HomeMy WebLinkAboutAgenda Report - November 6, 2002 I-06CITY OF LODI COUNCIL COMMUNICATION
AGENDA TITLE: Adopt Resolution Authorizing City Manager to Execute Additional Professional Services
Task Orders for White Slough Water Pollution Control Facility Discharge Permit Compliance
Activities and Appropriate $1,261,000
MEETING DATE: November 6, 2002
PREPARED BY: Public Works Director
RECOMMENDED ACTION: That the City Council adopt a resolution authorizing the City Manager to execute
additional professional services task orders for White Slough Water Pollution
Control Facility discharge permit compliance activities and appropriate $1,261,000.
BACKGROUND INFORMATION: The City's current wastewater discharge permit, issued by the State Regional
Water Quality Control Board in February 2000, includes a requirement for the
installation of filters (tertiary treatment) by May 1, 2004. Since the issuance
of the permit, City staff and our consultants have investigated several
alternatives for meeting discharge requirements, including ones that would not include filters. However, after
several meetings with Regional Board staff and other changes in regulations that will affect our next permit, it is
clear that not only will filters be needed, but also other measures will need to be implemented. The City Council
was briefed on these issues at the August 27, 2002 Shirtsleeve Session. An abbreviated version of the
presentation is attached as Exhibit A. In order to meet our permit obligations, staff proposes to implement
improvements to the Facility in two major phases (although there will be minor subphases). They are:
1) Predesign and environmental work for the entire project, interim aeration improvements and
filter installation — work in 2002, 2003, and 2004.
2) Final design and secondary plant improvements, land acquisition, treatment wetland
construction, and discharge relocation — work in 2004 and 2005.
The Phase 1 construction work will necessitate significant funding in 2003, on the order of $15 to $17 million.
Part of the work will be identifying financing methods, although timing issues may preclude use of a State
revolving fund loan for the entire project. However, other financing pools will likely offer favorable rates. The
work included in the requested appropriation is the following:
A) Predesign, financial, and environmental services with West Yost & Associates — this work
includes:
• analysis of membrane bioreactors as an alternative to secondary facilities upgrades
recommended in the adopted Master Plan
• analysis of alternate wetland sites (Figure 1) and preliminary design of the wetland by their
subconsultant, Brown & Caldwell
• preliminary Bishop Cut outfall, filter and disinfection designs
• financial analysis of funding alternates and rate/fee adjustments by subconsultant Hilton,
Farnkoph, Hobson
• miscellaneous mapping, aerial photography, filter and disinfection, and project management
• total cost $454,000
B) Design of Interim Aeration Improvements — This work, also by West Yost, includes final design
and preparation of plans and specifications for blower and air diffuser replacement to improve
Dix n Flynn -- City Manager
CADDLTASKORDERS.dw 10/31/02
Adopt Resolution Authorizing City Manager to Execute Additional Professional Services Task Orders for White
Slough Water Pollution Control Facility Discharge Permit Compliance Activities and Appropriate $1,261,000
November 6, 2002
Page 2
effluent quality until other improvements can be completed. The interim improvements will be
totally compatible with the planned secondary treatment improvements and would need to be
done anyway. The cost for this task is $140,000.
C) Design of Tertiary Filtration Improvements — West Yost & Associates' work on this phase of the
project includes final design and preparation of plans and specifications for site preparation,
pumping facilities, chemical handling, and tertiary filters. The construction would be divided into
two contracts with the first phase, earthwork and site preparation, starting spring 2003 and
ending fall 2003. Second phase of construction would immediately follow with completion
summer/fall 2004. This design work is expected to cost $555,000.
D) Groundwater Monitoring Report — This work, by Saracino-Kirby-Snow, will compile and analyze
our groundwater monitoring data at the Facility. This work is a permit requirement. The task
will be done in two phases; the first will be an initial study to evaluate recent monitoring and
derive preliminary conclusions and recommendations to be sure we have adequate monitoring
in place. The second phase will be a final report which will take place after additional
monitoring work is completed. The requested appropriation for this effort is $35,000
E) Bishop Cut Flow Meter Installation — This work includes the installation of a flow meter in Bishop
Cut where the City is planning to install a new outfall. This flow data is necessary to design the
outfall and storage facilities to meet State requirements. The Council previously authorized
staff to contract with the State Department of Water Resources (DWR) to install this meter;
however, we have been informed by DWR that due to budget cuts and staff shortages, they
may not be able to do this work. If that is the case, staff proposes to work with our existing
consultant team to do this work. This work is anticipated to cost $60,000.
