Loading...
HomeMy WebLinkAboutAgenda Report - February 18, 1994CIT1(OF LODI COUNCIL COMMUNICATION AGENDA TITLE: Acceptance of Improvements In Lodi West, Unit No. 1, Tract No. 1904 MEETING DATE: February 18. 1994 PREPARED BY: Public Works Director RECOMMENDED ACTION: That the City Council adopt the attached resolution accepting the development improvements for Lodi West, Unit No. 1, Tract No. 1904, approve the construction reimbursements shown in Exhibit A, and appropriate the necessary funds from the Storm Drain Development Impact Mitigation Fee Fund to reimburse the developer for the cost of the master storm drain installed as a part of this project It is also recommended that the City Council have the developer keep the streets in the subdivision dosed and maintain the barricades across Elm Street and Evergreen Drive until the City has energized the street lights. BACKGROUND INFORMATION: Improvements at Lodi West, Unit No. 1, Tract No. 1904, have been completed in substantial conformance with the requirements of the Improvement Agreement between the City of Lodi and Robert Batch, dated June 21, 1993, as shown on Drawings No. 93DO01 through 93D007, and as specifically set forth in the plans and specifications approved by the City Council. The Improvement Agreement provided for City reimbursement of one-half the cost of the street improvements and utilities fronting Westgate Park and the Master Storm Drain line. The final costs are shown in Exhibit A. These reimbursements are being applied to the remaining development impact mitigation fees owed by the developer resulting in a net fee of $19,782.30 being paid to the City. $17,000.00 was appropriated in the 1993/94 Capital Improvement Program for the construction of the master storm drain line in Evergreen Drive and was based on an older estimate available at the time. The final construction cost, based on the actual length of pipe installed, exceeded this amount and an additional $12,500.00 must be appropriated to fund this project Fees for the work involved in having the City install the necessary wiring to energize the street lights in the subdivision have been paid by the developer but City crews will not be able to complete their work for another two weeks. It is staffs recommendation that Council accept the subdivision improvements but require the developer to keep Elm Street and Evergreen Drive barricaded until the street lights are operational. APPROVED THOMAS A. PETERSON rKyc,b papa City Manager 00 cc -1 CACCEPTIM pZpyW -Acceptance of lrnoxnow w: il wwwo Lodi West, Unit No. 1, Tract No. 19jr February 16, 1994 Pap 2 The streets to be accepted are as follows: Streets Length In Miles Lower Sacramento Road 0.00 Elm Street. 0.27 Evergreen Drive 0.19 Eklerlca Way 0.13 AppWwood Ddva 0.02 Total NOW Miles Of city SbVeft 0.61 FUNDING: Additional $12,500.00 from Storm Drain Development Impact Mitigation Fee Fund; other funding per Exhibit A. ,eckRo.jnsko bric orks Director Prepared by Wes" K Fujitani, Senior CM Enginw JUVAWAM Attachment cc: City Aftmay Associate Traffic Engineer Associate Civic Engineer Street Supefterkdat Robert Batch Seumbach - PW= LODI WEST, UNIT NO.1 Fee Credit Wortshaat • Protect Cost LF City Partkoatlorl CorittuerRs' Descf4AW EstMeated Unit LF $1.75 Urdt City Of Work Quantities Unit Prke Cost Quantity Unit Price Cost MASTER STORM DRAIN SYSTEM SF $0115 $68640 Compact