HomeMy WebLinkAboutAgenda Report - February 3, 1993� OR CITY OF LODI COUNCIL COMMUNICATION AGENDA TITLE: Contract Change Order - Well 3-R Drilling, 144 South Rose Street (Southwest Corner of Hutchins Street Square) MEETING DATE: February 3, 1993 PREPARED BY: Public Works Director RECOMMENDED ACTION: This item is for information only. No action is required. BACKGROUND INFORMATION: This information is being given to the City Council in accordance with the Contract Change Order policy approved by Resolution 85-72. One of the requirements of this policy is that we inform the City Council of all change orders over 10% of the contract amount. The attached contract change order, approved by the City Manager, was in the amount of $11,190, which is 16.40* of the contract. Under normal circumstances, the development of a well consists of dropping a portable pump into the well to remove the mud and sand. Occasionally, this procedure is not effective and there are times when the well will become clogged during the drilling operation. When a well becomes clogged, as did Well 3-R, specialized procedures such as chemical treatments and selective strata pumping must be attempted. Both were tried and the strata pumping was successful. This change order covers the work needed to do the selective strata pumping. Fifteen working days were added to this contract. FUNDING: Originally Budgeted: Budgeted Amcunt for Total Budgeted Fund: Contract Amount: Bid Opening Date: 1992 Project: $260,000 Water Utility $68,370 eptember 2, 1992 V ack . Ronsko bl' Works Director Prepared by Wesley K. Fujitani, Senior Civil Engineer JLR/WKF/lm Attachment cc: Water/Wastewater Superintendent Associate Civil Engineer - Lindseth 00 APPROVED _---------__--- i, THOMAS A PETERSON ,cyuaa Do", ` City Manager cc � CCCOWL3P,/TYTW.02M (CO.COM) January 26, 1993 CITY OF-LODI PUALIC WORKS DEPARTMENT CONTRACT CHANGE ORDER NO. 2 Sheet I of 1 Date-7714/9T— Account 11o. PROJECT: Well Drilling, Well 3-R CONTRACTOR: Maggiora Bros. Drilling You are directed to make the following changes or do the following work not included in the Plans and Specifications on this contract. -------------------------------------------- Supply and install double swab suction section for strata pumping at the rate of $135 per hour. Estimate 80 hours x $135/hour = $10,800 Rental of discharge pipe 390 $11,190 PERCENT OF CONTRACT Original Czntract Price 5 68,370 Total Cost of This Change Order NOT TO EXCEED 590 16.4% Previous Change Orders $�0 Total Cost of All Change Orders to Date S - 18.1% Contract Price, including all Change Orders, will be: 57Sb Time of completion will be adjusted as follows: 15 working days -------------------------------------------- Submitted by Date 1 Approval RecomrdendedWDate Approved, Public Wor s Director Date t -r--173 -0 App ed r_C i a er i f over r o or eac or $DaS, toteCCUs) te (Thomas A. Petersdrror The undersitfhgdvtmdaactor, having carefully considered the change proposed, agrees, if this proposal is approved, to provide all equipment, furnish all materials, except as otherwise noted above, perform all services necessary for the work above specified, and accept as full payment the prices shown above. ACCEPTED: Date By Contractor Title If the Contractor does not sign acceptance of this order, the Contractor should refer to Section ^.-1.03A of the Standard Specifications regarding filing a written protest within the specified time.