HomeMy WebLinkAboutAgenda Report - March 20, 2002 E-04AGENDA TITLE: Contract Change Orders No. 1 through 3 and Accept Improvements Under Contract for Stockton Street Reconstruction, Tokay Street to Lodi Avenue MEETING DATE: March 20, 2002 PREPARED BY: Public Works Director RECOMMENDED ACTION: That the City Council accept the improvements under the "Stockton Street Reconstruction, Tokay Street to Lodi Avenue" contract. BACKGROUND INFORMATION: The project was awarded to Dell Engineering, of Lodi, on June 6, 2001, in the amount of $792,591.00. The contract has been completed in substantial conformance with the plans and specifications approved by the City Council. The contract completion date was January 29, 2002, and the actual completion date was January 23, 2002. The final contract price was $844,556.46. The difference between the contract amount and the final contract price is mainly due to Contract Change Orders No. 1, 2 and 3 (copies attached). These change orders addressed additional work done by Dell Engineering on our existing water and wastewater mains to repair broken lines or reroute lines because of our new construction. Contract Change Order No. 3 also included additional compensation to reconnect the lighting on several side streets to the Stockton Street lighting. Resolution 85-173 requires staff to inform Council of contract change orders when they exceed $25,000.00. The total cost of all three contract change orders was $52,638.70. Following acceptance by the City Council, the City Engineer will file a Notice of Completion with the County Recorder's office. FUNDING: Budgeted Fund: Measure K $ 537,436.09 Electric Utility Fund $ 86,857.91 Water Capital Outlay $ 93,410.34 Wastewater Capital Outlay $126,852.12 Contract Amount: $ 844,556.46 Prepared by Wesley K. Fujitani, Senior Civil Engineer RCP/WKF/lm attachments cc: Joel Harris, Purchasing Officer Street Superintendent Water/Wastewater Superintendent APPROVED: CCCO&ACCEPT dai Richard C. Prim Jr. Public Works Director H. Dixon Flynn -- City Manager 03/08/02 CITY OF LODI PUBLIC WORKS DEPARTMENT PROJECT: Stockton Street Reconstruction Tokay St. to Lodi Ave. CONTRACTOR: Dell Engineering CONTRACT CHANGE ORDER NO. 1 Sheet 1 of 2 Date 1/28/02 Account No: See distribution beow You are directed to make the following changes or do the following work not included in the Plans and Specifications on this contract. ---------------------------------------------------------------------- Description of work to be done, estimate of quantities, and prices to be paid. Specify whether additional work is at contract price, agreed price, or force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. 1. Additional work to connect to City water main at alley S/Lodi Ave. (DEWR 1115) Account: 181062 Agreed Upon Price $ 3,179.76 2. Remove and Replace existing Storm Drain Manhole at Eden St. (DEWR 1116) Account 171062 Agreed Upon Price $ 2,000.94 3. Additional work to correct two homes on one sewer service. Install new service, disconnect home from existing service and connect to new line. (DEWR 1117) Account 171062 Agreed Upon Price $ 1,341.31 4. Reroute 4 -inch sewer line due to grade conflict with existing water main (DEWR 1118) Account 171062 Agreed Upon Price $ 871.37 5. Additional work to repair existing water main (DEWR 1121) Account 181062 Agreed Upon Price 6. Additional work to expose PacBell conduits at Elm St. (DEWR 1122) Account 325062 Agreed Upon Price TOTAL CCo1 $ 889.08 $ 873.53 $ 9,155.99 PERCENT OF CONTRACT Original Contract Price $792,591.00 Total Cost of This Change Order NOT TO EXCEED $ 9,155.99 1.2% Previous Change Orders $ 0.00 Total Cost of All Change Orders to Date $ 9,155.99 1.2% Contract Price, Including All Change Orders, Will Be: $801,746.99 Time of completion will be adjusted as follows: Add five working days Submitted By Date VZ6/o Z Approval Recommended Date 1- o-oZ- Approved, Public Works Director wJ Date ) S) DZ Approved, City Manager (Per Public Works Policies and Pi cedures, Administration 4.1) N/A Date The undersigned contractor, having carefully considered the change proposed, agrees, if this proposal is approved, to provide all equipment, furnish all materials, except as otherwise noted above, perform all services necessary for the work above specified, and accept as full payment the prices shown above. ACCEPTED- Date By/t . 77, Contractor A LL Title � - /71• If the contractor does not sign acceptance of this order, the contractor should refer to Section 4- 1.03A of the Standard Specifications regarding filing a written protest within the specified time. CITY OF LODI PUBLIC WORKS DEPARTMENT PROJECT: Stockton Street Reconstruction Tokay St. to Lodi Ave. CONTRACTOR: Dell Engineering CONTRACT CHANGE ORDER NO. 2 Sheet 1 of 1 Date 2/25/02 Account No: 325065 You are directed to make the following changes or do the following work not included in the Plans and Specifications on this contract. ---------------------------------------------------------------------- Description of work to be done, estimate of quantities, and prices to be paid. Specify whether additional work is at contract price, agreed price, or force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. 1. Remove Trees and Stumps S/Flora (DEWR 1034) Agreed Upon Price $ 694.12 2. Adjust Sidewalk Grades E/Side Stockton St. at Flora. (DEWR 1030 and 1031) Account 325065 Agreed Upon Price $ 7,931.32 3. Remove Manhole, Install new Manhole and reconnect three Wastewater Mains (DEWR 1119) Account: 325065 Agreed Upon Price $ 8.921.23 TOTAL $17,546.67 PERCENT OF CONTRACT Original Contract Price $792,591.00 Total Cost of This Change Order NOT TO EXCEED $ 17,546.67 2.2% Previous Change Orders $ 9,155.99 Total Cost of All Change Orders to Date $ 26,102.66 3.3% Contract Price, Including All Change Orders, Will Be: $819,293.66 Time of completion will be adjusted as follows: Add seven working days Submitted ByDate 2 - 96 -02 Approval Recommended'Date -S - z'7 —a?- Approved, Public Works Director Date Z. Zb •«L Approved, Cit=Mn (Per ubl' orks Policies a d Procedures, Administration .1) Date o'2 The undersigned contractor, having carefully considered the change proposed, agrees, if this proposal is approved, to provide all equipment, furnish all materials, except as otherwise noted above, perform all services necessary for the work above specified, and accept as full payment the prices shown above. ACCEPTED: Date Feb o2 O, O 1 Contractor �D e I( F n g i n -e -e, r c:e ucl By v) ; _( tin IL( j 'A r -t ac Gl. Title �re5 1 d-�� If the contractor does not sign acceptance of this order, the contractor should refer to Section 4- 1.03A of the Standard Specifications regarding filing a written protest within the specified time. CCO2 CITY OF LODI PUBLIC WORKS DEPARTMENT PROJECT: Stockton Street Reconstruction Tokay St. to Lodi Ave. CONTRACTOR: Dell Engineering CONTRACT CHANGE ORDER NO. 3 Sheet 1 of 1 Date 3/5/02 Account No: 3S 1fo4oG2 You are directed to make the following changes or do the following work not included in the Plans and Specifications on this contract. ---------------------------------------------------------------------- Description of work to be done, estimate of quantities, and prices to be paid. Specify whether additional work is at contract price, agreed price, or force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. 1. Perform additional electrical work on side streets to connect Stockton St. lighting to existing lighting system (DEWR 1302) � -1 ` "r° 2 Wf Agreed Upon Price $ 17,424.91 2. Install posts at 1J2 E. Lodi Ave. (DEWR 1137) "t 3�5c "'F Agreed Upon Price $ 311.13 3. Compensation for lost time due to paving delay (DEWR 1179) "`-i' 3�SCIA-AF Agreed Upon Price $ 4,000.00 4. Additional compensation to work around existing water main N/Tokay St. (DEWR 1032) PST 325o�&-4 Agreed Upon Price $ 4.800.00 TOTAL $ 26,536.04 PERCENT OF CONTRACT Original Contract Price $792,591.00 Total Cost of This Change Order NOT TO EXCEED $ 26,536.04 3.3% Previous Change Orders $ 26,102.66 Total Cost of All Change Orders to Date $ 52,638.70 6.6% Contract Price, Including All Change Orders, Will Be: $ 845,229.70 Time of completion will be adjusted as follows: Add twenty-nine working days Submitted By i'' Date -5-02- Approval Recommende vi Date %-? �- Approved, Public Works Dire ' - Date 3 )r uz Approved, City 1oaWger r P b}ic Works Policies a Procedures, Administration 4.1) The undersigned contractor, having carefully considered the change proposed, agrees, if this proposal is approved, to provide all equipment, furnish all materials, except as otherwise noted above, perform all services necessary for the work above specified, and accept as full payment the prices shown above. ACCEPTED: Date 1-7 1 b z Contractor 3)'P_ I r By Title A_L4-� pp If the contractor does not sign acceptance of this order, the contractor should refer to Section 4- 1.03A of the Standard Specifications regarding filing a written protest within the specified time. CCO3 3250r.2 �_p L -P