Native Material (030') 30' Spam thein Pipe 769 LF $32.00 112,448.00 389 LF $72.00 $12,648110 36' Storm Drain Pipe 289 LF $41.00 St1.849.00 269 LF $11.00 $11,849110 4S Storm Drain Manhole 2 EA $1,100.00 52,200.0 2 EA $1,100.00 $2.200.00 SUBTOTAL FOR MASTER STORM DRAW SYSTEM $7,664110 $26,497.00 13.972 $26,497A0 WESTGATE BASitWARK FRONTAGE WROVEMENTS (Evergreen Drive; %of street, % d ullittes) Roadway Excavation 1,365 LF $1.75 $2,388.75 1,365 LF $1.75 $2.368.75 Comped Original Ground (0.50) 13,972 SF $0.05 $89x.60 13,972 SF $0115 $68640 Compact Native Material (030') 13,972 SF $0.10 $1,397.20 13,972 SF $0.10 $1,397.20 Aggregate Base. Class d (0.80) 13.972 SF $0.55 $704.60 13,972 SF $0.55 $7,664110 Asphalt Concrete. Type 8 (0.33) 13.972 SF Was $9.081.30 13,972 SF 50.65 $9,061.60 Vertical Curb 3 Gutter Only x66 LF $7.50 $5,010.00 668 LF $7.50 65.0/0110 Concrete Subgrade Compaction 1,900 SF $0.20 $380.00 1.900 SF $0.20 $360.00 SurveyMonumerd 2.50 EA $160.00 $400.00 230 EA $160.00 5600110 Commercial Driveway 30 LF $14.00 $420.00 30.00 LF $14.00 $420.00 Sireel Lights 2 EA $1,500.00 $3,000.00 2 EA SLMAO 13.000.0 8' Sanitary Soviet Pipe 249 LF $20.50 $5,104.50 249 LF $20.50 $5,104.50 Standard Sandary Sewer Manhole 1 EA $2.000.00 $2.000.00 1 EA $2,000.00 $2,000.00 12' Storm Drain Pipe 48 LF S1S.50 1744.00 48 LF $15.50 $744.00 Side Inlet Catch Basin 2 EA 1500.00 $1.000.00 2 EA $MAO $1,000.00 10' Water Pips (8' Price) 342 LF MAO $4,446.00 342 LF $13.00 $4,446.00 10' Valls (3' Price) 2 EA 5450.00 1900.00 2 EA $450.00 "WAD Fite Hydrant Assembly 0.50 EA $1.600.00 $800.00 0.50 EA 51,600.0 1600.00 SUVOTALFOR WESTGATESASIN-FARKFRONTAGE tMPROVEMENTS $45.45S.45 54S.SWAS TOTAL SUBJECT TO Aft ENGMEEaMGANDADMYvrSTRITIOW ALLOWANCE $71,952.45 571,952.45 10% Engawwww and Administration pa City Code 115.64.080 $7.19625 Meandering Sidewalk 1 LS $10,890.00 11000.00 1 LS $10,890.00 $10.990.OD Total Reimburseable Amount $90.037.70 Outstanding De fetopnant Impact Mitigation Fees: Police Facilities: $14.599.80 Ace 9 60 5.501 Maslar Storm Drain: Fire Fackies: $6.976.80 Acd 9 60 6.501 We09ale BaskgPs& Parks 6 Recreation Facilities: $0.00 Aad a 6D 7.501 General City FeWilies: $38 243.60 Aeet a 60 5-501 Cheek Total: Total: $109.820.00 FEECRED.XLS E^Pwm9 ewys one 4ontesutew:rray cents M t+wr prsrtste 129.146.70 Act 9121.052547 $NA91.00 Aad a 121.0525.80 $90.037.70 Net Raenbursement Dar to Developer (Taal Rek�e Amount leas Ouls(amft DevelopmsM Imped Litigation Feet): $ 0.00 Net Impact Fees Due to City (Outstanding Deveb faTtwtt Impad Willption Fees less Total Reimburse" Amount): $111.782.10 Page 1 of i 1W W RZSdLUTX= NO. 94-20 sasssessssssasss�sas A RZSOLUTIOX OF T= LODI CITY COUNCIL ACCCZPTM O THE DZVSLOPIUM INCLUDZD IN TRX XXI?ROVDOZNT AORZZHNT FOR LODI VM, UNIT NO. 1, TRAM NO. 1904 sassasssasasssasassssassasasasassassssassasssssssssssssssssssssssssssas The City Council of the City of Lodi finds: 1. That all requirements of the Improvement Agreement between the City of Lodi and Robert Batch, for the improvements for Lodi Went, Unit 1, Tract No. 1904, have been substantially cooplied with. The improvements are shown on Drawings Nos. 93DOO1 through 93DO07, on file in the Public Works Department, and as specifically set forth in the plans and specifications approved by the City Council on June 21, 1993. 