HomeMy WebLinkAboutAgenda Report - November 6, 2002 I-05� y04F via
77
Yl
COUNCILCITY OF LODI 1 1
qty/FORA,.
LL
AGENDA TITLE: Approve Plans and Specifications and Authorize Advertisement for Bids for
Phase II of the Lodi Lake Handicap -Accessible Pedestrian/Bicycle Corridor Project,
1101 W. Turner Road
MEETING DATE: November 6, 2002
PREPARED BY: Parks and Recreation Director
RECOMMENDED ACTION: That the City Council approve the plans and specifications and authorize
advertisement for bids for Phase II of the Lodi Lake Handicap -Accessible
Pedestrian/Bicycle Corridor Project, 1101 W. Turner Road.
BACKGROUND INFORMATION: In June of 2001, Phase I of the Lodi Lake Pedestrian/Bicycle
Corridor was completed. Prior to the completion of the project,
staff had begun working on construction documents for Phase ll.
Phase II is a continuation of the asphalt pathway meandering
along the waters edge and mature trees of the west bank, north towards the Woodbridge Cemetery,
over the west bank into the undeveloped 13 acre parcel out to Lower Sacramento Road in Woodbridge.
Plans and specifications and authorization of bids were approved by the City Council at their regular
meeting on September 19, 2001. At that time the project was being funded by the following sources:
$140,000.00 from Measure K funds; $163,000.00 from Transportation Enhancement funds;
$60,000.00 from Parks and Recreation Capital funds; and $30,000.00 from the Electric Utility Street
Lighting Program. The project went out to bid February 2, 2002, with a bid opening date scheduled for
March 27, 2002. While the project was out to bid the Transportation Enhancement funds were pulled
from the project and not replaced. Therefore the bid process was cancelled due to lack of project funds
until we could obtain other dollars to finance the construction.
Funding for the project has now been established once again and includes Community Development
Block Grant funds. In order to obtain these dollars from the County the project needs to be renamed.
The Phase II project will be known as: "Lodi Lake Handicap Accessible Pedestrian/Bicycle Corridor —
Phase II".
FUNDING: The project will be funded in the amount of $438,239.00 by the following funding sources.
Community Development Block Grant Funds $ 208,239.00
Measure "K" Funds: $ 140,000.00
Parks & Recreation Capital Funds $ 60,000.00
Street Lighting Program — E.U.D. $ 30,000.00
APPROVED:
H. Dixon Flynn -- City Manager
10/25/02
lyV`
CITY OF LODI
COUNCIL 1 1
The Staff Estimate for the above project is $403,478.13. This project was presented to the Parks and
Recreation Commission on October 2, 2002. The schedule is to bid the project over the winter, open
bids in January, award the contract in February, and start construction in March. This project is
scheduled to be an 80 day contract and be ompleted by July 4, 2003.
Roger Baltz
Parks and Recreation Director
seph,r
ommunity Improve t anager
Prepared By: Steve Virrey, Park Project Coordinator
RBAI
cc: City Attorney
Community Improvement Manager Wood
Electric Utility Director
Parks Superintendent
Purchasing Officer
Sr. Civil Engineer Fujitani
Alan N. Vallow Richa rima
Electric Utility Director Public Works Director
APPROVED:
H. Dixon Flynn -- City Manager
10/26M
ry
LJ
LLJ
L
Ld
U
L
fe
om R
!V
.004
i&W
a
C
FNMINpeWIN1NRi �O ImeI�MLM ��
Nlel� m-
� r
lied
F.
wiNi s
fy
W
Z
i. e�rr��s�nli errWlM elNu
L NCO a NNNN MNL IBM P l eWl �Mx
s NNNse MNYC ar Ml fMlNl MLL N1W4 IIrINW elNrr arINrINNNL
4 �N}�iNm•m ANs IMs Mals Ism NWer
L NMr loll NNW m mm POW am erlrNmL
L erwr OWI INr tom M rNW -NR Moo IIINWT ANIN WOMANK
a iOIIWrI�i WW�1mM W�INMe LM NO�1NI Ii0NL
MNNNIN.
