen difficulties or obstructions which
may arise or be encountered in the prosecution of the work until its
acceptance by the City, and for all risks of every description connected
with the work; also for all expenses incurred by or in consequence of the
suspension or discontinuance of work and for well and faithfully
completing the work, and the whole thereof, in the manner and according to
the Pians and Contract Documents and the requirements of the Engineer
under them, to -wit:
Perform the work necessary to remove one 2,000 gallon single-wall steel
underground fuel storage tank, piping, concrete dispenser island,
dispenser, vehicle slabs and adjacent asphalt concrete paving. The work
shall also include all. permits, inspection fees, draining, cleaning and
purging of fuel lines and tank, disposal and tracking of tank, soil tests
and report of test results, all excavation, backfill, import borrow,
compaction and grading to return the site to its original condition and
other incidental and related work, all as shown on the plans and
specifications for the project.
BIO ITEMS
ITEM EST'D.
NO. DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE
1. Removal of Fuel Tank,
Piping, Pump Island,
Equipment Vehicle
Slab, Asphalt Paving LS $3,325.71 $3,325.:1
2. Fuel and Rinsate
Disposal/Hazardous
Waste Manifest GAL 100 $ 1.95 $ 195.00
3. Disposal of Fuel
Tank and Tank
Tracking LS $ 200.00 $ 200.00
4. Soils Test (Est.) EA 6 $ 250.00 $1,500.00
5. Soils Report LS $Included $Included
4.2
FUELTANK.CON/TXid.C2M
ITEM
NO. DESCRIPTION
6. Permit (Closure of.
Underground Tank)
7. Health Inspector
(Fees/Rate) (Est.)
8. Import Borrow
9. Compaction of
Backfilled Import
Borrow
10. Asphalt Concrete
Paving
11. Excavation Safety
TOTAL BASE BIO
A. Additional Excavation
(as required to
reeve contaminated
soil)
B. Handling and Disposal
of Contaminated Soil
C. Crew Standby Charge
for Sampling Soil
(for samples in
excess of 6 samples)
EST'D. `
UNIT QTY. UNIT PRICE TOTAL PRICE
LS $ 234.00 S 234.00
HR 4 $ 78.00 S 312.00
TON 30 $ 25.72 $ 771.60
TON 30
TON 10
LS
S 36.95 $1,108.50
S 214.71
$Included
ADDITIONAL ITEMS OF WORK
$2,147.10
Slncluded
$9,793.91
CY
1
S
25.00
$
25.00
CY
1
S
115.00
$
115.00
HR 1 S 150.00 $ 150.00
ARTICLE V - By my signature hereunder, as Contractor, I certify that I am
aware provisions of Section 3700 of the Labor Code, which requires
every employer to be insured against liability for workers' compensation
or to undertake self-insurance in accordance with the provisions of that
code, and I will comply with such provisions before commencing the
performance of the work of this contract.
ARTICLE VI - It is further expressly agreed by and between the parties
hereto that, should there be any conflict between the terms of this
instrument and the Bid Proposal of the Contractor, then this instrument
shall control and nothing herein shall be considered as an acceptance of
the said terms of said proposal conflicting herewith.
4.3
FUELTANK. OON/TX74.02M
t
ARTICLE VII - The City is to furnish the necessary rights-of-way and
easements and to establish lines and grades for the work as specified
under the Special Provisions. All labor or materials not mentioned
specifically as being done by the City will be supplied by the Contractor
to accomplish the work as outlined in the specifications.
ARTICLE VIII - The Contractor agrees to commence work pursuant to this
contract within 15 calendar days after the Mayor has executed the contract
and to diligently prosecute to completion within 20 WORKING DAYS,
additional time will be allotted for permit process/tests/plan review.
WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF
COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES TO
PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE
SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE D-')UCTED
FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT.
IN WITNESS WHEREOF, the parties to these presents have hereunto set their
hands the year and date written below.
CONTRACTOR:
%• , �•,C t. f�E S 10 eAq T
it e
�. '.'CORPORATE SEAL)
4.4
FUELTANK. CON/TX'r4.OZM
CITY OFFLLODI '(/^JJ1
/ ,--'O ` ' ^�
By:
Mayo*
Date: x 1011q3
Attest:
`LI
ty Clerk
TO'd ZS9 9T6 GT.ZT 2661 -ba ---M
CITY OF LODI
PUBLIC WORKS DEPARTWENT COVTRACT CIIANGE ORDER NO. 6
Sheet 1 of t
Date Xu` ust107M
Account No. 45.7t1-760.60
PROJECT: HALE PARK 1lPROYENENTS, 208 East Locust St.
CONTRACTOR: BRCO Constructors
You are.directed to make the following changes or do the following work not included
in the Plans and Specifications on this contract.