F) Regulatory Assistance — This work, also by West Yost, consists of permit negotiations with the
Regional Board, much of which has already taken place. Staff will need significant additional
assistance in dealing with the Regional Board on the Bishop Cut outfall issue. The cost of
these efforts is estimated to be $70,000.
G) Miscellaneous Work and Contingencies — These items include bidding assistance, other
technical assistance as needed, laboratory analytical costs, appraisals and other outside direct
expenses. Plus, we request a contingency amount of roughly 3% of the above items for a total
amount of $37,000.
FUNDING: The above items total $1,351,000. We have $90,000 in unused prior appropriations which can
be applied to this amount thereby reducing the total new appropriation to $1,261,000. This work
was included in the fiscal year 2002/03 Wastewater CIP Budget, Page 37, with a total estimate
of $2.5 million.
Funding Available: rt�—
Vicky McAthie, Finance Director
�w
Richard . Prima, Jr.
Public Works Director
RCP/lm
Attachment
cc: Randy Hays, City Attorney
Fran Forkas, Water/Wastewater Superintendent
Del Kerlin, Assistant Wastewater Treatment Superintendent
Bruce West, West Yost & Associates
Glenn McPherson, Saracino-Kirby-Snow
CADDLTASKORDERS 10/29/02
Exhibit A
Chronology of Work
January 1999 - WYA retained for planning and regulatory
coordination
August 1999 to October 2000 — Draft findings/ presentations
to public advisory committee(6) and City Council (3)
January 2001 - Final Wastewater Master Plan
January 2001 - Began alternative outfall investigation/
discussions with RWQCB
January 2001 - Initiated percolation study of potential disposal
sites
September 2001 - Began pre -design of improvements to
existing treatment process
March 2002 - Completed feasibility study of membrane
bioreactor treatment process
Chronology of Regulatory
Actions
► February 2000: Existing permit adopted
► May 2000: State Implementation Plan (SIP)
adopted
► Several Permits Adopted in 2000 and 2001
Enforcing SIP Policy
► April 2001: New groundwater recharge
requirements proposed by DHS
► May 2002: RWQCB adopts the tentative
permit for Stockton, which does not allow
dilution credits for some criteria
1
State Implementation
Plan (May 2000)
► Establishes a Statewide Standard Approach for
Permitting Discharges of Toxic Pollutants (CTR
Criteria)
► Greatly Expands the Data Requirements for NPDES
Permit Development
► Triggers Unprecedented Treatment Plant Effluent
Standards
► Establishes a Schedule for Achieving Compliance
with New Standards (up to 5 years)
E
Master Plan Report
Sections
► Executive Summary
► Introduction
► Flow & Loading Projections
► Anticipated Discharge Requirements & Issues
► Compliance with Anticipated Discharge Requirements
► Evaluation Criteria
► Wetlands Treatment
► Industrial Wastewater Treatment & Disposal/Reuse
► Biosolids Disposal/Reuse Alternatives
► Alternatives for Effluent Land Treatment, Reuse & Storage
► Treatment Plant Upgrade & Expansion Alternatives
► Odor Control
► Combined Treatment & Disposal/Reuse Alternatives
Recommended Wastewater Program
2
Master Plan
Recommended
Primary/
Secondary
WPCP
Improvements
to 8.5 mgd
(2020)
► Project Cost: $16-M1
► Recent Changes: -Since
2000,20% BOD, 35% SS
loading increase
► Regulatory Change:
Related to chlorination
3
City of Lodi WPCF:
Discharge Issues
► Discharge Is to a Dead -End Slough with No
Dilution
► Drinking Water Beneficial Use Dictates
Stringent Effluent Limits for Priority Pollutants
► Agricultural Beneficial Use Dictates Title 22
Tertiary Treatment
► Effluent Limits Cannot Be Reliably Met Even
with Improved Treatment Facilities
}
4
Ongoing Regulatory
Negotiations: Dilution Issues
,
► Dilution Credits Are Critical
► Model Data Is Not Confirmed
► RWQCB Requires Flow Monitoring &
Tracer Study Data
► City Installing Flow Meter in Bishop Cut
► Additional Flow/Tracer Data Needed
after the Outfall Is in Place
5
SKS Groundwater
Monitoring Activities
► October 2000: City submitted Groundwater
Monitoring Report to RWQCB
► November 2000: RWQCB requested a
workplan
► January 2001: City submitted a workplan to
RWQCB
► January 2001: RWQCB approved the
workplan
.d£i Ef.fE f>. :< ;.. • > . '.. R 'F *, P,;'. ,. , .. ..[ E •'. if . "P+'.
ai
I
<
..._....
