Loading...
HomeMy WebLinkAboutAgenda Report - April 6, 1994 (79)OF CITY OF LODI COUNCIL COMMUNICATION AGENDA TITLE: Federal Funding of Street Lighting (information Only) MEETING DATE: April 6, 1994 PREPARED BY: Public Works Director RECOMMENDED ACTION: Information only. BACKGROUND INFORMATION: As indicated in the Capital Improvement Program report made to the City Council in the fall of 1993, staff has pursued obtaining federal grants for street lighting projects. We recently received word from Caltrans, who administers these funds, that we have competed successfully on two of three applications we submitted under the Hazard Elimination Safety Program. They are: • Cherokee Lane Arterial Lighting - Installing 73 additional lights between Pioneer Drive and Almond Drive, $290,000 at 100% reimbursement. • Various Arterial and Collector Streets - Installing 167 additional lights on various streets per the attached list, $289,000 at 100% reimbursement. We have a number of procedural hoops to go through before we can finally secure the funds, and we will have to award contracts and be reimbursed afterwards. The biggest concern is that the Program is over programmed by 25% and project plans and specifications will be approved on a first -come -first- served basis. This may be a problem on the Cherokee Lane project if we wish to coordinate this project with the revitalization study. We should discuss this with Michael Freedman in the near future. This is the first time we can recall that the City has obtained these funds. Thanks and congratulations should go to Electric Utility engineering and Public Works traffic engineering staff who put together the applications in a very short time frame in order to meet the submittal deadline. FUNDING: Hazard Elimination Safety Program. eL.c onsko orks Director JLRJrs cc: Electric Utility Director City Engineer Traffic Engineer Michael Freedman APPROVES.---- �'-- - --� --- ---- ----- — THOMAS A PETERSON eCy De City Manager CC STUGMTF DOC 03119+ ARTERIAL AND COLLECTOR STREET LIGHTING (PROJECT B) COST BREAKDOWN Street Limits Class LUMINAIRE 100 watt 100 watt 250 watt 250 watt on steel on wood on steel on wood standard standard standard standard Cost (ea.) Lighting Cost Engineering/ Contingencies Date: Sept 29,1993 ' Total Traffic Volume avg vshktes per Cost day Kettleman west city limit to Hwy 99 arterial - - - 15 $400 $6,000 $3,111 $9,111 20,250 Lodi all arterial - 13 - $2,000 $26,000 $2,794 $28,794 13,000 Ham Turner to Kettleman arterial - - 17 - $2,000 $34,000 $3,653 $37,653 12,750 Victor Cherokee to east city limits arterial - 3 - $2,000 $6,000 $3,889 $9,889 12,500 tr Lockeford Hutchins to Cherokee arterial - - 12 - $2,000 $24,000 $2,579 $26.579 10.000 Lockeford Hutchins to Cherokee arterial - - 1 $400 $400 $34 $434 10,000 Hutchins Lockeford to Kettleman arterial - 13 - - $400 $5,200 $447 $5,647 9,000 Stockton all arterial - 10 - - $400 34,000 $344 $4,344 6,750 Elm Lower Sac to Ham arterial - - 10 - $2,000 $20;000 $2,149 $22,149 5,750 Lockeford Ham to Hutchins collector 9 - - - $2,000 $18,000 $4,634 $22,634 9,500 Church Turner to Lockeford collector 4 - - - $2,000 $8,000 $638 $8,638 5,250 Lockeford Mills to Ham collector 3 - - $2,000 $8,000 $478 $6,478 5,25Q Lockeford Mills to Ham collector - 8 - $400 $3,200 $204 $3,404 5,250 Pine Stockton to Guild collector - 2 - - $400 $800 $165 $965 5,000 Central Locust to Kettleman collector 4 - - - $2,000 $8,000 $638 $8,638 4,750 Tokay all collector 12 - - - $2,000 $24,000 $1,913 $25,913 4,250 Elm Ham to Cherokee collector 4 - - - $2,000 $8,000 $2,059 $10,059 3,500 Fairmont Lodi to Kettleman collector 4 - - - $2,000 $8,000 $638 $8,638 3,500 Cluff all collector 4 - - - $2,000 $8,000 $638 $8,638 3,000 Vine all collector 13 - - - $2,000 $26,000 $2,072 $28,072 3,000 Mills Lodi - south collector 5 - - - $2,000 $10,000 $2,060 $12,060 2,000 Mills Lodi - south collector - 1 - - $400 5400 02 $482 2,000 HES ART.XLS