Loading...
HomeMy WebLinkAboutAgenda Report - July 17, 2002 I-03CITY OF LoLDI COUNCIL COMMUNICATION /:E:gFrLL L AA AGENDA TITLE: Authorize the City Manager to approve Contract Change Order No. 2 to professional services contract with ELS for additional services for Indoor Sports Complex facility design work ($365,620) MEETING DATE: July 17, 2002 PREPARED BY: Parks and Recreation Director RECOMMENDED ACTION: That the City Council authorize the City Manager to approve the requested Additional Services Change Order No. 2 for Indoor Sports Complex Facility Design work for $365,620 which would result in a total revised appropriation of $935,120 for planning, design, and construction administration. BACKGROUND INFORMATION: City Council awarded project design work contract to ELS Architecture and Urban Design on February 6, 2002, and appropriated a not to exceed amount of $681,135 for design work for the Indoor Sports Complex and Master Planning of a Parks and Recreation Campus. Of this total some $554,500 is for Indoor Sports Complex basic design services and reimbursables with an additional $15,000 designated from contingency for change order #1 for a total of $569,500 for fees. An assumption of the project at that time was an estimated project construction budget of $5,250,000 for the Indoor Sports Complex. The planning and concept design work has proceeded with various options for a two gymnasium and three gymnasium concept design along with multiple use areas and exterior landscaping being presented to Council. The City Council reviewed the concept design options and provided direction on May 1, 2002, to proceed with the Scheme B site plan option of three courts plus multiple use areas option of roughly 39,000 square feet and sitework as noted. At the May 1, 2002, meeting presentation Council was informed that these design concepts will increase the estimated project construction budget estimate to a total estimate of $9,404,413. Attached as Exhibits A and B are the site plan and program and budget analysis information from the May 1, 2002, Council meeting for this conceptual design. The design fees requested incorporate services needed to prepare for the construction work to include removal of existing building on site and also reflect an alternate component to eliminate the elaborate landscaping along Main Street and instead retain Main Street with a basic curb and gutter system and parking. This alternate was included after ELS met with the City Manager and staff to discuss the project. The attached requested Additional Services Change Order No. 2 from ELS is for a not to exceed amount of $345,620. The Additional Services Change Order is requested by ELS in response to City Council clarification and direction to proceed with the Scheme B site plan option concept plan elements which increases the original estimated project construction budget from $5,250,000 to $9,404,413. APPROVED: H. Dixon Flynn -- City Manager a7naaz After negotiations, ELS has indicated that the attached fee request is based upon their specific project phase amounts listed in their proposed fee breakdown and represents their position on the matter. ELS has performed their work to date well and has been responsive to staff requests. Council has expressed concern regarding the fact that the requested fees for this project have changed. As you may recall, the project concept design has expanded substantially from the original budget. The additional fees were requested by ELS after the final concept design was approved by Council and indicated a substantial change and expansion in the estimated construction budget. The total design fees indicated on this request for schematic design through construction administration and including reimburseable amounts to 9.4% of the estimated construction budget. The above 9.4% request for fees is not inconsistent with some of our other recent City projects. ELS was been directed to cease design work until this request is reviewed for action. This request represents the adjustment in fees as noted. Should Council approve, Additional Services Change Order No. 2 would result in total fees appropriated not to exceed $935,120. FUNDING: $365,620 Additional Services Change Order No. 2 requested amount for additional basic design services and reimbursables. (To come from COP Financing) Please note the following summary: $365,620 Additonal