Loading...
HomeMy WebLinkAboutAgenda Report - April 20, 1994OF CITY OF LODI is COUNCIL COMMUNICATION AGENDA TITLE: Plans and Specifications and Advertisement for Bids for Remodel of Carnegie Forum Basement. Remodel of City Hall Annex/Beckman Building. and Installation of Temporary Trailers MEETING DATE: April 20, 1994 PREPARED BY: Public Works Director RECOMMENDED ACTION: That the City Council approve the plans and specifications for the above project and authorize advertising for bids. BACKGROUND INFORMATION: This project includes the remodeling of the Carnegie Forum basement, the remodel of the City Hall Annex/Beckman Building, and installation of temporary trailers as the first phase of work to be completed under the Civic Center Improvements Project. In January 1993, the firm of Wenell Mattheis Bowe was retained by the City Council, after being chosen by an architectural selection committee, to do investigative and schematic design work for City Hall, the basement of the Carnegie Forum, and detailed design of the City Hall Annex/Beckman Building (Phase 1). On June 2, 1993, the City Council approved Phase II of architectural and engineering services to remodel the Carnegie Forum basement. On November 17, 1993, the City Council authorized the architectural work needed to complete the Civic Center Improvements Project. Included in this scope of work is to remodel the existing City Hall making it: a) handicap accessible (meeting Americans with Disabilities Act (ADA) requirements), b) structurally sound, c) more mechanically efficient, d) fire safe through installation of fire sprinklers, and e) more space efficient with minimal changes to better serve the public and staff. The plans and specifications for the remodel of City Hall will be brought to Council for approval in September 1994, While City Hall is being remodeled, other working spaces need to be provided for City staff. The Council, through this process, has chosen to utilize the Carnegie Basement, the City Hall Annex/Beckman Building, and a number of temporary trailers to house staff while City Hall undergoes this major remodeling. The plans and specifications are now complete for the remodel of the Carnegie Forum basement, the remodel of the City Hall Annex, and the lease and installation of temporary trailers. Included in the work will be the computer and communication link which entails site conduit installation. A separate contract will be let for installation of all voice and data cabling and connection devices. We will be using state-of-the-art fiber optic cable which will allow us to utilize, now and in the future, the new and emerging communication standards. It was also recommended to the City Council that the entry plaza APPROVED _.. THOMAS A- PETERSON City Manager �i •sc,c.ao oagw CC -1 CPsaA. DOC 04113,54 Plans and Specifications ari "Advertisement for Bids for Remodel ot'carnegte Forum Basement. Remodel of City Hall Annex/Beckman Building. and Installation of Temporary Traders April 20, 1994 Page 2 and handicap ramps to provide accessibility to the front of the City Hall be undertaken as a separate project to be funded by Block Grant monies. At the April 6. 1994, Council Meeting. the City Council voted to earmark $90.000 of Block Grant funds for this work. Now that more detailed drawings are completed, the estimate, attached as Exhibit A. has been revised. The total project estimate has increased by $76,000. primarily for the following reasons: a. Minor changes in architectural scope of work $ 9,580 b. City Hall Annex improvements $37.000 c. Computer and communication link $55.000 d. Security system $ 5,000 As a part of the November 1993 estimate, two items were still oeing evaluated. One, the office systems furniture, which is now anticipated to be less than originally estimated; and second, the computer and communication link, which represents the most significant increase from the original estimate. This increase is due to changing to a fiber optic cabling system which will be installed throughout the Civic Center. This type of cable accommodates both the local area network (PCs) and the main frame, AS400 systems, and will provide for both computer and communication links between all Civic Center facilities. A security system is now being recommended for the facilities under this contract and the future City Hall remodel. The increase in the City Hall Annex improvements of $37,000 is primarily due to the extent of HVAC work needed and energy/code requirements that don't allow reuse of existing lighting as originally planned. Also attached, as Exhibit B. is the most current revised schedule. FUNDING: Originally budgeted: 121.0-350.61 (City Hall Expansion and Remodel) Refer to Exhibit A for breakdown of funding sources. Bid Opening Date: May 19, 1994 lr'/l 1 Ja L. Ronsko Publi Works Director Prepared by Dennis J. Callahan, Building and Equipment Maintenance Superintendent JLR/DJC/Im Attachments cc: City Attorney Building and Equipment Maintenance Superintendent Wenell Mattheis Bowe Purchasing Officer CPSSA. DOC 41 t 3194 ~yYe LO/3DI CIVIC CENTER IMPROVEMENT TOTAL PROJECT ESTIMATE Architectural Services first phase (Trailers, Beckman Renovation Investigate City Hall/Camegic; $ 122,353 second phase (Carnegie Design, PS&E) 18,360 third phase (City Hall Design, PS&E) 135,089 (4) changes in scope 9.580 $ 285,382 GAil�v� s ra April 1994 November 1993 March 1993 Estimate Estimate Estimate $ 286,000 $ 276,000 $ 263,000 City Hall Annex Improvements $ 355.000 Renovation $ 305,000- Parking 05,000-Parking Lot 50.000 $ 355,000 Temporary Office Improvements $ 745,000 Carnegie Basement Renovation $ 248,000- 48,000•Trailer TrailerLease 118,000 Trailer Appurtenances 70,000 Furniture Systems 170,000 Computer & Communication Link 123,000 *Conduit Installation $ 33,000 *Voice & Data Cabling/Connection 90.000 $123,000 Miscellaneous City Hall Remodel Renovation Security Systems Entry Plaza & Handicap Ramps S 122.353 18.360 135.081 $ 275.802 $ 318,000 268.000 50, $ 318.000 $ 702,000 248.000 118,000 69,000 183,000•' 68,x.. 16.000 16.000 $ 735,000 = 702,000 $1,448,000 $1,443,000 $1,443,000 5.000 $1,448,000 TOTAL PROJECT ESTIMATE architectural fees already encumbered TOTAL FUNDING PROJECTION Unencumbered Balance Block Grant Funds/94-95 (Entry Plaza & Ramps) City Hall Litigation to Date Development Impact Mitigation Fees (GFI) 93-94 94-95 (& 95-96, if required) TOTAL $ 705,000 $1,343,000 $2,924,000 $2,848,000 $2,564,000 (276,000)14( 1,000) $2,648,000 $2,707,000 $1,476,000 $1,622,000 90,000 109,000 105,000 105,000 440,000 328,000 537.000 543,000 $ 2,648,000 $2,707,000 • There are $18,000 worth of possible deducts which could reduce these amounts. "These estimates were stili being evaluated. COSTREVIDOC 04/13f94 m mmmmm mmmmm mmmmm mm :-x j q To: Mayor Sieglock and Member of the City Council From: Ken Cantrell, President, Lodi Downtown Business Association Regretably the LDBA is unable to be present at this evening's meeting. However we would like to share our view of the proposed capital improve- ments for City Hall. The LDBA has gone on record in the past in support of using existing downtown buildings for city services. LDBA remains in full support of the City of Lodi's proposed capitol improvements for administrative offices. We realize that certain improvements are dictated by the Americans with Disabilities Act arid other, government regulations. With this in mind, the LDBA feels that improvements to City Hall are in effect investments in L --:-di and dovetail nicely with our Downtown Revital izat ic-ri efffi_-rts. We ,rye to move for -ward with needed impre-vements wing our- existing downt-:-wn buildings. Sir Icere 1 y , Ki�rrr�et h Cant re 1 1 , Le -di U wnt _wn B.�siress G1�s •c.at i..n