AGENDA TITLE: Contract Award for Civic Center Improvements, City Hall Annex Renovation,
Carnegie Basement Renovation, Portable Trailers ($619,300)
MEETING DATE: June 15, 1994
PREPARED BY: Public Works Director
RECOMMENDED ACTION: That the City Council adopt the attached resolution awarding the
contract for the above project to Diede Construction, Inc., in the amount
of $619,300.
BACKGROUND INFORMATION: This project consists of furnishing all labor, materials, tools and
equipment to complete the renovation of the
Camegie Forum Basement and City Hall Annex, site work and
underground conduit installation between buildings, and the
exterior stairs, ramp and decking around the portable trailers. Under the overall Civic Center
Improvement project, this contract will renovate the City Hall Annex (the leased Beckman Building at
212 West Pine Street) into office spaces for the Finance Department, convert the
Camegie Forum Basement at 305 West Pine Street into temporary office spaces for Administration, the
City Clerk's and City Attorneys' offices, and provide break room and bathroorn facilities for the
remaining City Hall employees who will be relocated to temporary trailers. Upon completion of the
City Hall renovation (under separate contract) the trailers will be removed and the Carnegie Basement
will be available for use by other departments.
Plans and specifications for this project were approved on April 20, 1994. The City received the
following six bids for this project
Bidder Location Base Bid
Engineer's Estimate
Meehleis Modular Buildings, Inc.
Diede Construction, Inc.
Younger General Contractors, Inc.
Barham Construction, Inc.
McDonald Glenn Company
RLA Construction, Inc.
A complete bid tabulation is attached as Exhibit A.
Lodi
$606,000
Woodbridge
$622,000
Sacramento
$656,000
Ceres
$681,959
Manteca
$720,708
Stockton
$825,000
APPROVEDj1V`
THOMAS A. PETERSON w.,c4a paoe.
C;ty Manager
CC
CAWARD.DC+C &&54
Contract Award for Civic Center Qw overreents, City Hall Annex Renovati;'
Carnegie Basement Renovation, Portable Trailers ($619.300)
June 15, 1994
Page 2
After the bids were opened, Meehleis Modular Buildings, Inc., in a letter dated May 27, 1994, (copy
attached as Exhibit B) requested to withdraw their bid due to mathematical tabulation errors.
Four bid alternates were included in the bid proposals. It is staffs recommendation that the
City Council accept Diede Construction, Inc.'s bid with Alternate 3 (a deduction of $2,700 by deleting
wood baseboard in some Carnegie Basement rooms and substituting 4 -inch rubber base), and award
the contract to Diede Construction, Inc. in the amount of $619,300.
FUNDING: Project Estimate: $656,000
Fund: Capital Outlay and Development Impact Mitigation Funds
Bid Opening Date: May 26, 1994
), &, �, 8, J C) Nf.�n�
D�� Jack L. Ronsko
Public Works Director
Prepared by Dennis J. Callahan, Building and Equipment Maintenance Superintendent
JLR/DJC/lm
Attachments
cc: City Attorney
Purchasing Officer
Building and Equipment Maintenance Superintendent
Wenell Mattheis Bowe
CAWnRD-DOC 06/0&V4
Public Works Department
Tabulation of Bids Received on 5!26/94
Project: Civic Center Improvements
Item
Description
Unit
I
Renovate Carnegie Forum Basement
LS
2
Renovate City Hal Annex
LS
3
Instal Underground Conduit, Portable Trailer Decking.
LS
Buildings Ino.
Electrical, and Related Site Work
Contractors Inc.
Total Bid
PIDALTERNATES
Total
A
810 ALTERNATE NO. ONE • CITY HALL ANflEX:
Total
Total
Delete the new storehont windows, Numbers 2 and 3 on
$222,000.00
$306.000.00
the north street elevation of the building Inckxdkg the
$370,00000
-
canvas awning over each vAn dow Existing masonry waits
$250,000.00
$332,285.00
to remain and existing wirtdwve to remain Paint weds
$370,000.00
-
utsids and outside as scheduled for adjacent surfaces.
$100.000.00
E
BID ALTERNATE NO. TWO - CITY HALL ANNEX:
05,000.00
$606,000.00
Delete the new windows, Numbers i I and 12 on the south
$664.000,00
$661,656.00
(alley) elevation of the building. Existing masonry wads to
$625,000.0000
remain outside, new furred wad inside. Paint wads Inside
and outside as scheduled lot adjacent surfaces.
C
BID ALTERNATE NO. THREE - CARNEGIE BASEMENT:
Deduct
Deduct
Delete wood base In Room Numbers 104, 106, 107, 109,
Deduct
110, 111, 112, and 113 and rsplacs with 4 -inch topset
rubber base. Al wads with existing wood base, remove
wood base and patch weds as required to match existing in
preparation for new rubber base.
D
BID ALTERNATE NO. FOUR - CITY HALL ANNEX:
Substitute lighting fixture typea per alternate light fixture
schedule, Shoot A•EO
Total Bid Alternate Deducts
a Corrected Figure
" Meehleis ties withdrawn the bid on 5/27184 due to tsbulation arta.
Engineer's
Estimate
Total
Deduct
••Moshfels
Diode
Younger
The McDonald
RLA
Modular
Construction
General
Barham Inc.