Ae
WSM10
�i WSM15 z 7
24
i
i
a A. WSM3
It
25
5
a N C <R t*: `:� WSM� WSM6
I
i
12
y`t
i
:
560 0 el_ 500 Metersl
Mht
`
Monitoring Wells
Fgi�rc I
City of Lodi
Date: August 2002
Sorncino Kirby 5rww,
Whit Slough Water Pollution Cmnrol Facility
(imundwaw'P.valuation
Prcjr—d Ry: BCW
6
SKS Groundwater
Monitoring Activities
► April 2001: construction of 9 new
monitoring wells completed
► July 2001: digital data loggers installed
in all 16 (7 existing and 9 new)
monitoring wells
► November 2001: Refined water quality
sampling protocol implemented
7
Interim Project
► Design & Construction of Interim Blower
Improvements
► Design & Construction of Interim Diffuser
Improvements
► Installation of Secondary Clarifier Polymer
Feed Equipment
Estimated Cost of
Improvements
► Interim Project: $1.3 to $1.8 million
► Long Term Project: $35 to $45 million*
* To be confirmed in Pre -Design
£
9
3t .I -;�Ct "i`-•- _: .`$ r .i._. e. .. _ x F e c.
I weir
�s
13 3 7 wxi I6. _ `\ _...
�. ' i - •' 0!--
Kingdom
FFF . i;
.e s,. ,, :. • I, ,
--------------
"./
i
Fig"
Clty of Lod tIYPCF
PollentlIall
Arou non
LEGEND•
H Monitoring Well
ff..H I N K E E _ \
?7 >
Wetland Sites:
Rio Blanco Site
Rio Blanco Alternative
T K A C T. \ - _ / 23 I 24 24 I
v r i Iia s
+
i' n
::iiiii City—Owned Site
rid//%p Coldani Alternative
E. Thornton Alternative
�`. �i/�j/ •. / :."�'•+� 'gr T� I
"'"'°'M �� I
of wei
•=
Land Application Sites:
- Coldani Site
F.rot --
-
�- t l.,
E. Thornton Site
,z�,,., r \` 9 R i ♦„
I I �
M .. 25
"„ •. ;i.-+f...r•r ..._...y.,_... "\: .... I >aa...._._ j "e5
30MnK
is
�7
i •I
qti ,���I
. a 5�. � 1 V'°1.,.Z• _ xw�gb ... _..
__. 'MMI .,..-....
_ ._.1, -------------
. :: _. _. _36
Y36
36I
's 31
— ,f y
3 c sl P;,
• �I� S3 tl 30
� � 4 � "iii• �: 4:f i
t •'y ' ... �'u
W, ••.II �� f
r
Iro "
n,•
y I I I I-
cm
LPNE
2L N i -•fi •' M
I
" I I I I I :�� I'�o•
o I I
_ I I
x
.I
__—�__'—TSI--•-- --- _— .���— I:- L -• L' — ---- I' _ --__ _'_: �;.�
tHOPNto I �y N S k lig \•dpi ®"p
-------------------
.. �✓/ 1, '1 dl is R�
�.�.�'— `"`�',
--
�
Q
_- a •���e -•-__-.�__=�_�-i_ _
F FR
W W
. _ ...._ ...
_
Mlynnne cera
I
s I
...._....
r :.t
„
'- a .i
to
O O
N c
N Q O
fn ,N,
c
O
I
S
D o
0
0
L
O
•c
y m m
O O
O D -c
-0 ~
p
U
C O
�
oeof
+T.