�IIrW�L
L M�71W0 AMA{AVOMNr�OWNIt<p1=�11-A MMN�IIO
WIr1lIL W WIC ININN MO I�IQ M rR
L lwselMW�Nr1rrLlWw.ailpWwpWNINr®IppWIrNWp�IIrNlim■Mp��a�rrNNIaWICL mM
pI 4 Ar r� (MNOrML7 i�OW �N[NwL�r: WL® Ai �
u M NNrWM rWL WaNa wwlNw�v ler Na wls� rvm ra rs M
ea�w�iiw°aiWi mM rWaMWr laiNler.NNrwinN
11. ltlt OIC U PMM AM MML M� 4rN UML FIV a la
la M!M NMWeIW !YLL Wr6 Ael NNNL 11elOML� 1M aWN 1NrN Nf NNMRW
li /��M iNWiOWtR r�rrY�NL 1IWR �NrML MfMrNI' a mM s WNIANIo 11Wi
µ �awL W iIWMI� ry�yy��s lwe rNQ a sw1wWr
IL M�MLR MWL 1.NIO�R qN�a rWIIfN� �Nr�y1f
IL jI�IMIN N�Nr�rNW1�L�NAmM��O16p��NO�RpNN�WQfJ� M rr!</L fW�Ye1Oa
n. A��Mrl�ll �p Off.-N� rr WN�/pMWeIRrL■IY�r1
la �ML lM� �e0 � ii l}�em°f� -�i °WNNWe IrM% i Ni N�i11iL iNW
n DELETED 1 s e m1W
s �mA°ll ImN�r.,U r l�n r r as
i1. NMVIW M L AiasiassMv �NN� NM YR N 71 WAC r11NLL s ZW 1MrL.
p p1rvMWetlaWaMN'Ieaaws
C= N1 o MM NeNmr a SM N IM WILL
O Cc s nNrl stood= ow N MN WILL
s tN rt, R AININNi NW.
[}A'( hu NW 1M11rW MM IIW a rWi N MN WWIL
ear ar LM I sM LFA
—arTE PLAN
t�omoON---
LODI LAKE BICYCLE/PEDESTRIAN CORRIDOR - PHASE II (ASPHALT PATHWAY - 2,165 LF)
ENGINEER'S ESTIMATE: 01-10-02
DESCRIPTION OF WORK
QTY./UNIT
UNIT PRICE
TOTAL PRICE
1.CLEARING & GRUBBING
A) DUST CONTROL
LUMP SUM
5,000.00
5,000.00
B) SPRAY APPLICATION
LUMP SUM
2,500.00
2,500.00
C) TURF REMOVAL
35,000 SF
1.00
35,000.00
D) SAW CUTTING
100 LF
2.00
200.00
2. GRADING / SOIL
A) ROUGH GRADING
26,000 SF
.25
6,500.00
B) FINE GRADING
26,000 SF
.10
2,600.00
C) ON-SITE EXCAVATION / GRADING
6,000 CY
8.50
51,000.00
D) SUB -GRADE COMPACTION
26,000 SF
.40
10,400.00
3. UNDERGROUND ELECTRICAL
A) ELECTRICAL SYSTEM
LUMP SUM
22,500.00
22,500.00
B) HALLBROOK PARK LIGHTS
14 EA
4,850.00
67,900.00
4. KEYSTONE WALL
A) DELETED FROM PROJECT
5. CONCRETE WORK
A) 6"x 12" CONCRETE CURB
4,330 LF
17.50
75,775.00
B) MISC. FLAT WORK
1,000 SF
4.50
4,500.00
6. ASPHALT WORK
A) 0.4" OF AGGREGATE BASE
360 CY
45.00
16,200.00
B) COMPACTION
21,650 SF
.25
5,412.50
C) 0.2" OF ASPHALT
350 TONS
65.00
22,750.00
7. PARK AMENTIES
A) 9FT PICNIC TABLES
2 EA
1,200.00
2,400.00
B) 8 FT PARK BENCHES
4 EA
500.00
2,000.00
C) TRASH RECEPTACLES
2 EA
650.00
1,300.00
D) 14 FT DOUBLE GATE (CHAIN LINK)
1 EA
3,000.00
3,000.00
SUB -TOTAL:
$336,937.50
15% CONTINGENCY:
$50,540.63
CONSTRUCTION STAKING
$16,000.00
DESIGN FEES:
$00.00 (NO COST IN-HOUSE)
TOTAL ESTIMATE: $403,478.13