AGENDA TITLE: Purchase of Padmount Transformers
MEETING DATE: January 6, 1993
PREPARED BY: Electric Utility Director
RECOMMENDED ACTION: That the City Council adopt the attached resolution
awarding the purchase of various sizes of padmount
transformers to the two responsible bidders whose
proposals and equipment met City of Lodi specifications,
specifications, and whose transformers yielded the lowest overall life -cycle
costs in each rating category:
Westinghouse Electric Supply Co., Concord, CA
Total, all sizes $69,299.41
BACKGROUND INFORMATION: On November 4, 1992, the City Council approved specifi-
cations and authorized advertisement for bids for
thirteen single-phase and seven three-phase padmount
transformers of various ratings.
On December 15, 1992, bids were opened, and total life -cycle costs were evalu-
ated. Life -cycle costs are the combined total of purchase price plus cost of
operation based on estimated power loss during the projected life of the trans-
former. Proposals are also evaluated on the basis of compliance with equipment
and bid specifications; failure to comply with both may lead to disqualification
of the bid. A summary of the bid evaluation is attached.
(continued on Page 2)
APPROVED - _ l i'!�t? [ �. __ — •
THOMAS A. PETERSON ,ecycled paper
1 City Manager
I
CC -1
ea
ince-phase 240/120V
$ 7,298.98
5
ea
75KVA
Single-phase 240/120V
7,704.12
2
ea
167KVA
Single-phase 240/120V
6,314.15
Subtotal
Tn_1T=
Pauwels
Transformers, Washington, MO
ea
ree-p ase
$ 3,111.82
1
ea
300KVA
Three-phase 208Y/120V
5,702.13
1
ea
500KVA
Three-phase 208Y/120V
7,691.20
1
ea
150KVA
Three-phase 480Y/277V
3,165.86
2
ea
225KVA
Three-phase 480Y/277V
10,499.16
1
ea
1500KVA Three-phase 480Y/277V
17,211.99
Subtotal
$47,98Z.76
Total, all sizes $69,299.41
BACKGROUND INFORMATION: On November 4, 1992, the City Council approved specifi-
cations and authorized advertisement for bids for
thirteen single-phase and seven three-phase padmount
transformers of various ratings.
On December 15, 1992, bids were opened, and total life -cycle costs were evalu-
ated. Life -cycle costs are the combined total of purchase price plus cost of
operation based on estimated power loss during the projected life of the trans-
former. Proposals are also evaluated on the basis of compliance with equipment
and bid specifications; failure to comply with both may lead to disqualification
of the bid. A summary of the bid evaluation is attached.
(continued on Page 2)
APPROVED - _ l i'!�t? [ �. __ — •
THOMAS A. PETERSON ,ecycled paper
1 City Manager
I
CC -1
Purchase of Padmount Transformers
January 6, 1993
Page 2
These transformers will be used in the electric distribution system in various
locations such as Century Meadows, Safeway, Payless, Lucky Stores, and the
Stadium. Additionally, some transformers will be used for PCB replacement, and
to replenish inventory.
FUNDING: Funds for this purchase are available in the Electric
Electric Department's operating fund.
ry J. Rice, tlectric ut m ty uirec
cc: Assistant Electric Utility Director
Electrical Engineer
Prepared by Joel Harris, Purchasing Officer
go
RESOLUTION NO. 93-0:.
A RESOLUTION OF THE LODI CITY COUNCIL
AWARDING THE BID FOR THE PURCHASE OF VARIOUS SIZES OF
PADMOUNr TRANSFORMERS FOR THE ELECTRIC UTILITY DEPARTMENT
=r===ass=as===s=aaa=a=ss=a=====s=ss:==r==r=====__=====a====raasasa=s===
WHEREAS, in answer to notice duly published
in accordance with
law and the order of this City Council, sealed bids
were received and
publicly opened on December 15, 1992 at 11:00 a.m. for the bid for the
purchase of various sizes of padmount transformers
for the Electric
Utility Department, described in the specifications
therefor approved
by the City Council on November 4, 1992; and
WHEREAS, said bids have been compared, checked,
and tabulated and
a report thereof filed with the City Manager as shown
on Exhibit A; and
WHEREAS, the City Manager recommends that award of the bid for
be made to the two responsible bidders whose proposals
and equipment
met City specifications, specifications, and whose transformers yielded
the lowest overall life -cycle costs in each rating category,
to wit:
Westinghouse Electric Supply Co.. Concord. CA
6 ea 37.5KVA Single-phase 240/120V
$ 7,298.98
5 ea 75KVA Single-phase 240/120V
7,704.12
2 ea 167KVA Single-phase 240/120V
6.314.15
Subtotal
$21,317.25
Pauwels Transformers. Washington. MO
1 ea 75KVA Three-phase 208Y/120V
$ 3,111.82
1 ea 300KVA Three-phase 208Y/120V
5,702.13
1 ea 500KVA Three-phase 208Y/120V
7,691.20
1 ea 150KVA Three-phase 480Y/277V
3,765.86
2 ea 225KVA Three-phase 480Y/277V
10,499.16
1 ea 1500KVA Three-phase 480Y/277V
17.211.99
Subtotal
$47,982.16
Total, all sizes
$69,299.41
NOW, THEREFORE, BE IT RESOLVED by the Lodi City Council that
award of bid for the above-described padmount transformers be and the
same is hereby awarded to the two above-described responsible bidders,
in the total amount of $69,299.41.
