Loading...
HomeMy WebLinkAboutAgenda Report - March 16, 1993S Pic CITY 2MEETING . Marchrch 244,, 1993 BUDGET PRESENTATION FOR PUBLIC WORKS DEPARTMENT (STREET DIVISION AND WATER/WASTEWATER DIVISION) CC -21(b) Mayor Pennino opened the meeting and reminded the audience of the following guidelines for public input at the "Town Hall" meetings. "Specifically, the public is invited to tell the City Council: 1. What City services do you (the public) feel could be reduced or eliminated? 2. What ideas do you have for making the City more efficient? 3. What City services are you willing to pay more for in order to maintain them? 4. What City service. are you UNWILLING to see cut, no matter what?" Mayor Pennino informed the public of the "Town Hall" Hotline phone number, 333-6896. Public I—rks Director Ronsko presented an overview of the Engineering and Water/Wastewater Division, mission statement, organization chart and an overview of duties. Glen Baltzer, Street Superintendent presented a report on the Street Division and Fran Forkas made a presentation regarding the Water Division, Wastewater Division and White Slough. The Cit) :ouncil posed sever -1 questions to staff And there were no persons wishing to speak on the matter. Mayor Pe:.zino informed the public that the next "Town Hall" meeting would be on March 30, 1993 regarding the Library and then on March 31, 1993 would be the Electric Utility Department. Mayor Pennino also reminded the public that the City Council meetings beginning April 7, 1993 will be starting at 7:00 p.m. ;AaffirSuess Praonpaegrteymetit M sAR 1 1q9� &BoydUAltORSO�. arse C('I*Y OL 12 March 1993 City of Lodi • %' UC NORt?C :r.'.'!.: •,, 221 West Pine Street Lodi. CA. 95240 Attn: Mr. Jack Ronscoe, Director Public Works Dear Mr. Ronscoe, It has been mentioned that due to the financial restraints that the City is currently experiencing it is possible that the graffiti abatement program may be cut. The purpose of this letter is express our dissatisfaction with that possibility. We feel it is a worthwhile program. As you know, the return on the money expended .is not always seen in cash, but it is seen in other ways. It is our ft, -ling that: this is one of those items. The City of Lodi is made more attractive and shows a sense of pride that all can enjoy because of the efforts put forth. Again, we wish to state our support for the graffiti abatement program and hope that the City Council fin• adequate funds to continue this important effort. Let me also add our appreciation for all of your hard work on behalf of the citizens of Lodi. It may go unspoken but not unnoticed. Schaffer Suess and Boyd, Realtors Property Managment Division Ltiid "� Kevin Suess Operations, Property Manager PUBLIC WORKS DEPARTMENT "Building a Better Community" Mission Statement To provide responsive and courteous service and to plan, design, construct, operate and maintain the City facilities assigned to Public Works in an efficient and professional manner. TABLE OF CONTENTS TransmittalMemo.............................................................................................. l Mission & Value Statement..................................................................................4 Privatization......................................................................................................... 5 Administration.................................................................................................. 7 EngineeringDivision..........................................................................................14 Building & Equipment Maintenance Division...................................................... 21 StreetDivision................................................................................................... 28 Water & Wastewater Division............................................................................38 Under each division shown above will be the following information: A. General Description/5-Year Budget and Staffing B. Organization Chart C. Comparable Staffing by Other Agencies D. Privatization E. Possible Cost Reductions and Revenue Enhancements F. Funding Chart 1 0 MEMORANDUM, City of Lodi, Public Works Department To: City Council Citizens of Lodi From: Public Works Director Date: March 16, 1993 Subject: Trwn Hall Meeting Handout The Public Works Department is a multi -service Department and is made up of the four operating Divisions shewn below. There is also an administrative section which includes the Public Works Director and other administrative and clerical support. .Engineering Division -Building and Equipment Maintenance Division •Street Division .Water/Wastewater Division These Divisions are very diverse and each Division Head has specialized training and experience in their field and is fully responsible for the operation of their Division. The Water/Wastewater Division operates as two separate enterprise utilities. The format of this document includes Administration and each of the operating Divisions and covers the following subject matter for each: -Description of responsibilities •5 -year budget and staffing -Organization chart -Privatization -Comparable staffing by other agencies -Possible cost reductions and revenue enhancements -Fund sources Mission and Value Statement Two years ago, the employees in the Public Works Department, working together, developed the attached Mission and Value Statement. The Mission Statement is our Department's purpose and goal. The n•.ission and value statements are used as tools in making everyday decisions related to policy and departmental operation. After using this document for two years, I feel good about the time our Department spent in its development. I feel strongly that Lodi could benefit from having a similar policy statement for the whole City. Privatization Because of the Council's specific interest in privatization, I have provided a discussion on this topic which describes and explains that making a decision on whether or not to contract out is more than just looking at the initial savings. Because the City may be Town Hall Meeting Handout Marcl 16, 1993 Page 2 faced with considering additional privatization, I wanted the Council to be aware of some of the considerations our Department has used in evaluating the advantages and disadvantages of contracting out. 5 -Year Budget and Staffing As part of the description of responsibilities for each Division, we have included the Division's budget amount and the number of full-time authorized positions over the past five fiscal years. We have also provided an explanation of the major increases and decreases in the budget amounts shown. Trainin In 1992/93, the Public Works Department reduced its budget for training, workshops and conferences by almost 40%. With the exception of a 25% reduction in general Departmental training, I am not proposing any further training reductions. I feel very strongly that, as the work force is decreased and we are asked to take on additional responsibilities, proper training becomes even more important to the Department's operation. Facility Maintenance The allocation of funds for preventative maintenance programs and general maintenance for the facilities we maintain is especially important during the times of tight budgets and financial shortfalls. CUITING BACK ON MAINTENANCE IS NOT A PRUDENT WAY TO SAVE MONEY. if proper maintenance is not provided, the long-term costs of repairing or rebuilding facilities appreciably increases. The City has major investments in the following facilities, systems and plants maintained by the Public Works Department: City Facility System. or Plant Approximate Replacement Value Street System $ 70,000,000 Storm System $ 25,000,000 Sanitary System $ 50,000,000 Treatment Plant $ 40,000,000 Water System S 50,000,000 Vehicles and Equipment $ 5,000,000 • Buildings $ 20.000,000 • TOTAL $260,000,000 *This includes only the equipment and buildings being maintained by the