Loading...
HomeMy WebLinkAboutAgenda Report - October 16, 2002 E-17AGENDA TITLE: Adopt Resolution Accepting Improvements in Arcadia Place, Tract No. 3147 MEETING DATE: October 16, 2002 PREPARED BY: Public Works Director RECOMMENDED ACTION: That the City Council adopt a resolution accepting the development improvements for Arcadia Place, Tract No. 3147. BACKGROUND INFORMATION: Improvements in Arcadia Place, Tract No. 3147, have been completed in substantial conformance with the requirements of the Improvement Agreement between the City of Lodi and Lodi Building Partners III, L.P., as approved by the City Council on October 21, 2001, and as shown on Drawings No. 001 D072 through 001 D097 and 001 D146. The streets to be accepted are as follows: Streets Length in Miles Arcadia Place 0.10 Argos Way 0.07 Cayman Drive 0.02 Cherokee Lane 0.00 Fairchild Drive 0.03 Kingston Way 0.02 Lanyard Way 0.02 Oriole Lane 0.16 Perlegos Way 0.18 Stockton Street 0.00 Tegea Lane 0.05 Voyager Drive 0.09 Total New Miles of City Streets 0.74 FUNDING: Not applicable. �0 Richard C. Prima, r. Public Works Director Prepared by Wesley K. Fujitani, Senior Civil Engineer RCP/WKFArn cc: City Attorney Senior Civil Engineer - Development Services Senior Traffic Engineer Street Superintendent (w/map) Senior Engineering Technician - Design Chief Building Inspector Lodi Building Partners III, L.P. APPROVED' A. Dixon Flynn '::—City Man ger CACCEPT 09/27/02 When Recorded, Return to: City of Lodi City Clerks Office P.O. Box 3006 Lodi, CA 95241-1910 RESOLUTION NO. 2002-200 A RESOLUTION OF THE LODI CITY COUNCIL ACCEPTING THE DEVELOPMENT IMPROVEMENTS INCLUDED IN THE IMPROVEMENT AGREEMENT FOR ARCADIA PLACE, TRACT NO. 3147 ` The City Council of the City of Lodi finds: 1. That all requirements of the Improvement Agreement between the City of Lodi and Lodi Building Partners III, L.P., for the improvements of Arcadia Place, Tract No. 3147, have been substantially complied with. The improvements are shown on Drawings No. 001D072 through 001 DO97 and 001D146, on file in the Public Works Department and as specifically set forth in the plans and specifications approved by the City Council on October 21, 2001. 2. The streets to be accepted are as follows: Streets Length in Miles Arcadia Place 0.10 Argos Way 0.07 Cayman Drive 0.02 Cherokee Lane 0.00 Fairchild Drive 0.03 Kingston Way 0.02 Lanyard Way 0.02 Oriole Lane 0.16 Perlegos Way 0.18 Stockton Street 0.00 Tegea Lane 0.05 Voyager Drive 0.09 Total New Miles of City Streets 0.74 Dated: October 16, 2002 --------------------------------------------------------------------------------- --------------------------------------------------------------------------------- I hereby certify that Resolution No. 2002-200 was passed and adopted by the City Council of the City of Lodi in a regular meeting held October 16, 2002, by the following vote: AYES: NOES: ABSENT: ABSTAIN: COUNCIL MEMBERS — Hitchcock, Howard, Land, Nakanishi, and Mayor Pennino COUNCIL MEMBERS — None COUNCIL MEMBERS — None COUNCIL MEMBERS — None SUSAN J.BLACKSTON City Clerk 2002-200 CITY COUNCIL PHILLIP A. PENNINO, Mayor SUSAN HITCHCOCK Mayor Pro Tempore EMILY HOWARD KEITH LAND ALAN S. NAKANISHI CITY OF LODI PUBLIC WORKS DEPARTMENT CITY HALL, 221 WEST PINE STREET P.O. BOX 3006 LODI, CALIFORNIA 95241-1910 (209)333-6706 FAX (209) 333-6710 EMAIL pwdept@lodi.gov http:\\www.lodi.gov October 17, 2002 Lodi Building Partners III, L.P. 3247 W. March Ln., Ste. 220 Stockton, CA 95219 SUBJECT: Arcadia Place, Tract No. 3147 H. DIXON FLYNN City Manager SUSAN J. BLACKSTON City Clerk RANDALL A. HAYS City Attorney RICHARD C. PRIMA, JR. Public Works Director The City Council of the City of Lodi, at its meeting on Wednesday, October 16, 2002, accepted the public improvements that were made in the subject project. Enclosed for your files is a copy of the resolution accepting the public improvements. From the date of the resolution, the City of Lodi will maintain the street and other public improvements installed within rights-of-way and public utility easements as shown on the approved plans. A copy of this letter will be sent to your bonding agency in order that the bond covering faithful performance can be exonerated. The bond covering labor and materials will have to remain in effect for a period of ninety days from the date of the resolution in conformance with State law. If you have any questions, please contact Rebecca Areida, Management Analyst, at (209) 333-6800 ext. 2658, or me at (209) 333-6709. F. Wally Sandelin City Engineer FWS/Im Enclosures cc: Electric Utility Department Water/Wastewater Division Street Division City Clerk Developers Surety and Indemnity Company LACCEPT