Loading...
HomeMy WebLinkAboutAgenda Report - January 19, 1994 (39)CITY OF LODI COUNCIL COMMUNICATION f 0 AGENDA TITLE: Consultant Agreement and Measure K Cooperative Agreement for Bicycle Transportation Master Plan ($30,000) MEETING DATE January 19.1994 PREPARED BY: Public Wore Director RECOMMENDED ACTION: That the City Council authorize the City Manager to execute a consultant agreement and the standard Measure K Cooperative Agreement for preparation of the Bicyde Transportation Master Plan. BACKGROUND INFORMATION: As part of the Capital Improvement Program (CIP), the City Council has appropriated $30,000 for the preparation of a Bicycle Transportation Master Plan. The project is to be funded with a Measure K grant ($24,300) and local Gas Tax funds ($5,700). Such a plan is a necessary first step in obtaining additional State funds for bicycle facilities. As described in the CIP project sheet (Exhibit A), the County has embarked on a countywide plan and has retained Brady & Associates to do part of the work. Brady will be conducting public meetings and performing a technical review of the County's plan. City staff has discussed the City's proposed plan with Brady and has developed a work plan utilizing the talents of both parties. The details of Brady's work are shown in Exhibit B. A summary of the work plan. showing City staff involvement, is shown below: TSI Brady Hours City Hours 1. Scoping session 8 12 2. Review & document existing conditions, base map 42 20 3. Community focus group (in SJ Co. work) Na 4 4. Draft goals & objectives 10 1 5. Draft bicyde network 16 10 6. Bicycle workbook 30 13 7. Shirtsleeve meeting 8 4 8. Public meeting/workshop* 36 9 9. Network finalization, priorities list, concepts* 76 16 10. Bicycle facilities standards 24 8 11. Safety, education d enforcement element 18 2 12. Draft plan preparation 56 16 13. Public hearing, final plan ..24 ..12 'Includes subconsulants' hours APPROVED` • . (.73:-/zei4est. THOMAS A. PETERSON City Manager r ICCNBAOC Total: 358 127 recycled p.p.r cc.1 Ma 104 Consultant Agreement and tare K Cooperative Agreement for Bk i Transportation Master Plan January 19,1994 Page 2 Note that the above City hours only include Engineering and Planning staff who will be directly invoked in the project. The project will be coordinated by Assistant Planner Mark Meissner. Additional required participation by Parks and Recreation. Police. and other staff has not been included. The total cost for Brady & Associates is $28.460. including an estimated $100 for printing, travel and miscellaneous expenses. Staff feels the use of Brady & Associates offers a number of advantages over other consultants or doing the entire plan in house: • The consultant brings experience in preparation of bks pians and avid No riding that City staff does not have; • The consultant Is very involved in the County plan public input process whkct will mean less confusion to the public and better coordination between Lodi's and the County's plans; • The consultant's nearly 300 hours of work is time that City stafi would have to take from other tasks assuming City staff had the expertise to do the work in a comparable time frame. The work plan contains one feature to reduce consultant and staff time that the Council should note. We have consolidated "official" review to a shirtsleeve session and a public hearing before the City Council. We have not budgeted for the consultant to appear separately before the Parks and Recreation and Planning Commissions. We propose to keep both Commissions informed through the various intenneatate reports and through staff involvement We also propose to invite both Commissions to the planned shirtsleeve and public hearing. If the Council wishes to change this arrangement, we will need to add roughly $800 per meeting to allow for preparation time, travel and appearance by the consultant. The consumes proposal also indudes a number of options that staff recommends we defer consideration of until the plan is nearer to completion. These options include a marketing and education outreach program, promotional events, maps and informational brochures, and custom signage design. With public input, interest level and other results of