Public Works Department and does not include buildings such as Hutchins Street Square, Parks and Recreation,'.ibrary, and the larger Fire apparatus. Since the City is not currently receiving o: putting funds aside for equipment or facility replacement, except in Streets and for the treatment plant, the maintenance of our -M%`KHE'40 DCC - C' Town Hall Meeting Handout Much l6, 1993 Page 3 facilities is even more important. A reasonable design life for the facilities shown above would be 50 years. Even if we said the facilities would last 100 years (and most of them will not), the City should be putting approximately 2.5 million dollars aside each year for facility replacement. We must evaluate how we're going to replace these facilities in the future. Comparable Staffing In prior years, we have evaluated the staffing of other agencies for street maintenance and equipment maintenance and have determined what would be reasonable levels of service. Our Department had not previously looked at administrative and clerical support, engineering or water and wastewater. The comparable staffing evaluations we recently completed in these other areas were very enlightening and we found that Lodi is using less staff than comparable cities to perform the same functions. The City Council should feel good about the high quality of service we provide the citizens with staffing that is less than most other comparable agencies. I don't believe there is any question that, in Lodi, the citizens are getting their money's worth. Cost Reductions and Revenue Enhancements Under each of the Divisions, we have recommended some possible cost reductions and revenue enhancements. With the exception of the Water/Wastewater enterprise funds, the amounts shown would have a direct effect on the City's General Fund and could be used to help balance the 1993/94 operating budget. It is felt that any savings or revenue enhancements made in Water/Wastewater should remain in those enterprise accounts to provide for some of the deficiencies that presently exist; i.e., system replacement, reasonable reserves, system upgrades, etc. We have recommended that a number of additional revenue enhancements be considered. Of those recommended, approximately $400,000 is simply charging out full overhead to all non -General Fund accounts. Full o,.,-7head would include not only the appropriate overhead in the Public Works Department, but also the full administrative overhead of the City Manager's office, City Attorney, City Council, etc. If we are to truly compete with private industry and evaluate additional privatization, it is important that we operate the City as a business and charge the full cost of its operation. The Public Works Department is looking forward to presenting this material to the City Council on March 23 and 24 and answering any questions the Council and citizens may have. NjJA " oub L. Ronsko c Works Director ILWlm attachment TOWNMEMO DJC __._ __ - CITY OF LODI PUBLIC WORKS DEPARTMENT 'BUILDING A BETTER COMMUNITY" OUR MISSION To provide responsive and courteous service and to plan, design, construct, operate and maintain the City facilities assigned to Public Works in an efficient and professional manner. WE VALUE: LODI'S FUTURE We take pride in conserving resources. We plan our work anticipating future needs. We work to make Lodi a better place to live. We encourage innovation and look for better ways. QUALITY SERVICE We believe in doing,. right the first time. We strive for excellence and take pride in our work. We are responsive to citizen complaints and concerns. We anticipate, listen, and respond to the needs of our community. TEAMWORK We encourage participation and ideas from all levels. We believe cur success depends on teamwork, trust, and honesty. We believe that all employees play an important role in the departmental team. We recognize our different values and skills; this diversity contributes to our success. THE INDIVIDUAL We take suggestions and complaints seriously. We encourage individual initiative and acceptance of responsibility. We promote the personal and professional growth of our empicy3es. We care about People, treat them fairly, and explain the decisi ; we make. HEALTH & SAFETY We plan cur work with safety in mind. We consider public health and safety cur tcp priority. We work safely and encourage others ,a do ;he same. We ;.rcviCe cretecave dcthing, ecuicment and training m work safely and efficiently. -4- PRIVATIZATION It is clear, from the previous town meetings, that the City Council is interested in privatization and what can be contracted out. In Public Works, the answer to "What can be contracted out?" is the same as with many City departments; that is, EVERYTHING. The question, "Can we save money and still provide acceptable service?" must be answered positively if we are to contract out any given task. In general, the three major factors in evaluating privatization are listed below. However, in evaluating and making the decision whether or not to contract out, a number of otter factors have to be considered and these are discussed later. Major Reasons for Contracting Out • dollar savings • existing workload ,or time restraints • lack of expertise or specialized equipment The Public Works Department currently contracts out around forty different types of tasks. The privatization used by each Division is included as part of the Division material provided in this packet and also indicates the major reason(s) Or contracting out. Th two major Public Works areas we currently contract out which were previously done by full-time City employees are: Janitorial Maintenance - The Public Works Department had a janitorial work force who maintained the majority of the City buildings. In 1979, this work was contracted out and the employees requesting to be kept on were reassigned to the Water/ Wastew-.er and Street maintenance forces. Landscape Maintenance - Landscape maintenance of Public Works facilities (i.e., around City buildings, street medians, parking lots, well sites and pumping stations) was accomplished by full-time Parks and Recreation Department employees. In 1979, it was decided to contract out this type of landscape maintenance. Prior to making a decision on contracting out work, there are other areas besides just cost, existing workloads or time restraints, and lack of expertise or equipment that have to be evaluated. Listed below are a few of these areas along with specific examples: 1. Initial cost versus potential long-term cost The City formally evaluated contracting out the operation of our White Slough Treatment Facility in 1979. As part of this evaluation, we fjund there were contractors who would come in and "low ball", providing a very attractive initial cost. When the agency has lost all of its trained personnel and done away with all of its specialized equipment, the contractor could -i drastically increase the operational costs since the public agency would have difficulties getting back into the business once they gave up providing the service. There is also no incentive for ra outside contractor to property maintain the CiWs equipment. Therefore, long-term cost of equipment replacement could increase. 2. Warranty work There's some work that must be done by certified firms or dealerships in order to maintain the warranty on a specific item or piece of equipment. 3. Providing emergency response If the City was to contract out all of its waterline maintenance work and repair and an emergency occurred, contractors may not be able to drop everything and call in their work forces from different areas to make immediate response. 4. Equipment downtime If the City was to contract out all equipment maintenance to a local garage, would they be able to drop all work in order to make a repair to a vehicle needed to keep a maintenance crew working in the field? 