AGENDA TITLE: Adopt Resolution Awarding Contract for the Water/Wastewater Main Replacement
Program (Project No. 1) to Crutchfield Construction Company, of Stockton ($911,530);
and Appropriate $1,150,000 for the Project
MEETING DATE: August 21, 2002
PREPARED BY: Public Works Director
RECOMMENDED ACTION: That the City Council adopt a resolution awarding the contract for the
above project to Crutchfield Construction Company, of Stockton, in the
amount of $911,526; and appropriate funds in accordance with the
recommendation below.
BACKGROUND INFORMATION: The Water/Wastewater Main Replacement Program is a multi-year,
multi -project program to rehabilitate existing water and wastewater
infrastructure in the oldest parts of the City. The limits of Project No. 1
are Stockton Street, Cherry Street, Central Avenue and Mission Street.
Project No. 1 includes trenchless rehabilitation of approximately 3,450 LF of existing 6 -inch diameter
wastewater main located in the backyards of homes; installation of approximately 1,450 LF of new 6 -
inch and 8 -inch diameter wastewater main; installation of approximately 3,300 LF of new 8 -inch diameter
water main in the public right-of-way, along with new water services (see attached map).
Plans and specifications for this project were approved on June 19, 2002. On July 31, 2002, sealed bids
were opened with the following results:
Bidder
Engineering Estimate
Crutchfield Construction Company
Ford Construction Company, Inc.
Location Bid
$1,289,846
Stockton $ 911,526
Lodi $1,964,195
The bid submitted by Crutchfield Construction Company is compliant with the City's plans and specifications
and the bidder possesses the required valid contractor's license. A bid summary is attached.
Construction of this project is anticipated to start in early September of this year. Inspection and
construction management services will be performed by City staff. In addition, City water/wastewater
crews will perform taps on existing mains. Staff, along with the contractor, will be holding public
information meetings to inform the community about the construction schedule and project activities.
An additional component of this project includes slurry sealing streets to mitigate the trench damage
within the project area. However, due to the timing of this project, it is desirable to postpone the slurry
seal component until the summer of 2003 to coincide with the regular street maintenance slurry
program. At such time, this additional slurry seal work will be funded by the Water and Wastewater
Utility Capital Outlay Funds.
APPROVED:
H. DIXON FLYNN 61TY MANAGER
CAWARD 08/12/02
Adopt Resolution Awarding Contract for the Water/Wastewater Main Replacement Program
(Project No. 1) to Crutchfield Construction Company, of Stockton ($911,530); and Appropriate
$1,150,000 for the Project
August 21, 2002
Page 2
FUNDING: Funding for this project will be from the Water and Wastewater Capital Outlay Funds and
distributed as shown below:
Requested Appropriation: $1,150,000
Water Utility Capital Outlay Fund $770,500
Wastewater Utility Capital Outlay Fund $379,500
Total Project Estimate: $1,150,000
Bid Opening Date: July 31, 2002
Funding Available: U��, M.` (OdL-»
Vicky McAthie, Finance Director
The difference between the contract and the requested appropriation includes funds for City -supplied
labor, water and wastewater materials, materials testing, and contingencies to fund anticipated change
orders arising from unforeseen changes in the work.
Richard C. Prima,
Public Works Director
Prepared by Charlie Swimley, Senior Civil Engineer
RCP/CES/lm
Attachments
cc: Randy Hays, City Attorney
F. Wally Sandelin, City Engineer
Wes Fujitani, Senior Civil Engineer
Sharon Welch, Senior Civil Engineer
Paula Fernandez, Senior Traffic Engineer
Joel Harris, Purchasing Officer
Fran Forkas, Water/Wastewater Superintendent
George Bradley, Street Superintendent
CAWARD 08/12/02
Bid Summary City of Lodi 08/01/2002
Water Wastewater Main Replacement Program
(Project No. 1)
Item No.
Description
Unit
Quantity Unit Price
a01 ...
��a
1
Total Price Unit Price
Total Price
A
Miscellaneous
1
Mobilization
LS
1 $
63,000.00
$ 63,000.00
$ 50,000.00
$ 50,000.00
2
Construction Photography
LS
1 $
2,500.00 • $
2,500.00
$ 4,000.00
$ 4,000.00
3
Public Notification
LS
1 $
5,000.00
$ 5,000.00
$ 5,000.00
$ 5,000.00
4
Clean and CCTV Existing 6"
Wastewater Pipeline
LF
3,400 $
2.25
$ 7,650.00
$ 2.25
$ 7,650.00
5
Sheeting, shoring, sloping, and
bracing or equivalent method
conforming to applicable safety
standards.