the Master Plan, we will be in a better position to evaluate these options. Also, these "extras" will require an additional appropriation of local funds as we will utilize all the Measure K funds with consultant and City staff time charges. The Measure K Cooperative Agreement is a standard agreement developed by San Joaquin Council of Governments (COG) staff jointly with local agency staff. It provides various administrative details such as reimbursement procedures. A copy is not included in this memo but is available upon request FUNDING: Measure K ($24,300) and Gas Tax ($5,700) Ronsko orks Director Prepared by Richard C. Prima. Jr. Assistant City Engineer attachments cc Community Development Director Parks and Recreation Director Police Chief Ban Joaquin County Transportation Planner Brady 5 Associates OIKECONS.DOC o1n+4 4 teastairalim *+ City of Lodi • EXHIBIT A tR... Streit Capital Improvement P yam Public tfrlorlcs Department Bicycle Transportation Master Plan This study will folios up on the recommendations of tM General Plan and the Padcs 8 Recreadon UMW Plan to specifically identity bicycle routes on -sheet and possibly. off-street. As of Sept, 1993. no formal eatlmate Ms been prepered for the cost of such a pian. San Joaquin County staff and a conaukant are soon to start a countywide plan undkr contract with the San Joaquin Council of Governments using Stale and Air Quality District grants. This study will cost �i i excess of S100.000. Staff sees three options to pursingthis study for the City of Lodi and r. ..r ill third option: 1) Hie a consultant to do a City pian - This would entail the development of a request for proposals and all the related dme and effort in selecting a consultant plus worldng with the consultant durtrg the study. 2) Have staff do the enahe plan - Unless other projects were put off. City staff would be hard pressed to work in this study with our regular work Phis we have no , . r. r to this work. 3) Tag onto the County study - Staff proposes to wait until the County selects their consultant ltant and approach that consultant on doing additional work in Lodi. This will certainly save staff time and should result in lower costs to the City for the consultant. This work may be funded by Measure K if the City can obtain funding under the competitive portion of this program. Prefect Number: Oats of ENR Updated Coat for Jul43 _ AMIS. ESIMIR ANL32512 Palm Eng EIR aaeatpt WO swag. tawttetbt CarMalraw Moir erfiz Ca budlur Otter. Total Cost $ 30,000 damuls DWaa Engraving fan aaptn ig d.Akipatad to be budgand pax b o . b urian: of not. A is Included m construction. ConeM aeon mamas mend i nepection uremia Mown dwww. 1 9113193 81KEPLAN.XLS • Exhibit A Ciq of Lodi Bicycle Transportation Maxtor Plan SCOPE OF WORK ■ . • L WORK TASKS This section gives a detailed outline of the work program that Brady and Associates and its suboonsultants will follow in completing the City of Lodi Bicycle Transportation Master Plan. PHASE I: INVESTIGATIONS In this phase, Brady and Associates will gather the background data necessary to successfully complete the City of Lodi Bicycle Transportation Master Plan. By gathering a large amount of data at the outset of the project, we will be in a position to evaluate the entire range of possibilities for the Master Plan. TASK L Scoping Session Brady and Associates will lead a scoping session to gather background information and elicit concerns regarding the plan process and potential bicycle network. We recomrx...od that staff members from the City of Lodi Police Department and Departments of Parks and Recreation, Public Works, Parking and Traffic, and Planning attend this session, along with a representative of the San Joaquin Bicycle Council and any others deemed appropriate by Gty staff. TASK 2. Review and Document Existing Conditions a. jdentifv Existing Recreation Routes and Destinations. City staff will map recreation sites and rights-of-way designated for recreational bicycle use in the draft Parks and Recreation Master Plan. 1 JANUIt0. 