HomeMy WebLinkAboutAgenda Report - November 7, 2001 E-10FF 7
CITY OF LODI COUNCILCOMMUNICATION
�7FOR�"
LL L
AGENDA TITLE: Adopt resolution awarding the contract for installation of utility substructures, Cherokee Lane
and Sunwest Area to Kinnan Engineering, Inc., of Camas Valley, OR ($68,927.00) (EUD)
MEETING DATE: November 7, 2001
SUBMITTED BY: Electric Utility Director
RECOMMENDED ACTION: That the City Council award the contract for installation of utility
substructures, Cherokee Lane and Sunwest Area to the low bidder, Kinnan
Engineering, Inc. of Camas Valley, OR in the amount of $68,927.00.
BACKGROUND INFORMATION: On October 24, 2001, seven bids were received and opened for this project.
The bid results are tabulated below:
BIDDER
AMOUNT
Kinnan Engineering, Inc. Camas Valley, OR
$68,927.00
Bockmon & Woody Electric Co., Inc., Stockton CA
99,936.40
Golden State Utility Co., Turlock, CA
111,777.00
Arrow Construction, Sacramento, CA
125,285.00
Cla born Contracting Group, Inc., Auburn, CA
127,789.00
Tim Paxin's Pacific Excavation, Inc., Elk Grove, CA
159,350.00
Aronson Constructors, Inc., Rancho Cordova, CA
169,649.50
This project will install utility (Electric and CATV) substructures (conduits and vaults) in the areas of Cherokee Lane at
Vine Street, Cherokee Lane between Harold Street and Tokay Street and at Heritage School. Installation of these
substructures will allow the Department to remove City owned overhead electric distribution facilities on Cherokee
Lane. All crossings of Cherokee Lane will be by Directional Horizontal Boring. AT&T Broadband (CATV) is
participating in the Vine Street crossing and will be reimbursing the City for their share of the costs at this crossing.
The substructures in the Sunwest area are required for a new 12 kV feeder to the west side of town from Henning
Substation. These substructures will also allow removal of overhead distribution facilities in the vicinity of the Twin
Arbors Athletic Club pool.
Plans and Specifications for this project were approved by the City Council at the meeting of October 3, 2001.
FUNDING: Included in the Department's 2001-03 Financial Plan and Budget (page E-30)
System Improvement, Business Unit #161652
Funding Approval: `f -ttl _
Vicky McAthie, Finance Director
aet"-
Alan N. Vallow
Electric Utility Director
Prepared by: Hans Hansen, Manager, Engineering and Operations
ANV/HH/lst
c: City Attorney Public Works Director Purchasing Officer
APPROVED:
H. Dixon F nn - City M Hager
RESOLUTION NO. 2001-249
A RESOLUTION OF THE LODI CITY COUNCIL
AWARDING THE CONTRACT FOR THE INSTALLATION
OF UTILITY SUBSTRUCTURES, CHEROKEE LANE
AND SUNWEST AREA
--------------------------------------------------------------------
--------------------------------------------------------------------
WHEREAS, in answer to notice duly published in accordance with law and the
order of this City Council, sealed bids were received and publicly opened on October 24,
2001, at 11:00 a.m. for the installation of Utility Substructures, Cherokee Lane and
Sunwest Area, described in the specifications, therefore approved by the City Council on
October 3, 2001; and
WHEREAS, said bids have been compared, checked, and tabulated and a report
thereof filed with the City Manager as shown as follows:
BIDDER AMOUNT
Kinnan Engineering, Inc., Camas Valley, OR $68,927.00
Bockmon & Woody Electric Co., Inc., Stockton CA 99,936.40
Golden State Utility Co., Turlock, CA 111,777.00
Arrow Construction, Sacramento, CA 125,285.00
Clayborn Contracting Group, Inc., Auburn, CA 127,789.00
Tim Paxin's Pacific Excavation, Inc., Elk Grove, CA 159,350.00
Aronson Constructors, Inc., Rancho Cordova, CA 169,649.50
WHEREAS, the City Manager recommends award of the contract for the
installation of Utility Substructures, Cherokee Lane and Sunwest Area, to Kinnan
Engineering, Inc., of Camas Valley, OR.