2. The streets to be accepted are as follows: STREETS LINGTH IN MILES Lower Sacramento Road 0.00 Elm Street 0.27 Evergreen Drive 0.19 Elderica Way 0.13 Applewood Drive 0.02 , Total New Kilos of City Streets 0.61 Dated: February 16, 1994 sansassssssssssasssssasssaassssssssaasassaaaasssss sssssassssssssssaasas I hereby certify that Resolution No. 94-20 was passed and adopted by the Lodi City Council in a regular meeting held Febraary 16, 1994, by the following vote: Ayes: Council Members - Davenport, Mann, Pennino, Snider and Sieglock (Mayor) Noes: Council Members - Nome Absent: Council Members - None e is M. errin C1 y Clerk 94-20 - .. v-;.+ ':.%'..�J.�'� vh,'��y.ti�i�".i!".�°: sr'. _." Y t'9�jY�f?`'�'��if.4�'-�'• L` ��.. ♦ � U1 r Y yr Lvui SPECIAL ALLOCATION REQUEERM TO: FINANCE DIRECTOR CITY MANAGER FROM: PUBLIC WORKS DIRECTOR DATE: Mwch 9.1994 ACCOUNT NUMBER: 121.0-525.47 Request is made for funds to accomplish the following project which was not included in the current budget. 571-7-117-1. • • •JL • =17' •,.. I- L o- I' •/ li $12,500.0 This amount is needed to reimburse the developer of Lodi West for installation of the master storm drain in Evergreen Detre. This appropriation was approved by the City Council at its meeting of February 16, 1994. i�llL?L40 It W�c J Dir i Jbnriifer M. Perin City Clerk (if you need more space, use additional sheet and attach to this foram.) Date of Approval February 16, 1994 AmountApproved Council Pity Manager FUND OR ACCOUNT TO BE CHARGED Current Budget S Prior Year Reserve S Contingent Fund $ General Fund Surplus S Capital Outlay Reserve $ Reimbursable Account 5 Utility Outlay Reserve $ Other: (Specify) 60.3 (Storm Drain IMF) 5 Account Number Dixon Flynn, Finance Director Thomas A. Peterson, City Manager ------------------------------------------------------------------------------ Submit this form in duplicate to the Finance Director. Distribution after approval will be as follows: 1) Originating Department 2) Finance Department CRY OF LODI SPECIAL ALLOCATION REQUESIft TO: FINALE DIRECTOR CRY MANAGER DATE: March,9,1994 FROM: PUBLIC WORKS DIRECTOR ACCOUNT NUMBER: 121.0-525.47-000 Request is made for funds to accomplish the following project which was not included in the current budget. Description of Probed Es*T*W Cost EVERGREEN DRIVE STORM DRAIN - LODI WM $12,500.0 This amount is needed to reimburse the developer of Lotti West for installation of the master storm drain in Evergreen Drive. This appropriation was approved by the City Council at its meeting of February 16, 1994. Fell ifZ94 -71 (If you need more space. use additional sheet and attach to this form.) Date of Approval February 16, 1994 Amount Approved * I Z, 500. Council City Manager X FUND OR ACCOUNT TO BE CHARGED Current Budget S Prior Year Reserve 5 Contingent Fund 5 General Fund Surplus $ Capital Outlay Reserve $ Reimbursable Account S Utility Outlay Reserve $ Other: (Specify) 60.3 ("'torm Drain IMF) $ & O- J -gyp- If Account Num Dixon Flynn, Finance Direct6r Thomas A. Peterson, City Manager ------------------------------------------------------------------------------ Submit this form in duplicate to the Finance Director. Distribution after approval will be as follows: 1) Originating Department 2) Finance Department a CIN OF LODI COUNCIL COMMUNICATION' AGENDA TITLE: Acceptance of Improvements in Lodi West, knit No. 1, Tract No. 1904 MEETING DATE: February 16,19% PREPARED BY. Pubic Works Director RECOMMENDED