++
Description of work to be done, estimate of quantities, and prices to be paid.
Specify whether additional work is at contract price, agreed price, or force
account. Unless otherwise stated, rates for rental of equipment cover only such
time as equipment is actually used and no allowance will be made for idle time.
Remove existing sprinkler system and
provide additional topsoil. Agreed upon price $1,386.00
PERCENT OF
CONTRACT
Original Contract Price $ 4581000.00
Total Cost of This Change Order NOT TO F�(CEED 1—i'T86.00 0.3
Previous Change Orders $ 79141325
Total Cast of All Chasge Orders to Date $ 80,799 ,15.0 p
Contract Price, including all Change Orders, will be: $538,199- 5 -
Time of completion will be adjusted as follows: no adjustment to working days
Submitted by - - - Date
Approval Recommend -
Approved, public Yo s rector Date a -:
Approved, City Alanager {if over ar er or eac�or Dat tots s
Date
The undersigned contractor, having carefully considered the change proposed, agrees,
if this proposal is approved, to provide all equipment, furnish all materials, except
as otherwise noted above, perform all services necessary for the work above specified,
and accept as full payment the prices shorn above.
ACCEPTED:
Date g �-�- 53
Contractor
_ (LNC__
gy YA�2
Title{pS�S-
e,&F
If the Contractor does not sign acceptance of this order. the Contractor should refer
to Section 4-1.03A of the Standard Specifications regaraing filing a written protest
within the specified time.
CCONALEWMI14.02M
:0'.i i%'0' n'� I %' 9T l31
CITY OF L� `��jTo
M
PUBLIC WORKS DEPARTMENT -wo rAd2r_l oca zC;..1L� 3
. Continued December 18, i
b) Approved the inclusion of the excess
widening on Highway 12 and the signal
relocation at Highway 12 and Lower
Sacramento Road as impact fee funded
projects.
The motion carried by the following vote:
Ayes: Council Members - Pennino, Sieglock, and
Pinkerton (Mayor)
Absent: Council Members - Hinchman
Abstain: Council Members - Snider
"NO PARKING" ZONE 1345 WEST KETTLEMAN
LANE (STATE HIGHWAY 12), AT ACCESS TO
THE MUNICIPAL SERVICE CENTER/ANIMAL SHELTER
RESOLUTION NO. 91-233
L48(e) The City Council was advised that the Engineering Division
300 has received a request for the installation of a "no
parking" zone on Kettleman Lane adjacent to the driveway
access to the MSC and Animal Shelter. Trucks and other
vehicles parking on Kettleman Lane adjacent to this
driveway make it difficult for drivers to. see approaching
vehicles while exiting onto Kettleman Lane. Exiting is
especially difficult for drivers of large trucks laden with
equipment or towing supplies such as power poles.
Engineering staff has surveyed this location to determine
truck parking and parking demand. The results of the
survey indicate that, on several occasions, staff has
observed trucks and other vehicles parking adjacent to this
driveway. Overall parking demands in the area appear to be
minimal. Available accident records, from 1988 to the
present, indicate that there have been no accidents at this
location.
In order to provide adequate sight distance for vehicles
exiting from this driveway, staff recommended that Council
approve the installation of 157 feet of "no parking" east
of the driveway and 72 feet west of the driveway. The
entire length of this "no parking" zone lies in front of
City owned property.
Caltrans approval is required for this "no parking" zone
after City Council approval.
Following discussion, on motion of Council Member Snider,
Pinkerton second, the City Council adopted Resolution No.
91-233 approving the installation of a "No Parking" zone on
the north side of Kettleman Lane adjacent to the driveway
21
I
inued' Decei fiber 18, 1991
access to the Municipal
Shelter. Forty-two feet
immediately west of the
Lane driveway. _---
IC WORKS LOCAL AREA NETWORK
RASE CONCEPT APPROVED
L
Service Center (MSC) and Animal
of parking area will be provided
Flame Liquor westerly Kettleman
LUTION NO. 91-235
.
2(d) The City Council was reminded that as part of the 1991/92
;00 operating budget, the City Council approved the purchase of
.
a microcomputer local area network for the Public Works
Department. This purchase was a major part of the
previously approved switch from a minicomputer -based,
=' Pt
limited use, drafting system to a more flexible, less
expensive microcomputer -based system. This switch was
approved by the Council in March 1991.
The budget request for the network was for $49,000. In
light of budget restrictions, it was decided to phase the
"t
work; thus $30,000 was approved in the budget with the
following funding:
$7,500 Sewer Fund
S7,500 Water Fund
'
57,500 Gas Tax
:�•
S7,500 Equipment Fund
Now that we have completed the drafting switch to
;= l
microcomputers, the need for the local area network to
<<;
share drawings and the plotter is more critical than ever.