5. Cost of administering contracts Some types of privatization take staff time to ensure that work is being accomplished correctly and in conformance to the contract agreement. Administering the landscape maintenance and janitorial maintenance contracts takes more staff time than administering elevator and boiler maintenance. 6. Public conveniencekustomer satisfaction The City might be able to show a cost savings if all our utility billing was contracted out. However, if the put;!;-- has to call Los Angeles or gets bounced back and forth between the City and the private rm to resolve a problem, the inconvenience may not be worth the sayings. 7. Internal convenience If we had no abili•y to make minor repairs or modifications to equipment and buildings, staff would spend more time looking for someone to do the work than it would take to get it done. -6- PUBLIC WORKS DEPARTMENT ADARNISTI2ATION MISSION STATEMENT Our mission is to provide administrative and management support for department divisions and ensure consistency with City policies and Council direction. This is accomplished under the guidance of the Public Works Department's mission and values. ADMINISTRATION The Public Works Department consists of the following four operating Divisions: • Engineering • Building and Equipment Maintenance • Streets • Water/Wastewater Public Works Administration provides overall administrative and management support for these departmental divisions, as well as clerical support for Administration, Building Maintenance, and all areas of Engineering which include design, construction, traffic and development services. Each Division within the Public Works Department is basically a department in itself. The Water/Wastewater Division is operated as two independent utility enterprise funds. The administrative staff coordinates the departmental functions and acts as liaison between the Public Works Department and other City departments in the overall operation of the City. The Director represents the City on numerous committees and coordinates and interacts with other governmental jurisdictions and private firms and organizations. Administration establishes the departmental rules, policies and procedures; coordinates the submittal of the aggregate Public Works Department Operations and Maintenance Budget; prepares reports and studies requested by the City Manager and City Council; oversees labor compliance requirements for City contracts, works with the City Attorney in the acquisition of all City property, and develops the department's in-service safety and training programs. The development and implementation of the annual Capital Improvement Program is also a major responsibility of Public Works Administration together with the Engineering Division. Budget Employees 5 -YEAR BUDGETiEMPLOYEES 92-93 91-92 90-91 89-90 88-89 5236,010 S288,830 1 S272,860 5232,585 5232,075 4 4 4 4 4 Major clang es in the years listed blow arc due to: 1990-91 • lrwease in equipmnA depreciation and salary aduwnems. 1992-93 . Decrease is due I.rgely to umnafe of equipmerd nuiirenanoe eape to Engineering. Budget Employees TOTAL PUBLIC WORKS DEPARTMENT 5 -YEAR BUDGET/EMPLOYEES 92-93 91-92 90-91 89-90 88-89 $7,735,155 58,018,460 $7,553,560 $6,545,860 _ $5,609,765 95 95 95 90 85 PUBLIC WORKS ADMINISTRATION ORGANIZATION JANUARY 1993 ENOINEPEPHNG DPASION PUBLIC WORKS DIRECTOR DEPARTMENTADMI I i I INISTRATIVE SECRETARY m ASSISTANT ADMINISTRATIVE CLERK II BUILDING i EQUIPMENT I ' STREET MAINTENANCE DIVISION DMS.ION TOTAL AUTHORIZED FULL-TIME DEPARTMENT POSITIONS 95 WATIRlWASTEWATER DMSIDN J. AUTNORIZED iULL-TIME ►GSITIONS 4 ADMINISTRATION - COMPARABLE STAFFING Full -Time Positions Employees in Administrative Public Works Assistant/ Deputy Analyst/Assist. AGENCY Depart. Director Positions Positions Clerical Positions Davis 99 1 2 8 Pop. 50,000 Manteca 94 2 0 4 Pop. 41,000 Roseville 130' 0 0 8 Pop. 51,000 Tracy 105 2 1 8 Pop. 40.000 Turlock 71** 1 0 5 Pop. 50,000 Vacaville 130 2 3 11 Pop- 70,000 Woodland 71 0 2 2 Pop. 43,000 Pop. 49,000 LODI 95 0 1 4•" Pop. 53,000 •Ttis i hrde the Water arnd WaAewater Devmoni emptoyees vow are pan of Eavirovvnentat Utiliti es —Includes Whits Depsrtrncrd which is nude up oithe Water and WaAewaw Division. This depubna t has 45 etaplo m including 3 clerical pokjorts —Two powtiaa are shown under Adminadrsuon and two are shown under Street Division -'LU•- K PRIVATIZATION Administration ACTrAWIPROJECT Reason for Contracting Out Dollar Savings Existing Workload or Time Restraints Lack of Expertise or Equip ment Architectural Services X Copying/binding {large jobs) X X Office Equipment Maintenance X Property Appraisals X Right of Way and Property Acquisition X X PPAOTOWk.XLS ADMINISTRATION Cost Reductions and Revenue Enhancements Cost Reductions 1. Eliminate Director's participation in League of California Cities Annual S 1,100 Confer-^ce, Transportation and Public Works Policy Committee and Program Committee. (Recommended) 2. American Public Works Association Congress and Equipment S 1,200 Show (Director). Director to pay his e-vn travel and per diem. Director is committed to attend due to his appointment to Education Foundation Board of Trustees and National Delegate representing Sacramento Chapter. (Consider if revenue enhancements are insufficient) 3. Reduce general departmental training by 25%. S 1,000 (Consider if revenue enhancements are insufficient) Revenue Enhancements 1. Charge full overhead (Public Works Administration and general S 160,000 City overhead) to "non -General Fund accounts". (Recommended) (approx.) Public Works Administration is now funded 30% by the Water and Wastewater enterprise funds and 70% by the General Fund. If the appropriate portion of labor costs (see positions listed below), plus expenses and full City overhead, is allocated to the appropr:ai-- `non - General Fund accounts," General Fund reimbursements would be increased. *Public Works Director (subdivisions, street revenues, en,c: prise and capital projects) *Administrative Assistant (COG and street revenues, enterprise and capital projects) -Department Secretary (subdivisions, enterprise, and capital projects) .Administrative Clerk 11 (subdivisions and capital projects) UMMED WC Enterprise I Revenues, Capitl watr EN Administrative Funding Present Proposed (Adding Full Overhead) neral Fund 70% General Fund 479E i i 1 PUBLIC WORKS DEPARTMENT ENGINEERING MISSION STATEMENT Our mission is to apply professional civil engineering principles, standards and judgment in planning, designing and constructing City facilities. This is accomplished under the guidance of the Public Works Department's mission and values. ENGINEERING DIVISION The Engineering Division is responsible for planning, designing and constructing the City's street, water, wastewater and drainage systems in conformance with the General Plan and as outlined in the City's Capital Improvement Program. Master plans for water, wastewater. drainage and street facilities are developed and maintained by this Division. Streit, parcel and utility system maps are also drawn and maintained by this Division. The majority of Public Works projects designed by the Engineering Design Section are constructed under the formal bidding process. This necessitates the Division's preparation of specifications and contract documents, as well as providing inspection and contract administration for these projects. The Division alto provides engineering services for other City departments. mainly Parks and Recreation Department Such work is either done in-house or by outside consultants depending on the scope of the project. Work done by outside consultants is coordinated and reviewed by this Division. The Division operates and maintains a microcomputer local area network supporting the Engineering Division, Public Works Administration and the Community Development Department. Drafting, mapping, word processing, spreadsheet, database and other specialized software is supported by this Division for the above personnel plus the Street. Water/Wastewater and Building and Equipment