Dated: January 6, 1993
=carrsssa=raaaaacaa=a=cacccc.cccc======ccccc=ccc=ccs=c=c=c=scasaacsr=sc
Resolution 9z-05
Page Two
Z hereby certify that Resolution No. 93-05 was passed and
adopted by the City Council of the City of Lodi in a regular meeting
held January 6, 1993 by the following vote:
Ayes: Council Members - Davenport, Mann, Sieglock, Snider
and Pennino (Mayor)
Noes: Council Members None
Absent: Council Members - None
&,!n. &mA-,
Alice M. ReSmche
City Clerk
93-05
RES9305/TXTA.02J
Footnotes:
(1) General Electric's proposal included terms and conditions which, among other things, (a) modified the method
by which actual transformer losses would be calculated for penalty purposes, a modification in GE's favor,
(b) placed risk of loss or damage of the transformers during shipment on the City of Lodi (bid specifications
require bidder assume that risk), and (c) dictated that matters relating to any order placed pursuant to the
bid, including any legal action the City may be required to take, be governed by laws of the State of New York.
A subsequent retraction of its standard terms and conditions which were in conflict with the City's bid
specifications was submitted after the bid opening by a GE representative who may not be authorized under the
terms and conditions to make such a retraction.
General Electric's bid must therefore be deemed non-responsive and subject to disqualification.
(2) General Electric's original bid was changed via FAXed revision submitted after the bid opening. Both bids are
therefore disqualified.
(3) Kuhlman's 37.SKVA and 75KYA Single-phase unit heights of 35' exceed specified equipment height maximum of 28';
the 167KVA unit height of 42' exceeds specified equipment height maximum of 33' for units IOOKVA and greater.
Bidders:
esi—ing_Eouse Electric Supply Co., Concord, CA
Pauwels Transformers, Washington, MO
Kuhlman Transformers, Versailles, KY
General Electric Supply Co., Martinez. CA
Square 0 Company, Pleasanton, CA
EST A 1
BID EVALUATION - P03MOUNT
TRANSFORMERS
BIDS
OPENED DECEMBER
15,
1992
(AMOUNTS SHOWN ARE BID AMOUNT /
LIFE -CYCLE COST)
B I
D D E R
QTY/RATING/DESCRIPTION
WESTINGHOUSE
PAUWLLS
—ERM
GLN. LLLLI.
SQUARE 0'
--------------------------------
------------
------------
------------
----(1)-----
------------
Single-Phase:
6 ea 37.SKVA
240/120V
$ 7,298.98/
No Bid
$
7,932.55/
(2)
No Bid
13,430.98
14,064.55(3)
5 ea 75KYA
240/120Y
f 7.704.12/
No Bid
$
7,968.11/
f 9,482.00/
No Bid
17,604.12
16,858.11(3)
19.012.00
2 ea 167KVA
240/120V
$ 6,314.15/
No Bid
$
5,215.10/
$ 5,721.53/
No Bid
12,978.15
12,443.10(3)
14.521.53
Three -Phase:
1 ea 75KYA
208Y/120V
$ 4,208.71/
$ 3,111.82/
No Bid
S 5,337.94/
No Bid
6,866.71
5,385.82
6,671.94
1 ea 300KYA
20BY/120V
S 5,893.92/
$ 5,702.13/
No Bid
S 8,266.58/
No Bid
13.633.92
12,186.13
13.174.58
1 ea SOOKVA
106Y/1ZOV
$ 8,452.98/
$ 7,691.20/
No Bid
510.351.54/
No Bid
19,330.98
17,867.20
20,439.54
1 ea 1SOKVA
480Y/277V
$ 4,773.32/
S 3,765.86/
No Bid
f 5,218.33/
No Bid
8,529.32
7,809.86
8.940.33
2 ea 225KVA
4BOY1277V
$10,613.37/
$10.499.16/
No Sid
$12,255.49/
No Bid
22.349.37
20,143.16
22.355.49
1 ea 1,500KVA
48OY/277V
$14,438.50/
$17,21I.99/
No Bid
$18,488.82/
$17.126.86/
42.908.50
39,333.90
44.410.82
46,050.86
Footnotes:
(1) General Electric's proposal included terms and conditions which, among other things, (a) modified the method
by which actual transformer losses would be calculated for penalty purposes, a modification in GE's favor,
(b) placed risk of loss or damage of the transformers during shipment on the City of Lodi (bid specifications
require bidder assume that risk), and (c) dictated that matters relating to any order placed pursuant to the
bid, including any legal action the City may be required to take, be governed by laws of the State of New York.
A subsequent retraction of its standard terms and conditions which were in conflict with the City's bid
specifications was submitted after the bid opening by a GE representative who may not be authorized under the
terms and conditions to make such a retraction.
General Electric's bid must therefore be deemed non-responsive and subject to disqualification.
(2) General Electric's original bid was changed via FAXed revision submitted after the bid opening. Both bids are
therefore disqualified.
(3) Kuhlman's 37.SKVA and 75KYA Single-phase unit heights of 35' exceed specified equipment height maximum of 28';
the 167KVA unit height of 42' exceeds specified equipment height maximum of 33' for units IOOKVA and greater.
Bidders:
esi—ing_Eouse Electric Supply Co., Concord, CA
Pauwels Transformers, Washington, MO
Kuhlman Transformers, Versailles, KY
General Electric Supply Co., Martinez. CA
Square 0 Company, Pleasanton, CA