HomeMy WebLinkAboutAgenda Report - April 21, 1993 (68)--�
v`
CITY OF LODI COUNCIL COMMUNICATION
AGENDA TITLE: Plans and Specifications and Advertisement for Bids for
Stockton Street Improvements, Lockeford Street to Turner Road
MEETING DATE: April 21, 1993
PREPARED BY: Public Works Director
RECOMMENDED ACTION: That the City Council approve the plans and specifications for
the above project and authorize advertising for bids.
BACKGROUND INFORMATION: This project includes the reconstruction and partial
overlay of Stockton Street. Minor widening will be done
along the Stockton Street frontage of Lawrence School.
(The School District is in the process of dedicating
10 feet of right-of-way to the Lity.) As compensation for the 10 -foot dedication,
it is recommended that the City pay for street improvements along the Lawrence
School frontage. Staff is currently negotiating with the School District and a
recommendation regarding the exact compensation will be made at the time of award.
$10,000 has been appropriated for the design and drafting portion of this project.
The construction phase of this project ($443,000) is shown in the 5 -year Capital
Improvement Program and will be appropriated in the 1993/94 fiscal year. In order
for this project to remain eligible for State/Local Transportation Partnership
funds, it must be awarded before July 1, 1993. A recommendation regarding the
funding for the construction phase of this project will be made at the time of award.
FUNDING: Originally Budgeted: 1992/93
Budgeted Fund: Gas Tax and State/Local Transportation Partnership
Current Appropriation: $ 10,000 (with $443,000 in 1993/94 CIP
appropriation)
Total Project Estimate: $408,000
Bid Opening Date: May 19, 1993
ac L. Ronsko
Pu lic Works Director
Prepared by Wesley K. FL'jitani, Senior Civil Engineer
JLR/WWF/lm
cc: Purchasing Officer
LUSD Facility Planning
APPROVED
THOMAS A. PETERSON
rOGYcllA Paper
` City Manager 00
cc
CSTOCKTI/TXTW.02M (CO.COM) April 13, 1993
CITY COUNCIL MEETING
April 21, 1993
PLANS AND SPECIFICATIONS AND ADVERTISEMENT
FOR BIDS FOR TRAFFIC SIGNAL AND LIGHTING
INSTALLATION, HIGHWAY 12 (KETTLEMAN LANE)
AND CENTRAL AVENUE, AND TURNER ROAD
AND STOCKTON STREET/MIWOK DRIVE APPROVED
CC -12.1(c) The City Council approved the plans and specifications for
traffic signal and lighting installation, Highway 12
(Kettleman Lane) and Central Avenue, and Turner Road and
Stockton Street/Miwok Drive and authorized advertising for
bids.
This project is to install traffic signals at the
intersection of Highway 12 (Kettleman Lane) and Central
Avenue, and Turner Road and Stockton Street/Miwok Drive.
Both intersections meet Caltrans signal warrants and are
being funded with Federal funds and Street Development
Impact Mitigation Fees.
Many years ago, the City Council approved standardising the
signal controllers. The controller is the computer that
operates the signal timing. The current vendor has changed
ownership many times over the years and the City is not
receiving the support needed to maintain and operate the
signals. Due to this poor service, staff recommended
changing to another vendor. Sometime in the near future,
staff will be recommending standardizing on controllers.