ACTION: That the City Council adopt the attached resolution accepting the development improvements for Lodi West, Unit No. 1, Tract No. 1904, approve the construction reimbursements shown in Exhibit A. and appropriate the necessary funds from the Storm Drain Development Impact Mitigation Fee Fund to reimburse the developer for the cost of the master storm drain installed as a part of this project. It is also recommended that the City Council have the developer keep the streets in the subdivision dosed and maintain the barricades across Elm Street and Evergreen Detre until the City has energized the street lights. BACKGROUND INFORMATION: Improvements at Lodi West, Unit No. 1, Tract No. 1904, have been completed in substantial conformance with the requirements of the Improvement Agreement between the City of Lodi and Robert Batch, dated June 21. 1993, as shown on Drawings No. 9313001 through 93DO07, and as specifically set forth in the plans and specifications approved by the City Council. The Improvement Agreement provided for City reimbursement of one-half the cost of the street improvements and utilities fronting Westgate Park and the Master Storm Drain line. The final costs are shown in Exhibit A. These reimbursements are being applied to the remaining development impact mitigation fees owed by the developer resulting in a net fee of $19,782.30 being paid to the City. $17,000.00 was appropriated in the 1993194 Capital Improvement Program for the construction of the master storm drain line in Evergreen Drive and was based on an older estimate available at the time. The final constriction cost based on the actual length of pipe installed, exceeded this amount and an additional $12,500.00 must be appropriated to fund this project. Fees for the work involved in having the City install the necessary wiring to energize the street lights in the subdivision have been paid by the developer but City crews will not be able to complete their work for another two weeks. it is stafrs recommendation that Council accept the subdivision improvements but require the developer to keep Elm Street and Evergreen Drive barricaded until the street lights are operational. APPROVED: THOMAS A. PETERSON City Manager W .ocYClW Osprr cc -1 021OW4 Acceptance of improv Lodi West. Unit No. 1, Tract No. 190 Fes/ 16.1994 Pop • The streets to be accepted are as foaaws: Streeft Length in Mites Lower Sacramento Road 0.00 Elm Street 0.27 Evergreen Drive 0.19 Eidwica Way 0.13 Applewood Drive 0.02 Total New Miles of City Streets 0.61 FUNDING: Additional $12.500.00 f om Storm Drain Development impact Mitigation Fee Fund; other funding per ExhM A. e4i�— onsko Dkedor Prepared by Wesley K Fufdani. Senior CMI Engineer JLR/WKFBm Attachment ca City Attorney Associate Traffic Engineer Associate CMI Engiriex Street Superintendent Robert Batch Baumbach - Piam A-4 7, N� _ WESTGATE BASIWARK FRONTAGE IMPROVEMENTS (Evergreen Ddw; % of slrset, % of utAAiss) Roadway Excavation 1,365 LF LOCI WEST, UNIT NO.1 $2,388.75 1,365 LF $1.75 82.388.75 Fee Credit Worksheet 13,972 SF $0.05 8698.60 13,972 Project cost $0.05 City Particlpatlon Continents Description Estimated Unk $0.10 $1,397,20 Unlf CRY ' of Work Quantities Unit Price Cost Quantity Unit Price Cod MASTER STORM DRAIN SYSTEM 13,972 SF Sol$ 87.684.60 Asphalt Concrete, Type B (0.33) 30' Storm Drain Pipe 309 Lf $32.00 $12.448.00 380 LF $34.00 