1994 ® EXHIBIT A: SCOPE OP WORK CITY OF IADI BICYCLE TRANSPORTATION MASTER FLAK Staff will also describe existing and proposed commute destinations, including schoob, recreational facilities, shopping areas, public buildings, and major employment centers, and will describe route and stop planning for Lodi's fixed route transit system (scheduled to start in 1994), park and ride lots, and the location of the internodal station planned for downtown Lodi. b. Review Existing Facilities. Brady and Associates will assess the City's existing bicycle network, which was adopted in 1971, but is currently not maintained. This subtask will include riding on all described routes, which is the only appropriate way to assess bikeways. An evaluation of the routing of this bicycle network will be made, including the identification of deficiencies, such as barriers, speed bumps, catch basin grates, railroad tracks and other impediments. c. jdentifv and Review Policy Standards and Regulations. Brady and Associates will discuss bicycle network maintenance issues with key staff persons from the Departments of Public Works, Parks and Recreation, and Parking and Traffic. Issues to be addressed will include current street sweeping, lighting, and pavement maintenance schedules and needs. Brady and Associates will review current ordinances that have major policy implications for bikeway and facility planning. This will include a review of the Traffic Code, Police Code and the City Planning Code, as pertinent. Brady and Associates will also review relevant policy statements in the City General Plan. d. Accident Data. City staff will collect Statewide Integrated Traffic Records Systems (SWITRS) data from the City on bicycle related accidents, and map accident locations on the project base map. TASK 3. Community Focus Group As part of the San Joaquin County Regional Bicycle Master Plan, Brady and Associates and MIG will facilitate a public Community Focus Group in Lodi. As part of this Focus Group, the community's needs and priorities regarding bicycle facilities and routes within Lodi will be ascertained. MIG will prepare a camera-ready newspaper advertisement, a press release a!:d a flyer to facilitate City staff in publicizing this meeting. Brady and Associates will also make telephone contact with representatives of bicycle clubs, bike stores, PTA's and major employers in the City to ask that they send representatives to this meeting. Brady and Associates and MIG will supply all materials needed for this Meeting and Workshop. MIG will prepare a summary of the outcome of this meeting, including information gathered from oral and written comments. 2 •MIAS 10. 1994 • maw At acorn or WORK WY OP LODI PICT LE TRANSPORTATION MASER PL* [Nott~ This task is not budgeted in this r e al, since it will be completed as part of the County's Bicycle Master Pian. Any change in Brady and Associates' Scope of Work with the County regarding this meeting may require changes to this scope as weft] PHASE lb PRELIMINARY PLANNING During this phase, Brady and Associates will develop a set of Goals and Objectives, and a Draft Bicycle Network. Both will be assembled, along with a summary of the results of the previous workshop and preliminary investigations, into a workbook to be used at a second public meeting facilitated by MM. TASK 4 Draft Goals and Objectives Based on the existing conditions and constraints identified in Phase I, and on input received from the Community Focus Group, Brady and Associates will create a preliminary list of goals and objectives for the City of Lodi Bicycle Transportation Master Plan. TASK S. Draft Bicycle Network This task will result in a draft bikeway network for Lodi. Brady and Associates will recommend changes and improvements to the network adopted in 1971, incorporate routes identified in the draft Parks and Recreation Master Plan, and recommend potential solutions to problems identified in the existing conditions review. Bicycle routes will be coordinated with recreation facilities, commute destinations, activity centers, transit planning, bicycle parking and other facilities. City staff will provide mapping services for the draft bicycle network. a. Recreational Cycling. Recreational cycling will be a major focus of the Bicycle Plan. The public opinion survey conducted by Walp & Moore as part of the forthcoming Parks and Recreation Master Plan indicates significant pubic interest in facilities for bicycling and walking. Brady and Associates' work in open space planning in Davis, Pinole and other California communities will provide important background for this effort. Brady and Associates will coordinate closely with the Department of Parks and Recreation. 