LS
1 $
15,000.00
i
$ 15,000.00
$ 20,000.00 ,
$ 20,000.00
Subtotal Miscellaneous
S 93,150.00
$ 86,650.00
B
Wastewater
1
Install new 8" Wastewater
Pipeline by open -cut methods
LF
810 $
140.00
$ 113,400.00
$ 46.00
$ 37,260.00
2
Install new 6" Wastewater
Pipeline by open -cut methods
LF
665 $
120.00
$ 79,800.00
$ 45.00
$ 29,925.00
3
Rehabilitate Existing 6"
Wastewater Pipeline
LF
3,438 $
70.00
$ 240,660.00
$ 29.00
$ 99,702.00
4
Internal / External Lateral
Reinstatement
EA
146 $
345.00
' $ 50,370.00
$ 305.00
$ 44,530.00
5
Point Repair - Open Cut Method
EA
4 $
2,500.001$
10,000.00
$ 2,050.00
$ 8,200.00
6
Manhole Rehabilitation
EA
18 $
1,500.00
$ 27,000.00
$ 1,325.00
$ 23,850.00
7
Abandon Existing 6"
Wastewater Pipeline
LF
132 $
23.00
$ 3,036.00
$ 20.00
$ 2,640.00
8,
Install 24" Diameter Riser
EA
2 $
1,750.00
$ 3,500.00
$ 800.00 $
1,600.00
91
WW Service Cleanout
EA
1 $
850.00
$ 850.00
$ 525.00
$ 525.00
10
Install WW Manhole
EA
4 $
2,500.00
$ 10,000.00
$ 2,000.00
$ 8,000.00
11
Abandon Exist. WW Manhole
EA
2 $
750.00
$ 1,500.00
$ 900.00
$ 1,800.00
Subtotal Wastewater
$ 540,116.00
$ 258,032.00
C
Water Improvements
1
Install new 8" Water Main
LF
2,628 $
85.00
$ 223,380.00
$ 50.00.
$ 131,400.00
21
Install new 6" Water Main
LF
676 $
75.00:
$ 50,700.00
$ 49.00
$ 33,124.00
3
Install 1" Water Service w/ Valve
Box (Tapping New Mains)
EA
105 $
950.00
$ 99,750.00
$ 1,400.00
$ 147,000.00
3
Install 1" Water Service w/ Valve
Box (Tapping Exist. Mains)
EA
54 $
700.00
$ 37,800.00
$ 1,300.00
$ 70,200.00
4
Connect New Water Service to
Buildings
EA
142 $
750.00
$ 106,500.00
$ 950.00
$ 134,900.00
5
Install 8" Gate Valve
EA
6 $
800.00
$ 4,800.00
$ 900.00
$ 5,400.00
6
Install 6" Gate Valve
EA
1 $
700.00
$ 700.00
$ 800.00
$ 800.00
7
Install Fire Hydrant Assembly
EA
7 $
2,700.00
$ 18,900.00
$ 3,000.00
$ 21,000.00
8
Install Permanent Water Blow
Off
EA
1 $
1,500.00
$ 1,500.00
$ 600.00
$ 600.00
Subtotal Water
S 544,030.00
$ 544,424.00
D
Storm Drain Improvements
1
Install new 12" Storm Drain
LF
35 $70.00
$ 2,450.00
$ 47.00: $
1,645.00
21
Abandon Existing 8" Storm
LF
35 3
60.00
$ 2,100.00
$ 15.00
• $ 525.00
Subtotal Storm Drain
Improvements
. S 4,550.00
$ 2,170.00
E
Street Improvements
2
Replace Existing Landscape
Improvements Damaged during
WAVW service
connection/disconnection, and
Point Repairs.
EA
135 $
800.00
$ 108,000.00
j
$ 150.001$
20,250.00
i
Subtotal Landscape Improvements
$ 108,000.00
$ 20,250.00
i
Total Bid Price
i
$ 1,289,846.00
$ 911,526.00
Bid Summary City of Lodi 08/01/2002
Water Wastewater Main Replacement Program
rpmi—f Nn 11
Item No.
Description
Unit
Quantity
Unit Price Total Price
Unit Price
Total Price
A
Miscellaneous
1
Mobilization
LS
1 $
170,000.00
$ 170,000.00
$ 110,000.00
$ 110,000.00
2
Construction Photography
LS
1
$
1,000.001$
1,000.00
$ 2,500.00 $
2,500.00
3
Public Notification
LS
1
$
1,000.00
$ 1,000.00
$ 3,000.00
$ 3,000.00
4
Clean and CCN Existing 6"
Wastewater Pipeline
LF
3,400
$
2.00.
$ 6,800.00
$ 2.13
$ 7,225.00
5
Sheeting, shoring, sloping, and
bracing or equivalent method
conforming to applicable safety
standards.
LS
1 $
10,000.00
$ 10,000.00
$ 15,000.00
$ 15,000.00
Subtotal Miscellaneous
$ 188,800.00
$ 137,725.00
B
Wastewater
1
Install new 8" Wastewater
Pipeline by open -cut methods
LF
810
$
100.00,$
81,000.00
$ 73.00
$ 59,130.00
2.
