Loading...
HomeMy WebLinkAboutAgenda Report - October 5, 1994 (69)OR CITY OF LODI COUNCIL COMMUNICATION AGENDA TITLE: Development Impact Mitigation Fee Program Annual Report MEETING DATE: October 5, 1994 PREPARED BY: Public Works Director RECOMMENDED ACTION: None BACKGROUND INFORMATION: State law under which the Development Impact Fee Program was adopted in 1991 requires an annual reporting of revenue and . expenses under the Program. In prior years this was done as part of the Capital Improvement Program which was usually done in the fall. This year, the Capital Budget was included with the City Operating Budget adopted in June, thus the final 93/94 fee program information was not available. The attached sheets list the projects which paid fees and the amounts in each fee category, the projects funded under the program and their expenses in FY 93/94 and interest and other adjustments made to the fund balances. FUNDING: none required Jack L. Ronsko Public Works Director Prepared by Richard C. Prima. Jr.. City Engineer JLR/RCP/pmf Attachment cc: City Engineer Associate Civil Engineer - Development Services APPROVED`_I _--�' -------------- ----- THOMAS A PETERSON a rIL Daox City Manager 93DNFRE-DOC OW224C. ' Impact Fee Fund: Water Appmp. & Enotanb. 8 Project/Fee 0 Paid Guarant'd , Unencumb. Unspent Spent Fiscal Year 93/94 $15,345.45 350.641.00 363,557.30 $0.00 ($397.60) $0.00 $0.00 $28,336.20 $0.00 30.00 $63.386.60 $0.00 $45.235.50 $54,965.40 $235.019.63 $67,660.00 $28.300.37 $22.889.50 $21.727.86 i $12,108.60 $0.00 $918.60 sewer Appmp.3 Enctyrlb. Pard Guaranrd I Unwwanb. a Unspent Spam 30.00 39,434.00 $11,840.20 $0.00 ($4.20) $0.00 $1,110.00 $5,278.80 $0.00 $0.00 $11.808.40 $0.00 $8,427.0 $10.239.60 121.0-525 42 SD Trunk tine w/Sylvan I I I 1 of 8 5+22/94 FEE_MSTXLS Prior year carry over amounts 18.1-450.09 Developments which paid fees. Century M. 11102 0 IF93401 Johnson Ranch 92 S IF93402 Lodi Muslim Mosq P IF93403 UM Dev. 0 IF92311 adjustment Lodi Foursquare C S IF93404 Croce's S IF93405 Century M.11193 S IF93406 U -Haul tt IF93407 Arredondo 0IF93408 Century M. 101 S IF93409 Anaya • IF93410 Towne Ranch #2 S IF93411 Towne Ranch 93 8 IF93412 Deferred fees (prior year RWsOsl: Century M. III #1 111 11792305 Towne Ranch 81 s IF92308 Bangs Ranch 91 S IF92301 Lodi West 91 S IF92312 Proiects funded from fees: 012.0.012.93 Police Patrol vehicle 16.1-460.25 Well 25 121.0-360.01 West Side Fire Station 121.0.370.01 Police Radio Repeater 121.0-500.10 Thurman Street (SD) 121.0.500.85 Traffic Signal, Tumer/LSR/Woodhaver 121 0-525.48 Tienda Dr. SD (Target) 121.0-525.80 Westgate Basin/Park 121.0.760.81 Indoor Recreation Facility $15,345.45 350.641.00 363,557.30 $0.00 ($397.60) $0.00 $0.00 $28,336.20 $0.00 30.00 $63.386.60 $0.00 $45.235.50 $54,965.40 $235.019.63 $67,660.00 $28.300.37 $22.889.50 $21.727.86 i $12,108.60 $0.00 $918.60 sewer Appmp.3 Enctyrlb. Pard Guaranrd I Unwwanb. a Unspent Spam 30.00 39,434.00 $11,840.20 $0.00 ($4.20) $0.00 $1,110.00 $5,278.80 $0.00 $0.00 $11.808.40 $0.00 $8,427.0 $10.239.60 121.0-525 42 SD Trunk tine w/Sylvan I I I 1 of 8 5+22/94 FEE_MSTXLS Carry over projects 18.1-450.09 Oversize Water Mains 18.1.460.99 Preliminary Well SRO Design 121.0-So0.61 Hwy 12 PSR 121.0.500.62 Lower Sac. Prelim. Eng. 121.0-500.64 Traffic Signals (pallial funding) 121.0.500.65 Century Bled widening 121.0-500.66 Hwy 12/LSR la Sw west PUTarget 121.0-500.81 Street Master Plan (repay last pry) 121.0-500.86 Elm St. Wide" W/LSR 121.0-525.41 G -Basin FenwEncay. $15,345.45 350.641.00 363,557.30 $0.00 ($397.60) $0.00 $0.00 $28,336.20 $0.00 30.00 $63.386.60 $0.00 $45.235.50 $54,965.40 $235.019.63 $67,660.00 $28.300.37 $22.889.50 $21.727.86 i $12,108.60 $0.00 $918.60 sewer Appmp.3 Enctyrlb. Pard Guaranrd I Unwwanb. a Unspent Spam 30.00 39,434.00 $11,840.20 $0.00 ($4.20) $0.00 $1,110.00 $5,278.80 $0.00 $0.00 $11.808.40 $0.00 $8,427.0 $10.239.60 121.0-525 42 SD Trunk tine w/Sylvan I I I 1 of 8 5+22/94 FEE_MSTXLS 121.0-525.44 121.0.525.47 121.0 760.79 121.0-525.01 121.0.525.01 Ck Designates Fund Balance Fund Balanc Impact Fee Fund: Water sewer Approp. d Encumb. 3 AppM. 3 Enatxnb. ProjecUFee M Paid Guaranrd Unen=6. Unspent spent Paid Guwanrd UnwwWb. d, Unspent Spent E -Basin (Westgate) Exp. Evergreen Dr. SD. Lodi W., Towne R. Parks d Recreation Master Plan Adiustments: E-wea SO reimbiusenwd E-Basinwestgate Park Acq. Reimb. Master Plans (ropyP-cpq $62,515.92 $90.172.95 Interest paid on fund ($1,985.40) $686.58 Program Adn instration (City Stafrj transfer for past projects 1.97% of prior year revenue: $4,803.22 Ised• (other fund balance Ors) 58,299.11 Subtctals: $303,759.00 $0.00 $271,337.88 $67,880.00 $108,646.71 $58,820.38 50.00 $0.00 $0.00 $90,172.95 I Reserve for Appropriated Projects: $339,017.88 $0.00 $67,827.83 $52,054.41 Available (w/o designated reserve): $406,845.71 $52.054.41 Total Fund (widesignated reserve): $67,827.83 $52,054.41 r e (Avail.) plus Guaranteed Revenue: 2 of 8 OWN FEE_ ESMS Impact Fee Fund: Storm Drainage ProieWFee N I Paid Guaranrd 121.0-525.42 SD TruM line w/Syhan $214,162.61 $67.907.00 $85.227.10 $554.40 (x'60) $403.20 $2,031.30 $37,997.40 $15.225.00 $201.60 $84.998.20 $176.40 $60.658.50 $73.705.80 Approp. d EncAmb. & Unencumb. Unspent Spent Fiscal Year 93/9. 18.1-450.09 Prior year carry over amounts 18.1.460.99 Developments which paid fees: Century M.111 012 N IF93401 Johnson Ranch #r2 N IF93402 Lodi Muslim Mosq N IF93403 LJM Dev. N IF92311 adjustment Lodi Foursquare C N IF93404 Croce's N IF93405 Century M. 111 03 N IF93406 U -Haul N IF93407 Arredondo N IF93408 Century M. 111 N IF93409 Anaya N IF93410 Towne Ranch N2 N IF93411 Towne Ranch 03 N IF93412 Deferred fees prior Yearoroiects): Century M. 11101 N IF92305 Towne Ranch 01 N IF92308 Bangs Ranch 01 N IF92301 Lodi West 91 N IF92312 Proiects funded from fees: 012.0-012-93 Police Patrol Vehicle 181-460.25 Well 25 121.0-360.01 West Side Fire Station 121.0-370.01 Police Rada Repeater 121.0-500.10 Thurman Street (SD) 