HomeMy WebLinkAboutAgenda Report - April 21, 1993 (64)CITY OF LODE
COUNCIL COMMUNICATION
AGENDA TITLE: Consider and Select Option for Peach Street Improvements,
Cochran Road to Tokay Street
MEETING DATE: April 21, 1993
PREPARED BY: Public Works Director
RECCMMENDED ACTION: That the City Council approve Option 2 including establishment
of a "no-parkirg" zore on the east side of the street to be
in-plemented upGn cccspletior of the iwproven:erts.
BACKUKUI C IKFORNATIOh: This Frc'Ject hes Frompteri by testincr:v frena arFa residerts
during the public hearings or: the expansion. of tke Twir
Arbors Athletic Club on Cochran Road. School children and
others walk on Peach Street between the residential area
south of Tokay Street to Vinewood School and Park. Peach Street was already
developed with homes when it was annexed many years ago. Shortly after annexation,
an assessment district was formed to install only water and sewer lines for the
homes. The street is approximately 24 feet wide with no shoulder improvements.
Many residents felt this was a hazard to pedestrians and bicyclists (see Exhibits A
and B). Prior to starting the design of the project, staff wished to notify the
residents and review the project with the Council.
Three improvement opticns have been identified:
1. This option includes installing new curb, gutter, sidewalk and paving on
the east side, and installing four street lights on Peach Street.
(Exhibit C)
2. This option includes paving and a raised curb on the east shoulder of
Peach Street to provide drainage and a walkway. Street lights are also
included in the estimate. (Exhibit D)
3. This option includes reconstructing pavement with asphalt concrete and
new base, installing new curb, gutter, and sidewalk on both sides of the
street, and installing street lights. (Exhibit E)
Estimates for each option are shown in Exhibit F. Although 3,000 square feet of
asphalt will eventually be replaced with curb, gutter and sidewalk in Option 2, this
is the option being recommended.
APPROVED:
THOMArrlTTERSON
City Manager J
CC -1
CPEACHST/TXTW.02M (CO.COM) April 13, 1993
Consider and Select Option for Peach Street Improvements,
Cochran Road to Tokay Street
April 21, 1993
Page 2
The 1992/93 Street Capital Improvement Program, approved by the Council last year,
included $23,000 for Option 2. Since the improvements under Options I and 3 are
normally borne by the property owner, staff felt it was inappropriate to recommend
additional taxpayer funding for these improvements. In addition, three of the four
curb return installations will require additional right-of-way.
If Option 2 is selected by the Council, it will be necessary that the east side of
Peach Street be designated a "no -parking" zone to be implemented upon completion of
the improvements. A resolution will be required for establishment of the
"no -parking" zone (see attached draft).
FUNDING: Measure K
Ronsko
Public Works Director
Prepared by Wesley K. Fujitani, Senior Civil Engineer
JLR/WKF/lm
Attachments
cc: City Attorney
Peach Street residents
CPEACHST/TXTW.02M (CO.COM)
April 13, 1993
CITY OF LODI
PUBLIC WORKS DEPARTMENT
Nr
I
al
wr .
s' r
t
J
I at
I
3
r
Twil~ 3.a,
VIG1�-IiTY MAS'
Exhibit A
r -/q I
1 Exhibit B
CITY OF LODI
PUBLIC WORKS DEPARTMENT
5/Rt
.� Exhibit Cl
to
r-
—•
o
H
0
r � ---
to
r-
i
OH NVHH000
I ` -
N
O
H
EL
ZS AVN01__--
1
I
1
I
1
1
i
1
> w o H
n`vz a
1
1
r
ui
ui
W
iii
1
1
N
1
K
W
1
ui
-- 1 J
a
�
--_--__-__ '
f
.
i
1
!
I
1
I
1
� •
1 ..
,� f
• to
!
1
i 1
t
I
�•
I
I
1 °
I
OH NVHH000
I ` -
Exhibit E
m
H
1S AVNOI
f
1 v
1
---
o
j ,
r
1 0
r
1
�
1
-
1
:
N A
T
1
t •O
N
n
1
�
"
W
V
�
J _
w
{
{ 1
0
1
s
s
I
,p
1tu
t �
t
t
1
1
t
08 NVUH000
1
based on 4I5 feet of frontage on the east side of Peach Street
' based on 830 feu of frontage on both sides of Peach Str; -t
Estimates include 105E for engineering and 205E contingencies_
YEACHSTALS
ExhiMt F
Peach St. Improvement Estimates
1. Improve East Side
Curb, gutter, drainage, paving
519,000 approx.