3 • 'AIWA 11194 t3XHIBrT A: SCOPE OF WORK CITY OF LODI MY= IRANSPORTAIION MASTER PLAN b. $iracde_Commute Route Recommendations. Commuting will be the other major focus of the Bicycle Plan, since trip reduction is the goal of many sources of bicycle funding. The results of the workshop will inform recommended changes and additions to the proposed commute mute network. C.i, for both employment generated and non -work generated (e.g. school and :bopping trips within neighborhoods) commuting will be considered School trips will be a special focus of this task, since children and youth commuting to school require especially safe neighborhood facilities. We will designate bikeways serving local elementary, middle and high schools. TASK 6. Bicycle Play Workbook The Draft Gosh: and Objectives and Proposed Bicycle Network, along with a brief report on existing conditions and constraints from Phase I and a summary of the results of the Community Focus Group, will be assembled into a workbook. The workbook format will encourage readers to interact with the material, and to use the conclusions regarding existing conditions to conceptualize a preferred network the City of Lodi. The workbook will also show specific alternatives for routings, facilities and projects throughout the City, as well as preliminary costs for the proposed facilities. a. Administrative Draft. Brady and Associates will submit three copies of an administrative draft of the Bicycle Plan Workbook for staff review and comments. b. Public Review Dug. After comments have been received from City staff and changes have been made, Brady and Associates will print 25 copies of the document for circulation to the public. PHASE Itis OUTREACH In this phase, we will present the results of our completed Phase I investigations and Phase 11 planning to various segments of the Lodi community, and elicit input regarding potential routes and needed facilities for the bicycle network. We have placed these meetings at this point in the work program in order to allow for maximally efficient use of a limited number of meetings, while still ensuring contact and participation for a large number of agencies and people. 4 ,444 i{l 1 n II 11 �U W.h.., 11, 1 k V JANUAIe.1994 EXI118 F A: SCOPE OF WORK CM oa LOD1 BICYCLE IRANSPORTATjON MASTER PtAT4 TASK 7. Meetings City Melds and Staff At this meeting, the results of completed Phase I investigations will be presented to offrciaab and stat members of the City of Lodi City Council, Planning Commission, and Departments of Parks and Recreation, Public Works, Planting. Parking and Traffic, as deemed appropriate by City stall This meeting might be conducted as a City Council shirtsleeve session. TASK 11. Pabik Information Meeting and Workshop Brady and Associates and MIG will solicit public input at a public workshop on the workbook. The goal of this workshop will be to create a community vision of the bic de network and facilities that the Oty seeks to develop. As in Task 4, MIG will prepare a camera-ready newspaper advertisement, a press release and a flyer to facilitate City staff in publicizing this meeting. Brady and Associates will again make telephone contact with representatives of bicycle dubs, bike stores, PTA's and major employers in the City to ask that they send representatives to this meeting. MIG will prepare a summary of the meeting. including information on community response to the proposed bicycle network and facilities. PHASE IVs PIAN IMPLEMENTATION During this phase of the project. Brady and Associates and its subconsultants will prepare the City of Lodi Bicycle Transportation Master Plan. TASK 9. Network Finalization, Priorities List and Conceptual Designs Based on the results of the Workshop, we will finalize the City's proposed bicycle network and a develop a list of facilities and projects needed to realize this network. We will also prioritize facilities projects