Maintenance divisions. Final subdivision maps, parcel maps and off-site improvement plans for private developments are reviewed to ensure conformance to City standards and master pians. The Engineering Division is responsible for the inspection of private devckpers' oS-site improvements and all street and underground improvements by other utility agencies installed under encroachment permits. Division issues encroachment percaits for all work. activities, and major uses in the public rights of way and easements. Legal descriptions needed for assessment districts, annexations, easement and street vacations, and the acquisition of rights -of --way, easements and property are prepared/revicwed by the Engineering Division. The Engineering Division is also responsible for design of traffic control facilities within. the City. This includes responding to public questions and complaints, the design, construction and inspection of traffic signals, and all studies and recommendations regarding loading zones, pedestrian crossings, school crossings, parking and no -parking zones, speed zoning and the installation of stop and yield signs. The Division administers the City's Development Impact Mitigation Fee Program and coordinates development work with the City's Capital Improvement Program. Budget' Employees 5 -YEAR BUDGET/EMPLOYEES 92-93 91-92 90-91 89-90 88-89 $788,130 $642,740 $630,630 $572,775 $490,065 15 15 IS 15 15 Major increases in the years listed below are due to: 1989-90 - salary adjustments. 1992-93 - reallocation of Street, Storm Drain, Water and Waster.,ater engineering expenses from those divisions into this division and also inclusion of equipment maintenance expenses which were previously charged to Administration. 'lrcludes amounts budgeted for Capital Improvement Program rnginc,:ring. -i5- ENGINEERING DIVISION ORGANIZATION JANUARY 1993 ASSISTANT CITY ENOINEER DEVELOPMENT SERVICES Two4c COMPUTER ENOINEERING COORDINATION DESIGN t CONSTRUCTION ENGINEEIWIG ASSOCIATE CIVIL ASSOCIATE TRAFFIC ENGINEERING SENIOR CML ENGINEER 1111 ENGINEER ASSISTANT ENGINEER iUl1•TIME I I rrr nra 16 ENGINEERING i TRAFFIC ENG. DESIGN DRAFTING A, CONSTRI'JTION TECHNICIAN IN I ASSISTANT r r r.n �wr SURVEfi ADMINISTRAMN ASSISTANT ASSOCIATE CML SENIOR ENG. ENGINEER ENGINEER ENG, TECHNICIAN M. TECHNICAN PUBUC WORKS =ISPECTOR I TECHNICIAN I SUPERVISOR SUPERVISOR INSPECTOR uu ENGINEERING ENGINEERING ENGINEERWG INTERN TECHNICIAN YR TECHNICIAN YII---------------- iI CONTRACT EMPLOYEE ----------------- PART-TIME i AUTHORIZED EMPLOYEE----------------- iUl1•TIME rosrnons 16 J ENGINEERING - COMPARABLE STAFFING Full -Time Positions AGENCY Total Engineering Positions Davis 24 Pbp. 501000 Manteca 9 Pop. 41.000 Roseville 27 Pop. 51,000 Tracy 17 Pop. 40,000 Turlock 14 Pop. 50.000 Vacaville 34 Pop. 70.000 Woodland 17 Pop. 43.000 Pop. 49,000 LODI 15 Pop. 53,000 -17- PRIVATIZATION ENGINEERING ACTIViTYIPROJECT Reason for Contracting Out Dollar Savings Existing Workload or Time Restraints Lack of Expertise or Equipment Aerial Photography X Architectural Services X Blueprinting (large lobs) X X X Laboratory Material & Soils Testing X Office Equipment Maintenance X Property Surveying X Specialty Engineering/Studies X X Traffic Signal Design (sometimes) X wtENTOVNM.x.IS — sv— -i ENGINEERING Cost Reductions and Revenue Enhancements Cost Reductions Leave anticipated 7/93 Engineering Technician (design section) vacancy S 14,000 unfilled. The annual cost of this position (salary plus benefits) is $32,000. Since only approximately 40`!0 of the work done by technicians in the design section is funded by the General Fund, the cost reduction is less. (The remainder is capital project and utility account -t.) This will mean a slowdown in capital project design and reduced services in mapping. (Not Recommended) 2. Cancel contract with half-time engineer. The total annual cost ofthis half- $ 8,000 time position (salary plus benefits) is $20,000. Since approximately 40% of the work done by this person is funded by the General Fund, the cost reduction is less. This will mean a slowdown in capital project design and traffic engineering services. (Not Recommended) Revenue Enhancements 1. Establish an encroachment permit fee. The City of Lodi presently has no $25,000-$50,000 charge for permitting and inspection of work done by utilities and other private parties within the City right of way. Lodi is one of the few communities in California that has not established this type of fee. City staff could develop this fee schedule in house. The amount of revenue enhancement would vary with permit activity. (Recommended) 2. Charge full overhead (Engineering, Public Works Administration and $170,000 general City) to enterprise, capital and development impact fee funds. This would place the hourly rates of engineers and technicians on a more comparable bases with those in the private sector. However, our rates would still be lower than those in the private sector. (Recommended) 3. Increase engineering fees to include full overhead. A study (which could $ 70,000 be done in house) would be needed to make the appropriate adjustments to the sliding scale fee structure. The amount of revenue enhancement would vary with development activity. (Recommended) 4. Charge for special curb markings. Many requests for curb markings $ 1,000 or less or similar traffic controls are primarily for the benefit of a single property owner/parcel. While staff has rLservations about "selling" traffic control, there is some validity in asking the owner to pay for these benefits. A policy would need to be developer) on this issuz. (Not Recommended) Capital Improvemef Program 21% Impact Fees 2 Eng;ner 1I� Capital improvement Program 2". In Encroachment Permit Engineering Fees Fees 5% 16% Engineering Division Funding Present Wster/Wastewater udlides Gas Tax 7% 1% Proposed (Adding Full Overhead) Watermastewater Utilttles Gas Tax 9% 1% General Fund 58% eneral Fund 37% PUBLIC WORKS DEPARTMENT BUILDING & EQUIPMENT MAINTENANCE MISSION STATEMENTS Building Maintenance Our mission is to manage and maintain City buildings in a professional and efficient manner, providing responsive service to all City departments. This is accomplished under the guidance of the Public Works Department's mission and values. Equipment Maintenance Our mission is to manage and maintain the equipment and vehicles for all departments. This is accomplished under the guidance of the Public Works Department's mission and values. BUILDING AND EQUIPMENT MAINTENANCE DIVISION The Building and Equipment Maintenance Division is responsible for the maintenance of City buildings and City vehicles and equipment This Division actually fimctions as two separate units, each with its own responsibilities. BUILDING MAINTENANCE - The Building Maintenance Section is responsible for the maintenance of most City buildings, totaling 186,000 square feet Janitorial duties in City Hall, the Fire Prevention Building, Carnegie Forum, Public Safety Building. and the Municipal Service Center are carried out by a contract janitorial sepia administered by the Building and Equipment Maintenance Division. The Division is responsible for the general maintenance and repair of the heating, air conditioning and other electrical and mechanical systems within most City buildings, including the fire stations. Thus Section performs, coordinates, andfor supervises minor congruetion and remodeling done on and in City buildings. Cc astruction administration of large building remodel or construction projects, and coordination of that work with architectural firms, is the responsibility of this Division's SuperintcndenL 5 -YEAR BUDGEVEMPLOYEES 92-93 91-92 90-91 89-90 88-89 Budget 5426.825 $450,845 5407,635 5307,635 5323,115 Em lovas 2.5 2.5 2.5 2.5 2.5 Maj mareaua in the years laded below are ate to: 989-90 - salary adjustroaas. additional eons of mew CArrrcgie Fm m antd additi n of lease for new standby generator in Public Safety l3usldins. EOUIPMENT MAINTENANCE - This Division is responsible for the preventive maintenance program and repair.