$45.80
per front foot'
Sidewalk
$6,000 approx.
$14.50
per front foot'
Street Lights
$7,000 approx.
$8.40
per front foot2
Total: 532,000
$68.70
2. Pave Shoulder on East Side
Paving & drainage
$15,000 approx.
$36.10
per front foot'
Street Lights
1 57,000 approx.
$8.40
per front foot'
Total: $22,000
$44.50
3. Improve Both Sides & Reconstruct Street
Curb, gutter, drainage, paving
$54,000 approx.
$65.10
per front foot2
Sidewalk
$12,000 approx.
$14.50
per front foot2
Street Lights
$7,000 approx.
$8.40
per front foot2
Total: $73,000
$88.00
based on 4I5 feet of frontage on the east side of Peach Street
' based on 830 feu of frontage on both sides of Peach Str; -t
Estimates include 105E for engineering and 205E contingencies_
YEACHSTALS
RESOLUTION NO. 93-_
azzasas¢:ssssasssaas�s
A RESOLUTION OF THE LODI CITY COUNCIL
APPROVING THE INSTALLATION OF A "NO PARKING"
ZONE ON THE BAST SIDE OF PEACH STREET
BETWEEN COCHRAN ROAD AND TOKAY STREET
xxasxxxxxaxxxxxx ansa xsx azazzzxasxaaasaszaaza xaaa saxxax xaaaaazsaassasxss
BE IT RESOLVED, that the Lodi City Council does hereby approve
the installation of a 416 -foot "No Parking" zone on the east side of
Peach Street between Cochran Road and Tokay Street, as shown on Exhibit
A attached hereto and incorporated herein by reference.
Dated: , 1993
aassesaaxasaes=aasssaeaasaaazaseanexxzxaaasssx=_-saaess:asza: _zaaaasssa
I hereby r-srtify that Resolution No. 93- was passed and adopted
by the City Council of the City of Lodi in a regular meeting held
1993 by the following vote:
Ayes: Council Members -
Noes: Council Members -
Absent: Council Members -
Jennifer M. Perrin
City Clerk
93-
RES93E/TXTA.01V
r
CITY Co vvCIL
PHILLIP A PE..NItip mj%or
JACK A SIECLOCK
♦favor Pro Tempore
RAY C DAVESPORF
SrEPHE'Q I ,t1A\N
JOHN R (Rand-) SLIDER
CITY OF LODI
CITY HALL. 221 WEST PINE STREET
P O BOX 3006
LODI. CALIFORNIA 95241.1910
(:091 3.34.5614
r 4% !:091 131
April 14, 1993
THOMAS PETERSON
cav Manager
JENNIFER .M PERRIN
cav Clerk
808 MCNATT
Coh AtMrnev
SUBJECT: Consider and Select Option for Peach Street Improvements,
Cochran Road to Tokay Street
Dear Property Owner/Resident:
Enclosed is a copy of background information on an item that will be
discussed at the City Council meeting on Wednesday, April 21, 1993,
at 7:00 p.m. The meeting will be held in the City Council Chamber,
Carnegie Forum, 305 West Pine Street. You are welcome to attend.
If you wish to communicate with the City Council, please contact
Jennifer Perrin, City Clerk, at (209) 333-6702.
If you have any questions about the item, please call Wes Fujitani or
me at (209) 333-6706.
Jack\L. Ronsko
ubl' Works Director
JLR/lm
Enclosure
cc: City Clerk
NPEACHST.NCC/TXTW.02M
&NAME
&ADD
&CITY
MR EARL MOORE
700 PEACH ST
LODI CA 95242
MR & MRS MICHAEL DROVIN
701 PEACH ST
LODI CA 95242
JERRY MANZEL
711 PEACH ST
LODI CA 95242
MR & MRS SCOTT DASKO
712 PEACH ST
LODI CA 95242
MRS ROSE GIER
717 PEACH ST
LODI CA 95242
MR RUDY SAUSEDA
718 PEACH ST
LODI CA 95242
MR & MRS JOHN KEAGY
731 PEACH ST
LODI CA 95242
MRS ANN CARLIN
2041 COCHRAN RD
LODI CA 95242