based on community needs and perceptions. Coastland Civil Engineering will review the proposed network and facilities. Using bicycle facility design standards established by Caltrans' California Highway Design Manual and AASHTO's Guide for Development of New Bicycle Facilities, Coastland Engineering will prepare a set of design standards for Lodi addressing • desirable curb lane width • intersection geometry 5 1.44//40,4" ,44 MINV064nTiarlinfiRAMBXVIMPAIMENOVOWITAIA. IgtagerANZ7Z 3ANUARir1.1994 411 EXHIBIT A: SCOPE OF WORK COY OF LODI BICYCLE TRANSPORTATION MASTER PLAN • signing and striping • recommended traffic and parking regulation; These standards will also include proto-typical cross-sections and general construction details for bike paths, barriers, curb cuts and other appropriate physical t r W .ents. Unit costs for items such as paving, earthworks, drainage, barriers, striping, signin& lighting, and traffic signal actuation will be provided. Order of magnitude cost estimates for both initial capital improvements and ongoing maintenance wW be made. Design results of this task will be completed in AutoCAD format, while cost estimates will be submitted on Lotus or similar spreadsheets. [Note: The total budget for this task is limited to S5,000. Brady and Associates will work with City staff to prioritize which items to provide designs and cost estimates for within this budget.] TASK 10. Bicycle Facilities Standards Element a. jtnprovements to Flanged BilteJgutg. Cost effective and simple implementation measures will be developed to make bike routes safe for recreation and conducive to commuting. Examples of improvements might include: • Repairing hazards such as diagonal railroad tracks and wheel -trapping drainage grates. • Repairing other significant surface imperfections and hazards, such as large potholes and ruts. • Improving the width and surface quality of the right-hand portion of mads. • Adjusting traffic signal detection, visibility and timing to accommodate bicyclists. • Sweeping roads regularly. • Resurfacing full shoulders as well as traffic lanes. b. Jmnruvements to Planned Bike Facilities. Secure bicycle parking is a prerequisite to encouraging bicycle commuting. Brady and Associates will provide specific standards for bicycle parking in new developments, and guidelines for appropriate;y locating new racks, lockers, indoor bicycle parking 6 . ' 1g g Li ani ,.i 1f1. yin 40.4111/1u )ANIS 10.1994 7 EXHIBIT Ar. SCOPE OF WORK CTf OF LODI B1CYG811IANSPORTATION MASTER PLAN facilities, and shower and dothing locker facilities within the existing community. TASK 11. Safety Education and Enforcement Element The objective of this task will be to develop a plan for bicycle safety education and enforcement programs in order to reduce the number and severity of bicycle related accidents. The safety education r ; . ent will be designed to help the Department of Parks and Recreation, City of Lodi Police and the City of Lodi School District develop new and expanded programs that pertain to bicycle safety for recreational users, commuters, and cyclists under the age of 14. The enforcement component will suggest methods for police to interact effectively with cyclists. This element will be based on: • An analysis of historical Lodi bicycle accident information, which will come from the Statewide Integrated Traffic Records Systems (SWITRS). Information in the system is compiled from peace officer accident reports. We will look at numbers of accidents, types, and locations. • An analysis of any additional hazards that could be introduced with the recommended Bike Plan. • An analysis of safety programs and results in other cities with similar bicycle issues. Preparation of this element will include a meeting with representatives of the Police Department, if necessary. The budget assumes that scheduling of this meeting will be coordinated with other trips to Lodi for this project. TASK 12. Draft Plan Preparation Brady and Associates will incorporate the products of Tasks 1-12 into an Administrative Draft Bicycle Transportation Master Plan that identifies the preferred network and includes policies on facilities, maintenance, and safety. a. Administrative Draft Plan. Three copies of an Administrative Draft Plan will be submitted to City staff for review and comment. b. Public Review Draft Plan. After comments have been received from City staff and changes made, Brady and Associates will print 25 copies of the Draft Plan for public review. 