NOW, THEREFORE, BE IT RESOLVED, that the Lodi City Council hereby awards
the contract for the installation of utility substructures, Cherokee Lane and Sunwest Area,
to Kinnan Engineering, Inc., of Camas Valley, OR, the lowest bidder, in the amount of
$68,927.00.
Dated: November 7, 2001
I hereby certify that Resolution No. 2001-249 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held November 7, 2001, by the following
vote:
AYES: COUNCIL MEMBERS — Howard, Land, Pennino and Mayor
Nakanishi
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — Hitchcock
ABSTAIN: COUNCIL MEMBERS — None
SUSAN J. BLACKSTON
City Clerk
2001-249
CITY COUNCIL
ALAN S. NAKANISHI, Mayor
PHILLIP A. PENNINO
Mayor Pro Tempore
SUSAN HITCHCOCK
EMILY HOWARD
KEITH LAND
CITY OF LODI
ELECTRIC UTILITY DEPARTMENT
ALAN N. VALLOW, DIRECTOR
1331 S HAM LANE
LODI, CALIFORNIA 95242-3995
(209)333-6762
FAX (209) 339-6839
November 8, 2001
Paul Furbush
Bockmon & Woody Electric Co Inc
930 E Miner Ave
Stockton CA 95201
Re: Utility Substructures -Cherokee Lane and Sunwest Area
H. DIXON FLYNN
City Manager
RANDALL A. HAYS
City Attorney
SUSAN J.BLACKSTON
City Clerk
At the City Council meeting of November 7, 2001, the City Council awarded the bid referenced
above to Kinnan Engineering, Inc., Camas Valley, OR, the lowest responsible bidder. The bids
received for this project are tabulated below:
BIDDER
AMOUNT
Kinnan Engineering, Inc., Camas Valley, OR
$68,927.00
Bockmon & Woody Electric Co., Inc., Stockton, CA
99,936.40
Golden State Utility Co., Turlock, CA
111,777.00
Arrow Construction, Sacramento, CA
125,285.00
Cla born Contracting Group, Inc., Aubum, CA
127,789.00
Tim Paxin's Pacific Excavation, Inc., Elk Grove, CA
159,350.00
Aronson Constructors, Inc., Rancho Cordova, CA
169,649.50
The bid bond you submitted with your bid proposal will be returned to you once the contract for
this project has been executed, expected within 30 days.
The City of Lodi wishes to thank you for your interest in this project, and assures you that we
welcome proposals from you in the future.
#ItkJeZi_&%47
Hans Hansen
Manager, Engineering and Operations
c: Electric Utility Director
City Clerk
Purchasing Officer
Award Notice 1.doc
CITY COUNCIL
ALAN S. NAKANISHI, Mayor
PHILLIP A. PENNINO
Mayor Pro Tempore
SUSAN HITCHCOCK
EMILY HOWARD
KEITH LAND
Mr. Keith Kinnan, President
Kinnan Engineering Inc.
3901 Upper Camas Road
Camas Valley OR 97416
CITY OF LODI
ELECTRIC UTILITY DEPARTMENT
ALAN N. VALLOW, DIRECTOR
1331 S HAM LANE
LODI, CALIFORNIA 95242-3995
(209)333-6762
FAX (209) 339-6839
November 8, 2001
Re: Utility Substructures, Cherokee Lane and Sunwest Area
H. DIXON FLYNN
City Manager
RANDALL A. HAYS
City Attorney
SUSAN J. BLACKSTON
City Clerk
At the City Council meeting of November 7, 2001, your firm was awarded the contract for Utility
Substructures, Cherokee Lane and Sunwest Area in the amount of $68,927.00. The bids
received for the project are tabulated below:
BIDDER
AMOUNT
Kinnan Engineering, Inc., Camas Valley, OR
$68,927.00
Bockmon & Woody Electric Co. Inc., Stockton, CA
99,936.40
Golden State Utility Co., Turlock, CA
111,777.00
Arrow Construction, Sacramento, CA
125,285.00
Cla born Contracting Group, Inc., Auburn, CA
127,789.00
Tim Paxin's Pacific Excavation, Inc., Elk Grove, CA
159,350.00
Aronson Constructors, Inc., Rancho Cordova, CA
169,649.50
At this time various documents need to be completed and/or provided by you in order to finalize
the Contract for this project. Therefore, enclosed with this letter you will find:
Contract, 3 copies.