UUw
O
a U
LJ
a Z
c
Q
W
mto
LJ
6
c
J
J
— ,f y
3 c sl P;,
• �I� S3 tl 30
� � 4 � "iii• �: 4:f i
t •'y ' ... �'u
W, ••.II �� f
r
Iro "
n,•
y I I I I-
cm
LPNE
2L N i -•fi •' M
I
" I I I I I :�� I'�o•
o I I
_ I I
x
.I
__—�__'—TSI--•-- --- _— .���— I:- L -• L' — ---- I' _ --__ _'_: �;.�
tHOPNto I �y N S k lig \•dpi ®"p
-------------------
.. �✓/ 1, '1 dl is R�
�.�.�'— `"`�',
--
�
�
_-_
�y
_- a •���e -•-__-.�__=�_�-i_ _
. _ ...._ ...
Mlynnne cera
I
s I
...._....
r :.t
„
'- a .i
�
I
RESOLUTION NO. 2002-223
A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING THE
CITY MANAGER TO EXECUTE ADDITIONAL PROFESSIONAL
SERVICES TASK ORDERS FOR WHITE SLOUGH WATER
POLLUTION CONTROL FACILITY DISCHARGE PERMIT
COMPLIANCE ACTIVITIES, AND FURTHER APPROPRIATE
FUNDS FOR THIS PROJECT
----------------------------------------------------------------------
----------------------------------------------------------------------
WHEREAS, the City's current wastewater discharge permit, issued by the State
Regional Water Quality Control Board in February 2000, includes a requirement for the
installation of filters (tertiary treatment) by May 1, 2004; and
WHEREAS, since the issuance of the permit, City staff and our consultants have
investigated several a Itematives f or meeting d ischarge requirements, i ncluding some that
would not include filters; and
WHEREAS, following several meetings with the Regional Board staff and other
changes in regulations that will affect our next permit, it is clear that not only will filters be
needed, but also other measures will need to be implemented; and
WHEREAS, in order to meet our permit obligations, staff proposes to implement
improvements to the Facility in two major phases (that will also include minor subphases).
They are as follows:
1) Predesign and environmental work for the entire project, interim
aeration improvements, and filter installation — work in 2002, 2003,
and 2004.
2) Final design and secondary plant improvements, land acquisition,
treatment wetland construction, and discharge relocation — work in
2004 and 2005.
The Phase 1 construction work will necessitate significant funding in 2003, on the
order of $15 to $17 million. Part of the work will be identifying financing methods,
although timing issues may preclude use of a State revolving fund loan for the entire
project. However, other financing pools will likely offer favorable rates. The work
included in the requested appropriation is the following:
A) Predesign, financial, and environmental services with West Yost &
Associates — this work includes:
• analysis of membrane bioreactors as an alternative to secondary
facilities upgrades recommended in the adopted Master Plan
• analysis of alternate wetland sites and preliminary design of the
wetland by their subconsultant, Brown & Caldwell
• preliminary Bishop Cut outfall, filter, and disinfection designs
• financial analysis of funding alternates and rate/fee adjustments by
subconsultant Hilton, Farnkoph, Hobson
• miscellaneous mapping, aerial photography, filter and disinfection,
and project management
• total cost $454,000
B) Design of Interim Aeration Improvements — This work, also by West
Yost, includes final design and preparation of plans and
specifications for blower and air diffuser replacement to improve
effluent quality until other improvements can be completed. The
interim improvements will be totally compatible with the planned
secondary treatment improvements and would need to be done
anyway. The cost for this task is $140,000.
C) Design of Tertiary Filtration Improvements — West Yost &
Associates' work on this phase of the project includes final design
and preparation of plans and specifications for site preparation,
pumping facilities, chemical handling, and tertiary filters. The
construction would be divided into two contracts with the first phase,
earthwork and site preparation, starting spring 2003 and ending fall
2003. Second phase of construction would immediately follow with
completion summer/fall 2004. This design work is expected to cost
$555,000.
D) Groundwater Monitoring Report — This work, by Saracino-Kirby-
Snow, will compile and analyze our groundwater monitoring data at
the Facility. This work i s a p ermit r equirement. T he t ask w ill b e
done in two phases; the first will be an initial study to evaluate recent
monitoring and derive preliminary conclusions and
recommendations to be sure we have adequate monitoring in place.
The second phase will be a final report which will take place after
additional monitoring work is completed. The requested
appropriation for this effort is $35,000.
