Loading...
HomeMy WebLinkAboutAgenda Report - September 7, 1994 (45)OI CITY OF LODI COUNCIL COMMUNICATION AGENDA TITLE: Contract Award for Treated Wastewater Pump and Motor. White Slough Water Pollution Control Facility Equalization Pond, 12751 North Thornton Road (522,150) MEETING DATE: September 7, 1994 PREPARED BY: Public Works Director RECOMMENDED ACTION: That the City Council adopt the attached resolution awarding the contract for the above project to Pump Repair Service Company of Daly City in the amount of $22,150.00. BACKGROUND INFORMATION: This project provides for the purchase and installation of a small low -lift wastewater pump that transfers effluent from the holding ponds to irrigate the fields adjacent to the treatment plant. This equipment is required to more efficiently handle the plant effluent to the existing and recently expanded farm operations. On July 6, 1994. eight bids were received for the Treated Wastewater Pump and Motor. A copy of the bid tabulation sheet is attached. The first four bids do not meet the specifications and are unacceptable. The fifth bid, a Verti-Line Pump furnished by Pump Repair Service Company, is being recommended for the award of the contract. The bid proposal from Pump Repair Service Company also had two informalities that staff is asking Council to waive in awarding the contract: 1. Pump Repair Service Company used one bid proposal to furnish a price for both the Verti-Line Pump and the Prime Pump. Deputy City Attorney Luebberke reviewed the bid proposal and determined that the two bids on one form was not a problem and that the informality could be waived by the Council. 2. The bid proposal from Pump Repair Service Company also indicated that the Verti-Line Pump would be delivered eight to ten weeks after the submittals had been approved. The specifications provided for 30 working days. Pump Repair Service Company informed the City that Verti-Line Pump Company was recently purchased by Aurora Pump Company and that there is a large backlog of orders because of the merger. The additional few weeks of delivery time on the pump and motor will not cause a problem at the treatment plant. APPROVED THOMAS A. PETERSON recruea paver City Manager CAWARD DOC y c I Contract Award for Treated Waster..ater Pump and Motor, White Slough V' i 4,ilr Pollution Control Facility Equalization Pond, 12751 North Thornton Road ($22,150) September 7, 1994 Page 2 Bidder Engineers Estimate Location Bpi 1. Howk Systems Modesto $13,800.00 2. Pump Repair Service Co. Daly City $19,850.00 3. Moorman's Water Systems, Inc. Stockton $19,874.00 4. Moorman's Water Systems, Inc. Stockton $ 20,849.00 5. Pump Repair Service Co. Daly City $ 22,150.00 6. Noack Pump Stockton $ 22,623.00 7. Pete Fuller Construction Vacaville $ 25,298.00 8. Kirby's Pump and Mechanical Inc. Rancho Cordova $ 58,750.00 A comparison was made between the cost of running two of the existing 60 horsepower pumps or running one 60 horsepower pump with the new 20 horsepower pump. The annual energy and maintenance savings will be approximately $9,000.00. This savings will pay for the purchase and installation of the 20 horsepower pump and motor in less than three years. As this is a reasonable payback period for any capital improvement, staff is recommending that Pump Repair Service Company be awarded the contract for the treated wastewater pump and motor. FUNDING: Originally Budgeted: 1993/94 Budgeted Fund: Wastewater Capital Reserve Fund Current Appropriation: $22,000.00 Total Project Estimate: $26,500.00 Bid Opening Date: July 6, 1994 Ja L. Ronsko 1 PubM Works Director .` 11 Prepared by Wesley K. Fujitani, Senior Civil Engineer JLR..NKF/Im Attachments cc: City Attorney Deputy City Attorney Purchasing Officer Water/Wastewater Superintendent Pump Repair Service Company Prime Pump Corp., Attn- John Theodosi CAWARD.DOC City of Lodi ` Public Works Department Tabulation of Bids Received on 716194 Project: Treated Wastewater Pump 3 Motor Company Engineers Estimate Howk Systems Pump Repair Service Co. Moorman's Water Systems, Inc, Moorman's Water Systems, Inc. Pump Repair Service Co. Noack Pump Pete Fuller Construction Kirby's Pump b Mechanical Inc. Pump Manufacturer Not Subrn*W Prone Pump Fairbanks Morse Pump Carp. Peerless