121.0.500.85 Traffic Signal, Tumer/LSRIWoodhavel 121.0-525.48 Tienda Dr. SD (Target) 121.0-525.80 Westgate Basin/Park 121.0-760.81 Indoor Recreation Facility 121.0-525.42 SD TruM line w/Syhan $214,162.61 $67.907.00 $85.227.10 $554.40 (x'60) $403.20 $2,031.30 $37,997.40 $15.225.00 $201.60 $84.998.20 $176.40 $60.658.50 $73.705.80 Approp. d EncAmb. & Unencumb. Unspent Spent Carry over projects 18.1-450.09 Oversize Water Mains 18.1.460.99 Preliminary Well Site Design 121.0-500.61 Hwy 12 PSR 121.0-500.62 Lower Sac. Prelim. Eng. 121.0-500.64 Traffic Signals (partial funding) 121.0-500.65 Century Blvd widening 121.0-500.66 Hwy 12ILSR Q Sunwest Pl rarget 121.0-500.81 Street Master Plan (repay past project) 121.0-500.86 Elm St. Widening W/LSR 121.0-525.41 G -Basin Fence/Excay. 121.0-525.42 SD TruM line w/Syhan $214,162.61 $67.907.00 $85.227.10 $554.40 (x'60) $403.20 $2,031.30 $37,997.40 $15.225.00 $201.60 $84.998.20 $176.40 $60.658.50 $73.705.80 Approp. d EncAmb. & Unencumb. Unspent Spent Streets Paid Guarant'd If Approp. a Enctimb. 3 Unencumb. Unspent Spent :: ...::::..::.:::.: ,::.:..«,,. <.,:o:.o>, J \h 1� : rc;.v :.:t ::.:ao::a:am..h :;-x...:,:;:•8;;g:3i N A O' J A' `. '. •.ti,:ai:'sa::,:'r:,sycxa.:.:: Nw;::�<xr;_;: �:.;•.pcx ..•�'Y . G 9iL,I+ �,,y WIN°r'`'fs'` .>t'°Ee '.,f.•.''. �``�`'sr.f.'�"yn`,a $277 597.G $48,416.00 $60.764.80 $0.00 ($4.20) $0.00 $0.00 $27.091.20 $16,980.00 $470.40 $60.601.60 $411.60 $43.248.00 $52.550.40 $34.000.00 $19.506.01 $26.493.99 $75,000.00 $150.901.25 $54.306.75 $92.000.00 $19,014.25 $985.75 $29.768.09 $0.00 $1.700.00 i1T0.086.80 $763.00 ($0.00) $83.018.21 $0.00 $10.144.0 1,•100,432.88 $0.00 $0.00 5.38.956.54 3 Of 8 Orzm FEE_WST.XLS 121.0.525.44 121.0.525.47 121.0.760.79 121.0.525.01 121.0.525.01 CM Designate Fund Balanu Fund Balanc Impact Fee Fund: Storm Drainage Street$ Approp. d Encurnb. a I Approp. 6 Entomb. d ProjeWFes if Pald Guaranrd Unenaxnb. Unspent Spent Paid Guaranrd Unwmmb. Unspent Spent E -Basin (Westgate) Exp. $49,S25.70 $44,189.49 Evergreen Dr. SD, Lodi W., Towne R. $0.00 553.135.50 Parks S Recreation Master Plan Adiustments: E -area SD reimbursement $68,753.66 $110,375.50 E-B4nlWestgate Park Acq. Reimb. above $65.870.84 Master Plans (spay proiacq [ocluded Interest paid on fund $43.368.96 518,272.71 Program Adminstration (City staff) 1 transfer for past projects 1($139,389.42) Q 8.38% of prior yaw frAmue: =26.558.48 sed projects - (other fund balance ad(s) 50.70 Subtotals: $471,945.26 $0.001 — $378,18061 $0.00 $327,878.06 $328,802.51 $0.00 $324,355.15 $0.00 $149,663.71 1 Reserve for Appropriated Projects: $378,180.61 $324,355.15 $468,397.65 $177,264.96 Available (wro designated reserve): $846.578-26 $501,820.11 Total Fund (widesignated reserve): $468,397.65 5177,264.96 , e (Avail.) plus Guaranteed Revenue: 4of8 OrAMW FEE_HIST= Impact Fee Fund Police Appnop. 