- of vehicles and major equipment for all City departments, except for the Fire Department's larger apparatus trucks and the Parks and Recreation Department's small equipment (mowers, Cushman, etc.). The maintenance garage is responsible for smog certifications on all City vehicles and inspection certification on Dia) -A -Ride vehicles and heavy-duty trucks, per State regulations. The Division is also responsible for Clean Air Act regulations, alternative fuel issues and environmental and recycling requirements related to ithicics and equipment. In addition to the maintenance function, the Division recommends the replacement schedules for equipment and prepares the specifications and contract bidding documents for the purchase of new City 'chicles and equipment Budget Employees 5 -YEAR BUDGET/EMPLOYEES 92-93 91-92 90-91 89-90 88-89 S737.990 S1.015.620 S998.235 5851,570 5665,800 7.5 8.5 8.5 8.5 7.5 Major change in the yeas listed beio- arc due to: 19$9-90- Addition of lead \Madame position (partial years salt ry adjuatrnaw, increases in materia! costs and usage and equipn :nt depreciation srtd robutldetgof Public Works Iii -Tanga. 1990-91- Full -year cod of 1.rad Mechanic position and increase t, oWipment dtproiatiorc 1992-93 -. F.lirninuion of Pa -y Coordinator position due to hiring h -cru, eliminaaion of all equipment depreciation, decrease in fuel coat and uuge. T6= decr a were ofact by increases clue to salary adjustrnents cernd addition of Fire Depart ce tick nu n emme- BLDG. & EQUIP. MAINTENANCE DIVISION ORGANIZATION JANUARY 1993 BLDG. i EQUIP. MAINTENANCE SUPERINTENDENT BUILDING I EQUIPMENT DI MATENANCE MAINTENANCE SENIOR BLDG. EQUIP. MAINT, MAINT. WORKER I I SUPERVISOR BUILDING I L±LEADEQUIPMENT MAINT. WORKER CHANIC WELDER - MECHANIC 9"URANCE CLAIM6 } u MEA.I t4U1P. HEAVY EQUIP. MEC►44-41C MECHANIC HEAVY EQUIP. HEAVY EQUIP, MECHANIC MECHANIC WELDER - MECHANIC 9"URANCE CLAIM6 } u EQUIPMENT MAINTENANCE STAFFING COMPARISONS (EQUIPMENT -TO -PERSONNEL) AVERAGE OF CITIES SURVEYED 39.2 53.6 (w/Tracy) 37.5 48.2 /w/oTracvl LODI 1.5 .5 Adm. Clerk (20 hr./wk.) 4 0 274 102 376 no••• yes yes 51.9 71.6 •Parts Coordinator eliminated .5 lead mechanic through hiring freeze last year .75 welder 11�ni�eat-IaPenawnd when employee retired Direct Sh0P lAbor E41lipmeal Malntalne4 Total 7.25 Ratio Musca A Supervisor (NW %pport Staff 1ltechaale Servke Wr1wr IA"v3e4 Vehkk Non-l.kenu4 T•W ReAre Wdele Pollee Ptrt Overall Direct IAbor I)AVIS I I Adm. Clerk (full-time) 4 0 200 12 212 yes yes yes 35.3 53 Cotal 6.00 TRACY 1 1.25 Adm. Clerk 3 0 128 131 259 yes yes no 49.3 86.3• (I full-time plus 1 part -tine ® 10 hr./wk.) Total 5.25 MANTECA 1 .25 to .375 Adm. Clerk 4 0 150 20 170 refine yes yes 32.4 42.5 (10-15 hr./wk, posting costs + only) 41'artslcomputer position not filled wbm employe transferral last year. inial 5.25 VACAVILLE 1 .125 Adm. Clerk (5 hr./wk.) 3 2 230 45 I75 no no yes 44.9 55 work order input only 1.,.±I 6.125 + L,RLOCK 1 0 4 0 240 50 290 buses yes yes 48.3 58 ` 1 lead mcchartic 600 e'MSEVILLE 2 1.5 Adm. Clerk 12 3 400 I50 S50 yes yes yes 29.7 36.7 (I Cull -lime, 1 part-time) r�.-.1 I8.50 IS fOCKTON 5 1.125 - 1.5 Adm. Clerk 22-(2)-20 0 853 113 966 refuse yes yes 34.2 43.9 (1 Cull -time, 1 part-time (hiring freeze) [4.20 hr./4.1, as needed) 1 welder fabricator 1 body shop foreman Total 28.25 AVERAGE OF CITIES SURVEYED 39.2 53.6 (w/Tracy) 37.5 48.2 /w/oTracvl LODI 1.5 .5 Adm. Clerk (20 hr./wk.) 4 0 274 102 376 no••• yes yes 51.9 71.6 •Parts Coordinator eliminated .5 lead mechanic through hiring freeze last year .75 welder when employee retired mechanic•• Total 7.25 • Tracy only docs servicing and minor repair work 0:1D0(.1TOWNSRVS Ms I • • 2594 time spend on nonlquipment welding 3/1693 ••• Lodi will add buses in 1993/94 A PRIVATIZATION BUILDING MAINTENANCE ACTIVITY/PROJECT Reason for ContractingOut Dollar Savings Dollar Savings Existing Workload or Time Restraints Lack of Expertise or Equipment Boiler Maintenance X X Elevator Maintenance X X Janitorial Maintenance X X X Landscape Maintenance X X Paint and Body Work Property Manaf-smertt X Radiator Repair Security Alarm Maintenance X X Smoke Detection Maintenance (Jail) X X Specialized Repair/installation: carpet, painting/wallpapering, glass replacement X X EQUIPMENT MAINTENANCE ACTIVITY/PROJECT Reason for ContractingOut Dollar Savings Existing Workload or Time Restraints Lack of Expertise or Equipment Aerial Lift Truck Maintenance/Certification X Glass Replacement X Large Tire Repair/Changing X Major Diesel Engine Repair/Rebuilding X X Paint and Body Work X Radiator Repair X Transmission Repair X NOTE: Equipment Maintenance is currently evaluating privatization of vehicle and equipment maintenance. Pft3CT,h+AJ YLS BUILDING AND EQUIPMENT MAINTENANCE Cost Reductions and Revenue Enhancements Cost Reductions Building Maintenance 1. Evaluate the consolidation of the Building Maintenance functions S 7???? City wide. There may be a direct dollar savings but, at the minimum, there could be an increase in organizational efficiency. (Recommended) Eauioment Maintenance 2. Evaluate a vehicle reduction program on a City wide basis. S Evaluation would include review of total vehicles assigned, take-home vehicles, better utilization of motor pool and Council van, monthly car allowance, sharing of vehiclestequipment, etc. (Recommended) rxc —% Z... Parks d Re 7% Dial -A -Rich 6% Etectrfc 10% Building Maintenance Funding Equipment Maintenance Funding Other 10'X. General Fund 100% 170 Water -- --.1 24% 4% LEGEND O GENERAL FUND ((m�li�ul ENTERPRISE FUNDS 10 TRANSPORTATION DEVELOPMENT ACT rTDAr F(i*;OS 7 i sr PUBLIC WORKS DEPARTMENT STREET MISSION STATEMENT Our mission is to manage and maintain streets, curbs, gutters, sidewalks, City trees, traffic and street signs and markings, the storm drainage system and provide street cleaning services. This is accomplished under the guidance of the Public Works Department's mission and values. z 18 STREET DIVISION The Street Division is responsible for the maintenance of street systems and public parking lots and the operation and maintenance of the storm drain system. Street Maintenance - This includes the general maintenance, repair, sealir% and resurfacing of 156 miles of street and 16 miles ofslley. Curb, Gutter, and Sidewalk Maintenance - This includes inventory of all public sidewalks within the City, temporary repairs to all areas which could cause someone to trip and fall in order to reduce the City's liability, and administering the City's sidewalk repair program which removes and replaces sidewalks having an offset greater than 3/4 inch. Street Tree Maintenance - This includes the maintenance of 4,940 trees (consisting of 56 different species) in parkways, tr-e wells, City building grounds and public parking lots. General maintenance consists of spraying, trimming, root surgery, and removal. The Division also administrates and conducts an annual street tree planting program. Street Cleaning - This includes sweeping over 320 miles of street curbs, 16 miles of alley and 19 public parking lots. Downtown parking lots are swept weekly; residential street curbs on a 12 -working day frequency and, during leaf season, on a 10 -day frequency; downtown commercial street curbs are swept 3 times per week and alleys are swept biannually. Traffic Control - This includes installation and maintenance of 4,730 directional, regulatory, warning and street signs, painting of lane lines, crosswalks, pavement legends, parking stalls and curbs. The Division is also responsible for the signalized intersections and 4 overhead beacons; however, the electrical maintenance is provided by the Electric Utility Department. Street Light Maintenance - The Street Division is responsible for funding the maintenance and power for the City's 4,030 streetlights. Actual maintenance is performed by the Electric Utility Department. Storm Drain Maintenance - This includes th,s general maintenance of 102 miles of trunk lines, 1,515 manholes and 2,445 catch basins and the operation and maintenance of 14 pumping stations, 37 pumps and motors (5 hp to 50 hp) and 9 retention basins. The Division is also responsible for responding during storms to keep the drainage system functioning properly and ensuring that the pumping stations and retention basins, which are a crucial part of the system, are working to their full capacity. Public Parking Lots - This includes the general maintenance, repair, sealing, resurfacing, cleaning and painting of parking stalls in 19 public parking lots. MOWN.mr_ The Street Division is also responsible for the supervision of the Municipal Service Center clerical staff, public . right-of-way encroachment violations, graffiti abatement, administration of the Public Works landscape maintenance contract and maintenance of related irrigation systems, annual public right-of-way weed control program and the management of the Public Works radio system. 