In our budget request we assumed we would go to bid for a
complete turn -key package. However, through our research
and preparatory training we have concluded that the City
would be better served by purchasing the various system
components separately and setting up the network
ourselves. We would still obtain price quotes on the
components from various vendors. We will save resale
-
markup and installation costs. We will also be able to
select and purchase the components on our schedule rather
-
than specifying and purchasing everything in one lump SUM.
We propose to make limited use (not to exceed S2 ,000) of a
local consultant to help select some of the hardware and
assist in the initial set up.
In this way, our staff will have a much better knowledge of
the system and will be able to add users and make system
changes without an expensive on-going support contract. i
Thus we will save money in the long run as well as in the
short term.
The components of the system will cost less than 55,000
apiece, so our normal informal purchasing procedures can be
22
.ec-9a
TO: FINANCE DIRECTOR
CITY MANAGER
FROM: CITY CLERK
CITY OF LODI ,r*�
SPECIAL ALLOCATION REQUEST
DATE: ;,eptember 24, 1993
ACCOUNT NUMBER: 121.0-500.86
Request is made for funds to accomplish the following project which was not included in the
current budget.
Description of Project Estimated Cost
Elm Street Improvements - Lodi West it $ 10,145
This is needed to cover the cost of the
excess right of way on Elm Street and
also the street improvements on Elm Street.
This appropriation was approved by the
City Council at its meeting of August,18, 1993.
r
Jen6ifer errin
City Clerk
you need more space, use additional sheet and attach to this form.
Date of
Approval
Amount Approved
Council
City Manager
FUND OR ACCOUNT TO BE CHARGED
Current
Budget
$
Prior Year Reserve
$
Contingent Fund
$
General Fund Surplus
$
Capital
Outlay Reserve
$
Reimbursable Account
$
Utility
Outlay Reserve
$
Other: (Specify)
60.4
$ 10,145
Account Num er
City Manager
Dixon Flynn,
Finance Director
Thomas A. Peterson,
----------------------------------------------
Submit this form in duplicate to the Finance Director. Distribution after approval will
be as follows: 1) Originating Department 2) Finance Department
SAELMST/TXTW.02M
#DOV,,,
CITY OF LODI
COUNCIL COMMUNICATION
-10
AGENDA TITLE: Improvement Agreement Addendum for Lodi West, Unit No. 1, Tract No. 1904
MEETING DATE: August 18, 1993
PREPARED BY: Public Works Director
RECOMMENDED ACTION: That the City Council approve the improvement Agreement Addendum for Lodi
West, Unit No. 1, Tract No. 1904, authorize the City Manager to execute the
Agreement, appropriate the necessary funds from the Street Development Impact
Mitigation Fee Fund and authorize the Finance Director to make the necessary
refunds for engineering and inspection fees.
BACKGROUND INFORMATION: Lodi Municipal Code Section 16.24.040 provides for reimbursement to
developers for the cost of street improvements in excess of 68 feet in width.
The reimbursement is to include right-of-way costs.
The right-of-way credit on Elm Street for the subject subdivision was inadvertently omitted from the original
Improvement Agreement bet%vm the City and the developer and the reimbursement for street improvements on Elm
Street was incomplete.
In addition, the developer is not required to pay engineering or inspection fees for the portion of the street
improvements to be funded by the City. These costs are usually deducted from the portion of the Cost Estimate for
Improvement Security (Schedule A) on which the engineering and inspection fees are based. Since the
reimbursements were incomplete, the developer was overcharged for engineering and inspection and a portion of
these fees needs to be refunded.
Staff has prepared the attached Improvement Agreement Addendum to address these items which has been signed by
the developer.
The Lodi West Addendum also includes the following:
• A correction on the Billing Schedule to include a credit engineering and administration (10% of oversize
cost) for oversize water mains. This item was included in the Cost Estimate for Improvement Security, but
was omitted from the Billing Schedule attached to the Improvement Agreement and needs to be refunded to
the developer. Sufficient funds have already been appropriated from the Water Development Impact
Mitigation Fee Fund to cover this item; no additional appropriations are required.
APPROVED i t,
THOMAS A. PETERSON roc rUsO pspa
City Manager
CC -1
couNc-oku roc 090&93
W
Improvement Agreement Addendum for Lodi West, Unit No. 1, Tract No. 1904
August 18, 1993
Page 2
• A correction in the quantities shown on the Cost Estimate for Improvement Security and the resultant
payments shown on the Billing Schedule for street improvements on Evergreen Drive to be made at the
time of acceptance of the subdivision improvements. The original quantities and payments shown were
too high. ..
Staff recommends Council approve this Agreement addendum.