Services Change Order No. 2 referenced above. $569,500 Current total appropriated for project design. Approved by City Council February 6, 2002, (To come from COP Financing) $935,120 Total revised appropriation for project design services for indoor complex and excluding master planning compensation. (To come from COP Financing) Funding Available: "1 X14 'K Finance Direr -�6oae-4 4 &4 Roger Baltz Parks and Recreation Director cc: City Attorney APPROVED: -- City Manager a711ao2 ELS ARCHITECTURE AND URBAN DESIGN Fax Transmittal To: Mr. Roger Baltz Company: Fax No: From: 2040 Addison Street Berkeley, CA 94704 510.549.2929 510.843.3304fax Date: July 2, 2002 Lodi Parks and Recreation Department Project: Indoor Sports Facility 209-333-0162 Project No: 200117 David Petta Subject: Revised Add Serve Request: Expanded Budget & Scope No. of pages including this transmittal Original to follow in regular mail: Date original mailed: 3 Yes LS Attached please find our request for Additional Services, second revision. I believe it picks up all the points of your 6/27 fax and our conversation of the same date. If it does not meet with your expectations, or if you have other language to suggest, please let me know immediately. If it does, please advise so I may send clean copies overnight. The Main Street Alternate is specifically included in our services, at no additional fee; however, as we discussed, any further alternates would have to be evaluated individually for fee impact. Let me know when I may come to explain our approach in person to any elected officials, prior to the presentation to Council on July 17. ELS ARCHITECTURE AND URBAN DESIGN 2040 Addison Street Berkeley, CA 94704 510.549.2929 510.843.3304 fax Additional Services Request No. 2R2 Date: July 2, 2002 To: Roger Baltz Project: Lodi Indoor Sports Complex Project No: 200117 Es From: David Petta Subject: Increased Budget and Scope ELS REQUESTS ADDITIONAL SERVICES AUTHORIZATION FOR THE FOLLOWING: At the request of the Department of Parks and Recreation, ELS proposes to provide the additional design services required for a 39,000 sq. ft. sports facility with a construction budget of $9,404,413, including three 50' x 84' basketball courts, 7.000 sq. ft. of multi use spaces, and integrated outdoor recreation and parking facilities on the Main Street right of way. Services also include documentation for a Bid Alternate for the work in the Main Street right-of-way, and documents to provide for demolition of existing structures. This represents a change of scope to currently contracted services, which included design of a 30,000 sq. ft. facility with a budget of $5,250,000. ( ) WORK HAS BEGUN PER VERBAL DIRECTION AND TO MAINTAIN SCHEDULE. (X) AUTHORIZATION REQUIRED BEFORE WORK RECOMMENCES. (X) RESPONSE REQUESTED WITHIN 5 DAYS PROPOSED FEE INCREASE: Design Services: $351,620 Increase to Reimbursables: $14,000 Total: $365,620 Original Contract Amount: $554,500 Additional Service No. 1: $15,000 Proposed Not to Exceed Total: $935,120 Submitted By: ELS Authorized by: City of Lodi Date Date Attachment: Fee Breakdown by discipline and phase City of Lodi Indoor Sports Complex Additional Service No. 2 July 5, 2002 Proposed Indoor Sports Complex Compensation This Proposed Fee Breakdown replaces the Indoor Sports Complex Compensation fees listed on Exhibit B of the Agreement for Professional Consulting Services dated February 6, 2002. Percentile Comparisons Planning Schem Design Design Develop Constr. Docs Bid Constr. Admin Subtotal SD -CA Reimb Total $41,370 Civil $9,400 $9,200 $7,350 $10,950 $1,350 $3,120 $31,970 Landscape $4,000i $7,305 $9,740 $19,480 $2,435 $9,740 $48,700 $52,700 Programming $4,000 $4,000 Architecture $11,100 $85,000 $109,395--$222,1105 $13,600 $105,000--$535,1100 $546,200 Structural $13,200 $17,600' $35,200 $4,400 $17,600 $88,000 $88,000 Mechanical $10,70_0 $10,7001 $21,4001 $2,675 $8,025 $53,500 $53,500 Electrical $15,000 $10,0001, $_21,0001 $3,0001: $11,000 $60,000 $60,000 Food Service $1,000 $3,000 $1,0W $6,000 $2,550! _$9,100; $1,700 $6,250 $18,100 - - $6,250 Cost Estimating $18,100 Reimb. Exp. - -- $50,000 $50,000 Add Serve No. $15,000 $15,000 Subtotal $43,500 $144,405 $171,785 $341,785 $27,460$156,185 $841,620 $50,000 $935,120 Date $43,500 $65,000 $100,000 $200,000 $25,0001$100,000 $490,000 $36,000 $569,500 Increase $0 $79,405 $71,785 $141,785 $2,460 $56,185 $351,620 $14,000 $365,620 Percentile Comparisons Original SD -CA Fee ($490,000) as a percent of construction budget ($5.25m) 9.33% Proposed SD -CA Fee ($841,620) as a percent of construction budget ($9.4+m) 8.95% Approved Construction Budget $9,404,413 Original Construction Budget $5,250,000 1$4,154,413 Increase to Construction Budget Notes 1.Professional fees are "not -to -exceed" amounts, billed hourly. Allocations for subconsultants may be redistributed between subconsultants, within the overall approved totals. Not -to -exceed amounts are intended to be cumulative, such that amounts "under" limits for any completed phase may be applied to subsequent phases throughout the project; and amounts "over" limits may be applied to subsequent phases through the CD phase only. However, if City elects not to proceed with subsequent phase, consultant is solely responsible for any overrun in last phase completed. At no time during the course of the project shall billings exceed the total authorized amount to that point. 2. Fee for Construction Administration Phase services is based on a duration of 15 months. 3. Reimbursable expenses shall not exceed $50,000 without advance notice and written approval by City. However, please note that reimbursable expenses are not solely under the control of Consultant. 4. Documentation for work within the Main Street right-of-way as a Bid Alternate is included at no additional cost. mezzanine plan _ 1 � 0 a parking pedestrian U-8 L ,oda. Downtcmm Community __..._. ��door Sports Complex SIM Street 1 IMI i u u I scheme B site plan City of Lodi Indoor Sports Complex April 23, 2002 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 2C 21 22 23 24 2E 2E 27 28 Program and Budget Analysis Program Areas Plan A Plan B Indoor Sports Building (Same Program as Plan A) A. Support Spaces 4,800 B. Large Gym: 2 x 50'x 84' 15,230 C. Activity Rooms Divisible Multi Use for 80 2,925 Cardio / Aerobics Studio 2,250 Climbing Wall 300 Babysit Room 750 D. Food Catering Kitchen 600 Caf6 250 Total Net Area 27,105 Gross Area 31,825 Cost $/sq.ft. $190 Cost $6,046,750 $6,046,750 Small Gym 1 x 50'x 84' 7,150 Net Area Gross Area 7,280 Cost $/sq. ft. $175 Cost $1,274,000 Site Work Civil $500,000 $500,000 Landscape $357,000 $357,000 Contingency 15% Total Recommended Budget $1,035,563 $7,939,313 $1,226,663 1 $9,404,413 IFf o rv, RESOLUTION NO. 2002-160 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING THE CITY MANAGER TO APPROVE CONTRACT CHANGE ORDER NO. 2 TO PROFESSIONAL SERVICES CONTRACT WITH ELS ARCHITECTURE AND URBAN DESIGN FOR ADDITIONAL SERVICES FOR INDOOR SPORTS COMPLEX FACILITY DESIGN WORK, AND FURTHER APPROPRIATING ADDITIONAL FUNDS ------------------------------------------------------------------------ ------------------------------------------------------------------------ WHEREAS, the City Council awarded the project design work contract to ELS Architecture and Urban Design on February 6, 2002, and appropriated $681,135.00 for the Indoor Sports Complex and Master Planning of a Parks and Recreation Campus; and WHEREAS, at the Council meeting of May 1, 2002, the City Council provided direction to proceed with Scheme B site plan option, which includes three courts, plus multiple use areas option of roughly 39,000 square feet and site work as noted; and WHEREAS, at the May 1, 2002 meeting, the City Council was informed that these design concepts will increase the estimated project construction budget estimate to $9,404,413.00. NOW, THEREFORE, BE IT RESOLVED, that the Lodi City Council does hereby authorize the City Manager to approve Contract Change Order No. 2 to professional services contract with ELS Architecture and Urban Design for additional services for the Indoor Sports Complex facility design work; and BE IT FURTHER RESOLVED, that additional funds in the amount of $365,620.00 be appropriated from the COP Financing for the project design; and BE IT FURTHER RESOLVED that the City Manager is hereby authorized to execute said Contract Change Order on behalf of the City of Lodi Dated: July 17, 2002 I hereby certify that Resolution No. 2002-160 was passed and adopted by the City Council of the City of Lodi in a regular meeting held July 17, 2002 by the following vote: AYES: COUNCIL MEMBERS — Hitchcock, Howard, Land, Nakanishi, and Mayor Pennino NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None SUSAN J. BLACKSTON City Clerk 2002-160