5 -YEAR BUDGEVEMPLOYEES MOWN.Doc -3,,'- 92-93 91-92 91 89-90 88-89 Budget V,366,320 S2 397 820 $ _$1,935,415 $ 1 729 320 j Employees 30 30 27 26 Myst i++aaea m the yeas L4edbdow arc due to: 1989 40 - addtkm ar& c wkJ pmk;m add' m orkm for anadw sw. qw. iaaew,s is bob eW mat mai dinar s rd fled material cast; 1940.91- new refine di Ww4 I Z addhimA electric w addit wd shat a*awin<cbargm sd&dw ordree labww poaitioert, additional mrterial and e4uipment and sslary irweasee, 1991-92 - additi=W elearie saa8e, addit =4 mataiak and aalwy iw. ew . MOWN.Doc -3,,'- LO STREET DIVISION ORGANIZATION JANUARY 1993 T! S T. ALLEY. TRAFFIC MAINTENANC L STRER CI.SANlNO STRUT SUPERINTENDENT HSUPERVISINO A[+MIN. CLERK ADMINSTRATTVE CLERK N -------------' I ADMNNSTRATTVE I CLERK! (put bm) --------------- ASSISTANT srREE r SUPERINTENDENT --------------ASSISTANTSTREETSUPERINTENDENT OMSION INSURANCE cUJMt6 I I STREET, StORM DRAIN. TREE. SIDEWALK MAWTSNANCS i -------I PART-TIME i EMPLOYEE ' -------------- NOTE: Dt.1.Ion r*W"s drevkd Md Imtnnvnts"a a o.wMnw ruppon Iron TheElonvle UdktY Dept. la adrK wqult tt.r! pUmn pw,.Onp eletlOrr,. AUYNOIM2ED tlAl-TIM[ ►oNmoNN 30 STREET SUPERVISOR STREET SUPERVISOR — MArt+iENANCE MAINTENANCE STREET CLEANING MAINTENANCE MAINTENANCE MAINTENANCE NANRENANCE MAINTENANCE ST. Mw III si ww nl SWEEPER OPER ST. MVV III ST. MfMV 111 ST. M W NI ST. MW IN SR. TREE TRMR Mew n AAM N I MAIN MN S IAM N N.N N TREE TRMR I Mw" l �I (II so ER��II�IJ Mw N MN 1 MMN N ' MW 1 TREE TRMR i -------I PART-TIME i EMPLOYEE ' -------------- NOTE: Dt.1.Ion r*W"s drevkd Md Imtnnvnts"a a o.wMnw ruppon Iron TheElonvle UdktY Dept. la adrK wqult tt.r! pUmn pw,.Onp eletlOrr,. AUYNOIM2ED tlAl-TIM[ ►oNmoNN 30 STREET - COMPARABLE STAFFING In 1985, a survey of typical valley cities showed the average ratio of street miles to employees who strictly maintained streets was 12.6 miles per employee. This is an approximate method of measuring level of service similar to uniformed officers per 1,000 population is for police services. In 1985:86, using this ratio of 12.6 miles per employee as a desirable level of service, we justified adding 2 street maintenance workers. Three additional street maintenance personnel were added in 1990191 in order to maintain this level of service. Based on our present 172 miles of streets and alleys and 12.5 authorized street maintenance personnel, our current ratio is 13.5 miles per employee. The 12.5 authorized street maintenance Firsonnel does not include employees performing functions such as tree trimming, street cleaning, traffic painting, sidewalk replacement, etc. There are presently 2 vacant positions in street maintenance personnel. Since these positions are funded with Street dollars. they would normally be filled even though there's a hiring freeze in place. However, since other maintenance positions in the City may be eliminated, we feel it is prudent not to fill these vacant positions until the budget is prepared. If the 2 existing vacant positions were not filled, the ratio would increase to 16.4 miles per employee. However, when these 2 vacant Street positions are filled, we will be able to provide newly the same level of service and street maintenance as we provided in 1985_ To actuat;y reach the desirable level of service of 12.6 miles per employee, the City would have to add one additional street maintenance worker. 1". 'C0A1P.D0 r /I— PRIVATIZATION I - PRIVATIZATION STREET NOTE: Street Division will be evelusting privatization of painting crosswalks, pavement legends, parking stalls and curbs. Reason for Contracting Out Existing Workload or Lack of Expertise or ACTIVITY/PROJECT Dollar Savin s Time Restraints Equipment Answering Service (Emergency X Calls after Midnight) Concrete Work X X Discing undeveloped retention' basin property X Landscape Maintenance X Lane -lino Painting X Preparing Required Herbicide Use Program X Root Grinding X Slurry Seal and Chip Seal Application X Tree Insecticide Spraying/ Injecting X Two-way Radio Maintenance X Weed Spraying of Frontage Road X Drainage Ditch X NOTE: Street Division will be evelusting privatization of painting crosswalks, pavement legends, parking stalls and curbs. STREET Cost Reductions and Revenue Enhancements Cost Reductions 1. Defer mercury street light conversion program. S33,000 The 1992193 budget includes 533,280 in the Strata (General Fund) budget for converting 241 mercury street lights to sodium vapor lights„ thus saving energy costs. This approximate amount is budgt A annually. The payback is just under 5 years. Although not recommended for all future years, this deduction is reasonable for this next year. (Consider if revenue enhancements are insufficient) 2. Eliminate graffiti removal program S 11, a0 (Consider if revenue enhancements are insufficient) 3. Eliminate residential surer cleaning. $55,000 (Consider if revenue eahanccmc s are insufficient) However, continue City-wide Ieaf season pickup and downtown, commercial. industrial, and parking lot sweeping. 4. Eliminate entire street cleaning program. $220,000 (Consider if revenue enhancements are insufficient) Revenue Enhancements 1. Minimize Maintenance of Effort. (Recommended) S397,000 With the passing of State Proposition f I 1 and the San Joaquin County Measure K, a Maintenance of Effort (MOE) requirement was implemented. Proposition 111 and Measure K provided public agencies with additional dollars for strut maintenance and construction. Since most agencies use both General Fund and suect dollars for the total funding of their street maintenance and construction needs, an MOE requirement was implemented in order to enwre that all of the new street dollar✓ passed by the voters would actually be used on struts. It requires that the average amount of General Fund dollars used for greets during 1987188, 198889 and 1989/90 be maintained Lodi's MOE amount is 51,403,800. This is the amours of General Fund finding that must be maintained from year to year. If an agency is using more General funds for streets than is required by their MOE amount, the agency may reduce the amount to that of the MOE rcgvirement In the 1992/93 budget. Lodi is using $1,801,300 of General funds on the street system. Therefore, $397,500 in street dollars could be used to enhance the General Fund. However, these dollar are currently budgeted for capital projects in our long-range street program; therefore, we would have to eliminate some proposed street projects_ 2. Establish a storm water utility. (Recommended) $360,000 The Public Works Department .,xis strongly that a norm �.dter utility should be established. This %+ill be the subject of the May 4, 1993, shirtslccvc session. With the new EPA restrictions on storm water discharge, this amount could easily double in the neat 2 or 3 1 years. Because of the future dischargle requirements to local agencies, it is reasonable to include City-wide street cleaning in the storm water utility. I.f" -w two services were combinod in an enterprise fend, the City Could recoup at least 5360,000, plus City overhead. This would amount to roughly SIM per parcel per month. If this concept is to be considered, we recommend . Consultant be retained to develop the appropriate charge per parcel (based on size, zoning. street frontage and storm runoff volume) and to help promote the concept to the public. 