AGENDA TITLE: Contract Change Order - Well 3-R Drilling, 144 South Rose Street
(Southwest Corner of Hutchins Street Square)
MEETING DATE: February 3, 1993
PREPARED BY: Public Works Director
RECOMMENDED ACTION: This item is for information only. No action is required.
BACKGROUND INFORMATION: This information is being given to the City Council
in accordance with the Contract Change Order policy
approved by Resolution 85-72. One of the requirements of
this policy is that we inform the City Council of all
change orders over 10% of the contract amount.
The attached contract change order, approved by the City Manager, was in the amount
of $11,190, which is 16.40* of the contract. Under normal circumstances, the
development of a well consists of dropping a portable pump into the well to remove
the mud and sand. Occasionally, this procedure is not effective and there are times
when the well will become clogged during the drilling operation.
When a well becomes clogged, as did Well 3-R, specialized procedures such as
chemical treatments and selective strata pumping must be attempted. Both were tried
and the strata pumping was successful. This change order covers the work needed to
do the selective strata pumping.
Fifteen working days were added to this contract.
FUNDING: Originally Budgeted:
Budgeted Amcunt for Total
Budgeted Fund:
Contract Amount:
Bid Opening Date:
1992
Project: $260,000
Water Utility
$68,370
eptember 2, 1992
V
ack . Ronsko
bl' Works Director
Prepared by Wesley K. Fujitani, Senior Civil Engineer
JLR/WKF/lm
Attachment
cc: Water/Wastewater Superintendent
Associate Civil Engineer - Lindseth
00
APPROVED _---------__--- i,
THOMAS A PETERSON ,cyuaa Do",
` City Manager
cc �
CCCOWL3P,/TYTW.02M (CO.COM) January 26, 1993
CITY OF-LODI
PUALIC WORKS DEPARTMENT CONTRACT CHANGE ORDER NO. 2
Sheet I of 1
Date-7714/9T—
Account 11o.
PROJECT: Well Drilling, Well 3-R
CONTRACTOR: Maggiora Bros. Drilling
You are directed to make the following changes or do the following work not included
in the Plans and Specifications on this contract.
--------------------------------------------
Supply and install double swab suction section for strata pumping at the rate
of $135 per hour.
Estimate 80 hours x $135/hour = $10,800
Rental of discharge pipe 390
$11,190
PERCENT OF
CONTRACT
Original Czntract Price 5 68,370
Total Cost of This Change Order NOT TO EXCEED 590 16.4%
Previous Change Orders $�0
Total Cost of All Change Orders to Date S - 18.1%
Contract Price, including all Change Orders, will be: 57Sb
Time of completion will be adjusted as follows: 15 working days
--------------------------------------------
Submitted by Date 1
Approval RecomrdendedWDate
Approved, Public Wor s Director Date t -r--173
-0 App ed r_C i a er i f over r o or eac or $DaS, toteCCUs)
te
(Thomas A. Petersdrror
The undersitfhgdvtmdaactor, having carefully considered the change proposed, agrees,
if this proposal is approved, to provide all equipment, furnish all materials, except
as otherwise noted above, perform all services necessary for the work above specified,
and accept as full payment the prices shown above.
ACCEPTED: Date
By
Contractor
Title
If the Contractor does not sign acceptance of this order, the Contractor should refer
to Section ^.-1.03A of the Standard Specifications regarding filing a written protest
within the specified time.