Please execute each copy on page 4.4 under CONTRACTOR and return the three
copies to the City for execution. The effective date of this contract will be the date the
City executes the Contract.
Contract Surety Bonds (Labor and Materials, Faithful Performance) 1 copy of each.
Please have these bonds completed and submitted with the Contract. See section
2.900 of "Information to Bidders". The bonds must be executed on the forms enclosed
with this letter in addition to any other documents your Surety Company may wish to
supply. The "California All -Purpose Acknowledgment" must also be completed for each
Bond.
Insurance Certificate
Please provide and include the insurance certificates with the Contract, as required per
section 2.1100 and 2.1200 of "Information to Bidders". The "Certificate Holder's"
address should be City of Lodi, 221 West Pine, Lodi, California, 95240.
Please return all documents to:
Hans Hansen, Manager, Engineering and Operations
City of Lodi, Electric Utility Department
1331 South Ham Lane
Lodi CA 95242-3995
Upon execution of the contract a pre construction meeting will be scheduled at the Electric
Utility Service Center, 1331 S. Ham Lane, Lodi CA. Please indicate the name or names of the
individual(s) in your organization we should contact regarding the specific date and time of the
pre construction meeting.
A copy of the "Specifications" for this project has been enclosed for your reference.
Upon execution of the contract by the City your Cashiers Check will be returned.
Should you have any questions, please do not hesitate to contact me at (209) 333-6769.
1
Hans Hansen ;%
Manager, Engineering and Operations
Enclosures
c: Electric Utility Director
City Clerk
Purchasing Officer
CITY COUNCIL
ALAN S. NAKANISHI, Mayor
PHILLIP A. PENNINO
Mayor Pro Tempore
SUSAN HITCHCOCK
EMILY HOWARD
KEITH LAND
Kent Ridgley
Aronson Constructors Inc
11297 Coloma Road Suite B
Rancho Cordova CA 95670
CITY OF LODI
ELECTRIC UTILITY DEPARTMENT
ALAN N. VALLOW, DIRECTOR
1331 S HAM LANE
LODI, CALIFORNIA 95242-3995
(209)333-6762
FAX (209) 339-6839
November 8, 2001
Re: Utility Substructures -Cherokee Lane and Sunwest Area
H. DIXON FLYNN
City Manager
RANDALL A. HAYS
City Attorney
SUSANJ.BLACKSTON
City Clerk
At the City Council meeting of November 7, 2001, the City Council awarded the bid referenced
above to Kinnan Engineering Inc., Camas Valley, OR, the lowest responsible bidder. The bids
received for this project are tabulated below:
BIDDER
AMOUNT
Kinnan Engineering, Inc., Camas Valley, OR
$68,927.00
Bockmon & Woody Electric Co. Inc., Stockton, CA
99,936.40
Golden State Utility Co., Turlock, CA
111,777.00
Arrow Construction, Sacramento, CA
125,285.00
Cla born Contracting Group, Inc., Auburn, CA
127,789.00
Tim Paxin's Pacific Excavation, Inc., Elk Grove, CA
159,350.00
Aronson Constructors, Inc., Rancho Cordova, CA
169,649.50
The bid bond you submitted with your bid is herewith returned to you.
The City of Lodi wishes to thank you for your interest in this project, and assures you that we
welcome proposals from you in the future.