3. Establish a City -aide street cleaning maintenance district. $220,000 (Not Recommendod) 4. Evaluate establishing a streetlight maintenance district 5370,000 (Consider if revenue enhancements are insufficient) Presently, all citizens are paying for streetlights even though many do not have streetlights on their stress. if a district was formed, these costs would be spread to those who actually are receiving benefit It would be recommended that a consultant be retained to develop the district and appropriate charges. This would have to be done under the St-ect Lighting and Landscaping Act of 1972. It would require a vote of landowners within the City limits. S. Evaluate charging new subdivisions for street cleanup. S10,000 (Recommended) After a subdivision is accepted, and until there is approximately 60% buildup. the City incurs a major cosi in additional street cleaning. This cleaning includes the streets and storm drains due to dirt and construction material which leaves the undeveloped sites and ends up in the curb and gutter or storm drain system. We could charge the developers on a time -and -material basis or require a maintenance deposit to cover this work which is required by City forces. 6. Charge full ove hcad on billings to City's Enterprise Funds S 9,000 (Water, Wastewater and Electric Utility) for cost of trench paving and repair. Charges made should be credited back to the Street Division, which is now not being accomplished. (RecDnunended) 7. Charge full overhead on billings for damage to City property. S 1,000 (Recommended) These billings include cleanup of hazardous spills and damage to signs, traffic signs, fences and trees which are all normally paid by instrance companies. General Fund 68% Street Division Funding - Present -36- tFunds B% Transportation Development Act (TDA) Funds 14% Administration Parking Lot Main 1% Tree MainL 7% Street Light IN 165: Street Division Funding Present Street Cleaning Stone Maint. 9% 6% =-A C&G Maint. 3% raNic Control MainL 2% ntrol Maint. 1011. Future - Minimizing Maintenance of Effort (MOE) Administration Parking Lot Mair 1% Tree Maint. 7% Street Light 1 165'e Street Cleaning Storm Maint, 9% 6% int. Cdv Maint. 3% )ntrol Maint. 3% PUBLIC WORKS DEPARTMENT WATER/WASTEWATER MISSION STATEMENTS Water Our mission is to manage and deliver a reliable supply of safe drinking water to meet the residential, commercial, industrial and fire protection needs of Lodi. This is accomplished under the guidance of the Public Works Department's mission and values. Wastewater Our mission is to provide quality wastewater services and promote a healthier environment through collection, treatment, reuse, and disposal of wastewater generated by the City of Lodi. This is accomplished under the guidance of the Public Works Department's mission and values. WATER/WASTEWATER DIVISION The Water/Wastewater Division is responsible for the operation and maintenance of the Water Utility and the Wastewater Utility. The personnel working in these two utilities have overlapping duties and responstbilitics. WATER UTELITY This Division operates the water utility which provides potable water to 23,000 residential, commercial, and industrial customcm The Water Utility is also responsible for providing water for adequate fire flows and pressures to the City's fire hydrants, private fire suppression systems, and private on-site hydrants. All of Lodi's water is pumped from the groundwater table. This Division provides this water by operating and maintaining 23 water wells and related equipment which includes standby generators, chlorination s}stems, sand separators, one elevated water tank, and one granulated activated carbon filtration system These wells deliver from 1,300 to 2,200 gallons per minute and have a total capacity of over 50 million gallons per day. The water is distributed through water mains ranging in size from 2 inches to 14 inches in diameter. Water crews are responsible for the opera!ion, maintenance and repair of the 196 mites of water mains, 23,000 customer services, 3,400 water valves, and 1,600 fire hydrants. This Division routinely monitors water at each well and throughout the distribution system to ensure that State and EPA water quality requirements are met. The Division must also review, research and be familiar with all new State and EPA regulations and legislation, available loans and grants, and new treatment system concepts, etc., all of which is changing on a daily basis. The Division is responsible for the administration, coordination, and implementation of all activities related to Lodi's dibromochloropropane (DBCP) dilemma This includes staffing the Mayor's DBCP Committee and meeting and coordinating the efforts of the City Attorney, outside legal counsel, Iocal legislators, along with State and EPA staff. Since 1976, the Division has also managed the highly successful water conservation program which has more than offset its costs with electrical pumping cost savings. Budget Employees 5 -YEAR BUDGETlEMPLOYEES 92-93 91-92 90-91 89-90 88-89 $1,154,690 $1,203,630 $1,094,955 $919,800 $765,765 12 12 1 12 1 12• 10 Major mages in the years titled below arc due to, 1989-90 - increases in tWirical power costs and mandated testing of weer wells. 1990-91 - inereaux in cloctneal power cost and repair needs at wells, reallocation of labor and salary adjustrnents and mardatcd quartaty DBCP notices, addition of 30% of new Assistant wata/Wastewater superintendents salary. L991-92 - increases in clavical power cost. new sate mandated annual fee by the DepwUnent of Health Sa vices, shifting a larger percentage of Assist Wata/Wastewala Supaintardert's salary from wastewater atterV= to water Mapnse and increased part-time staff for stepped-up Water eomavation Program 1992.93 - decreases in usage and cost of electrical power, decrease in materials and supplies, elimination of equipment depreciation. and transfer of engineering expense to the Enginaring Division. However the decreases were offid by increases in costs for DBCP expenses and increased labor oats. IrLe addition of a two-pason meter ind-tilation aew was budgeted in the Capita Improvement Prvgram and is not reflected in the Operating Budget WASTEWATER UTILITY WASTEWATER COLLECTIONS - This Division operates the wastc"atcr utility which is responsible for collecting and conveying the domestic and industrial Wastewater to Lodi's White Slough Water Pollution Control Facility. The collection system includes 162 miles of wastewater mains ranging in size from 6 incl <s o tR nches, 1n miles of 30 -inch industrial caste outfall line, 3,600 manholes, I industrial waste -3S+- "-- and 7 domestic pumping stations, and 23,000 wastewater service laterals. The maintenance staff is responsible for the operation, maintenance and repair of these facilities. Maintenance is determined, scheduled and performed using a computerized preventative maintenance program The maintenance progn -n consists of systematic rodding, hydrocleaning, smoke testing and Tying wastewater mains throughaut the City. Additionally, the maintenance staff inspects, by TVing, all newly installed wastewater and storm lines installed by contractors. The Division responds to all customer complaints, and installs, repairs and replaces customers' wastewater service laterals as required. Budget Employees 5 -YEAR BUDGET/EMPLOYEES 92-93 91-92 90-91 89-90 88-89 $452,460 $521,385 $573,750 $370,195 8284,210 10 10 1 10 8 1 8 Major a -c" a the yera tisted below was dee to. 1989 90 - Vic eas" in utility civenem Le, eleciriMy, phos• etc.. and tmtanats and supplies, resNamix-e of tabor and salary 19W91 - addifion of sewer inaidaaance Der, cud inaeasea in equipm d d%reciwion, reallocation of labor, salary adJ+sbmaitz. and addition of 50%of new Asittut water/Wastewater Supairdadaits salary. 