Glenn Co.
Construction
Buildings Ino.
Inc.
Contractors Inc.
Is1e•
Total
Total
Total
Total
Total
Total
-
$222,000.00
$306.000.00
$279,002.00 $326.402.00
$370,00000
-
$338,000.00
$250,000.00
$332,285.00
$337,630.00
$370,000.00
-
$84,000.00
$100.000.00
$70,012.00
$56.6713.00
05,000.00
$606,000.00
$422,000.00
$664.000,00
$661,656.00
$720,706.00
$625,000.0000
Deduct
Deduct
Deduct
Deduct
Deduct
Deduct
$1,100.001 $8,200.001 $3.000.001 $6,976.001 $11.464.001 $7.67300
$500.001 $4.000.001 $2.000.001 $4,1159.1701 $4.999.001 $2.000.00
$500.001 $2.700.001 $4.000.001 $1.350.00 $179.00 111.Ayon
124,100.00 $16,600.00 $12,000.00 $35,666.00
$26.750.001 $3,000.00
$43,362.00 • 114,177.00
IN
FA
Meehleis Modular Buildings, Inc.
® Design an oi Construction Co. uG 14734M
• 1303 East Lodi Avenue • Lodi, Califomia 95240 • (209) 334-4637
RECEIVED
May 27, 1994 MAY 2 71994 -
Lodi City Council __
P.O. Box 3006 , +` 0-1 Y 0. L'vi�.1
Lodi, CA 95241-1910,x' rueietwoeKsotr�R:�nrr
RE: Lodi Civic Center Improvements
Bid of 5/26/94 @ 11:00 a.m.
Gentlemen:
We request our bid for the "Lodi Civic Center Improvements" be
withdrawn as allowed per California Government Code Section 4200,
SS 4203.
Our bid Item # 3 and Alt. # 4 contained mistakes which occurred
during the final tabulation period moments before the bid deadline
and made our bid materially different than intended.
We missed the electrical cost for Bid Item # 3 while running our
final total. This $29,953 - omission made our bid materially
different than intended. Our bid for Item # 3 should have been
$58,446 - and ou- Total Bid $637,446.00.
Alternate # 4 amount was revised by our listed Electrical
Subcontractor too late for us to revise our total. Our Alternate
# 4 should have been a deduct of $5000.00. This is materially
different than intended.
Find enclosed documentation related to these events.
Please withdraw our bid of 5/26/94 @ 11:00 a.m. for the Lodi Civic
Center Improvements project.
Sincerely,
Mike Sinclair
Vice President
MEEHLEIS MODULAR BUILDINGS, INC.
.__-�--..- ia- a --... _. -..� .,�X..-- .....-... .•- . - -�.... „ .� ,. _ .,;.. .. - - . �ra�+a�-jeT.�t�rr ��sai'. L,'I:_ r,u t' y ,.r'. � s.?it._��'-
RESOLUTION NO. 94-72
araasaazaxaax-axaxaax
A RESOLUTION OF THE LODI CITY COUNCIL
AWARDING THE CONTRACT FOR CIVIC CENTER IMPROVEMENTS,
CITY HALL ANNEX RENOVATION, CARNEGIE BASEMENT RENOVATION,
PORTABLE TRAILERS
aarasaaaxaaraaxxax ax sssaaaaaarassaassrxaaaarxaxrxsaasaassrarsrssaassaa:
WHEREAS, in answer to notice duly published in accordance with
law and the order of this City Council, sealed bids were received and
publicly opened on May 26, 1994 at 11:00 a.m. for the bid for Civic
Center Improvements, City Hall Annex Renovation, Carnegie Basement
Renovation, Portable Trailers, described in the specifications therefor
approved by the City Council.on April 20, 1994; and
WHEREAS, said -bids have been compared, checked, and tabulated and
a report thereof filed with the City Manager as follows:
BIDDER
Engineer's Estimate
Meehleis Modular Buildings, Inc.
Diede Construction, Inc.
Younger General Contractors,Inc.
Barham Construction, Inc.
McDonald Glenn Company
RLA Construction, Inc.
LOCATION
BASE BID
$656,000
Lodi
$606,000
Woodbridge
$622,000
Sacramento
$656,000
Ceres
$681,959
Manteca
$720,708
Stockton
$825,000
WHEREAS, the City Manager recommends that award of the contract
for Civic Center Improvements, City Hall Annex Renovation, Carnegie
Basement Renovation, Portable Trailers, be made to Diede Construction,
Inc.;
NOW, THEREFORE, BE IT RESOLVED by the Lodi City Council that
award of contract for Civic Center improvements, City Hall Annex
Renovation, Carnegie Basement Renovation, Portable Trailers, be and the
same is hereby awarded to Diede Construction, Inc., in the amount of
$619,300.00.
Dated: June 15, 1994
I hereby certify that Resolution No. 94-72 was passed and adopted
by the City Council of the City of Lodi in a regular meeting held June
15, 1994 by the following vote:
Ayes: Council Members - Mann, Pennino, Snider and
Sieglock (Mayor)
Noes: Council Members - Davenport
Absent: Council Members - None
iter M Per
i y Clerk
94-72