7 JANU IO 1994 TASK 13. Had Plan Preparation 410 EXHIBIT A: SCOPE OF WORK CR'Y OF LODI BICYCLE TRANSPORTATION MASTER PLAN a. Public Nearing David Early will attend one public hearing on the Plan to answer questions and elicit any necessary revisions. b. Final Plan. Brady and Associates will revise the Draft Plan to te public and decision -maker and produce a Final City of Lodi Bicycle Transportation Masten Plan. One camera-ready copy of this document will be submitted to the City for printing and distribution. II. PRODUCTS Products submitted to the City of Lodi in preparation of the Bicycle Transportation Master Plan will include: 1. Plan Area base map. 2. Bicycle Plan Workbook, including reports of investigation findings, existing conditions and proposed network maps and other presentation graphics (3 administrative draft copies and 25 public review copies). 3. Draft City of Lodi Bicycle Transportation Master Plan (3 administrative draft copies and 25 public review copies). 4. Final City of Lodi Bicycle Transportation Master Plan (1 camera ready copy). III. MEETINGS One of the keys to a successful bikeways study process will be establishing working relationships between the consultant team and City staff, San Joaquin County agencies, the San Joaquin Bicycle Council and the public. We propose to work closely with all of these parties throughout the bicycle plan process. Brady and Associates will lead four meetings and workshops, at which our team will make all necessary presentations and supply all necessary presentation quality graphics. The specific goals of our meeting and participation process will be: • To disseminate information to all parties involved and interested in the process. 8 MNL 10.11!4 • - 6mIB*T At score or vatic • • err y of LODI BICYCLE IRANSPORTMION MASTER MAN • To solicit input regarding the appropriate alternative for the bicycle network. • To build a commas regarding the outcome of the Plan. All meeting will be attended by David Early of Brady and Associates. The following five meetinp describe attendees and purpose. 1. Seeping Session At the beginning of the project, Brady and Associates will lead a meeting for staff members from the (Sty of Lodi Departments of Parks and Recreation, Public Works, Parking and Traffic and Planning, along with a representative of the San Joaquin Bicycle Council and any others deemed appropriate by city stat[. The purpose of this meeting will be to gather background information and elicit concerns regarding the plan process and potential bicycle network. 2. Couunualty Focus Group As part of the San Joaquin County Regional Bicycle Master Plan, Brady and Associates and MIG will conduct a Community Focus Group in Lodi. As part of this Focus Group, the community's needs and priorities regarding bicycle facilities and routes within Lodi ascertained. 3. City Officials and Staff After completing our investigations of existing conditions, and preliminary planning, Brady and Associates will lead a meeting of officials and staff members of the City of Lodi Departments of Parks and Recreation, Public Works, Planning. Parking and Traffic, a representative of the San Joaquin Bicycle Council, and any others deemed appropriate by City staff. The purpose of this meeting will be to review our findings and set the foundation of the draft plan. 4. Public Information Meeting and Workshop At this second public meeting, Brady and Associates and MIG will present of the proposed bicycle network and draft goals and objectives. The purpose of this workshop will be to create a community vision of the bicycle network and facilities that the City seeks to develop. 9 JANU•3.,N S. Mlle Hearing •.A, - crryOF LOIXf BICYCLE IRANSPORTAIION MASTEN tit The (Sty wgl conduct a public bearing on the Draft Plan prior to adoption. David Early will attend this bearing to present the Plan, answer questions about it, and dist mucous or changes. 10 Exhibit B av of WM Bkyds Tramspostation Mass Phut COM • • • 1 estimated contract be for al professional services by the Brady and Associates team for the City of Lodi Bicycle blaster Plan is S28,4160. A detailed breakdown of costs by firm and task am itemised in Table 2 The total estimated �t ndudes attendance at five meetings as described in Exhibit A. The estimate also includes printing and delivery of the specified quantities of the documents described in Exhibit A. • .11 lilooIiiiIi1•11.,, • I"' • I . „ .‘ • •",:",t, • JANUARY 11.1994 • EXHIBIT B: COSTS ESIDUT B • CITY OF LODI BICYCLE TRANSPORTATION MASTER PLAN TASK Tabk2 COST ESTIMATE BRADY AND ASSOCIATES LABOR COST I Early I Asaillard I Graphics 1 Tow MUS! B INVESTIGATIONS Usk 1. Saving Smoke — Mak 2. Review and Document Bening ConditionsIII 20 I 10 I 12 1 Task 3. Community Rees Chomp included In County Bicycle Mantes Plan .1 MW! II: PRELIMINARY PLANNING 'task 4. Draft Goat and Oejxtiraa 2 8 Ttik 5. Draft B ey& Network 4 12 — Task 6. Myth Workbook 6 4 20 PHASE 116 mama' Task 7. Meeting City DIlkials and Staff Task 8. Public In8 rmatlon Mea* and Worblwp I 6 1 — I —' PHASE Ili: PLAN IMPLEMENTATION Task 9. Network Finalization. Priorities List and 8 10 8 Conceptual Dimly)* Task 10. Bicycle Facilities Standards Element 4 12 8 Task 11. Sir Edueadon and Enforcement Element 6 8 4 Task 12 Draft Pion Preparation 8 24 24 Task 13. Fina Plan Preparation 10 8 16 Hours 90 96 92 Rate 8100 S60 S45 Tots 89,000 85.760 84,140 818,900 MISCELLANEOUS COSTS Deliveries 5100 Travel (6 trips x 190 miles x S0.2Mhe) 320 Mapsithnslteports 300 Report Prior (56 copies @ $ISkopy) 840 Total Mhaihasoos 81,540 SUBCONSULTANTS 14113 (30 hours) 83,000 COattla0d Civil Engineering (SO hours) 5,000 Total Saboo.soltaats $8,000 1 S2a,460 TOTAL CONTRACT FEE 2 TO: , RNANCE DIRECTOR CITY MANAGER DATE Janunty 20,19Q4 FROM: CITY CLERK ACCOUNT NUMBER: 12t.0.500:94 Request is mads for funds to accomplish the following project which was not indudsd N due current budget asalmbn of Protect Appropriate funds for Bicycle Transportation Master Plan. Approval for expenditure of Gas Tax funds in the amount of $.000 was given by the City Council on December 15, 1993. pending approval of pant to use Measure K funds. That approval has been received and those funds must also be appropriated. eglati-sd Cost (Please use Measure K funds first) Measure K funds (38.0) S 24.300 Gas Tax funds (36.0) S 8.000 J er M. City Clerk (if you need mors space. use additional sheet and attach to this form.) Data of Approval Amount Approved Council City Manager FUND OR ACCOUNT TO BE CHARGED Current Budget $ Prior Year Reserve S Contingent Fund S General Fund Surplus $ Capital Outlay Reserve $ Reimbursable Account $ Utility Outlay Reserve $ Other (Specify) $ Account Number .� a_ le" -- Dixon Flynn. Finance Director Thomas A. Peterson. City Manager Submit this form in duplicate to the Finance Director. Distribution after approval will be as follows: 1) Originating Department 2) Finance Department SNOWPDOC • TO:. FINANCE DIRECTOR CITY MANAGER DATA Jewry 20. 1904,.. FROM: CITY CLERK ACCOUNT NUMBER: 121.0-500.J0 Request Is made for funds to accomplish the following projsctwhicN was not included In the crimen budget. QIICOSILIalant Appropriate funds for Bicycle Transportation Maslen Plan. Approval for expenditure of Gm Tax funds in the amount of ,6.000 was given by the gat Council on December 15.1993, pending approval of grant to use Measure K funds. That approval has bssn received and those funds must also be appropriated *SPECIAL ALLOCATION REQUEST (Pleas use Measure K funds first) Esthsalad Cost Measure K funds (38.0) $ 24.300 'Gas Tax funds (38.0) $ 8,000 M eerdn /1t31)). —AAA/1p—, City Clerk (If you need more space, use additional sheet and attach to this form.) Date of Approval Amount Approved Council City Manager FUND OR AQQUNT TO BE CHARGED Currant Budget $ Prior Year Reserve $ Contingent Fund $ Capital Outlay Reserve $ Utility Outlay Reserve $ General Fund Surplus $ Reimbursable Account $ Other. (Specify) Account Number $ < mas A. Peterson, City Manager Submit this form in duplicate to the Finance Director. Distribution after approval will be as follows: 1) Originating Department 2) Finance Department SAIIIKEMPADOC