1491-92 - decreases resuhed fran drifting Assistant Wata/Waatew" Supo iniadar's salary tion wadewater b water enterprise, redxtim in equipment deprodatioq ard shifting statrtiow to water (DBCP). 1992-93 - decrease wit. due to traraderring o ngutesieg expenses to the Enginesug Divili and elvnimtian of equipmeot I , ;jatjon . WASTEWATER TREATNE - This Division operates a wastewater utility which is responsible for the operation, maintenance and repair of the City's White Slough Water Pollution Control Facility located south of Highway 12, off of Thornton Road. This wastewater treatment plant was originally constructed in 1.967 with a treatment capacity of 3.5 million gallons per day (MGD) and its most recent expansion was completed in 1992 providing a current capacity of 8.5 MGD. This facility presently processes and treats an average flow of 5.8 MGD or 2,100 million gallons per year. During the spring, summer and fall months, the treated effluent is combine! with 260 million gallons a year from the City's industrial system and is used for irrigation of feed and fodder crops and permanent pasture on the City's property which totals 1,040 acres. During the winter months, the effluent is discharged directly into the San Joaquin delta The Facility is staffed 7 days a week 16 hours a day. The City's State -licensed plant operators, together With the plant maintenance personnel, are responsi! !k ibr ensuring that all treated wastewater generated by the City of Lodi is properly treated to conform to the requirements of our State of California discharge permit prior to land irrigation or discharge to the delta. This Division staffs and operates a State -certified laboratory at the White Slough Facility. The laboratory is responsible for measuring and testing the influent, the treatment plant process, the quality of the effluent, industrial flows under the pretreatment program, and groundwater and delta water quality to ensure compliance with the mandated requirements of the State and Federal agencies. The laboratory personnel tests industrial discharges for compliance with City ordinances and State and EPA mandates, and calculates motnthly and annual wastewater service charges for industrial users. The laboratory also performs weekly bacteriological testing on the City's water system and administers and enforces the City's cross -connection control program as required d by the State Department of Health Services and EPA. M Kt OZ iZ £Z £Z I tZ OtS`880'IS SOZ`6SZ'IS OIL'tZ9'IS SLS'L89'IS OZ8'tL9`IS 68-88 06-68 16-06 Z&16 I £6-Z6 S33A:O'7d14i3/.L3oms Ud31I-9 A.I.IIM VUYA&USYM'IVIOI mf1dtui3 p$prg tpwa uxw�ss prr rpwp�a lerp&s a sarawop w Par sero Par ar/era Pp. pM a! --LoP A4 wW tsa p-&dw4FOO&Par"P-Npud-al.—pwsrmAnn ase0 w-w—wwaumR—a%L-1'd—t f=MPar!vp—°°u>nr Par Ao&u 1-wo p—pAm!ap-prod p -pop pOO pM -ZgIW A"Par Spam -" Par 4ddns T -m— hoary." !=wwA paupopp poo pm a8an I , !Is r - Tdly—z 'NaaP N.CL Par aoasdaslra>uomPr+oidt!�'6d�T8 i z £1 £I £1 til 0£ NS$ 010'6885 096`OSO'IS 061'991'IS 09£`ZZZ'1S 68-88 06-68 1 16-06 1 Z6-16 I £6-Z6 S33JiO'IdY1i3f.L31JQflfl'lItl3JCK s2o.(oldmg pBP�fi I I STAFFING OF COMPARABLE OPERATIONS CITY WATER WASTEWATER WASTEWATER TOTAL COLLECTION TREATMENT Davis Pop, 50,000 25 employees 8 employees 13 employees 46 Flow: 5.0 MGD Manteca Pop. 41,000 11 employees 4.5 employees 11.5 employees 27 Flow: 4.7 MGD Tracy Pop. 40,000 20.5 employees 9 employees 15.5 employees 45 Flow: 6.5 MGD Turlock Pop. 50,000 15.5 employees 9 employees 15.5 employees 40 Flow: 9.0 MGD Vocaville ,p. 70,000 24.5 employees 11 employees 24.5 employees 60 Flow: 7.5 MGD AVERAGE Pop. 50,200 19.3 employees 8.3 employees 16 employees 43.6 Flow: 6.5 MGD Lodi Pop. 53,000 12 emp!oyees 10 employees 14 employees 36 Flow: 5.8 MGD Legend: Pop. - Population MGD - Million Gallon per Day (Flow at Wastewater Treatment Plant) 0193WR.12 r LU Hz Z N y O O a CL 3 ui N N O p O0 O C* Q O In O fl C. E O (D E Q1 E O CO4c LU CU to N � a7 i O O MT T T vi T r N LU Z N N d N co N 3 ClO O,0 N 0 O 0 V a) � Ww ~J c~i O In O cz C. E O a o a _o a CO4c 1 CU to N � a7 cf z u O O O O 02 O T m A 0 a E M Cri(' O 2 p O s 0 � C5 Oc) C) Caq� � ClO O,0 N N N cl N! � V a) � O O O In O = > C) t` O Q L cO rj ro o o m Q0 a m O O A 0 U .-�3 '� w� 3 > cf z u O O O O 02 O O fl. Q Q CL CL E E WI E E O d �) a) a) N LO - 3 N T �- m A 0 a E M Cri(' O 2 p O p 0 p C5 Oc) C) Caq� � ClO O,0 O O� 00 O� Op� C* � N1l9 cl N! � V a) � OCD `t Y U O In O = > C) t` O Q L cO rj ro o o m Q0 a m CL ��Q� A 0 U .-�3 '� w� 3 > cf z u O �� ci �� O CD .� 02 c0 M N N 0 CL N O T c a � C O Cl ~ E s` N � A W 3 s U. A 0 C6 (7 0 O o Cj O CD ;o C. LO� v �= 5 vIci �I LL n .o 0 5 p PRIVATIZATION WATER ACTIVITY"OJECT Reason for Contracting Out Dollar Savin2s Existing Workload or Time Restraints Lack of Expertise or Equipment Answering Service (Emergency Calls after Midnight) X Collection Agency X X X Laboratory Work (specialized) X X X Landscape Maintenance X X Miscellaneous Concrete Work X X WASTEWATER ACTIVITYIPROJECT Reason for ContractingOut Do -'Sar Savings Existing Workload or Time Restraints Lack of Expertise or Equipment Answering Service (Emergency Calls after Midnight) X Boiler Maintenance X Collection Agency X X Laboratory Work Ispecialized) X Landscape Maintenance X Miscellaneous Concrete Work X X Security Alarm Maintenance X Weed Abatement at White Slough X NOTE: Wastewater Utility is currently evaluating privatization of our collection system preventative maintenance program. Mxt 'ovwr. us -44- WATER Cost Reductions and Revenue Enhancements Coto Reductiom I. Eliminate meter retrofit program. Under this posram, a $110.000 two, jxrson meter crew installs meters on all commercial and industrial senders. (Not Recommended) 2. Require a water meter installation as a condition of any We $180,000 e f property in the City of Lodi. The State now requires that all new water services be metered. The State will ultimately mandate ail water agencies to retrofit all existing residential with a water meter. The City is presently metering, at its cost, all existing commercial and industrial water services. A policy statement in the City's existing General Plan reads, 'Tire City shall develop a program for metering all existing residential uses.* Depending on whether it's a newer home (1975•I992), where a meter box already exists, or an older home, water meter installations coat the %icy between $200 and $600. In the last 12 months, there acre 468 residential transactions. Assuming an average cost of 5400 per installation, and 450 sales of untnctcred parcels per year, the City could save $180,000 per year toward future meter retrofit costs. (Recommended) Revenue Enhancements 1. Charge full overhead on billings for damage to City property. S 2,000 These billings include damage to fire hydrants, meter boxes, etc., which are normally paid by car insurance companies. (Recommended) WASTEWATER Cost Reductions and Revenue Enhancements Cost Reductions 1. Require a sewer cleanout installation as a condition of any S 'M sale of property in the City of Lodi. This would bring sewer lateral up to current standards, reduce time field personnel take to determine location of sewer problcR and will reduce cost to new owner if their sewer lateral becomes clogged. (Recommended) 2. Eliminate prevcntati-,t maintenance sewer cleaning crew. $ 70,000 This crew was established by the City Council in 1990-91 to provide routine preventative maintenance to he wastewater collection system. Since 1989, the callouts for clogged sewers has born by reduced 40% and claims filed against the City has gone from 9 to zero in 1992 and !o date in 1993. ('Not Rcx:ornmcndcd) Ck'. "'.:ER 7 Water/Wastewater Funding Water Wastewater Water Fund 100% Fund f