HomeMy WebLinkAboutAgenda Report - October 16, 2002 E-17AGENDA TITLE: Adopt Resolution Accepting Improvements in Arcadia Place, Tract No. 3147
MEETING DATE: October 16, 2002
PREPARED BY: Public Works Director
RECOMMENDED ACTION: That the City Council adopt a resolution accepting the development
improvements for Arcadia Place, Tract No. 3147.
BACKGROUND INFORMATION: Improvements in Arcadia Place, Tract No. 3147, have been completed in
substantial conformance with the requirements of the Improvement
Agreement between the City of Lodi and Lodi Building Partners III, L.P.,
as approved by the City Council on October 21, 2001, and as shown on
Drawings No. 001 D072 through 001 D097 and 001 D146.
The streets to be accepted are as follows:
Streets Length in Miles
Arcadia Place
0.10
Argos Way
0.07
Cayman Drive
0.02
Cherokee Lane
0.00
Fairchild Drive
0.03
Kingston Way
0.02
Lanyard Way
0.02
Oriole Lane
0.16
Perlegos Way
0.18
Stockton Street
0.00
Tegea Lane
0.05
Voyager Drive
0.09
Total New Miles of City Streets 0.74
FUNDING: Not applicable.
�0
Richard C. Prima, r.
Public Works Director
Prepared by Wesley K. Fujitani, Senior Civil Engineer
RCP/WKFArn
cc: City Attorney
Senior Civil Engineer - Development Services
Senior Traffic Engineer
Street Superintendent (w/map)
Senior Engineering Technician - Design
Chief Building Inspector
Lodi Building Partners III, L.P.
APPROVED'
A. Dixon Flynn '::—City Man ger
CACCEPT 09/27/02
When Recorded, Return to:
City of Lodi City Clerks Office
P.O. Box 3006
Lodi, CA 95241-1910
RESOLUTION NO. 2002-200
A RESOLUTION OF THE LODI CITY COUNCIL ACCEPTING THE
DEVELOPMENT IMPROVEMENTS INCLUDED IN THE IMPROVEMENT
AGREEMENT FOR ARCADIA PLACE, TRACT NO. 3147
` The City Council of the City of Lodi finds:
1. That all requirements of the Improvement Agreement between the City of Lodi and Lodi Building
Partners III, L.P., for the improvements of Arcadia Place, Tract No. 3147, have been substantially
complied with. The improvements are shown on Drawings No. 001D072 through 001 DO97 and 001D146,
on file in the Public Works Department and as specifically set forth in the plans and specifications
approved by the City Council on October 21, 2001.
2. The streets to be accepted are as follows:
Streets
Length in Miles
Arcadia Place
0.10
Argos Way
0.07
Cayman Drive
0.02
Cherokee Lane
0.00
Fairchild Drive
0.03
Kingston Way
0.02
Lanyard Way
0.02
Oriole Lane
0.16
Perlegos Way
0.18
Stockton Street
0.00
Tegea Lane
0.05
Voyager Drive
0.09
Total New Miles of City Streets
0.74
Dated: October 16, 2002
---------------------------------------------------------------------------------
---------------------------------------------------------------------------------
I hereby certify that Resolution No. 2002-200 was passed and adopted by the City Council of the
City of Lodi in a regular meeting held October 16, 2002, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
COUNCIL MEMBERS — Hitchcock, Howard, Land, Nakanishi, and Mayor Pennino
COUNCIL MEMBERS — None
COUNCIL MEMBERS — None
COUNCIL MEMBERS — None
SUSAN J.BLACKSTON
City Clerk
2002-200
CITY COUNCIL
PHILLIP A. PENNINO, Mayor
SUSAN HITCHCOCK
Mayor Pro Tempore
EMILY HOWARD
KEITH LAND
ALAN S. NAKANISHI
CITY OF LODI
PUBLIC WORKS DEPARTMENT
CITY HALL, 221 WEST PINE STREET
P.O. BOX 3006
LODI, CALIFORNIA 95241-1910
(209)333-6706
FAX (209) 333-6710
EMAIL pwdept@lodi.gov
http:\\www.lodi.gov
October 17, 2002
Lodi Building Partners III, L.P.
3247 W. March Ln., Ste. 220
Stockton, CA 95219
SUBJECT: Arcadia Place, Tract No. 3147
H. DIXON FLYNN
City Manager
SUSAN J. BLACKSTON
City Clerk
RANDALL A. HAYS
City Attorney
RICHARD C. PRIMA, JR.
Public Works Director
The City Council of the City of Lodi, at its meeting on Wednesday, October 16, 2002,
accepted the public improvements that were made in the subject project.
Enclosed for your files is a copy of the resolution accepting the public improvements.
From the date of the resolution, the City of Lodi will maintain the street and other public
improvements installed within rights-of-way and public utility easements as shown on
the approved plans.
A copy of this letter will be sent to your bonding agency in order that the bond covering
faithful performance can be exonerated. The bond covering labor and materials will
have to remain in effect for a period of ninety days from the date of the resolution in
conformance with State law.
If you have any questions, please contact Rebecca Areida, Management Analyst, at
(209) 333-6800 ext. 2658, or me at (209) 333-6709.
F. Wally Sandelin
City Engineer
FWS/Im