Hans Hansen
Manager, Engineering and Operations
Enclosure (1)
c: Electric Utility Director
City Clerk
Purchasing Officer
MAUSERIENGGid SpecsWILiTY SUBSTRUCTURMAward Nonce2d.doc
CITY COUNCIL
ALAN S. NAKANISHI, Mayor
PHILLIP A. PENNING
Mayor Pro Tempore
SUSAN HITCHCOCK
EMILY HOWARD
KEITH LAND
CITY OF LODI
ELECTRIC UTILITY DEPARTMENT
ALAN N. VALLOW, DIRECTOR
1331 S HAM LANE
LODI, CALIFORNIA 95242-3995
(209)333-6762
FAX (209) 339-6839
November 8, 2001
Prescilla Gastelum
Tim Paxins Pacific Excavation Inc
9701 Dino Drive Suite 110
Elk Grove CA 95624
Re: Utility Substructures -Cherokee Lane and Sunwest Area
H. DIXON FLYNN
City Manager
RANDALLA. HAYS
City Attorney
SUSAN J.BLACKSTON
City Clerk
At the City Council meeting of November 7, 2001, the City Council awarded the bid referenced
above to Kinnan Engineering Inc., Camas Valley, OR, the lowest responsible bidder. The bids
received for this project are tabulated below:
BIDDER
AMOUNT
Kinnan Engineering, Inc., Camas Valley, OR
$68,927.00
Bockmon & Woody Electric Co. Inc., Stockton, CA
99,936.40
Golden State Utility Co., Turlock, CA
111,777.00
Arrow Construction, Sacramento, CA
125,285.00
Cla born Contracting Group, Inc., Auburn, CA
127,789.00
Tim Paxin's Pacific Excavation, Inc., Elk Grove, CA
159,350.00
Aronson Constructors, Inc., Rancho Cordova, CA
169,649.50
The bid bond you submitted with your bid is herewith returned to you.
The City of Lodi wishes to thank you for your interest in this project, and assures you that we
welcome proposals from you in the future.
x1i lZti4e,,
Hans Hansen
Manager, Engineering and Operations
Enclosure (1)
c: Electric Utility Director
City Clerk
Purchasing Officer
WUSERTNG\Bid SpecsWTILITY SUBSTRUCTURMAward Nolice2c.doc
CITY COUNCIL
ALAN S. NAKANISHI, Mayor
PHILLIP A. PENNINO
Mayor Pro Tempore
SUSAN HITCHCOCK
EMILY HOWARD
KEITH LAND
CITY OF LODI
ELECTRIC UTILITY DEPARTMENT
ALAN N. VALLOW, DIRECTOR
1331 S HAM LANE
LODI, CALIFORNIA 95242-3995
(209) 333-6762
FAX (209) 339-6839
November 8, 2001
David G. Gove
Claybom Contracting Group Inc
10556 Combie Road
Auburn CA 95602-8908
Re: Utility Substructures -Cherokee Lane and Sunwest Area
H. DIXON FLYNN
City Manager
RANDALL A. HAYS
City Attorney
SUSAN J.BLACKSTON
City Clerk
At the City Council meeting of November 7, 2001, the City Council awarded the bid referenced
above to Kinnan Engineering Inc., Camas Valley, OR, the lowest responsible bidder. The bids
received for this project are tabulated below:
BIDDER
AMOUNT
Kinnan Engineering, Inc., Camas Valley, OR
$68,927.00
Bockmon & Woody Electric Co. Inc., Stockton, CA
99,936.40
Golden State Utility Co., Turlock, CA
111,777.00
Arrow Construction, Sacramento, CA
125,285.00
Cla born Contracting Group, Inc., Auburn, CA
127,789.00
Tim Paxin's Pacific Excavation, Inc., Elk Grove, CA
159,350.00
Aronson Constructors, Inc., Rancho Cordova, CA
169,649.50
The bid bond you submitted with your bid is herewith returned to you.
The City of Lodi wishes to thank you for your interest in this project, and assures you that we
welcome proposals from you in the future.