812.418.00 36' Stam train Pipe 289 Lf $41.00 $11,649.00 289 LF $41.00 S11".00 48' Stam train Manhole 2 EA $1.100.00 $2,200.00 2 EA $1,100.00 82,200.00 SUBTOTAL FOR MASTER S TORM DRAIN SYSTEM SF $26.497.00 $380.00 1,900 $26.497.00 WESTGATE BASIWARK FRONTAGE IMPROVEMENTS (Evergreen Ddw; % of slrset, % of utAAiss) Roadway Excavation 1,365 LF $1.75 $2,388.75 1,365 LF $1.75 82.388.75 Compact Original Ground (0.5(Y) 13,972 SF $0.05 8698.60 13,972 SF $0.05 8698.60 Compact Native Material (0.50) 13,972 SF $0.10 $1,397,20 13,972 SF $0.10 $1.397.20 Aggregate Base. Class k (0.80 13,972 SF $0.55 87,684.60 13,972 SF Sol$ 87.684.60 Asphalt Concrete, Type B (0.33) 13.972 SF $0.65 $9,081.80 13,972 SF $0.66 89.81.80 Vertical Curb 6 Guftw Only 688 LF $7.50 $3,010.00 666 LF 87.50 $5.010.00 Concrete Subgrads Compaction 1,900 SF $0.20 $380.00 1,900 SF $0.20 8380.00 SraveyMonument 2.50 EA $160.00 $400.00 2.50 EA $160,00 $400.00 Commercial Driveway 30 LF $14.00 $420.00 30.00 LF $14.00 8420.00 Street Lights 2 EA $1,500.00 $3,000.00 2 EA 81.500.00 83,000.00 8' Sanitary Sevier Pipe 249 LF $20.50 $5,104.50 249 LF $20.50 $5.104.50 Standard Sanitary Sewer Manhole 1 EA $2,000.00 $2.000.00 1 EA $2.00.00 $2,000.00 12' Storm Drain Pipe 48 LF 515.50 $744.00 48 LF $15.50 $744.00 Side kNet Catch Basin 2 EA $500.00 $1,000.00 2 EA SS00.00 61,000.0 10' Water Pipe (8' Price) 342 LF $13.00 $4,446.00 342 LF $13.00 $4.446.00 10' Valves (8' Price) 2 EA $450.00 $900,00 2 EA $450.00 8900.00 Fire Hydrant Assembly 0.50 EA S 1,600.00 $800.00 0.50 EA $1,600.00 $800.0 SUBTOTAL FOR AES TGATE SAS/NPARK FRONTAGE IMPROVEMENTS 845,455.45 645.155.46 TOTAL SUBJECT70rO%ENGMEERWGAND ADMINISTRATION ALLOWANCE $71,952.45 $7102.45 10% Engineering and Administration per City Code s1S.64.080 $7,19526 Meandenng Srdevralk 1 LS $10.690.00 810.690.00 1 LS 810,890.00 8101890.0 69renyearpran/anaectaaeri0eaxeMGyeerswd Total Reimburseable Amount $90.037.70 AM Outstanding Development Impact Mitigation Fees: Police facilities: $14,509.60 Acct 860 5501 Master Storm Drain: $29,146.70 Aed 6121.0425.47 Fire FwJlAies: $6,976.80 Acct SOD 6.501 Westgate Bashva& $60,891.0 Acct 6121.0625.80 Parks 8 Raaestion facilities: $0.00 Acct a 60 7.501 General City Facilities: $88,24;160 Acd a 60 8.501 Cheek Total: $90,037.70 Total: $109,820.00 Net Reimbursement Due to Dowlopor (Total Reimbumeable Amount less Outstanding Development impact Litigation Fees): $ 0,00 Net Impact Fess Due to City (Outstanding Dewbprneni impact Laigalion Fees less Total Reimbosesbie Amount): $19.782.30 / y FEECREOALS Pop 1 off Auk RMSOLD'n= NO. 94-20 A RZSOLDTION OF T= LODI enT Coax= ACCZPT= UM DZVZLOBDGT 7j=OVZWM-aa INCLDDZD IN TRZ ZKPROV- w IF AGRzaaw FOR LODI waSTa mm no. 1, TRACT lip. 1904 ssasss..ss..sss..s.sss:sss:sss:ssss.s�ssssss:sssas:s..asss.ss..sassssss The City Council of the City of Lodi finds: 1. That all requirements of the Improvement Agreement between the City of Lodi.. and Robert Batch, for the improvements for Lodi West, unit 1, Tract No. 1904, have been substantially complied with: The improvements are shown on Drawings BOB. 93DO01 through 93D007, -on file in the Public Works Department, and 'as specifically set forth in the plans and specifications approved by the City Council on June 21, 1993. 