FUNDING: $10,144.30 Strad Development Impact Fee Fund
S 58.50 Fagincering Fees
3 97.50 Inspection Fees
Q LL
ack L.
blic orlcs Director
Prepared by Shwon A. welch, Associate Civil Engineer
JLPJSAw/lm
AUwJ=cnt
CM city Attorney
Robot Bach
Bwmbach - Pian
Farman A Memhaub Bank
'4w'gla-
fO: FINANCE DIRECTOR
CITY MANAGER
FROM: CITY CLERK
CITY OF LODI
SPECIAL ALLOCATION REQUEST
DATE:
ACCOUNT NUMBER:
(14[ 06 93
C''tw
Se p tembe f� .494,rs 993
N.
121.0-500.86 - ,VG
-14=4.3
Request is made for funds to accomplish the following project which was not included in the
current budget.
Description of Project Estimated Cost
Elm Street Improvements - Lodi West #1 $ 10,145
This is needed to cover the cost of the
excess right of way on Elm Street and
also the street improvements on Elm Street.
This appropriation was approved by the
City Council at its meeting of August 18, 1993.
iepqifer Ferr1n
City Clerk
you need more space, use additional sheet and attach to thisform.)
Date of Approval I 0 AI 3 Amount Approved '$/D 145•
Council
City Manager x
FUND OR ACCOUNT TO BE CHARGED
Current Budget $ Prior Year Reserve $
Contingent Fund $ General Fund Surplus $
Capital Outlay Reserve $
Utility Outlay Reserve $
Reimbursable Account $
Other: (Specify)
60.4 $ 10,145
Account Number
�- 0 / . 0 (�?z �C� �
J '
Dixon yn i ance hecto homas Peterson, City Manager
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Submit this form in duplicate to the Finance Director. Distribution after approval will
be as follows: 1) Originating Department 2) Finance Department
SAELMST/TXTW.02M
r
os as
OITY OF LODI
/—a
COUNCIL. COMMUNICATION
AGENDA TITLE: Improvement Agreement Addendum for Lodi West, Unit No. 1, Tract No. 1904
MEETING DATE: August 18, 1993
PREPARED BY: Public Works Director
RECOMMENDED ACTION: That the City Council approve the Improvement Agreement Addendum for Lodi
West, Unit No. 1, Tract No. 1904, authorize the City Manager to execute the
Agreement, appropriate the necessary funds from the Street Development impact
Mitigation Fee Fund and authorize the Finance Director to make the necessary
refunds for engineering and inspection fees.
BACKGROUND INFORMATION: Lodi Municipal Code Section 16.24.040 provides for reimbursement to
developers for the cost of street improvements in excess of 68 feet in width.
The reimbursement is to include right-of-way costs.
The right -0f --way credit on Elm Street for the subject subdivision was inadvertently omitted from the original
Improvement Agreement between the City and the developer and the reimbursement for strut improvements on Elm
Street was incomplete.
In addition, the developer is not required to pay engineering or inspection fees for the portion of the street
improvements to be funded by the City. These costs are usually deducted from the portion of the Cost Estimate for
Improvement Security (Schedule A) on which the engineering and inspection fees arc based. Since the
reimbursements were incomplete, the developer was overcharged for engineering and inspection and a portion of
these fees needs to be refunded.
Staff has prepared the attached improvement Agreement Addendum to address these items which has been signed by
the developer.
The Lodi West Addendum also includes the following:
• A correction on the Billing Schedule to include a credit engineering and administration (10% of oversize
cost) for oversize water mains. This item was included in the Cost Estimate for Improvement Security, but
was omitted from the Billing Schedule attached to the Improvement Agreement and needs to be rc;undcd to
the developer. Sufficient funds have already been appropriated from the Water Development Impact
Mitigation Fee Fund to cover this item; no additional appropriations are required.
APPROVED_ --
THOMAS A PETERSON
City Manager
ear
.ecrUea oeoer
CC -1
OVD411
Improvenxnt Agreement Addendum for Lodi West, Unit No. 1, Tract No. 1904
August 18, 1993
Page 2
• A correction in the quantities shown on the Cost Estimate for improvement Security and the resultant
payments shown on the Billing Schedule for street improvements on Evergreen Drive to be made at the
time of acceptance of the subdivision improvements. 'The original quantities and payments shown were
too high. ..
Staff recomnxads Council approve this Agreement addendum.
FUNDING: 510,144.30 Stred Development Impact Fee Fund
S 58.50 Er entering Fees
5 97.50 Inspediom Feta
ack L. Mko
blie orks Director
Prepared by Sharon A. Welch, Associate Cog Eniaat
cc: City Attorney
Robert Batch
Banrnbach - Piana
Feraws a Merchants Bank
cocnNcoWnoC ou06.s"