Pump Ved line Pump Verb- ine Pump Floway Pump Mot Subm0ed Bid is rejected because of incomplete bid submittal. Lump Sum Price 322,000.00 313,800.00 s19,85o.00 519,874.00 520,849.00 522.150.00 $22.523.00 325.298.00 558.750.00 I RESOLUTION NO. 94-99 s:oaassasassssazsaaa � A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE BID FOR TREATED WASTEWATER PUMP AND MOTOP, WHITE SLOUGH WATER POLLUTION CONTROL FACILIT"f EQUAL27J.:tON POND 12751 NORTH THORNTON ROAD a saaaaaaaaasaazaaaz:aamaas: saamaaassaasaa sass a aaa aaas asazsaaz a saaz arias WHEREAS, in answer to notice duly published in accordance with law and the order of thie City Council, sealed bids were received and publicly opened on July 6, 1994 at 11:00 a.m. for the bid for Treated Wastewater Pump and Motor, White Slough Water Pollution Control Facility Equalization Pond, 12751 North Thornton Road, described in the specifications therefor approved by the City Council on June 1, 1994; and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as follows: Bidder Engineer's Estimate Howk Systems Pump Repair Service Co. Moorman's Water System, Inc. Moorman's Water System, Inc. Pump Repair Service Co. Noack Pump Pete Fuller Construction Kirby's Pump and Mechanical Inc. Location Hiid $22,000.00 Modesto $13,800.00 Daly City $19,850.00 Stockton $19,874.00 Stockton $20,849.00 Daly City $22,150.00 Stockton $22,623.00 Vacaville $25,298.00 Rancho Cordova $58,750.00 WHEREAS, the City Manager recommends that award of the bid for Treated Wastewater Pump and Motor, White Slough Water Pollution Control Facility Equalization Pond, 12751 North Thornton Road be made to the responsible bidder whose proposal and equipment met City of Lodi specifications, Pump Repair Service Company of Daly City; NOW, THEREFORE, BE IT RESOLVED by the Lodi City Cotsicil that award of bid for Treated Wastewater Pump and Motor, White Slough Water Pollution Ccntrol Facility Equalization Pond, 12751 North Thornton Road be and the same is hereby awarded to Pump Repair Service Company of Daly City, in the amount of $22,150.00. Dated: September 7, 1994 I hereby certify that Resolution No. 94-99 was passed and adopted by the City Council of the City of Lodi in a regular meeting held September 7, 1994 by the following vote: Ayes: Council Members - Mann, Pennino, Snider and Sieglock (Mayor) Noes: Council Members - Davenport Absent: Council Members - None ife Perrin ity Cl k 94-99 CITY COUNCIL JACK A. SIECLOCK. Mavor STEPHEN I MANN Mayor Pro Tempore RAY C. DAVENPORT PHILLIP A. PENNINO JOHN R. (Randy) SNIDER CITY OF LODI CITY HALL. ':1 WEST PINE STREET P O BOX 3006 LOOI. CALIFORNIA 95241.1910 (2091 334-5634 FAXI.M) I)Iti b$ PUMP REPAIR SERVICE COMPANY P 0 BOX 34321 SAN FRANCISCO CA 94134 August 30, 1994 PRIME PUMP CORPORATION ATTN JOHN THEODOSI 660 S 31ST ST RICHMOND CA 94804 THOMAS A PETERSON Gtr Manager IFvNIFFR .M PERRIN Cov Clerk BOB McNATT Clty Attornev SUBJECT: Contract Award for Treated Wastewater Pump and Motor, White Slough Water Pollution Control Facility Equalization Pond, 12751 North Thornton Road ($22,150) Enclosed is a copy of background information on an item that is on the City Council agenda of Wednesday, September 7, 1994, at 7 p.m. The meeting will be held in the City Council Chamber, Carnegie Forum, 305 West Pine Street. This item is on the consent calendar and is usually not discussed unless a Council Member inquests discussion. The public is given an opportunity to address items on the consent calendar at the appropriate time. If you wish to write to the City Council, please address your letter to City Council, City of Lodi, P O. Box 3006, Lodi, California, 95241-1910. Be sure to allow time for the mail. Or, you may h,und-deliver the letter to City Hall, 221 West Pine Street If you wish to address the Council at the Council meeting, be sure to fill out a speaker's card (available at the Carnegie Forum immediately prior to the start of the meeting) and give it to the City Clerk. If you have any questions aboL:t communicating with the Council, please contact Jennifer Perrin, City Clerk, at (209) 333-5702. If you have any questions about the item itself, please call Wes Fujitani at (209) 333-6706. Jack L:. Ronsko Public Works Director JLRArn Enclosure cc: City Clerk f' NCMTGALVD DOC