3 Erwunb. a Proiect/Fee if Paid Guaranrd Unancumb. Unspent Spent 121.0525.42 SD Trunk line %/Sylvan Fire Paid $4.806.00 $6.031.80 $0.00 $2.60 $0.00 $0.00 $2.175.00 $72.80 $53.70 AWW. a Enclrffi. d Gusranrd I Urlancumb. Unspent $32,913.20 $2,669.20 i $6.015.60 $4.293.00 $5.216.40 $2.719.80 Fiscal Year 93/9 '..r1r}ri Oversize Water Mains 18.1-460.99 Prior year carry over amount: 121.G-SW.61 585.447.11 1210-500.62 Lower Sac. Prelim. Eng. Developments which paid fees: Traffic Signals (partial funding) 121.0500.65 Century Blvd widening Century M.111 02 i IF83401 910,W7.00 Street Master Plan (repay past project] 121.0-500.86 Johnson Ranch 82 S IF93402 $12,622.10 Lodi Muslim Mosq 9 IF93403 $0.00 UM Dev, i IF92311 adjustment $2.80 Lodi Foursquare C i IF93404 $0.00 Croce's i IF93405 $0.00 Century M. 11103 i IF93406 $5,627.41 U -Haul i IF93407 $6,990.00 Arredondo S IF93408 $282.40 Century M. 191 i IF93409 $12.588.2! Anaya 8IF93410 6247.10 Towne Ranch i2 a IF93411 $8.983.5( Towne Ranch 93 i IF93412 $10.915.8( Deferred fees (prior Mr prolecta): Century M. 111 01 i IF92305 $5,805.30 ($5.805.3( Towne Ranch 01 of IF92308 511,421.90 ($11.421.9( 1 Bangs Ranch it i IF92301 $8,880.00 ($8.880.0( Lodi West tit a IF92312 $14,599.60 ($14.599.6( Protects funded from fees: 012 0012.93 Police Patrol Vehicle $0.00 $25.000.00 18.1-460.25 Well 25 121.0360.01 West Side Fire Station 121.0370.01 Police Rada Repeater $3,776.89 9383.41 $26,039.70 121.0500.10 Thurman Street (SD) 121.0500.85 Traffic Signal, Turner/LSRAIVoodhavu 121.0525.48 Tienda Dr. SD (Target) 121.0525.80 Westgate Basin/Park 121.0-760.81 Indoor Recreation Facility 121.0525.42 SD Trunk line %/Sylvan Fire Paid $4.806.00 $6.031.80 $0.00 $2.60 $0.00 $0.00 $2.175.00 $72.80 $53.70 AWW. a Enclrffi. d Gusranrd I Urlancumb. Unspent $32,913.20 $2,669.20 i $6.015.60 $4.293.00 $5.216.40 $2.719.80 Carry over proiects 18.1-450.09 Oversize Water Mains 18.1-460.99 Preliminary Wed Site Design 121.G-SW.61 Hwy 12 PSR 1210-500.62 Lower Sac. Prelim. Eng. 121.0500 64 Traffic Signals (partial funding) 121.0500.65 Century Blvd widening 121 Z-500.66 Hwy 12/LSA Q Sulwest PL/Target 121.0500.81 Street Master Plan (repay past project] 121.0-500.86 Elm St. Widening W/LSR 121.0525.41 G -Basin Fence/Excay. 121.0525.42 SD Trunk line %/Sylvan Fire Paid $4.806.00 $6.031.80 $0.00 $2.60 $0.00 $0.00 $2.175.00 $72.80 $53.70 AWW. a Enclrffi. d Gusranrd I Urlancumb. Unspent $32,913.20 $2,669.20 i $6.015.60 $4.293.00 $5.216.40 $2.719.80 ($2,7119.60 $5,350.80 ($5,350.80 $4.160.00 ($4.160.00 $6.976.80 ($6,976.80 120,000.00 5 of 8 9/22/00 FEE_HISTJU Impact Fee Fund: Police Fire Approp. b Encumb. a Approp. a Encumb. a Project/Fee 6 Paid Guarant d Unencumb. Unspent Spent Paid Gusranrd Unencurnb. Unspent Spent 121.0-525.44 E -Basin (Westgate) Eip. 121.0-525.47 Evergreen Dr. SD, Lodi W., Towne R. 121.0-760.79 Parks d Recreation Master Plan Adiustments: 121.0.525.01 Earea SD reirnbursernert t� I 121.0-525.01 E-Basin/Westgate Park Acq. F •imb. 1 Master Plans Re"y w"m Interest paid on fund $6.086.48 ` $2,440.05 Program Adminstration (City Staff transfer for past projects Closedp_ojects • (other