Install new 6" Wastewater
Pipeline by open -cut methods
LF
665
$
75.00
$ 49,875.00
$ 60.00
$ 39,900.00
3
Rehabilitate Existing 6"
Wastewater Pipeline
LF
3,438
$
30.00
$ 103,140.00
$ 29.50
$ 101,421.00
4
Internal / External Lateral
Reinstatement
EA
146 $
275.00
$ 40,150.00
$ 290.00
$ 42,340.00
51
Point Repair - Open Cut Method
EA
4 $
5,000.00
$ 20,000.00
$ 3,525.00
$ 14,100.00
6
Manhole Rehabilitation
EA
18 $
1,200.00
$ 21,600.00
$ 1,262.50
! $ 22,725.00
7
Abandon Existing 6"
Wastewater Pipeline
LF
132 $
125.00
$ 16,500.00
$ 72.50
$ 9,570.00
8!
Install 24" Diameter Riser
EA
2 $
3,600.00
$ 7,200.00
$ 2,200.00
$ 4,400.00
9
WW Service Cleanout
Fro
1 $
1,500.00
$ 1,500.00
$ 1,012.50
$ 1,012.50
101
Install WW Manhole
EA
4 $
3,000.00
$ 12,000.00
$ 2,500.00
$ 10,000.00
11
Abandon Exist. WW Manhole
EA
2 $
2,200.00
$ 4,400.00
$ 1,550.00
$ 3,100.00
Subtotal Wastewater
S 357,365.00
$ 307,698.50
C
Water Improvements !
1
Install new 8" Water Main
LF
2,628 $
140.00
$ 367,920.00
$ 95.00
$ 249,660.00
2
Install new 6" Water Main
LF
676 $
135.00
$ 91,260.00
$ 92.00
$ 62,192.00
3
Install 1" Water Service w/ Valve
Box (Tapping New Mains)
EA
105 $
3,000.00
$ 315,000.00
$ 2,200.00
$ 231,000.00
3
Install 1" Water Service w/ Valve
Box (Tapping Exist. Mains)
EA
54 $
2,700.00
$ 145,800.00
$ 2,000.00
$ 108,000.00
4
Connect New Water Service to
Buildings
EA
142 $
2,500.00 $
355,000.00
$ 1,725.00
$ 244,950.00
5
Install 8" Gate Valve
EA
6 $
1,000.00
$ 6,000.00
$ 950.00
$ 5,700.00
6
Install 6" Gate Valve
EA
1 $
900.00
$ 900.00
$ 850.00
$ 850.00
7
Install Fire Hydrant Assembly
EA
7 $
5,000.00
$ 35,000.00
$ 4,000.00
$ 28,000.00
8
Install Permanent Water Blow
Off
EA
1 $
900.00
$ 900.00
$ 750.00
$ 750.00
Subtotal Water
$ 1,317,780.00
$ 931,102.00
D
Storm Drain Improvements
11
Install new 12" Storm Drain
LF
35 $
350.00
$ 12,250.00
$ 198.50
$ 6,947.50
21
Abandon Existing 8" Storm
LF
35 $
200.00
$ 7,000.00
$ 107.50
$ 3,762.50
Subtotal Storm Drain
Improvements
$ 19,250.00
$ 10,710.00
E
Street Improvements
2
Replace Existing Landscape
Improvements Damaged during
W/WW service
connection/disconnection, and
Point Repairs.
EA
135 $
j
600.00
$ 81,000.00
$ 375.00
$ 50,625.00
Subtotal Landscape Improvements
E 81,000.00
$ 50,625.00
i
Total Bid Price
$ 1,964,195.00
i
$ 1,437,860.50
RESOLUTION NO. 2002-183
A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE
CONTRACT FOR THE WATER/WASTEWATER MAIN REPLACEMENT
PROGRAM (PROJECT NO. 1), AND FURTHER APPROPRIATE
FUNDS TO COVER THE PROJECT
WHEREAS, in answer to notice duly published in accordance with law and the order of
this City Council, sealed bids were received and publicly opened on July 31, 2002 at 11:00 a.m.
for the Water/Wastewater Main Replacement Program (Project No. 1), described in the
specifications therefore approved by the City Council on June 19, 2002; and
WHEREAS, said bids have been compared, checked, and tabulated and a report thereof
filed with the City Manager as follows:
Bidder Location Bid
Engineering Estimate $1,289,846.00
Crutchfield Construction Company Stockton $ 911,526.00
Ford Construction Company, Inc. Lodi $1,964,195.00
WHEREAS, the City Manager recommends award of the contract for the
Water/Wastewater Main Replacement Program (Project No. 1) to Crutchfield Construction
Company, of Stockton, California.
NOW, THEREFORE, BE IT RESOLVED, that the Lodi City Council does hereby award
the contract for the Water/Wastewater Main Replacement Program (Project No. 1) to Crutchfield
Construction Company, of Stockton, California, in the amount of $911,526.00; and
BE IT FURTHER RESOLVED that funds in the amount of $1,150,000.00 be
appropriated as follows for this project:
Water Utility Capital Outlay Fund $770,500.00
Wastewater Utility Capital Outlay Fund $379,500.00
Dated: August 21, 2002
I hereby certify that Resolution No. 2002-183 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held August 21, 2002, by the following vote:
AYES: COUNCIL MEMBERS — Hitchcock, Howard, Land, Nakanishi, and Mayor
Pennino
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None
SUSAN J. BLACKSTON
City Clerk
2002-183