Loading...
HomeMy WebLinkAboutAgenda Report - October 19, 1994 (64)4 + CITY OF LODI COUNCIL COMMUNICATION A AGENDA TITLE: Contract Award for Pig's Lake Levee Repair ($36,700) MEETING DATE: November 2,1994 PREPARED BY: Public Works Director r RECOMMENDED ACTION: That the City Council adopt the attached resolution awarding the contract for the above project to Altman General Engineering of Yuba City in the amount of $36,700. BACKGROUND INFORMATION: This project will install approximately one hundred lineal feet of erosion - control structures, consisting of logs, stumps and boulders, along the river side of the levee. An impermeable cutoff trench will be installed along the centerline of the levee and a permeable trench will hydraulically connect Pig's Lake with the Mokelumne River. The work will be done this winter while the Woodbridge Irrigation District has its boards removed from the dam. Plans and specifications for this project were approved on August 17, 1994, and bids were received on September 21, 1994. Only two bids were received on that date. The apparent low bidder submitted an improper bid and the second bidder's proposal was almost double in price. Staff recommended that the bids received on September 21 be rejected and the project be rebid. On October 5, the City Council rejected the two bids and authorized the rebidding of the project. The City received the following five bids or this project on October 19: Bidder Location Bid Engineer's Estimate $ 36,330 Altman General Engineering Yuba City $ 36.700 Cimarron Construction Modesto $ 37,380 A.M. Stephens Lodi $ 44,650 Eagle Enterprise Woodbridge $ 52,153 Jardin Pipeline, Inc. Castro Valley $ 53,900 FUNDING: Originally Budgeted: 1994 Budgeted Fund: State Wildlife Conservation Fund Current Appropriation: $41,000 Total Project Estimate: $44,000 Second Bid Opening Date: October 19. 1994 » r.fack L. Ronsko l Public Works Director Prepared by Wesley K. Fujitani. Senior Civil Engineer • JLR/WKFIIm Attachment cc: City Attomey Finance Director Purchasing Officer Lampe Engineering Wildlife Conservation Fund APPROVED---- a CAWARD.DOC THOMAS A. PETERSON City Manager r recycled paper 1DrZ4i 4 =_ RESOLUTION NO. 94-129'.— A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE CONTRACT FOR PIG'S LAKE LEVEE REPAIR WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on October 19, 1994 at 11:00 a.m. for the bid for Pig's Lake Levee Repair, described in the specifications therefor approved by the City Council on August 17, 1994; and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as follows: $IDDER Engineer's Estimate Altman Contractors Cimarron Construction A. M. Stephens Construction Eagle Enterprise Jardin Pipeline, Inc. LOCATION Yuba City Modesto Lodi Woodbridge Castro Valley AMOUNT BIQ $ 36,330 $ 36,700 $ 37,380 $ 44,650 $ 52,153 $ 53,900 WHEREAS, the City Manager recommends that award of the bid for Pig's Lake Levee Repair be made to the low bidder, Altman Contractors of Yuba City, California; NOW, THEREFORE, BE IT RESOLVED by the Lodi City Council that award of bid for Pig's Lake Levee Repair, be and the same is hereby awarded to Altman Contractors of Yuba City, California, the low bidder, in the amount of $36,700. Dated: November 2, 1994 I hereby adopted by the held November 2, ====_�____ certify that Resolution No. 94-129 was passed and City Council of the City of Lodi in a regular meeting 1994 by the following vote: Ayes: Council Members - Davenport, Mann, P::nnino, Snider and Sieglock (Mayor) Noes: Council Members - None Absent: Council Members - None ifer ,'1 Perrin ty Cle 94-129