E) Bishop Cut Flow Meter Installation — This work includes the
installation of a flow meter in Bishop Cut where the City is planning
to install a new outfall. This flow data is necessary to design the
outfall and storage facilities to meet State requirements. The
Council previously authorized staff to contract with the State
Department of Water Resources (DWR) to install this meter;
however, we have been informed by DWR that due to budget cuts
and staff shortages, it may not be able to do this work. If that is the
case, staff proposes to work with our existing consultant team to do
this work. This work is anticipated to cost $60,000.
F) Regulatory Assistance — This work, also by West Yost, consists of
permit negotiations with the Regional Board, much of which has
already taken place. Staff will need significant additional assistance
in dealing with the Regional Board on the Bishop Cut outfall issue.
The cost of these efforts is estimated to be $70,000.
G) Miscellaneous Work and Contingencies — These items . include
bidding assistance, other technical assistance as needed, laboratory
analytical costs, appraisals, and other outside direct expenses.
Plus, we request a contingency amount of roughly 3% of the above
items for a total amount of $37,000.
NOW, THEREFORE, BE IT RESOLVED, that the Lodi City Council does hereby
authorize the City Manager to execute additional professional services task orders for White
Slough Water Pollution Control Facility Discharge Permit Compliance Activities; and
BE IT FURTHER RESOLVED, that funds in the amount of 1,261,000.00 be
appropriated as follows:
The above items total $1,351,000. We have $90,000 in unused prior
appropriations which can be applied to this amount thereby reducing the total
new appropriation to $1,261,000. This work was included in the fiscal year
2002103 Wastewater CIP Budget, Page 37, with a total estimate of $2.5 million.
Dated: November 6, 2002
I hereby certify that Resolution No. 2002-223 was passed and adopted by the Lodi
City Council in a regular meeting held November 6, 2002 by the following vote:
AYES: COUNCIL MEMBERS — Hitchcock, Howard, Land, Nakanishi, and
Mayor Pennino
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None
SUSAN J. BLACKSTON
City Clerk
2002-223
CITY COUNCIL
PHILLIP A. PENNING, Mayor
SUSAN HITCHCOCK
Mayor Pro Tempore
EMILY HOWARD
KEITH LAND
ALAN S. NAKANISHI
CITY OF LODI
PUBLIC WORKS DEPARTMENT
Mr. Bruce West
West Yost & Associates
1260 Lake Blvd., Ste. 240
Davis, CA 95616
CITY HALL, 221 WEST PINE STREET
P.O. BOX 3006
LODI, CALIFORNIA 95241-1910
(209)333-6706
FAX (209) 333-6710
EMAIL pwdept@lodi.gov
http:\\www.lodi.gov
October 31, 2002
Mr. Glenn McPherson
Saracino-Kirby-Snow
980 Ninth Street, Ste. 1480
Sacramento, CA 95814
H. DIXON FLYNN
City Manager
SUSAN J. BLACKSTON
City Clerk
RANDALL A. HAYS
City Attorney
RICHARD C. PRIMA, JR.
Public Works Director
SUBJECT: Adopt Resolution Authorizing City Manager to Execute Additional
Professional Services Task Orders for White Slough Water Pollution
Control Facility Discharge Permit Compliance Activities and Appropriate
$1,261,000
Enclosed is a copy of background information on an item on the City Council agenda of
Wednesday, November 6, 2002. The meeting will be held at 7 p.m. in the
City Council Chamber, Carnegie Forum, 305 West Pine Street.
This item is on the regular calendar for Council discussion. You are welcome to attend.
If you wish to write to the City Council, please address your letter to City Council,
City of Lodi, P. O. Box 3006, Lodi, California, 95241-1910. Be sure to allow time for the
mail. Or, you may hand -deliver the letter to City Hall, 221 West Pine Street.
If you wish to address the Council at the Council Meeting, be sure to fill out a speaker's
card (available at the Carnegie Forum immediately prior to the start of the meeting) and
give it to the City Clerk. If you have any questions about communicating with the
Council, please contact Susan Blackston, City Clerk, at (209) 333-6702.
If you have any questions about the item itself, please call Wally Sandelin,
City Engineer, at (209) 333-6709.
Richard C. Prima, Jr.
Public Works Director
RCP/pmf
Enclosure
cc: City Clerk
NCADDLTASKORDERS