fund balance adps) $75,994.68 $82,855.20 $3,776.89 $383.41 $51,039.70 $.'u4,799.35 531,920.201 $20.000.00 $0.00 50.00 1 Subtotals: Designated Reserve for Appropriated Projects: $4,160.30 520.000.00 Fund balance Available (w/o designated reserve): 598,526.93 $38,953.01 $102.687.23 F $58.953.01 Total Fund (w/designated reserve): $181,382.13 $70,873.21 Fund Balance (Avail.) plus Guaranteed Revenue: 6 Of 8 W2244 FEE_HIST.XLS Impact Fee Fund P"s a Recreation Proiect/Fee N t Paid Guamrvrd 121.0525.42 SD Trunk line w/Sylvan $106,287.00 $132,141.10 $0.00 ($21.00) $0.00 $0.00 $0.00 $0.00 $0.00 $292,342.80 $58.913.411 $131.786.2(1 $94.048.50 $114.277.8(1 $62,655.40 ($62.655.4('1 $123.274.20 ($123,274.2(1 $95.840.00 ($95.840.0(1 $0.00 $0.0( General City Approp. a Enctunb. a I Appmp. a Emumb. a Unenwmb. Unspent Spent I Paid Guararlyd Unancumb. Unspent Spent $20,986.45 $0.00 $7,405.55 $300.00 $8.787.00 $76,291.10 $0.00 $63.00 $0:00 $0.00 $0.00 Sabo $34,013.40 $76.086.20 $54.298.50 $65.977.80 533.367.40 ($33 $65.650.20 ($8S $51,04000 051 $88.243.60 ($88 7 of 8 9f22(94 FEE HIST.XLS Fiscal Year 93/94 Prior year ca" over amounts Developments which paid fees: Century M. 11102 N IF93401 Johnson Ranch 92 N IF93402 Lodi Muslim Mosq N IF93403 LJM Dev, N IF92A I adjustment Lodi Foursquare C N IFF3404 Croce's N IF'13405 Century M. 11103 N IF 4406 U -Haul - N IF9 407 Arredondo 9IF93108 Century M. 1 fit N IF93409 Araya N 1 F9341 Towne Ranch 02 N IF93411 Towne Ranch 43 N IF93412 Deferred fees (prior yearamiects): Century M. 111# 1 N IF92305 Towne Ranch N1 N IF92308 Bangs Ranch N1 N IF92301 Lodi West Nt N IF92312 Proiects funded from fees: 012.0-012.93 Police Patrol Vehicle 18.1-460.25 Well 25 121.0.360.01 West Side Fire Station 121.0-370.01 Police Radio Repeater 121.0-500.10 Thurman Street (SD) 121.0.500.85 Traffic Signal, TumedLSR/Woodhavei 121.0.525.48 Tienda Dr. SD (Target) 121.0-525.80 Westgate Basin/Park 121.0-760.81 Indoor Recreation Facility Carry over projects 18.1-450.09 Oversize Water Mains 18.1-460.99 Preliminary Well Site Design 121.0-500.61 Hwy 12 PSR 121.0-500.62 Lower Sac. Prelim. Erg. 121.0500.64 Traffic Signals (partial funding) 121.0500.65 Century Blvd widening 121.0500.66 Hwy 12/LSR Q Sunwest PI./TargM 121.0-500.81 Street Master Plan (repay past project) 121.0-500.86 Elm St. Widening W/LSR 121.0525.41 G -Basin Fence/Exeay. 121.0525.42 SD Trunk line w/Sylvan $106,287.00 $132,141.10 $0.00 ($21.00) $0.00 $0.00 $0.00 $0.00 $0.00 $292,342.80 $58.913.411 $131.786.2(1 $94.048.50 $114.277.8(1 $62,655.40 ($62.655.4('1 $123.274.20 ($123,274.2(1 $95.840.00 ($95.840.0(1 $0.00 $0.0( General City Approp. a Enctunb. a I Appmp. a Emumb. a Unenwmb. Unspent Spent I Paid Guararlyd Unancumb. Unspent Spent $20,986.45 $0.00 $7,405.55 $300.00 $8.787.00 $76,291.10 $0.00 $63.00 $0:00 $0.00 $0.00 Sabo $34,013.40 $76.086.20 $54.298.50 $65.977.80 533.367.40 ($33 $65.650.20 ($8S $51,04000 051 $88.243.60 ($88 7 of 8 9f22(94 FEE HIST.XLS u �k@ §�2 464 §R§ E � § � m 4- 0 OD v