Hans Hansen
Manager, Engineering and Operations
Enclosure (1)
c: Electric Utility Director
City Clerk
Purchasing Officer
MAUSERIENG\Bid SpecsIUTILITY SUBSTRUCTURE&Award Nctice2b.doc
CITY COUNCIL
ALAN S. NAKANISHI, Mayor
PHILLIP A. PENNINO
Mayor Pro Tempore
SUSAN HITCHCOCK
EMILY HOWARD
KEITH LAND
Jim L Sams
Arrow Construction
7307 Roseville Road #16
Sacramento CA 95842
CITY OF LODI
ELECTRIC UTILITY DEPARTMENT
ALAN N. VALLOW, DIRECTOR
1331 S HAM LANE
LODI, CALIFORNIA 95242-3995
(209)333-6762
FAX (209) 339-6839
November 8, 2001
Re: Utility Substructures -Cherokee Lane and Sunwest Area
H. DIXON FLYNN
City Manager
RANDALL A. HAYS
City Attorney
SUSAN J,BLACKSTON
City Clerk
At the City Council meeting of November 7, 2001, the City Council awarded the bid referenced
above to Kinnan Engineering Inc., Camas Valley, OR, the lowest responsible bidder. The bids
received for this project are tabulated below:
BIDDER
AMOUNT
Kinnan Engineering, Inc., Camas Valley, OR
$68,927.00
Bockmon & Woody Electric Co. Inc., Stockton, CA
99,936.40
Golden State Utility Co., Turlock, CA
111,777.00
Arrow Construction, Sacramento, CA
125,285.00
Cla born Contracting Group, Inc., Auburn, CA
127,789.00
Tim Paxin's Pacific Excavation, Inc., Elk Grove, CA
159,350.00
Aronson Constructors, Inc., Rancho Cordova, CA
169,649.50
The bid bond you submitted with your bid is herewith returned to you.
The City of Lodi wishes to thank you for your interest in this project, and assures you that we
welcome proposals from you in the future.
/Llt4J /flrtC/
Hans Hansen
Manager, Engineering and Operations
Enclosure (1)
c: Electric Utility Director
City Clerk
Purchasing Officer
MAUSEMENGtBid SpecstUTILITY SUBSTRUCTURE&Award Notice2a.doc
CITY COUNCIL
ALAN S. NAKANISHI, Mayor
PHILLIP A. PENNINO
Mayor Pro Tempore
SUSAN HITCHCOCK
EMILY HOWARD
KEITH LAND
Gary Schmidt
Golden State Utility Co
2007 W Tuolumne Road
Turlock CA 95380
CITY OF LODE
ELECTRIC UTILITY DEPARTMENT
ALAN N. VALLOW, DIRECTOR
1331 S HAM LANE
LODI, CALIFORNIA 95242-3995
(209)333-6762
FAX (209) 339-6839
November 8, 2001
Re: Utility Substructures -Cherokee Lane and Sunwest Area
H. DIXON FLYNN
City Manager
RANDALL A. HAYS
City Attorney
SUSAN J.BLACKSTON
City Clerk
At the City Council meeting of November 7, 2001, the City Council awarded the bid referenced
above to Kinnan Engineering Inc., Camas Valley, OR, the lowest responsible bidder. The bids
received for this project are tabulated below:
BIDDER
AMOUNT
Kinnan Engineering, Inc., Camas Valley, OR
$68,927.00
Bockmon & Woody Electric Co. Inc., Stockton, CA
99,936.40
Golden State Utility Co., Turlock, CA
111,777.00
Arrow Construction, Sacramento, CA
125,285.00
Cla born Contracting Group, Inc., Auburn, CA
127,789.00
Tim Paxin's Pacific Excavation, Inc., Elk Grove, CA
159,350.00
Aronson Constructors, Inc., Rancho Cordova, CA
169,649.50
The bid bond you submitted with your bid is herewith returned to you.
The City of Lodi wishes to thank you for your interest in this project, and assures you that we
welcome proposals from you in the future.
Hans Hansen
Manager, Engineering and Operations
Enclosure (1)
c: Electric Utility Director
City Clerk
Purchasing Officer
\\EUDPDC120003\EUD-DATA\USER\ENG\Bid Specs\UTILITY SUBSTRUCTURES\Award Nchce2.doc