2. The streets to be accepted are as follows: aSTRZXTS LXNGTW IN MILES Dower Sacramento Road 0.00 Elm Street 0.27 Evergreen Drive 0.19 Elderica Way 0.13 Applewood Drive 0.02 Total New Doles of City Streets 0.61 Dated: February 16, 1994 a=az=nonan=aac===aaaaaasaaas=sa=a==aaaa=nonan=ass=aaaasazasa:asaaasasa= I hereby certify that Resolution No. 94-20 was passed and adopted by the Lodi City Council in a regular meeting held February 16, 1994, by the following vote: ]lyes: Council Members - Noes: Council Members - Absent: Council Members Jennifer M. Perrin City Clerk RES9420/TXTA.OIV CITY COUNCIL THOMAS A. PETERSON JACK A. SIECLGCK, Maya STEPHEN J. MANN CITY OF L O D I % , r' (_ ! % f --T1 JENNIFER M. PERRIN , ' - City Clerk Maya Pro Tempore RAY C. DAVENPORT CITY HALL P.O.2221 OX T PINE STREET 's y 1-7 •• ! mpg AkNATT PHILLIP A. PENNING �'. �`; i i ! ^' CkY Attorney JOHN R. (Randy) SNIDER LODI. CALIFORNIA 95241-1910 (209) 334-S634 _ FAX (709) 333-bM February 17,1994 Farmers and Merchants Bank Attn: Newt Wakeman, Vice President P. O. Box 380 Lodi, CA 95241-0380 SUBJECT: Lodi West, Unit No. 1, Tract No. 1904 LC/UB 658 and LC/UB 659 The City Council of the City of Lodi, at its meeting on Wednesday, February 16.1994, accepted the public improvements in the subject project. A copy of the resolution is enclosed for your files. This letter is your authorization to exonerate the Instrument of Credit covering faithful performance. The Instrument of Credit covering labor and materials must remain in effect until May 17, 1994, in conformance with State law. You will receive no further correspondence regarding the release of the Instrument of Credit. If you -have any questions, please contact me. W� Richard C. Prima, Jr. City Engineer RCPAm Enclowm ca Robert Etatct► City Clerk CITY COUNCIL THOMAS A. PETERSON %hCity MA" JACK A. STEPHEN) MANN Mayor CITY OF LO D, I,!r �� - ftENNIFER M PERK LA ", -7 .. City Clerk Maya Pro Tempore CITY HALL, 221 WEST PINE STREET !7 RAY G. DAVENPORT "i'll: P13 McNATT PHILLIP A. PENNINO P.O. BOX 3006 City Attorney JOHN R. (Randy) SNIDER LODI• CALIFORNIA 95241-1910 (209) 334.5634 4- FAX 12M 333.6795 February 18,1994 Mr. Robert Batch 1819 S. Cherokee Ln-, #67 Lodi, CA 95240 SUBJECT: Lodi West. Unit No. 1. Tract No. 1904 The City Council of the City of Lodi, at its meeting on Wednesday. February 16, 1994. accepted the public improvements that were made in the subject project Enclosed for your files is a copy of the resolution accepting the public improvements. From the date of the resolution, the City of Lodi will maintain the street and other public improvements installed within rights-of-way and public utility easements as shown on the approved plans. Due to the delay in paying for the electrical work at the subdivision, you are required to maintain the street barricades in place until the street lights are operational. The enclosed letter has been sent to your bank so the Instrument of Credit covering faithful perrormance can be exonerated. The Instrument of Credit covering labor and materials must remain in effect for a period of ninety days from the date of the resolution, in conformance with State law. On May 17, 1994, this instrument can be released if no claims have been filed. If you have any qu stions, please contact me. Richard C. Prima, Jr. U City Engineer RCPAm Enclosure W. Building Division Police Department Fire Department Electric Utility Department WaterAVastewater Division Street Division City Clerk Farmers and Merchants Bank Ben Schaffer •.iia - _.._