AGENDA TITLE: Plans and Specifications and Advertisement for Bids for Westgate Park/Basin
Chain Link Fence
MEETING DATE: August 3, 1994
PREPARED BY: Public Works Director
RECOMMENDED ACTION: That the City Council approve the plans and specifications for the above
project and authorize advertising for bids.
BACKGROUND INFORMATION: This project consists of installing the permanent perimeter fence
around the top of the basin. A temporary fence was installed by
the contractor during excavation of the basin. That fence is being
maintained on a rental basis until the permanent fence is installed.
Some additional fencing will to constructed along the southern and westem boundaries of the park as
the adjacent residential lots are developed and as the balance of Applewood Drive is completed.
FUNDING: Originally Budgeted: 1992/93
Budgeted Fund: Capital Outlay Reserve Fund
Current Appropriation: $93,715 (total improvements)
Total Project Estimate: $57,000 (this phase)
Bid Opening Date: 8/24/94
Jack . Rorsko
Publi Works Director
Prepared by Mark J. Lindseth, Associate Civil Engineer