Loading...
HomeMy WebLinkAboutAgenda Report - August 18, 1993 (63)CITY OF LODI Of COUNCIL COMMUNICATION AGENDA TITLE: Authorization to Retain Consultant to Prepare Plans and Specifications for Public Safety Building Air -Conditioner Replacement MEETING DATE: August 18, 1993 PREPARED BY: Public Works Director RECOMMENDED That the City Council retain Wenell Mattheis Bowe for the preparation of plans and specifications to replace the existing Public Safety Building air -conditioner chillers. BACKGROUND INFORMATION: The existing Public Safety Building heating, ventilation and air-conditioning (HVAC) system was installed when the building was constructed in 1968. Recently two chiller units, located in the basement underneath the jail, failed. In attempting to repair the units, we found, from the manufacturer, that parts are unavailable and the units cannot be repaired. See the attached letter from ValAir, the local distributor for Carrier Corporation (Exhibit 1). The recommendation is that these units be replaced by a single, aboveground chiller unit, similar in size, capacity, and function to the large chiller unit that presently serves City Hail and the Carnegie Forum. The cost of this replacement unit will be approximately $85,000 to $100,000. It is recommended that Council hire the firm of Wenell Mattheis Bowe to develop plans and specifications for this replacement chiller at an estimated cost of $9,500 to $12,000. Billing will be on a time -and -material basis (see attached Exhibit 2). The estimated time frame to complete this project is approximately three months from the time the architect is retained. Plans and specifications, when completed, will be brought back to Council for approval and authorization to go to bid. FUNDING: Current appropriation: None Total project estimate: $85,000 to $100,000 Proposed funding: City Hall Expansion and Remodel CIP Account (121.00-,3,550. ) 4v r0� ac L. Ronsko Pub is Works Director Prepared by Dennis J. Callahan, Building and Equipment Maintenance Superintendent Attachments cc: Assistant City Manager Chief of Police Fire Chief Finance Director Building and Equipment Purchasing Officer Maintenance Superintcndent APPROVED THOMAS A. PETERSON r cydad paper I City Manager .10 cc. -1 CP&SAIR/TXTW.02M (CO.COM) August 18, 1993 AUG 18 '93 13:04 VALAIR, INC. - SACTO Exhibit 1 rte. 10 spAorOmw5avem A OIV131ON OR THE EDWARD B WARo 6 co. RECEIVED t AU91W 18, 1993 ASG 1$ t?9 CITY Of LORI ladust W Commercial Refrigeration 1021 Black Diamond Way Lodi, CA 95240 t } ATM DAVID W95M ` StMj M CI III M PARTS i Thankyou foryourinterestinreplacementparts for the 30U045-4 and 30iJ065-4 cbillem , Our Parts Department did extensive research in an effort to locate the parts you had requested. + l These parts are no longer stocked or manufactured by Carder due to the age of these 2 chillers. in addition, Carrier Engineering Support was contacted to determine if these parts could ' be produced on a special order, and we were informed that Carrier no longer o. ms. the tooling to produce thse parts. If you have any questions or require any assistance, please contact myseV or Glenda s Baumgart to our Parts Department. y Regards, f r. Jeff Small Territory Manager JS/Mv SACRAMENTO • FRESNO 8875 23rd Avenue • Saaamento. CaW0Mt& 95828 - PH. (918) 387-3000 - FAX (918) 387-3070 August 'S, 1993 Exhibit. 2 MZB RECEIVED AUG 18 i39 ( �'C vGCN:wc �:PAR(htEKi Dennis Callahan CITY OF LODI PUBLIC WORKS DEPARTMENT P.O. Box 3006 Lodi, CA 95241-1910 SUBJECT:' PROPOS." t_ FOR SERVICES PUBLIC SP&ETY CHILLER REPLACEMENT Dear Dennis We are pleased to submit this proposal to provide architectural and engineering services to replace the HVAC Chiller Unit for the Public Safety Building. The scope of work that this proposal is based upon is as follows: SCOPE OF WORK Replace two existing HVAC chiller units located in the Public Safety Building basement mechanical room with one new outside pad -mounted chiller unit. Provide redesign of equipment yard area and electrical service and hook-up of chiller. The scope of services is as follows: FEE WENELL MATTHEIS BOWE, Architects $2,500 • Meeting with Client • Site evaluation • Demolition Plan and Site Plan • Specifications (not including City of Lodi "Boilerplate") • Cost Estimate • Coordination of consultant engineers • Site construction inspections (3 trips) U� w, .0 7iw MarAeis Thomas Bour. Archie" N"" I o.•krforA.Sr. :09 H,V.Bj58 i i.`; -'d" jaY 5008 1 r PROPOSAL FOR SERVICES PUBLIC SAFETY CH:: i ER REPLACEMENT August 18, 1993 Page 2 of 3 GIBSON & ASSOCIATES, Mechanical Engineers $ 3,000 • Meeting with Client • Site evaluation • Engineering calculations • Mechanical demolition and new equipment plan and schedules • Cost estimate • Specifications • Site construction inspections (2 trips) A.C. SY.STEMN, Electrical Engineers $3,500 - $6,000* • Meeting with Client f• Site evaluation • Service demand calculations • Electrical demolition and new service plan and schedules • Cost estimate • Specifications • Site construction insptctions (2 trips) * The lower fee assumes that the site evaluation determines the existing service panel and transformer are adequate to service the new chiller. The higher fee assumes the servica panel and transformer are inadequate to meet the demand. In that case, the new panel and transformer would be designed and located to accommodate the City Hall Renovation and Addition service demands as well as the chiller replacement. FEE The fee ranges from $9,000 to $11,500 and will be billed on a time not -to - exceed basis plus reimbursables (estimate $500). PROPOSAL FOR SERVICES PUBLIC SAFETY CHILLER REPLACEMENT August 18, 1993 Page 3 of 3 SCHEDULE The proposed time frame is as follows: Award A/E Contract August 19 Complete A/E Design & Construction Documents September 1 City Council Approval of Documents September 1 City Council Approval of Bid September 15 Construction end' November 15 • Dependent on availability of chiller units If this proposal meets with your approval, please sign one copy of this proposal or provide a purchase order and we will begin work immediately on this project. Sincerely, ELL MATTH S G�� Larry nell resident LW:mh f:2/9362 AUTHORIZATION TO PROCEED: By: Date: