HomeMy WebLinkAboutAgenda Report - April 17, 2002 E-08CITY OF LODI COUNCIL COMMUr1ICATION
AGENDA TITLE: Adopt Resolution approving the Recommendations of the Multi -Jurisdictional 2x2x2
Greenbelt Task Force to fund the contract (not to exceed $25,000) for services for
Phase 2 of the Lodi/Stockton Community Separator
MEETING DATE: April 17, 2002
PREPARED BY: Community Development Director
RECOMMENDED ACTION: Staff is recommending that the City Council adopt the attached Resolution
to affirm the 2x2x2 Greenbelt Task Force recommendations with regard to
Phase 2 of the Lodi/Stockton Community Separator. Adopting the
Resolution would also authorize funding of one-third of the cost of the
contract for services to complete Phase 2 of the Study.
BACKGROUND INFORMATION: One of the major goals recently identified by the City Council is the
creation of a Greenbelt Policy. In order to accomplish this goal, the
City Council appointed two Council Members to the 2x2x2
Greenbelt Task Force to study the creation of open space, or a
community separator between Lodi and Stockton. The remaining four members are from the Stockton
City Council and the San Joaquin County Board of Supervisors, two from each jurisdiction.
Approximately one year ago, the City Council passed a Resolution adopting four Task Force
recommendations concluding Phase One of the project. The four recommendations, considered the
next steps in the process, were to investigate land trusts, to investigate funding mechanisms, to explore
the feasibility of establishing an Urban Growth Boundary, and to ensure full involvement.
At the 2x2x2 Task Force Meeting held on March 25, 2002, the Task Force decided to build on the earlier
work to develop agricultural and open space protection and preservation options and proceed with
Phase Two. The Draft Scope of Work is summarized below and is included in its entirety as an
attachment.
• Two Technical Memos
• Power Point Presentation
• Two Community Forums
• Two 2x2x2 Task Force Meetings
• Final Report with Presentation to Elected Officials
Representatives of all three jurisdictions recognized the importance of jointly implementing the scope to
develop a plan of options. Community members in attendance at the meeting also agreed that a "plan"
should be developed so that options for financing, preservation, etc. can be analyzed in real terms. In
APPROVED:
H. Dixon Flynn -- City Manager
Council Communication
April 17, 2002
Page 2
other words, a consensus of the attendees felt the time had come for a physical
document, or "plan" to be developed outlining options for consideration.
With the approval of the respective jurisdictions, staff will work with the consultant to
implement the contract for services. The lead project management for Phase Two will
come from the San Joaquin County Community Development Department. An
estimated time line for Phase Two would see the 2x2x2 Task Force meeting again by
approximately the first week of July (Task 3 in the Scope).
FUNDING: Total cost is $64,112, plus contingencies.
City of Lodi portion, one-third of the total, not to exceed $25,000. It is
proposed to use General Fund Contingency for this work.
FUNDING AVAILABLE:
Vicky McAthie
Finance Director
lk
711s�
Konradt Bartlam
Community Development Director
Prepared by Eric Veerkamp, Associate Planner
KB/ev
{Attachment(s)
ATTACHMENT A
MIG Preliminary Scope of Services and Cost Estimate
Lodi -Stockton Community Separator Project — Phase 2
TASK 1 STAFF PLANNING SESSION
Daniel Iacofano and Steve Reiner will meet with staff for a two-hour meeting to refine the
objectives for Phase 2 and strategize about the content and structure of the first Technical Memo
that will be presented at the first pair of Community Forums. Based on this planning session, MIG
will prepare an agenda and other background materials for the first 2x2x2 Task Force meeting.
MIG Product- Facilitated staff meeting.
Professional Tb?w.................................... $ 2,210
Direct Costs ............................................. $100
TotalCosts ....................................................... $ 2,310
TASK 2 TELEPHONE CONFERENCES I PROJECT COORDINATION (SIX HOURS)
Updates on project progress and planning for next steps will often be achieved by conference calls
rather than by staff meetings. This task includes six (6) hours of telephone calls.
MIG Pr akv Telephone conferences (6).
Professional Tvne.................................... $ 1,300
Direct Costs ............................................... $ SO
TotalCosts ....................................................... $1,350
TASK 3 PRE -FORUM 2x2x2 TASK FORCE MEETING
Daniel Iacofano will meet with the 2x2x2 Task Force to discuss the goals of Phase 2 and strategies
to develop plan options leading to a draft plan and Final Report.
MIG Produir.• Facilitated 2x2x2 Task Force meeting.
Professional nw.................................... $ 3,340
Direct Costs ............................................. $ 301
TotalCosts ....................................................... $ 3,641
TASK 4 TECHNICAL MEMO #1: Agriculture and Open Space Protection and
Preservation Options
MIG will prepare a review draft and final draft of Technical Memo #1 detailing options to protect
and preserve agriculture and open space between the cities of Lodi and Stockton. The memo will
analyze existing policy documents for their impacts on preservation options; it will look at other
communities to identify their successful best practices; and it will recommend those best practices
and approaches tailored for San Joaquin County. MIG will rely on base maps and planning data to
be prepared by County staff. MIG will submit one paper copy and one electronic copy of the
Technical Memo.
MIG Product. Technical Memorandum 1.
Professional Tmae.................................. $11,720
Direct Costs ............................................. $ 250
Total Costs ...................................................... $11,970
TASK 5 POWERPOINT PRESENTATION
MIG will prepare a PowerPoint presentation for the pair of Community Forums (see Task 6) to
present background material and the protection and preservation strategies.
MIG Prodtut• PowerPoint presentation.
Professional T ?w .................................... $ 2,960
Direct Costs ................................................. $ 0
TotalCosts ....................................................... $ 2,960
TASK 6 PAIR OF COMMUNITY FORUMS (LODI and STOCKTON)
PRESENTATION OF PLAN ALTERNATIVES
The Community Forums (one in Lodi and the other in Stockton) will provide the setting for both
information sharing and collecting. MIG and County/City staff will present the community with the
plan alternatives to preserve and protect viable community separators between Lodi and Stockton.
Following an overview presentation, participants will divide into smaller groups to engage in more
in-depth discussion of specific issue areas. The small groups will reconvene and report their findings
to the rest of the Forum participants. In addition to taking part in discussions, participants will be
able to record their ideas, concerns, and suggestions on individual comment sheets that will be
collected at the end of the Forum. All discussion will be documented on wallgraphics and/or flip -
charts and all work produced will be incorporated into a summary report consisting of one camera-
ready copy and an electronic copy for County reproduction and distribution.
1.) The Principal -in -Charge and Project Director will lead MIG activities with the assistance of two
Pro)ect Associates. A combination of County and Lodi and Stockton staff who have taken the
MIG introduction to facilitation will augment any additional facilitation needs.
2.) MIG will provide one camera-ready and one electronic copy of public noticing graphics in
advance of the Community Forums (assuming that the venue and other details have been
determined).
1.) The County will find appropriate venues for the Forums.
2.) The County will publish notices in the newspaper and distribute notices of the Community
Forums designed by MIG.
3.) The County will provide additional staff that have completed the MIG Facilitation Training for
the facilitation of small groups as needed.
MIG Producu- Facilitated Community Forums (2).
Working Paper summarizing the perspectives of the community about the issues dis-
cussed.
Professional Tnm .................................. $10,205
Direct Costs ............................................. $ 695
Total Costs ...................................................... $10,900
TASK 7 POST -FORUM STAFF PLANNING SESSION
Daniel Iacofano and Steve Reiner will meet with staff for a two-hour meeting to review the
Community Forums and to discuss the process of crafting a draft plan. Based on this planning
session, MIG will prepare an agenda and other background materials for the second 2x2x2 Task
Force meeting.
MIG Proauya• Facilitated staff meeting.
Professional Tnne.................................... $ 2,268
Direct Costs ............................................. $175
TotalCosts ....................................................... $ 2,443
TASK 8 TECHNICAL MEMO #2: Draft Plan
M1G will prepare a review draft and final draft of Technical Memo #2 detailing preferred plan
options and strategies to protect and preserve agriculture and open space between the cities of Lodi
and Stockton. The memorandum will contain:
■ specific recommendations to change existing planning policies, to draft potential new
ordinances, or to modify existing ordinances;
■ an analysis of appropriate preservation techniques and recommendations for their use for
the Lodi -Stockton Separator;
■ a discussion of alternative funding mechanisms;
■ a proposed timeframe to implement strategies; and
■ a future work program for additional tasks.
The memorandum will contain text, maps and other graphics to illustrate preservation opportunities
and techniques.
MIG will submit one paper copy and one electronic copy of the Technical Memo for reproduction
and distribution by the County.
MIG I� Technical Memorandum 2.
Professional Tune.................................1$10,340
Direct Costs ............................................. $ 250
Total Costs ...................................................... $10,590
_: e o1
TASK 9 2x2x2 TASK FORCE MEETING
Daniel Iacofano will meet with the 2x2x2 Task Force to discuss the draft plan and implementation
strategy.
MIG 1-%e • Facilitated 2x2x2 Task Force Meeting.
Professional Tnne.................................... $ 3,340
Dirt Costs ............................................. $ 301
TotalCosts ....................................................... $ 3,641
TASK 10 FINAL REPORT
MIG will prepare a review draft and final draft of the Final Report. MIG will submit one paper copy
and one electronic copy of the Final Report to the County for reproduction and distribution.
MIG Proms- Final report.
Professional Tnne.................................... $ 7,840
Dira-t Costs ................................................. $ 0
TotalCosts ....................................................... $ 7,840
TASK 11 PRESENTATIONS OF FINAL REPORT (3)
Lodi City Council, Stockton City Council,
San Joaquin Board of Supervisors
Daniel Iacofano will present the Final Report to the City Councils of Lodi and Stockton and to the
San Joaquin County Board of Supervisors and discuss the next steps to implement the preferred
plan.
MIG Praducs Presentations (3).
Professional Tnne.................................... $ 6,594
Dirt Costs ............................................. $ 336
Total Costs ....................................................... $ 6,220
TOTAL ESTIMATED COST — PHASE 2...................................................................... $ 64,112
OPTIONAL TASK A ADDITIONAL MEETINGS (4)
Daniel Iacofano and Steve Reiner will be available to participate in up to four additional meetings
with staff, elected officials and staff of other agencies as needed to discuss Phase 2 of this study
and/or other initiatives the County is taking regarding agricultural preservation and community
separators.
MIG I'rr>diats.• Facilitated meetings (4) (Optional).
Professio" Tine .................................. $11,540
Dirmt Costs ............................................. $125
Total Costs ...................................................... $11,665
RESOLUTION NO.
A RESOLUTION OF THE LODI CITY COUNCIL
APPROVING THE RECOMMENDATIONS OF THE MULTI -
JURISDICTIONAL 2X2X2 GREENBELT TASK FORCE TO
FUND THE CONTRACT FOR SERVICES FOR PHASE 2
OF THE LODI/STOCKTON COMMUNITY SEPARATOR
WHEREAS, the City of Lodi, the City of Stockton, and the County of San Joaquin
have, on the authority of their respective elected bodies, jointly formed the 2x2x2
Greenbelt Task Force and are continuing in a multi -jurisdictional effort to study the
creation of a community separator between Lodi and Stockton; and,
WHEREAS, the Task Force representatives, as well as members of the public in
attendance at the 2x2x2 Task Force Meeting held on March 25, 2002, recognize the
importance of jointly implementing the scope in order to develop a plan of options;
WHEREAS, the Task Force, unanimously adopted a motion to proceed with
Phase Two of the process, including recommending approval of the proposed Scope of
Work (see attachment). Furthermore, the three jurisdictions unanimously agree to share
equally the cost of work associated with implementation of the proposed Scope of Work;
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Lodi
hereby adopts the above stated 2x2x2 Greenbelt Task Force's recommendations, and in
conjunction with the City of Stockton and San Joaquin County, agrees to participate and
fund Phase Two of the community separator planning process.
Dated:
hereby certify that Resolution No. was passed and adopted by the City
Council of the City of Lodi in a regular meeting held , by the following vote:
AYES: COUNCIL MEMBERS -
NOES: COUNCIL MEMBERS -
ABSENT: COUNCIL MEMBERS -
ABSTAIN: COUNCIL MEMBERS -
City Clerk
98-102
RESOLUTION NO. 2002-82
A RESOLUTION OF THE LODI CITY COUNCIL APPROVING THE
RECOMMENDATIONS OF THE MULTI -JURISDICTIONAL 2X2X2
GREENBELT TASK FORCE TO FUND THE CONTRACT FOR
SERVICES FOR PHASE 2 OF THE LODI/STOCKTON
COMMUNITY SEPARATOR
WHEREAS, the City of Lodi, the City of Stockton, and the County of San Joaquin have,
on the authority of their respective elected bodies, jointly formed the 2x2x2 Greenbelt Task
Force and are continuing in a multi jurisdictional effort to study the creation of a community
separator between Lodi and Stockton; and
WHEREAS, the Task Force representatives, as well as members of the public in
attendance at the 2x2x2 Task Force meeting held on March 25, 2002, recognize the importance
of jointly implementing the scope in order to develop a plan of options; and
WHEREAS, the Task Force unanimously adopted a motion to proceed with Phase Two
of the process, including recommending approval of the proposed Scope of Work (see
attachment). Furthermore, the three jurisdictions unanimously agree to share equally the cost
of work associated with implementation of the proposed Scope of Work.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Lodi hereby
adopts the above stated 2x2x2 Greenbelt Task Force's recommendations, and in conjunction
with the City of Stockton and San Joaquin County, agrees to participate and fund Phase Two of
the community separator planning process.
Dated: April 17, 2002
------------------------------------------------------------------------
------------------------------------------------------------------------
I hereby certify that Resolution No. 2002-82 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held April 17, 2002, by the following vote:
AYES: COUNCIL MEMBERS — Hitchcock, Land, and Mayor Pennino
NOES: COUNCIL MEMBERS — Howard and Nakanishi
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None
Susan J. Blackston
City Clerk
2002-82
ATTACHMENT A
MIG Preliminary Scope of Services and Cost Estimate
Lodi -Stockton Community Separator Project — Phase 2
TASK I STAFF PLANNING SESSION
Daniel Iacofano and Steve Reiner will meet with staff for a two-hour meeting to refine the
objectives for Phase 2 and strategize about the content and structure of the first Technical Memo
that will be presented at the first pair of Community Forums. Based on this planning session, MIG
will prepare an agenda and other background materials for the first 2x2x2 Task Force meeting.
MIG Product Facilitated staff meeting.
Professional Tvm.................................... $ 2,210
DirectCosts ............................................. $100
TotalCosts ....................................................... $ 2,310
TASK 2 TELEPHONE CONFERENCES I PROJECT COORDINATION (SIX HOURS)
Updates on project progress and planning for next steps will often be achieved by conference calls
rather than by staff meetings. This task includes six (6) hours of telephone calls.
MIG Prom Telephone conferences (6).
13*:sib al ?"rme.................................... $1,300
DirectCosts ............................................... $ SO
TotalCosts ....................................................... $1,350
TASK 3 PRE -FORUM 2x2x2 TASK FORCE MEETING
Daniel Iacofano will meet with the 2x2x2 Task Force to discuss the goals of Phase 2 and strategies
to develop plan options leading to a draft plan and Final Report.
MIG P'rodioct Facilitated 2x2x2 Task Force meeting.
Aoore Iacofano Goltsman, Inc. Scope of Services
Lodi -Stockton Community Separator — Phase 2 Page 1 of 1
14 Mar 02
Avfessimd Tune .................................... $ 3,340
Direct Costs ............................................. $ 301
Total Costs ....................................................... $ 3,641
TASK 4 TECHNICAL MEMO #1: Agriculture and Open Space Protection and
Preservation Options
MIG will prepare a review draft and final draft of Technical Memo #I detailing options to protect
and preserve agriculture and open space between the cities of Lodi and Stockton. The memo will
analyze existing policy documents for their impacts on preservation options; it will look at other
communities to identify their successful best practices; and it will recommend those best practices
and approaches tailored for San Joaquin County. MIG will rely on base maps and planning data to
be prepared by County staff. MIG will submit one paper copy and one electronic copy of the
Technical Memo.
MIG Prahrct Technical Memorandum i.
)Wessiwd Torre .................................. $11,720
DirectCosts ............................................. $ 250
Total Costs ...................................................... $11,970
TASK 5 POWERPOINT PRESENTATION
MIG will prepare a PowerPoint presentation for the pair of Community Forums (see Task 6) to
present background material and the protection and preservation strategies.
MIG Product• PowerPoint presentation.
Prufessiwd Tum .................................... $ 2,960
DiracCosts ................................................. $ 0
TotalCosts ....................................................... $ 2,960
Moore iacofano Goitsman. Inc. Scope of Services
Lodi -Stockton Community Separator — Phase 2 Page 2 of 2
14 Mar 02
TASK 6 PAIR OF COMMUNITY FORUMS 1LOD1 and STOCKTON)
PRESENTATION OF PLAN ALTERNATIVES
The Community Forums (one in Lodi and the other in Stockton) will provide the setting for both
information sharing and collecting. MIG and County/City staff will present the community with the
plan alternatives to preserve and protect viable community separators between Lodi and Stockton.
Following an overview presentation, participants will divide into smaller groups to engage in more
in-depth discussion of specific issue areas. The small groups will reconvene and report their findings
to the rest of the Forum participants. In addition to taking part in discussions, participants will be
able to record their ideas, concerns, and suggestions on individual comment sheets that will be
collected at the end of the Forum. All discussion will be documented on wallgraphics and/or flip -
charts and all work produced will be incorporated into a summary report consisting of one camera-
ready copy and an electronic copy for County reproduction and distribution.
Additional MiG Responsibilities:
1.) The Principal -in -Charge and Project Director will lead MIG activities with the assistance of two
Project Associates. A combination of County and Lodi and Stockton staff who have taken the
MIG introduction to facilitation will augment any additional facilitation needs.
2.) MIG will provide one camera-ready and one electronic copy of public noticing graphics in
advance of the Community Forums (assuming that the venue and other details have been
determined).
San Joaquin County Responsibilities:
1.) The County will find appropriate venues for the Forums.
2.) The County will publish notices in the newspaper and distribute notices of the Community
Forums designed by MIG.
3.) The County will provide additional staff that have completed the MIG Facilitation Training for
the facilitation of small groups as needed.
MIG Pr x&m.. Facilitated Community Forums (2).
Working Paper summarizing the perspectives of the community about the issues dis-
cussed.
Pmfessk al Tmx.................................. $10,205
Dirat Costs ............................................. $ 695
Total Costs ...................................................... $10,900
Moore lacofano Goltsman, Inc. Scope of Services
Lodi -Stockton Community Separator — Phase 2 Page 3 of 3
14 Mar 02
TASK 7 POST -FORUM STAFF PLANNING SESSION
Daniel Iacofano and Steve Reiner will meet with staff for a two-hour meeting to review the
Community Forums and to discuss the process of crafting a draft plan. Based on this planning
session, MIG will prepare an agenda and other background materials for the second 2x2x2 Task
Force meeting.
MIG Pro Facilitated staff meeting.
Prufessk aal Tim .................................... $ 2,268
Direct Costs ............................................. $175
TotalCosts ....................................................... $ 2,443
TASK 8 TECHNICAL MEMO #2: Draft Plan
MIG will prepare a review draft and final draft of Technical Memo #2 detailing preferred plan
options and strategies to protect and preserve agriculture and open space between the cities of Lodi
and Stockton. The memorandum will contain:
■ specific recommendations to change existing planning policies, to draft potential new
ordinances, or to modify existing ordinances;
■ an analysis of appropriate preservation techniques and recommendations for their use for
the Lodi -Stockton Separator;
■ a discussion of alternative funding mechanisms;
■ a proposed timeframe to implement strategies; and
■ a future work program for additional tasks.
The memorandum will contain text, maps and other graphics to illustrate preservation opportunities
and techniques.
MIG will submit one paper copy and one electronic copy of the Technical Memo for reproduction
and distribution by the County.
MIG Pma4ut Technical Memorandum 2.
Prrfessimd Time .................................. $10,340
DinsiCosts ............................................. $ 250
TotalCosts ...................................................... $10,590
Moore Iacofano Goltsman. Inc. Scope of Services
Lodi -Stockton Community Separator — Phase 2 Page 4 of 4
14 Mar 02
TASK 9 2x2x2 TASK FORCE MEETING
Daniel Iacofano will meet with the 2x2x2 Task Force to discuss the draft plan and implementation
strategy.
MIG Pr &a- Facilitated 2x2x2 Task Force Meeting.
Professional Tvne.................................... $ 3,340
Direct Costs ............................................. $ 301
TotalCosts ....................................................... $ 3,641
TASK 10 FINAL REPORT
MIG will prepare a review draft and final draft of the Final Report. MIG will submit one paper copy
and one electronic copy of the Final Report to the County for reproduction and distribution.
MIG Pwa6a• Final report.
Professional Tvne.................................... $ 7,840
DirectCosts ................................................. $ 0
TotalCosts ....................................................... $ 7,840
TASK 11 PRESENTATIONS OF FINAL REPORT (3)
Lodi City Council, Stockton City Council,
San Joaquin Board of Supervisors
Daniel Iacofano will present the Final Report to the City Councils of Lodi and Stockton and to the
San Joaquin County Board of Supervisors and discuss the next steps to implement the preferred
Plan.
MIG liuduts. Presentations (3).
Professiartal Tvne.................................... $ 6,594
DirectCosts ............................................. $ 336
TotalCosts ....................................................... $ 6,220
Moore Iacofano Goltsman. Inc. Scope of Services
Lodi -Stockton Community Separator — Phase 2 Page 5 of 5
14 Mar 02
TOTAL ESTIMATED COST — PHASE 2...................................................................... $ 64,112
OPTIONAL TASK A ADDITIONAL MEETINGS (4)
Daniel Iacofano and Steve Reiner will be available to participate in up to four additional meetings
with staff, elected officials and staff of other agencies as needed to discuss Phase 2 of this study
and/or other initiatives the County is taking regarding agricultural preservation and community
separators.
MIG Prat . Facilitated meetings (4) (Optional).
P4wiwd Tim .................................. $11,540
DirwtCosts ............................................. $125
TotalCosts ...................................................... $11,665
or
Moore Iacofano Goltsman, Inc. Scope of Services
Lodi -Stockton Community Separator — Phase 2 Page o of E
14 Mar 02